WINDOM ICE ARENA ICE SYSTEM REPLACEMENT

Similar documents
UTMDA - GAMMA KNIFE DRESSING AREA

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF DESIGN

R404A/R507 R407C. Danfoss Compressors V 50 Hz & 60 Hz REFRIGERATION & AIR CONDITIONING DIVISION. Quick reference

PROPOSED REPLACEMENT STRUCTURE: CMU BLOCK SHED BUILDING AND APPROX 30' LF OF FENCE REPAIR/REPLACEMENT. FLOOR AREA = 854 SF ROOF AREA = 1158 SF

CAUTION: Do not install damaged parts!!!

ONE SYSTEM CFA-2/HTH-GRAY S1 LOW ONE SYSTEM CFA-2/HTH -GRAY S2 LOW ONE SYSTEM 118/HSB-WHITE S3 SUB ONE SYSTEM 118/HSB-WHITE S6 SUB

Factory Modifications

ONE SYSTEM CFA-2 S1 LOW ONE SYSTEM CFA-2 S2 LOW ONE SYSTEM 118/HSB S3 SUB ONE SYSTEM 118/HSB S6 SUB ONE SYSTEM 118/HSB S4 SUB ONE SYSTEM 118/HSB S5

10' WATER EASEMENT. 1'x16' WATER EASEMENT. 1'x16' WATER EASEMENT. 5'x10' WATER EASEMENT 5'X10' WATER EASEMENT 5'X10' WATER EASEMENT

Danfoss Compressors for light commercial applications V 50 Hz. R404A/R507 R134a R290. Quick reference

SITE NAME: PROJECT SITE I.D.#: PROJECT #: LOCATION #: SITE ADDRESS: DENVER (56.9 MI) EXIT 153 I-25 COLORADO SPRINGS NOT TO SCALE DIRECTIONS

Sliding clamp, compact single acting with spring return

Single-stage safety solenoid valves MVD, MVD/5, MVDLE/5

AF General Information. Ordering. Popular Downloads. Dimensions. Technical

REMOVE EXIST. SLAB. INSTALL NEW 12" CONCRETE SLAB REINFORCED WITH 6X6 W2.1XW2.1 WWF CONCRETE SLAB CONTROL JOINT SEE TYP. DETAIL (TYP.

AF General Information. Ordering. Popular Downloads. Dimensions. Technical

AF General Information. Ordering. Popular Downloads. Dimensions. Technical

Direct or Remote Mounted Gas Actuated Dial Thermometers

Service and Meter Requirements Edition

Service and Meter Requirements

February 9, Bid Opening Date: February 13, 2018 February 20, 2018

Power Distribution Board SVS201-PWR (ControlPlex )

Speed Controller with One-touch Fittings

hat channel purlins B SCREW PATTERNS: DOUBLE SCREW PATTERN ON UPPER AND LOWER ROOF PURLINS (FOR ROOF PANELS).

CENTERVILLE CHLORAMINE BOOSTER STATION GOOCHLAND COUNTY DEPARTMENT OF PUBLIC UTILITIES G1.0. Drawing Index GENERAL CENTERVILLE CHLORAMINE

{\fcopperplate32bc b0 i0 c0;all REQUIRED

Steam-converting Valve Type DUP. and spray water valve

MX MXA ALUMINIUM MOBILE ENCLOSURE APPLICATON EXAMPLE. DESKTOP AUDIO PREAMPLIFIER with USB WIRELESS MICROPHONE SYSTEM MODEL RAILROAD CONTROLLER

Grooved End Fittings. System No. Submitted By Spec Sect Para Location Date Approved Date CARBON STEEL PIPE - GROOVED FITTINGS

ARLINGTON DOWNS RETAIL 3400 W EUCLID AVENUE

Speed Controller with One-touch Fittings

BUILDING FOUR ±245,094 SF OFFICE/WAREHOUSE ON ±28.71 ACRES COMPAQ CENTER DRIVE WEST HOUSTON, TX TOMBALL PARKWAY HWY 249 COMPAQ CENTER DRIVE

Single-Hung Side Load Windows Builders Vinyl

STRONGHOLD BUILDING 4802 COUNTY ROAD 69, ROBSTOWN, TEXAS, 78380

FRAMED PIVOT DOOR INSTALLATION INSTRUCTIONS

Needle Felted Camping Tutorial

Single-Hung Windows Builders Aluminum

A V 50Hz / V 60Hz

Switches and Indicators 14

3061, 3096, 3126 foam systems gpm Installation Instructions

o one can argue the fact that Volkswagen made all the right moves when it came to the inception of the Gen-IV Golf. German engineers put tremendous

