Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Similar documents
DART Priorities Overview

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

ANDERSON PROPERTY SITE ANALYSIS

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Letter EL652 City of Mercer Island. Page 1. No comments n/a

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

The Design-Builder shall meet local road criteria provided by the local governing agencies.

I-290 Phase I Study Summary of NFPA-130 Analysis of Proposed CTA Station Platform Widths May 2016

Business Advisory Committee. July 7, 2015

City of Houston Fondren Road Paving and Drainage

Business Advisory Committee. November 3, 2015

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

ALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c. PH

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Appendix H: Construction Impacts H-2 Transportation

UBC Watermain as shown on Sheet 202 : Sub total 97,050

US 67 WIDENING PROJECT

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

Confederation Line West Alignment Improvement. September 21, 2016

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

Appendix F-1 Description of the Long-Term Alternatives

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

3.15 SAFETY AND SECURITY

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030

DART Capital Program Update

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

COST ESTIMATES: Curb-Running

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Table Station Elements

Appendix C Preferred Solution

APPENDIX E. Traffic Analysis Report

City of Bellevue East Link Light Rail B7/C9T to NE 2nd Portal (B7 Revised) Alternative RP03 Interim Analysis Report

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Wentzville Parkway South Phase 2 & 2A

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Confederation Line West Queensway Terrace North. May 27, 2017

EXCEPTION TO STANDARDS REPORT

Transit City Etobicoke - Finch West LRT

Cost to extending KC Streetcar north approximately ½ mile

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

PUBLIC INFRASTRUCTURE PROJECTS

ACTION TRANSMITTAL No

Proposed Program of Interrelated Projects

METRO Orange Line BRT American Boulevard Station Options

IMPROVEMENT CONCEPTS

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

SEPULVEDA PASS CORRIDOR

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

Mobility Corridor Updates. Transit & Active Transportation Projects

Traffic Impact Statement (TIS)

Median Barriers in North Carolina

This letter summarizes our observations, anticipated traffic changes, and conclusions.

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

APPENDIX A Basis of Design and Design Criteria Memorandum

Appendix G Aquilla Lake Pool Rise Recreational Resources

FREQUENTLY ASKED QUESTIONS

Central Corridor LRT Project Technical Information and Studies APPENDIX J2 ELECTROMAGNETIC FIELDS AND INTERFERENCE

Public Health Services San Joaquin Co.

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

RECOMMENDED ALTERNATIVE REPORT

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

FREQUENTLY ASKED QUESTIONS

Brent Spence Bridge Design Exceptions - Alternative I

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

The Re:Queen and Sparks Traffic Brief - Addendum #2

Please do not hesitate to contact me with any questions or concerns. I look forward to hearing from you.

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

TRAFFIC IMPACT ANALYSIS

Request for Design Exception (#1) S.M. Wright Phase IIB

Alternatives Analysis Findings Report

Chapter 5. General Site and Building Elements

Appendix E Description of Alternatives DRAFT ENVIRONMENTAL IMPACT STATEMENT

City of Grand Forks Staff Report

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Craigieburn Employment Precinct North and English Street

Committee Report. Transportation Committee. Business Item No

RECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Terminal Alternatives

Standards for Design and Construction

Ottawa LRT Stage 2. McKellar Park Information Session

Transportation & Traffic Engineering

Attachment 5 Eglinton West LRT Planning and Technical Update

Transcription:

Appendix C 5% Design Plan and Profile Drawings/ Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies are available for review at study area libraries and at DART Headquarters. An electronic PDF version is available for viewing on www.dart.org/soc3. Final Local Environmental Assessment C 1

ADDITIONAL DESIGN INFORMATION The following information was developed after the issuance of the 5% Preliminary Engineering (PE) drawings provided with the Draft Environmental Assessment (EA). The 5% PE package is not being modified for this Final EA; however, some of the information discussed below has resulted in design refinements that are addressed in this Final EA and will be carried forward into final design. Exhibit 1 Geothermal Wells and Police Driveway Relocation Exhibit 2 Ledbetter Station Platform Extension and Level Boarding Modifications Concept Exhibit 3 Ledbetter Station Architectural Site Plan Changes Exhibit 4 Oncor Transmission Lines Crossing and Steel Pole Assessment C 2 Final Local Environmental Assessment

