ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

ELECTRIC SCHEDULE EV Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE FOR PLUG-IN ELECTRIC VEHICLE CUSTOMERS

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I

ELECTRIC SCHEDULE E-37 Sheet 1 Medium General Demand-Metered Time-of-Use Service To Oil & Gas Extraction Customers

Schedule D DOMESTIC SERVICE

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

REVISED. February 27, Advice 2975-E-A (Pacific Gas and Electric Company ID U39E) Public Utilities Commission of the State of California

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE S Sheet 1 STANDBY SERVICE

Public Utilities Commission of the State of California

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

ELECTRIC SCHEDULE A-10 Sheet 1 MEDIUM GENERAL DEMAND-METERED SERVICE

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

Schedule TOU-EV-9 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, LARGE DEMAND METERED

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 12th Revised CPUC Sheet No. 76 Canceling 11th Revised CPUC Sheet No.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

May 22, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

Subject: Revenue Neutral Time-of-Use Rate Proposal --Electric Rate Schedule A-10

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Per Meter, Per Month. Effective July 1, 2018 Customer Charge Flat Charge $8.86

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

Overview of Net Energy Metering (NEM) Successor Tariff (NEM 2.0)

Public Utilities Commission of the State of California (CPUC)

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Please Refer to Attached Sample Form

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet 3-1 Cancels First Revision of Sheet 3-1

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

SERVICE CLASSIFICATION NO. 7 LARGE GENERAL TIME-OF-DAY SERVICE

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

MISSOURI SERVICE AREA

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

Phase 2 of 2009 General Rate Case Proposed Tariff Changes and Proposal for Commercial Submetering in High Rise Office Buildings

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 310 of New York, Inc. Superseding Original Leaf No.

GAS RULE NO. 12 Sheet 1 RATES AND OPTIONAL RATES A. APPLICABILITY

RIDER RTP REAL-TIME PRICING

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SAC04 Codes and SAC15 Descriptions For EDI 810 v4010 Last Updated: November 8, 2017

Please Refer to Attached Sample Form

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE ("MSC")

This rate schedule applies anywhere the City of Palo Alto provides Electric Service. Demand Charge (kw) $3.49 $20.35 $23.84

Subject: Establishment of Schedule NEMLGRR Net Energy Metering Service for Local Government Remote Renewable Self Generation

Consolidated Edison Company of New York, Inc.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SUBJECT: Implementation of the New Solar Homes Partnership Program Rate Change Pursuant to D Effective October 1, 2016

April 2, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

December 12, 2017 Advice Letter 3886-G. SUBJECT: October 1, 2017 Gas Core Procurement Rate Changes

NET METERING. The terms set forth below shall be defined as follows, unless the context otherwise requires.

JEA Distributed Generation Policy Effective April 1, 2018

February 4, 2019 VIA ELECTRONIC FILING. Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR Attn: Filing Center

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

Large General Service Time-of-Use Storage Program

October 30, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

RIDER NM NET METERING

Residential Time-of-Day Service Rate Schedule R-TOD

Tariff cover sheets reflecting all rates approved for April 1 in Dockets 4218 (ISR) and 4226 (Reconciliation Filing).

SERVICE CLASSIFICATION NO. 1

RE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

December 2, Advice Letter 2856-E-A

Transcription:

Revised Cal. P.U.C. Sheet No. 42736-E Cancelling Revised Cal. P.U.C. Sheet No. 41884-E ELECTRIC SCHEDULE EL-1 Sheet 1 APPLICABILITY: This schedule is applicable to single-phase and polyphase residential service in singlefamily dwellings and in flats and apartments separately metered by PG&E (see Special Condition 3) and to all single-phase and polyphase farm service on the premises operated by the person whose residence is supplied through the same meter where the applicant qualifies for California Alternate Rates for Energy (CARE) under the eligibility and certification criteria set forth in Rule 19.1, 19.2, or 19.3.* The provisions of Schedule S Standby Service Special Conditions 1 through 6 shall also apply to customers whose premises are regularly supplied in part (but not in whole) by electric energy from a nonutility source of supply. These customers will pay monthly reservation charges as specified under Section 1 of Schedule S, in addition to all applicable Schedule EL-1 charges. See Special Conditions 11 and 12 of this rate schedule for exemptions to standby charges. TERRITORY: RATES: The entire territory served. Total bundled service charges are calculated using the total rates below. Customers on this schedule are subject to the delivery minimum bill amount shown below applied to the delivery portion of the bill (i.e. to all rate components other than the generation rate). In addition, total bundled charges will include applicable generation charges per kwh for all kwh usage. Direct Access (DA) and Community Choice Aggregation (CCA) charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL RATES Total Energy Rates ($ per kwh) Baseline Usage $0.13686 (I) 101% - 400% of Baseline $0.18075 (I) High Usage Over 400% of Baseline $0.27987 (I) Delivery Minimum Bill Amount ($ per meter per day) $0.16427 California Climate Credit (per household, per semi-annual payment occurring in the April and October bill cycles) ($39.42) * The Rules referred to in this schedule are part of PG&E s electric tariffs. Copies are available at PG&E s local offices and website at http://www.pge.com/tariffs Advice 5339-E Issued by Date Filed July 27, 2018 Decision 18-06-011 Robert S. Kenney Effective September 1, 2018