B30ST ! IMPORTANT SAFEGUARDS! SAVE THESE INSTRUCTIONS. Installation Instructions SELF-TESTING EMERGENCY LIGHTING EQUIPMENT

2017 Manhole Rehabilitation CONTRACT NO ADDENDUM NUMBER ONE

Section 2. PROGEF Natural PP Piping System. Serviced by GF Tustin

MIT CENTER FOR TRANSPORTATION & LOGISTICS April - October 2017

General Information. Ordering. Popular Downloads. Dimensions. Technical

BKF Off-line filter / cooler unit

FITTINGS FOR SPECIAL APPLICATIONS ECCENTRIC JUNCTIONS AND TRANSITION PIECES

PIglide AT3 Linear Stage with Air Bearings

CUSTOMER COPY PCB LAYOUT RECOMMENDED E D B .075[1.90] SEE NOTE 13 2X THRU C INSERTION DEPTH

Leadership in Filtration. ENTARON XD/MD 40 High performance for high air flows

Overload Relays D-LINE Bimetallic

DRAWING APPROVAL SHEET

Sliding Windows Builders Vinyl

model1001 with1920 ADA Compliant Wall-Mount Fountain and Bottle Filler FEATURES & BENEFITS MODEL CHOICES OPTIONS SPECIFICATIONS

SECTION 2 POLY V-PLOW

Air Combination Air Filter + Regulator + Lubricator. AC20-A to AC40-A. How to Order. Description. Rc NPT 1/8 1/4 3/8 1/2 3/4

ISOMETRIC VIEW SCALE: 1/2

Section 4. SYGEF Plus HP PVDF Piping System. Serviced by GF Tustin

TIG Welding (Outside) Cooldown LN2 Input Bayonet DIA. CYLINDER O.D. SECTION A-A SECTION B-B

System 6 Quickfit-Expando Connectors

model1001 with1920 ADA Compliant Wall-Mount Fountain and Bottle Filler FEATURES & BENEFITS MODEL CHOICES OPTIONS SPECIFICATIONS

SITE #32 PERMIT DRAWING SHEET 101 OF 114 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DENOTES IMPACTS IN SURFACE WATER

MBF Series. Xe nâng Pallet chi phí thấp... Hàng chất lượng cao MB25 MB30 MB35 MB50. Frame and body

Centred disc butterfly valves with AMRING elastomer liner. PS 16 bar: DN 40 to 200. PS 10 bar: DN 250 to 1000

Valves PROGEF Standard Ball valve type 546 With mounting inserts With butt fusion spigots long PE100 SDR11 metric

SIMONA piping systems made of high-performance plastics the ultimate in chemical resistance

AUSTRALIAN SPORTS COMMISSION AIS - HPC HPC SSSM BUILDING PACKAGE 1 WORKS

Addendum # 2 Date Issued 04/25/2018. Mountrail County Health Center Assisted Living, Chapel Additions & Interior Remodel

Fan Coil Unit Product Catalogue

WATER SOURCE HEAT PUMP WSHP

Series AW. Modular Type Filter Regulators AC AF AR AL A G AV AW10 AW20 AW30 AW40 AW40-06 AW60 AW20K AW30K AW40K AW40K-06 AW60K AWM20 AWM30 AWM40 AWD20

4900 Series Air Separators Standard & High Velocity

VOLTS. A u.060 REV. NAMEPLATE .500 TOP TOP ARROW ON BASE ARROW ON BASE SLOT DETAIL (4) SLOT DETAIL (4)

Pre-Load Bolt Assemblies BS EN HRC Assemblies BAPP

4 POL 4 POL 8 POL 8 POL. CONNECTOR SPECIFICATION / Steckverbindungs-Eigenschaften L =[mm] see table TABLE 1

Selection of pressure gauges The bowl is covered with a transparent bowl guard! Square embedded type pressure gauge.

Backwater Valves Series swing-check Backwater Valve shown installed in a manhole terminal.

8. INSTALLATION/WIRE CONNECT GUIDE

S80A_exp_ REX S80A 2018/8/17 Pag e Item No. Page title CE Part No. Part Name Spec. Q'ty Remarks No. 1 1 Base F091 Base casting assembly 1 1 2

0.90 ±0.05 HOUSING (2X) C L OF PAD XX ±

Province of Alberta FORESTS ACT SCALING REGULATION. Alberta Regulation 195/2002. With amendments up to and including Alberta Regulation 99/2012

제품문의 : SR Tech KALLER GAS SPRING 공식공급업체 100 ( xStroke ) K 500 x 25 mm Initial Force 500 dan 80 ( xStroke )

SECTION 4 POLY V-PLOW

DRAWING INDEX SEPTEMBER 14, 2012 WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC NO. REVISION DATE PROJECT IDENTIFIER IF1203