GEOTHERMAL WELLS AND POLICE DRIVEWAY RELOCATION After issuing the 5% PE drawings, DART was informed that multiple geothermal wells exist in the landscaped area on the east side of the Dallas South Central Police Station between the police station building and Patrol Way. This area is where the proposed bridge structure for the South Oak Cliff Corridor Blue Line Extension project is located. As built drawings showing the geothermal wells were subsequently received from the City of Dallas. The actual configuration of the geothermal wells was estimated based on coordination with engineers and contractors involved with the geothermal well installation and will need to be verified as part of additional subsurface utility investigation (SUE) during final design. The attached exhibit shows the estimated location of the geothermal wells, and also shows proposed modifications to the 5% design. The proposed design avoids the geothermal wells, and also includes relocation of the northern police station driveway in order to increase the vertical clearance over the driveway from between the 12.7 14.7 foot clearance discussed in the Draft EA to a new clearance of 15.8 feet described in this Final EA. The second exhibit includes a cross section showing that the total structural depth of the bridge structure above the driveway can be decreased in order to provide the 15.8 foot vertical clearance at that location. Also, moving the driveway south would allow for installation of bridge piers in locations outside the anticipated geothermal well areas near the driveway. Final Local Environmental Assessment C 3

SOC3-CC1-0010b-GEO.040 11/27/2012 5:01:29 PM 521.6 SMH 514.5 513.4 505 502.7 492.9 12.4 CLEARANCE 488.6 495.8 495.7 15.8 CLEARANCE 492.6 495.5 494.3 485.5 487.5 488.7 488.4 488.5 488.8 16.5 MIN 489.3 492.5 488.3 491.6 487.5 491.7 486.2 490.3 490.9 490.2 488.2 491.1 489.1 487.6 DWG No. RELOCATE 12" WATER LINE 11/27/2012 I:\Projects\_SOUTH\GPC 5\TO 24 SOC-3 PE-EA\EXHIBITS\Geo Wells Exhibits\SOC3-CC1-0010b-GEO.040 2104 515 74+00 TS 75+95.86 100 ROW 510 SMH FH SC 76+45.86 76+00 76+00 TS 75+99.27 500 15-6" (TYP) DALLAS8" PVCSS EXISTING GEOTHERMAL WELL (TYP.) (SEE NOTE 5) DALLAS12" PVCW SC 76+49.27 495 SOC-3 NB SOC-3 SB 8-6" (TYP) CONSTRUCT NEW CURB INLET DALLAS 24" RCP SD 78+00 78+00 PIER OFFSET FROM CENTER OF BRIDGE (SEE NOTE 4) DALLAS36" RCPSD FH RELOCATE FIRE HYDRANT 80 ROW RELOCATE DRIVEWAY EXISTING GEOTHERMAL WELL (TYP.) (SEE NOTE 5) SOC3-CC 490 80+00 80+00 SOC3-C AS REQUIRED IN AREA OF PROPOSED BRIDGE PIERS ADJACENT TO PATROL WAY. PROPOSED ROW DALLAS8" PVCSS 490 DALLAS12" PVCW SOC-3 NB 82+00 82+00 SOC-3 SB PROPOSED ROW PIER OFFSET FROM CENTER OF BRIDGE (SEE NOTE 4) DALLAS SOUTH CENTRAL POLICE STATION RCP 15-6" (TYP) SD DALLAS 48" ONCORUGE12.5 KV 490 RCP DALLAS SD 24" 24" CS 83+49.82 RCP CS 83+55.36 NOTE: HORIZ VERT SOC3-C (SB) SOC3-CC (NB) Rc= 1300.00 Rc= 1315.50 Ls= Lc= Ea= Eu= V= 0 0 50.00 700.55 1.25" 1.53" 30 MPH SCALE (IN FEET) 20 40 SCALE (IN FEET) 10 15 5 20 Ls= Lc= Ea= Eu= V= 80 50.00 709.50 1.25" 1.49" 30 MPH 1. SEE DWG. No. CC1-0001 FOR ADDITIONAL NOTES. 