Revised Cal. P.U.C. Sheet No. 42737-E Cancelling Revised Cal. P.U.C. Sheet No. 41885-E ELECTRIC SCHEDULE EL-1 Sheet 2 RATES: Total bundled service charges shown on customers bills are unbundled according to the component rates shown below. Where the delivery minimum bill amount applies, the customer s bill will equal the sum of (1) the delivery minimum bill amount plus (2) for bundled service, the generation rate times the number of kwh used. For revenue accounting purposes, the revenues from the delivery minimum bill amount will be assigned to the Transmission, Transmission Rate Adjustments, Reliability Services, Public Purpose Programs, Nuclear Decommissioning, Competition Transition Charges, Energy Cost Recovery Amount, and New System Generation Charges based on kwh usage times the corresponding unbundled rate component per kwh, with any residual revenue assigned to Distribution.*** UNBUNDLING OF TOTAL RATES Energy Rates by Component ($ per kwh) Generation: $0.10780 Distribution**: $0.01441 (I) Conservation Incentive Adjustment: Baseline Usage ($0.02860) (R) 101% - 400% of Baseline $0.01529 (R) High Usage Over 400% of Baseline $0.11441 (I) Transmission* (all usage) $0.02734 Transmission Rate Adjustments* (all usage) $0.00214 Reliability Services* (all usage) $0.00260 Public Purpose Programs (all usage) $0.00742 Nuclear Decommissioning (all usage) $0.00020 Competition Transition Charges (all usage) $0.00132 Energy Cost Recovery Amount (all usage) ($0.00005) New System Generation Charge (all usage)** $0.00228 * Transmission, Transmission Rate Adjustments and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. *** This same assignment of revenues applies to direct access and community choice aggregation customers. Advice 5339-E Issued by Date Filed July 27, 2018 Decision 18-06-011 Robert S. Kenney Effective September 1, 2018

Revised Cal. P.U.C. Sheet No. 34233-E Cancelling Revised Cal. P.U.C. Sheet No. 30428-E ELECTRIC SCHEDULE EL-1 Sheet 3 1. BASELINE RATES: PG&E may require the customer to complete and file with it a Declaration of Eligibility for Baseline Quantities for Residential Rates. 2. BASELINE (TIER 1): The following quantities of electricity are to be billed at the rate for baseline use: BASELINE QUANTITIES (kwh PER DAY) Code B - Basic Quantities Code H - All-Electric Quantities Baseline Summer Winter Summer Winter Territory* Tier I Tier I Tier I Tier I P 13.8 (C) 12.3 (C) 16.4 (C) 29.6 (C) Q 7.0 I 12.3 I 8.3 I 29.6 I R 15.6 I 11.0 I 18.8 I 29.8 I S 13.8 I 11.2 I 16.4 I 27.1 I T 7.0 I 8.5 I 8.3 I 14.9 I V 8.7 I 10.6 I 13.6 I 26.6 I W 16.8 I 10.1 I 20.8 I 20.6 I X 10.1 I 10.9 I 9.3 I 16.7 I Y 10.6 I 12.6 I 13.0 I 27.1 I Z 6.2 (C) 9.0 (C) 7.7 (C) 18.7 (C) 3. ANNUAL CONTRACT: For customers who use service for only part of the year, this schedule is applicable only on an annual contract. 4. ALL-ELECTRIC QUANTITIES (Code H): All-electric quantities are applicable to service to customers with permanently installed electric heating as the primary heat source. All-electric quantities are also applicable to service to customers of record as of November 15, 1984, to whom the former Code W (Basic plus Water Heating) lifeline allowance was applicable on May 15, 1984, and who thereafter maintain continuous service at the same location under this schedule. If more than one electric meter serves a residential dwelling unit, the all-electric quantities, if applicable, will be allocated only to the primary meter. * The applicable baseline territory is described in Part A of the Preliminary Statement. Advice 4450-E-A Issued by Date Filed July 9, 2014 Decision 14-06-029 Brian K. Cherry Effective August 1, 2014 Vice President Resolution Regulatory Relations