Precision Rotation Stage

TF General Information. Ordering. Dimensions. Popular Downloads. Technical

TF General Information. Ordering. Dimensions. Popular Downloads. Technical

How to Order. Description. Without backflow function With backflow function. Metric thread (M5) Rc NPT G M5 1/8 1/4 3/8 1/2 3/4

Centred disc butterfly valves with AMRING elastomer liner. DN 32 to 600 Allowable pressure PS 20 bar Design in accordance with EN 593 and ISO 10631

A FORMAT: Met-lega-master-tb-prod-A3 REVISION: C DATE: 2017/02/06

TAO LEE A1.0 PAULO OFFICES - NASHVILLE. associates. Nashville, TN Ambrose Ave RENOVATION EXTG FLOOR PLAN SCHEMATIC DESIGN

Safety Stations with Eyewash

MK15. MK15-BW Refr. MK15-BW MK15-BWFGR SA MK15-BWFGR TÜV MK15-BWFDR SA AT MK15-BWFDR TÜV MK15-BWFG MK15-BWFD SA TÜV MK15-BWFD ASME.

GREAT OCEAN ROAD CHOCOLATERIE & ICE CREAMERY 15 ELKINGTON ROAD, BELLBRAE, VICTORIA

SECTION 7 10 FT POLY TRIP EDGE SNOW PLOW

Volvo Engines Specifications

Electric Motors. Electric Motors

WIRING INSTRUCTIONS MITER SAW UPPER CONTROL BLACK WHITE

aestro Collection By DaVinci Custom Fireplaces

Transcription:

WINDOM ARNA SYSTM RPLAMNT WINDOM, MINNSOTA O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - SHT IND GNRAL G00 TITL SHT LTRIAL 00 LTRIAL MODIFIATION PLAN RFRIGRATION R00 RINK LGND, SYMBOLS & ABBRVIATIONS RD00 RINK FLOOR DMOLITION PLAN RD0 RFRIGRATION SYSTM DMOLITION PLAN R00 RINK FLOOR PLAN R0 RFRIGRATION SYSTM ARA PLAN R00 RINK STIONS AND DTAILS R0 RINK STIONS AND DTAILS R0 RINK DTAILS AND SHDULS R00 SONDARY RFRIGRANT FLOW DIAGRAM WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 TI O N U R O N ST N W O I V FO R O T R O F N ADDRSS OF FAILITY WINDOM ARNA 0 TH AV WINDOM, MN 0 LY R 00-- //0 No. ALTRNAT BID ITMS. FURNISH AND INSTALL A SHDUL 0 0L STAINLSS STL OIL IN PLA OF SHDUL 0 STL OIL. OIL SHALL HAV TH SAM SIZ AND ONFIGURATION OF TH OIL SHOWN IN TH PROJT. (ADD). RPLA " AND "" STL GLYOL PIPING ON RFRIGRATION PAKAG AND IN BUILDING WITH SH. 0 PV. (DDUT). DLT NW ONRT RADIUS WORK ON STUDIO RINK. (DDUT). DLT BAK-UP RINK PUMP (P-) (DDUT). RDU SIZ OF NW SWITHBOARD FROM,000 AMPS TO 00 AMPS. (DDUT) Description TITL SHT G00 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - TOOL OFF TOOL OFF WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 NOT FOR LTRIAL DMOLITION PLAN SAL: /" = '-0" LTRIAL NW WORK PLAN SAL: /" = '-0" DMO KY NOTS: GNRAL NOTS: 00-- //0 SWITHBOARD INFO. RMOV AND DISPOS OF ISTING MAIN SRV PANL AND ASSOIATD WIRING AND ONDUITS.. ISTING ONDITIONS WR DTRMIND FROM SIT OBSRVATIONS AND VRY LIMITD ISTING PLANS INFORMATION. AS-BUILT INFORMATION WAS NOT AVAILABL. MARK AMPS DSRIPTION A B 000 00 00 MAIN DISONNT FOR NW RFRIGRATION SYSTM FOR. R BALL OURT/ARHRY. RMOV AND DISPOS OF ISTING 00 AMP SRV FDR. ONDUITS TO RMAIN.. RMOV AND DISPOS OF ISTING DISONNTS.. ISTING TRANSFORMR TO RMAIN.. OORDINAT ALL INSTALLATION RQUIRMNTS WITH TH UTILITY OMPANY.. ALL SIT WORK SHALL B PRFORMD IN AORDAN WITH TH ITY SPIFIATIONS.. LTRIAL ONTRATOR TO PROVID SRV ONDUITS, TRNHING, T STION, MTR SOKT(S), SWITHBOARD AND GROUNDING PROVISIONS PR N.. UTILITY TRANSFORMR SAL: NTS SWITHBOARD A B G D F LTRIAL RISR DIAGRAM - NW 000A SRV OUTDOOR RFRIGRATION SKID PAKAG D F G 00 0 0 00 FOR. VOLT LIGHTING PANL FOR. HAUST FAN FOR. LIGHTS SPAR NW WORK KY NOTS:. FURNISH AND INSTALL NW 0V/P/W SWITH BOARD AND RLATD LTRIAL DVS. S DTAIL /00 FOR SRV RISR DIAGRAM.. FURNISH AND INSTALL 00 AMP DISONNT ON TRIOR OF BUILDING.. FURNISH AND INSTALL NW 000A OPPR FDR TO NW SWITHBOARD ROUTD IN. () TWO " ONDUITS. FURNISH AND INSTALL NW OPPR GROUND WIR AND GROUND ROD.. ISTING LTRIAL TRANSFORMR.. FURNISH AND INSTALL NW LTRIAL FD TO SORRS BO. ROUT NW " SH. 0 PV ONDUIT IN RFRIGRATION PIP TRNH AND ISTING HADR TRNH TO/FROM SORRS BO.. FURNISH AND INSTALL 00 AMP OPPR FDR BTWN NW SWITHBOARD, DISONNT AND RFRIGRATION SKID PAKAG.. LTRIAL ONTRATOR SHALL ONNT NW SWITHBOARD AND BRAKRS TO ALL ISTING LTRIAL PANLS, SWITHS, T.. ONTRATOR SHALL FILD VRIFY ALL ISTING DIMNSIONS AND ONDITIONS PRIOR TO BIDDING AND START OF. NOTIFY TH NGINR IF THR AR DISRPANIS BTWN TH DRAWINGS AND TH FILD ONDITIONS.. DO NOT SAL DRAWINGS.. WORK SHOWN HATHD SHALL B RMOVD.. INSTALL ALL PROTTION SYSTMS AS RQUIRD PRIOR TO STARTING DMOLITION WORK. 0. ONTRATOR TO OMPLY WITH ALL APPLIABL ODS AND ORDINANS.. UT, PATH AND PAINT ISTING WALLS, FLOORS AND ILINGS AS RQUIRD FOR INSTALLATION OF NW WORK OR RMOVAL OF ISTING WORK.. IDNTIFY ALL RSTRITIONS PRIOR TO UTTING THROUGH ISTING WALLS, FOUNDATION WALLS, OR PRAST PANLS.. LAN ALL FLOOR AND WALL SURFAS AFTR DMOLITION.. PATH AND PAINT ALL HOLS LFT BY DMOLITION.. RMOV ALL ISTING LTRIAL OMPONNTS, ONDUITS, WIRING, T. ASSOIATD WITH RMOVD QUIPMNT.. RLOAT ALL LTRIAL OMPONNTS, ONDUITS, WIRING, T. THAT ONFLIT WITH NW.. PROTT ALL LTRIAL ASSOIATD WITH QUIPMNT TO RMAIN.. S DMOLITION RQUIRMNTS FOR OTHR MHANIAL, LTRIAL, AND BUILDING SYSTMS SHOWN LSWHR. No. Description LTRIAL MODIFIATION PLAN 00. ALL ITMS IDNTIFID TO B RMOVD SHALL B DISPOSD OF OFF SIT BY ONTRATOR. STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