2. LOSS OF PARKING SPACES AT THE DALLAS POLICE SUBSTATION MUST BE MITIGATED PRIOR TO CONSTRUCTION. FINAL DESIGNER MUST COORDINATE FURTHER WITH THE CITY OF DALLAS AND DART TO DETERMINE THE LOCATION AND CONFIGURATION OF REPLACEMENT PARKING SPACES, DRIVE AISLES AND OTHER SITE IMPROVEMENTS AFFECTED BY THIS PROJECT. chad_allen_v8i $$MODEL$$ 540 530 520 510 500 490 480 470 PROPOSED T/R ELEV EXISTING GROUND ELEV STA 75+36.64 END CAMP WISDOM STATION VPC 75+80.00 + 1.00% ex = 0.78 K = 108 LVC= 260 EL 508.36 PVI 77+10.00 EL 509.66 507.56 509.96 508.06 507.54 508.58 501.59 509.29 498.90 510.23 497.33 75+00 76+00 77+00 511.40 494.83 VPT 78+40.00 EL 514.09 + 3.41% VPC 79+80.00 EL 518.87 INVERTED TEE TX28 PIER CAP PROPOSED TOP OF RAIL ex = -2.15 K = 113 LVC= 440 BEAM EXISTING ENTRANCE EXISTING PROPOSED DRIVEWAY DRIVEWAY EXISTING GROUND 512.80 493.66 514.43 493.10 516.14 492.88 517.84 495.28 519.53 494.32 521.04 493.65 522.32 492.67 523.38 492.00 524.22 491.37 524.83 491.02 525.23 491.00 78+00 79+00 80+00 81+00 82+00 83+00 PVI 82+00.00 EL 526.37 540 530 520 510 500 490 480 470 3. MINIMUM REQUIRED VERTICAL CLEARANCE OF 16.5 FEET ACCORDING TO DART DESIGN CRITERIA IS NOT BEING PROVIDED OVER THE NORTHERN DRIVEWAY CONNECTION TO THE DALLAS SOUTH CENTRAL POLICE STATION. A DART DESIGN EXCEPTION WILL BE REQUIRED DURING THE FINAL DESIGN EFFORT IF DART AND THE CITY OF DALLAS AGREE TO LEAVE THE DRIVEWAY OPEN, OR THE DRIVEWAY MAY BE CLOSED AND DEMOLISHED AS PART OF THE PROJECT. IF THE DRIVEWAY IS REMOVED, REPLACEMENT ACCESS MAY NEED TO BE PROVIDED FROM CAMP WISDOM ROAD AT THE WEST SIDE OF THE POLICE STATION PROPERTY. ADDITIONAL COORDINATION WITH THE CITY OF DALLAS AND DART ABOUT THIS ISSUE IS REQUIRED PRIOR TO COMPLETION OF THE FINAL DESIGN PROCESS. 4. CRASH PROTECTION MAY BE REQUIRED FOR ROAD ADJACENT TO PROPOSED BRIDGE PIERS. FINAL DESIGNER TO DETERMINE IF CRASH PROTECTION IS REQUIRED PER CITY OF DALLAS CRITERIA. THE EXISTING SIDEWALK AT EACH PIER LOCATION WILL NEED TO BE RECONSTRUCTED AND REROUTED AROUND THE PIER. 5. THE LOCATIONS OF THE GEOTHERMAL WELLS SHOWN ON THIS SHEET ARE APPROXIMATE AND ARE BASED ON RECORD DRAWINGS PROVIDED BY THE CITY OF DALLAS. THE FINAL DESIGN TEAM SHALL FIELD VERIFY THE THE LOCATIONS OF THE GEOTHERMAL WELLS IN THE VICINITY OF THE PROPOSED BRIDGE PIERS PRIOR TO ISSUING FINAL CONSTRUCTION PLANS FOR THE PROJECT. THE LOCATIONS OF SOME OF THE PROPOSED BRIDGE PIERS MAY NEED TO BE ADJUSTED, OR DART AND THE CITY OF DALLAS MAY DECIDE TO RELOCATE SOME OF THE GEOTHERMAL WELLS AFTER THEIR LOCATIONS HAVE BEEN MORE ACCURATELY DETERMINED. NOT AN APPROVED DRAWING PRELIMINARY ENGINEERING 5% DESIGN CONTRACT SHEET No. IN-PROGRESS THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF REVIEW UNDER THE AUTHORITY OF: CHAD ANTHONY ALLEN, P.E. NO. 88427 ON 11/27/2012 URS CORPORATION TBPE ID #F-3162 1950 NORTH STEMMONS FREEWAY SUITE 6000 DALLAS, TEXAS 75207 214-741-7777 URS CORPORATION TBPE ID #F-3162 DART PROJECT SCALE DRAWN DESIGNED CHECKED IN CHARGE DATE AS SHOWN C. KESTILA C. KESTILA/J. YEOW C. ALLEN P. ZHAO 27 NOV 12 LIGHT RAIL TRANSIT SYSTEM LINE SECTION SOC-3 GEOTHERMAL WELL EXHIBIT 1 OF 2: GUIDEWAY PLAN AND PROFILE STA 75+00.00 TO STA 83+00.00 REV AMEND CR DATE DESCRIPTION BY ENG CHK APP IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES. c DART, all rights reserved, 1987-2011 CONTRACT DWG No. REV I:\Projects\_SOUTH\GPC 5\TO 24 SOC-3 PE-EA\EXHIBITS\Geo Wells Exhibits\SOC3-CC1-0010b-