Revised Cal. P.U.C. Sheet No. 40867-E Cancelling Revised Cal. P.U.C. Sheet No. 31771-E ELECTRIC SCHEDULE EL-1 Sheet 4 5. ADDITIONAL METERS: If a residential dwelling unit is served by more than one electric meter, the customer must designate which meter is the primary meter and which is (are) the additional meter(s). Only the basic baseline quantities will be applicable to the additional meter(s). 6. SEASONAL CHANGES: The summer season is May 1 through October 31 and the winter season is November 1 through April 30. Bills that include multiplying the applicable daily baseline quantity for each season by the number of days in each season for the billing period. 7. STANDARD MEDICAL QUANTITIES (Code M - Basic Plus Medical Quantities, Code S - All-Electric Plus Medical Quantities): Additional medical quantities are available as provided in Rule 19, for both the primary and additional meters. 8. COMMON-AREA ACCOUNTS: Common-area accounts that are separately metered by PG&E have a one-time option of switching to an applicable general service rate schedule by notifying PG&E in writing. Common-area accounts are those accounts that provide electric service to Common Use Areas as defined in Rule 1. Accounts that switch to a general service tariff will have one, and possibly two, opportunities to return to a residential rate schedule. Please see Common-Area Accounts Section of General Service Schedules A-1, A-6, A-10, and E-19 for more details. 9. BILLING: A customer s bill is calculated based on the option applicable to the customers: Bundled Service Customers receive supply and delivery services solely from PG&E. The customer s bill is based on the Total Rates and Conditions set forth in this schedule. Transitional Bundled Service Customers take transitional bundled service as prescribed in Rules 22.1 and 23, or take bundled service prior to the end of the six (6) month advance notice period required to elect bundled portfolio service as prescribed in Rules 22.1 and 23. These customers shall pay charges for transmission, transmission rate adjustments, reliability services, distribution, conservation incentive adjustment, nuclear decommissioning, public purpose programs, New System Generation Charges, the applicable Cost Responsibility Surcharge (CRS) pursuant to Schedule DA CRS or Schedule CCA CRS, and short-term commodity prices as set forth in Schedule TBCC. Direct Access (DA) and Community Choice Aggregation Service (CCA Service) Customers purchase energy from their non-utility provider and continue receiving delivery services from PG&E. Bills are equal to the sum of charges for transmission, transmission rate adjustments, reliability services, distribution, conservation incentive adjustment, public purpose programs, nuclear decommissioning, New System Generation Charges, the franchise fee surcharge, and the applicable CRS. The CRS is equal to the sum of the individual charges set forth below. Exemptions to the CRS, including exemptions for Medical Baseline and continuous DA service, are set forth in Schedules DA CRS and CCA CRS. (T) (T) (D) Advice 5127-E Issued by Date Filed August 18, 2017 Decision Robert S. Kenney Effective October 24, 2017

Revised Cal. P.U.C. Sheet No. 41886-E Cancelling Revised Cal. P.U.C. Sheet No. 40636-E ELECTRIC SCHEDULE EL-1 Sheet 5 9. BILLING : DA / CCA CRS Energy Cost Recovery Amount Charge (per kwh) ($0.00005) (R) DWR Bond Charge (per kwh) $0.00000 CTC Charge (per kwh) $0.00132 (I) Power Charge Indifference Adjustment (per kwh) 2009 Vintage $0.02785 (I) 2010 Vintage $0.03167 (I) 2011 Vintage $0.03286 (I) 2012 Vintage $0.03379 (I) 2013 Vintage $0.03388 (I) 2014 Vintage $0.03354 (I) 2015 Vintage $0.03338 (I) 2016 Vintage $0.03345 (I) 2017 Vintage $0.03346 (I) 2018 Vintage $0.03346 (N) 10. SOLAR GENERATION FACILITIES EXEMPTION: Customers who utilize solar generating facilities which are less than or equal to one megawatt to serve load and who do not sell power or make more than incidental export of power into PG&E s power grid and who have not elected service under Schedule NEM, will be exempt from paying the otherwise applicable standby reservation charges. 11. DISTRIBUTED ENERGY RESOURCES EXEMPTION: Any customer under a time-of-use rate schedule using electric generation technology that meets the criteria as defined in Electric Rule 1 for Distributed Energy Resources is exempt from the otherwise applicable standby reservation charges. Customers qualifying for this exemption shall be subject to the following requirements. Customers qualifying for an exemption from standby charges under Public Utilities (PU) Code Sections 353.1 and 353.3, as described above, must transfer to a time-of-use rate, to receive this exemption until a real-time pricing program, as described in PU Code 353.3, is made available. Once available, customers qualifying for the standby charge exemption must participate in the real-time program referred to above. Qualification for and receipt of this distributed energy resources exemption does not exempt the customer from metering charges applicable to time-of-use (TOU) and real-time pricing, or exempt the customer from reasonable interconnection charges, non-bypassable charges as required in Preliminary Statement BB Competition Transition Charge Responsibility for All Customers and CTC Procurement, or obligations determined by the Commission to result from participation in the purchase of power through the California Department of Water Resources, as provided in PU Code Section 353.7. 12. DWR BOND CHARGE: The Department of Water Resources (DWR) Bond Charge was imposed by California Public Utilities Commission Decision 02-10-063, as modified by Decision 02-12-082, and is property of DWR for all purposes under California law. The Bond Charge applies to all retail sales, excluding CARE and Medical Baseline sales. The DWR Bond Charge (where applicable) is included in customers' total billed amounts. Advice 5231-E Issued by Date Filed February 16, 2018 Decision Robert S. Kenney Effective March 1, 2018