LGND SYMBOLS ABBRVIATIONS ISTING PROPOSD NTR LIN SPOT LVATIONS AIR LIN AIR SPARATOR (INLIN) LVL Y LIQUID DRAINR ALT AMP APPRO ALTRNAT AMPR APPROIMAT INV KW KWH INVRT KILOWATT KILOWATT HOUR FLOW ARROW BURID / OVRD FN RISR AIR VNT, MANUAL AUTOMATI VNT BALL VALV LONG RADIUS LBOW NDL VALV OIL SPARATOR ARH BHP BLDG BTU FM ARHITT / ARHITTURAL BRAK HORSPOWR BUILDING BRITISH THRMAL UNIT LSIUS UBI FT PR MINUT LBS POUNDS LF LINAR FT MA MAIMUM MBH THOUSAND BTU'S/HOUR M MOTOR ONTROL NTR MIL MIL ISTING MATRIALS TO B RMOVD STION OIL OOLR LIN OIL RTURN LIN ORL ORL HIGH PRSSUR LIQUID RFRIGRANT LOW PRSSUR LIQUID RFRIGRANT HIGH PRSSUR GAS/VAPOR RFRIGRANT LOW PRSSUR GAS/VAPOR RFRIGRANT QUALIZATION LIN VNT LIN BRIN SUPPLY BRIN RTURN GLYOL SUPPLY GLYOL RTURN PROPOLYN GLYOL SUPPLY PROPOLYN GLYOL RTURN ONDNSR WATR SUPPLY ONDNSR WATR RTURN OLD WATR SUPPLY OLD WATR RTURN HOT/OLD WATR SUPPLY HOT/OLD WATR RTURN OL HPLR LPLR HPVR LPVR L ATV BS BR GS GR PS PR S R WS WR HS HR OL HPLR LPLR HPVR LPVR L ATV BS BR GS GR PS PR S R WS WR HS HR BUKT TRAP BUTTRFLY VALV HK VALV HK, SPRING VALV ONT. NOT (SAM SHT) ONT. NOT (SPRAT SHT) ONTROL SYSTM NOT QUIPMNT TAG BAK PRSSUR RGULATING VALV PANSION VALV, HAND PANSION VALV, AUTOMATI PANSION VALV, THRMOSTATI FILTR AND DRIR FLANG PITH OF PIP, RIS (R) DROP (D) PRSSUR GAG AND OK PRSSUR RGULATING VALV PRSSUR SWITH RDUR RLIF VALV RVISION NOT RUPTUR DISK SHORT RADIUS LBOW SIGHT GLASS (IN-LIN) SIGHT GLASS (TRNAL) SOLNOID VALV STRAINR (BRIN/GLYOL) STRAINR (RFRIGRANT) O LANOUT ONN ONNTION W OLD WATR DMO DMOLITION DIA DIAMTR DWG DRAWING D DIRT PANSION A AH L LTRI LV LVATION QUIP QUIPMNT ISTING H HAUST PANSION F FAHRNHIT FD FLOOR DRAIN FF FINISHD FLOOR LVATION FT FOOT OR FT GAL GALLONS GPM GALLONS PR MINUT HDR HADR HDP HIGH DNSITY POLYTHYLN HT HIGHT HR HOURS HP HORSPOWR HVA HATING, VNTING, AIR ONDITIONING H HAT HANGR HZ HRTZ ID INSID DIAMTR MIN MH NA MINIMUM MHANIAL NOT APPLIABL N NORMALLY LOSD NO NTS O OD PH POLY PSI NORMALLY OPN NOT TO SAL ON NTR OUTSID DIAMTR PHAS (LTRI) POLYTHYLN PIP POUNDS PR SQUAR INH PV POLYVINYL PIP RBAR RQ'D RH RM RPM SF SP SS RINFORMNT RQUIRD RLATIV HUMIDITY RVOLUTIONS PR MINUT SQUAR FT SPIFIATION STAINLSS STL STD STANDARD TMO TMPRATUR TP TMPRATUR TYP TYPIAL V VOLTS VFD VARIABL FRQUNY DRIV W/ WITH W/O WITHOUT O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 NOT FOR FILL LIN DRAIN GAS SANITARY SWR BLOW FLOOR FILL D SS G FILL D SS G FLIBL ONNTOR FLOAT SWITH FLOAT SWITH (PILOT TYP) SUTION DIFFUSR THR-WAY VALV THRMAL BULB 00-- //0 KYNOT FLOAT VALV, HIGH SID THRMOMTR ONTINUATION - SAM SHT FLOAT VALV, LOW SID THRMOMTR WLL, ONLY ONTINUATION - SPARAT SHT FLOW ARROW THRMOSTAT, LTRI QUIPMNT TAGS FLOW ONTROL VALV FLOW SWITH THRMOSTAT, SLF-ONTAIND THRMOSTAT, RMOT BULB No. Description B BOILR P PUMP GAS DTTOR TRIPL DUTY VALV P OMPRSSOR HMIAL FD PUMP PU PUMPR DRUM SP SUMP PUMP GAT VALV GLOB VALV W/ SAL AP UNION VIBRATION ABSORBR U ONDNSING UNIT H LTRI UNIT HATR F HAUST FAN T TANK V VSSL WH WATR HATR GLOB VALV W/ SAL AP, ANGL WATR MTR RINK LGND, SYBMOLS & ABBRVIATIONS H HAT HANGR WS WATR SOFTNR L LOUVR NOT: NOT ALL SYMBOLS, ABBRVIATIONS OR LINTYPS SHOWN ON THIS SHT AR USD IN THIS ST OF DRAWINGS. R00 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