SOC3SX03-GEO.008 11/27/2012 3:54:17 PM " = 1-0" DWG No. 11/27/2012 I:\Projects\_SOUTH\GPC 5\TO 24 SOC-3 PE-EA\EXHIBITS\Geo Wells Exhibits\SOC3SX03-GEO.008 10" 3-6" 10" DRIP GROOVE (TYP) EDGE OF DECK CONCRETE (TYP) NB 8" LOW POINT MIN HIGH POINT BRIDGE TOP OF LOW RAIL LOW POINT 40:1 40:1 40:1 40:1 3" @ BEARING 33-2" LEVEL (TYP) CATENARY POLE, NIC SB PGL 4-3" 4-3" 8-8" 4-3" 4-3" EDGE OF DECK CABLE TROUGH HAND RAIL, TYP TEXAS DOT TX28 I-GIRDER (TYP) 4-10" APPROX. HANDRAIL 6-0" 3-0" 6-6" PEJ 6-0" min. 6-0" min. FINISHED GRADE FINISHED GRADE 1-0" MIN 6-6" min. DRILLED SHAFT 1-0" MIN 6-6" min. DRILLED SHAFT DIA DIA PIER PIER TYPICAL SECTION SCALE: "=1-0" 1 ELEVATION SCALE: "=1-0" 2 chad_allen_v8i $$MODEL$$ STA 58+96.00 TO STA 59+70.00 STA 78+38.50 TO STA 78+93.43 NOT AN APPROVED DRAWING PRELIMINARY ENGINEERING 5% DESIGN CONTRACT SHEET No. IN-PROGRESS THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF REVIEW UNDER THE AUTHORITY OF: B.W. ISAAC HWANG, P.E. NO. 59161 ON 11/27/2012 URS CORPORATION TBPE ID #F-3162 1950 NORTH STEMMONS FREEWAY SUITE 6000 DALLAS, TEXAS 75207 214-741-7777 URS CORPORATION TBPE ID #F-3162 DART PROJECT SCALE DRAWN DESIGNED CHECKED IN CHARGE DATE C. KESTILA C. KESTILA I. HWANG C. ALLEN LIGHT RAIL TRANSIT SYSTEM LINE SECTION SOC-3 GEOTHERMAL WELL EXHIBIT 2 OF 2: TEXAS DOT TX28 I-BEAM 27 NOV 12 TYPICAL SECTION 3 REV AMEND CR DATE DESCRIPTION BY ENG CHK APP IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES. c DART, all rights reserved, 1987-2011 CONTRACT DWG No. REV I:\Projects\_SOUTH\GPC 5\TO 24 SOC-3 PE-EA\EXHIBITS\Geo Wells Exhibits\SOC3SX03-GEO.00