GNRAL NOTS:. ISTING ONDITIONS WR DTRMIND FROM SIT OBSRVATIONS AND VRY LIMITD ISTING PLANS INFORMATION. AS-BUILT INFORMATION WAS NOT AVAILABL. 0 00'-0" TO FA OF DASHRS '-0" TO PRIMTR URB ***AUTION*** ***AUTION*** ***AUTION*** '-" TO FA OF DASHRS & PRIMTR URB 0 STUDIO RINK '-0" TO FA OF DASHRS '-0" TO PRIMTR URB '-" TO FA OF DASHRS & PRIMTR URB MAIN RINK. ONTRATOR SHALL FILD VRIFY ALL ISTING DIMNSIONS AND ONDITIONS PRIOR TO BIDDING AND START OF. NOTIFY TH NGINR IF THR AR DISRPANIS BTWN TH DRAWINGS AND TH FILD ONDITIONS.. DO NOT SAL DRAWINGS.. VRIFY LOATION OF BURID UTILITIS PRIOR TO DMOLITION. VRIFY SIZ, LOATION AND INVRT LVATION OF NW AND ISTING UTILITIS PRIOR TO BGINNING WORK.. WORK SHOWN HATHD SHALL B RMOVD.. INSTALL ALL PROTTION SYSTMS AS RQUIRD PRIOR TO STARTING DMOLITION WORK.. RMOV AND DISPOS OF ALL PIPING, VALVS, HANGRS, ONTROLS, LTRIAL AND OTHR MATRIALS ASSOIATD WITH QUIPMNT THAT IS SPIFID TO B RMOVD UNLSS OTHRWIS NOTD.. OWNR TO DRAIN, SALVAG, AND STOR. GLYOL FROM BOTH MAT SYSTMS AND RLATD HADRS. ONTRATOR TO DRAIN ALL OTHR SYSTMS PRIOR TO DMOLITION.. ONTRATOR TO OMPLY WITH ALL APPLIABL ODS AND ORDINANS. 0. UT, PATH AND PAINT ISTING WALLS, FLOORS AND ILINGS AS RQUIRD FOR INSTALLATION OF NW WORK OR RMOVAL OF ISTING WORK.. IDNTIFY ALL RSTRITIONS PRIOR TO UTTING THROUGH ISTING WALLS, FOUNDATION WALLS, OR PRAST PANLS.. RMOV FITURS AND QUIPMNT AS INDIATD. AP PIPING SUH THAT NW AND FINISHS AN B OMPLTD AS INDIATD AND RQUIRD.. ANY DAMAG TO TH PRIMTR ONRT AUSD BY DMOLITION SHALL B RPAIRD BY TH ONTRATOR.. LAN ALL FLOOR AND WALL SURFAS AFTR DMOLITION.. PATH AND PAINT ALL HOLS LFT BY DMOLITION.. RMOV ALL ISTING LTRIAL OMPONNTS, ONDUITS, WIRING, T. ASSOIATD WITH RMOVD QUIPMNT.. RLOAT ALL LTRIAL OMPONNTS, ONDUITS, WIRING, T. THAT ONFLIT WITH NW.. PROTT ALL LTRIAL ASSOIATD WITH QUIPMNT TO RMAIN.. S DMOLITION RQUIRMNTS FOR OTHR MHANIAL, LTRIAL, AND BUILDING SYSTMS SHOWN LSWHR. 0. ALL ITMS IDNTIFID TO B RMOVD SHALL B DISPOSD OF OFF SIT BY ONTRATOR. KY NOTS:. ISTING MAIN RINK MAT SYSTM AND HADR PIPING TO B SALVAGD, STORD AND MODIFID FOR US ON STUDIO RINK BY OWNR.. ISTING STUDIO RINK MAT SYSTM TO B DRAIND, RMOVD AND DISPOSD OF BY OWNR.. ISTING ONRT URB AROUND RINK TO RMAIN UNLSS NOTD OTHRWIS.. RMOVAL,STORAG, MODIFIATION AND RINSTALLATION OF ISTING DASHR BOARD SYSTM BY OWNR.. ISTING UNDRGROUND TRANSMISSION MAINS AND HADR SYSTM TO/FROM STUDIO RINK TO RMAIN.. RMOV AND DISPOS OF ISTING ONRT URB FOR MODIFIATION OF ND RADII. O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 NOT FOR 00-- //0. RMOV AND DISPOS OF ISTING BLOW GRAD RINK PIPING LOATD IN ARAS THAT ONFLIT WITH NW WORK. ABANDON PIP IN-PLA WITH FLOWABL GROUT IN ALL OTHR LOATIONS. 0 ' 0' 0' SAL: /" = '-0". RMOV AND DISPOS OF ISTING PRIMTR ONRT SLAB FOR INSTALLATION OF NW TRANSMISSION MAINS. RMOV, SALVAG, AND R-INSTALL ISTING SKAT TIL FLOORING IN AFFTD ARAS. No. Description. ISTING STRUTURAL STL STRAND TIS. DO NOT DISTURB. 0. ISTING LTRIAL ONDUITS UNDR RINK FLOOR. DO NOT DISTURB. S RD0. ISTING LTRIAL & A/V QUIPMNT AND WIRING. OWNR TO RMOV AND RINSTALL. RINK FLOOR DMOLITION PLAN RINK DMOLITION PLAN SAL: /" = '-0" RD00 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