LEDBETTER STATION PLATFORM EXTENSION AND LEVEL BOARDING MODIFICATIONS CONCEPT The anticipated extension and level boarding improvements at Ledbetter Station have been modified since the issuance of the 5% PE drawings for the project. A study is being conducted of existing platforms on the DART Red and Blue Lines in order to provide consistency with future extension and level boarding modifications throughout the LRT system. As part of the study, the plans for Ledbetter Station have been revised to incorporate a proposed canopy in the extension area and a shortened ramp length on the north end of the existing platform. The attached concept drawing shows these improvements relative to the existing conditions at the platform. C 6 Final Local Environmental Assessment

LEDBETTER STATION ARCHITECTURAL SITE PLAN CHANGES Additional coordination has been performed with TxDOT about the Ledbetter Station site improvements currently shown in the 5% PE drawings for the project. It was determined that the previously proposed northbound left turn lane into the proposed kiss & ride area from Lancaster Road was too short and did not meet TxDOT design criteria. As a result, a new location for the kiss & ride area has been developed in coordination with TxDOT. The kiss & ride area is now envisioned to be located between Shellhorse Street and 56 th Street. Kiss & ride vehicles would enter at Shellhorse Street, drop off on a lane parallel to the bus lane, and exit south of 56 th Street. A revised architectural site plan is attached to show the new improvements. C 8 Final Local Environmental Assessment

GUARDRAIL, TYP NEW PLANTERS 1 15 2"ABOVE RAMP RAMP 1 15 2"ABOVE 1 15 2"ABOVE 22 WIDE 4.8%SLOPED SIDEWALK NEW PLANTERS STEPS TO RAISED PLATFORM 22 WIDE 4.8% SLOPED SIDEWALK 8"ABOVE GUARD RAIL KISS AND RIDE BUSES ONLY 22 WIDE 4.8% SLOPED SIDEWALK STEPS TO RAISED PLATFORM 1 15 2"ABOVE ONLY ONLY ONLY GUARDRAIL, TYP NEW LANDSCAPE TRAFFIC SIGNAL LANCASTER ROAD TRAFFIC SIGNAL LANCASTER ROAD TRAFFIC SIGNAL LEDBETTER SITE STUDY LEVEL BOARDING PLATFORM 1201 Elm Street Suite 5240 Dallas, TX 75270 T. 214.742.0400 F. 214.742.0401 www.kaitexas.com TBPE REGISTRATION No. F-9010 1950 NORTH STEMMONS FREEWAY SUITE 6000 DALLAS, TEXAS 75207 214-741-7777 URS CORPORATION ID #3162 DART PROJECT R SCALE DRAWN DESIGNED CHECKED IN CHARGE DATE AS SHOWN G. BRINGAS V. SADR J. LIBURY D. JAMES 26 NOV 12 SOUTH OAK CLIFF 3 BLUE LINE EXTENSION PE/EA LEDBETTER STATION SITE LAYOUT STUDY REVISED c DART, all rights reserved, 2012-2014

ONCOR TRANSMISSION LINES CROSSING AND STEEL POLE ASSESSMENT Additional coordination was conducted with Oncor about the proposed crossing under the transmission lines south of Camp Wisdom Road near Runyon Springs Branch Creek. Oncor has analyzed the crossing and has provided the attached drawing showing the steel pole modifications anticipated to be required as part of this project. Oncor currently believes it will be necessary to raise three nearby steel poles in order to provide the vertical clearance required over the proposed South Oak Cliff Corridor Blue Line Extension tracks. This includes the poles immediately adjacent to and on either side of the rail crossing and one additional pole to the east. All wires between the three poles and between these poles and the two adjacent outside poles will be required to be adjusted and raised. This assessment is based on the track profile currently shown in the 5% PE drawings that were issued with the Draft EA. The possible lowering of the track profile to reduce the extent of pole modification has not yet been assessed and was not considered at the time. Final design efforts may examine lowering the profile to minimize pole and wire modifications. C 10 Final Local Environmental Assessment

90 STEEL POLE 95 STEEL POLE 85 STEEL POLE CONDUCTOR SHOT 32.0 364 403 418 392