GNRAL NOTS: MAIN RINK. ISTING ONDITIONS WR DTRMIND FROM ISTING PLANS AND SIT OBSRVATION. AS-BUILT INFORMATION WAS NOT AVAILABL.. ONTRATOR SHALL FILD VRIFY ALL ISTING DIMNSIONS AND ONDITIONS PRIOR TO BIDDING AND START OF. NOTIFY TH NGINR IF THR AR DISRPANIS BTWN TH DRAWINGS AND TH FILD ONDITIONS.. DO NOT SAL DRAWINGS.. VRIFY LOATION OF BURID UTILITIS PRIOR TO DMOLITION. VRIFY SIZ, LOATION AND INVRT LVATION OF NW AND ISTING UTILITIS PRIOR TO BGINNING WORK.. WORK SHOWN HATHD SHALL B RMOVD.. RMOV AND DISPOS OF ALL PIPING, VALVS, HANGRS, ONTROLS, LTRIAL AND OTHR MATRIALS ASSOIATD WITH QUIPMNT THAT IS SPIFID TO B RMOVD UNLSS OTHRWIS NOTD. O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () -. OWNR TO DRAIN, SALVAG, AND STOR. GLYOL FROM BOTH MAT SYSTMS AND RLATD HADRS. ONTRATOR TO DRAIN ALL OTHR SYSTMS PRIOR TO DMOLITION.. ONTRATOR TO OMPLY WITH ALL APPLIABL ODS AND ORDINANS.. UT, PATH AND PAINT ISTING WALLS, FLOORS AND ILINGS AS RQUIRD FOR INSTALLATION OF NW WORK OR RMOVAL OF ISTING WORK. 0. IDNTIFY ALL RSTRITIONS PRIOR TO UTTING THROUGH. WALLS, FOUNDATION WALLS, OR PRAST PANLS.. RMOV FITURS AND QUIPMNT AS INDIATD. AP PIPING SUH THAT NW AND FINISHS AN B OMPLTD AS INDIATD AND RQUIRD. WINDOM ARNA SYSTM RPLAMNT OFF. ANY DAMAG TO TH PRIMTR ONRT AUSD BY DMOLITION SHALL B RPAIRD BY TH ONTRATOR.. LAN ALL FLOOR AND WALL SURFAS AFTR DMOLITION. 0 TH AV, WINDOM, MN 0. PATH AND PAINT ALL HOLS LFT BY DMOLITION.. RMOV ALL ISTING LTRIAL OMPONNTS, ONDUITS, WIRING, T. ASSOIATD WITH RMOVD QUIPMNT.. RLOAT ALL LTRIAL OMPONNTS, ONDUITS, WIRING, T. THAT ONFLIT WITH NW.. PROTT ALL LTRIAL ASSOIATD WITH QUIPMNT TO RMAIN.. S DMOLITION RQUIRMNTS FOR OTHR MHANIAL, LTRIAL, AND BUILDING SYSTMS SHOWN LSWHR.. ALL ITMS IDNTIFID TO B RMOVD SHALL B DISPOSD BY ONTRATOR. NOT FOR KY NOTS:. RMOV AND DISPOS OF ISTING R- RFRIGRATION SYSTM INLUDING BUT NOT LIMITD TO: OMPRSSORS, PUMPS, LTRIAL PANLS, OVRHAD PANSION TANKS, PIPING, VSSLS, STL FRAM, T.. RMOV AND DISPOS OF ISTING ABOV GROUND TRANSMISSION MAINS.. ISTING ABOV GROUND TRANSMISSION MAINS TO RMAIN. 00-- //0. ISTING BLOW GROUND TRANSMISSION MAINS TO STUDIO RINK TO RMAIN.. RMOV AND DISPOS OF ISTING BLOW GRAD RINK TRANSMISSION PIPING TO MAIN RINK IN LOATIONS THAT ONFLIT WITH NW. ABANDON PIPING IN PLA IN ALL OTHR LOATIONS AND FILL WITH FLOWABL GROUT AND AP. 0 ' ' ' ' TOOL. RMOV AND DISPOS OF ISTING AIR OOLD ONDNSR AND APPURTNANS INLUDING BUT NOT LIMITD TO: UNIT, RFRIGRATION PIPING, LTRIAL, STL STRUTUR, T. ONRT PAD TO RMAIN.. ISTING MP QUIPMNT AND PIPING. DO NOT DISTURB.. RMOV AND DISPOS OF ISTING PRIMTR ONRT SLAB FOR INSTALLATION OF NW TRANSMISSION MAINS. RMOV, SALVAG AND R-INSTALL ISTING SKAT TIL FLOORING IN AFFTD ARAS. SAL: /" = '-0" No. Description. ISTING RAISD ONRT HOUSKPING PAD TO RMAIN. RFRIGRATION SYSTM DMOLITION PLAN RFRIGRATION SYSTM DMOLITION PLAN SAL: /" = '-0" RD0 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

GNRAL NOTS:. FILD VRIFY ALL DIMNSIONS.. PIPING SHOWN IN SHMATI FORM. R0'-0" TO FA OF DASHR & PRIMTR URB (TYP.) 0 0 '-" TO FA OF DASHRS & PRIMTR URB ***AUTION*** ***AUTION*** ***AUTION*** '-" TO FA OF DASHRS '-0" TO PRIMTR URB STUDIO RINK '- " TO FA OF DASHRS & PRIMTR URB '-" TO FA OF DASHRS '-0" TO PRIMTR URB MAIN RINK 0 R'-" PRIMTR URB KY NOTS:. ONRT: " THIK.. WIR MSH: " " W. W.. " MINIMUM OVRLAP BTWN SHTS. TI TO RBAR VRY ". TRMINAT " FROM RINK DG.. RINK PIPING: " POLYTHYLN PIP @ " O.. FUSION WLDD ONNTIONS.. RINFORMNT: # BARS @ " O.. PARALLL WITH RINK PIPING AND " O.. PRPNDIULAR WITH RINK PIPING. MINIMUM LAP OF ".. PIP AND RBAR SUPPORT HAIRS @ '-0" O.. TH NTIR LNGTH OF TH RINK. SUPPORT HAIR STIONS SHALL OVRLAP A MINIMUM OF TWO RINK PIPS. S DTAIL -.. FLOOR INSULATION: TWO () LAYRS OF /" THIK, '-0" '-0" SHTS - STAGGR JOINTS. FINISHD INSULATION THIKNSS SHALL B ". OVR INSULATION WITH VAPOR BARRIR AND TAP ALL HOLS AND JOINTS. " POLYTHYLN SUPPLY HADR.. " POLYTHYLN RTURN HADR.. ISTING UNDRGROUND TRANSMISSION MAINS TO/FROM STUDIO RINK. DO NOT DISTURB. 0. /" SH. 0 PV ONDUIT & ABLS TO/FROM RFRIGRATION PAKAG.. AND SUB-FLOOR TMPRATUR SNSOR, BO AND ONDUIT. S DTAIL -.. PANSION JOINT AROUND NTIR PRIMTR OF RINK FLOOR. S DTAIL -.. " POLYTHYLN PIP AROUND NTIR PRIMTR OF RINK FLOOR.. ISTING ONRT URB AROUND NTIR RINK TO RMAIN UNLSS NOTD OTHRWIS.. ISTING DASHR BOARD SYSTM. R-INSTALLATION AND MODIFIATIONS BY OWNR.. " BURID INSULATD POLYTHYLN TRANSMISSION MAINS TO/FROM. S STIONS AND SHMATIS FOR ATUAL PIP SIZ AND ONFIGURATION.. S DTAIL -0.. S DTAIL - AND - @ RADIUS.. ONRT INFILL. S DTAIL - AND -. 0. ISTING STRUTURAL STL STRAND TIS. DO NOT DISTURB.. NW RINFORD ONRT URB RADII ON STUDIO RINK. MATH ADJANT URB WIDTH AND THIKNSS. S DTAIL -.. ISTING LTRIAL ONDUIT UNDR RINK FLOOR. DO NOT DISTURB.. S SHT 00 FOR INSTALLATION OF NW LTRIAL FD AND ONDUITS FROM TO SORRS BO.. FURNISH AND INSTALL () " SH. 0 PV ONDUIT ADJANT TO ISTING ONDUIT AROSS RINK FLOOR FOR FUTUR US. OORDINAT WITH OWNR. O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 NOT FOR 00-- //0 0 ' 0' 0' SAL: /" = '-0" No. Description S R0 RINK FLOOR PLAN RINK FLOOR PLAN SAL: /" = '-0" R00 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

'-0" '-0" GAT '-0" MAIN RINK '-0" O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - GNRAL NOTS: KY NOTS: TOOL OFF '-0" 0 0'-0" '-0" LAR MIN. '-0" '-0" '-0" LAR MIN. '-0" **AUTION** '-0" **AUTION** 0'-0" '-" WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 NOT FOR 00-- //0 '-0" '-0" GAT. " BURID INSULATD POLYTHYLN TRANSMISSION MAINS TO/FROM MAIN RINK FLOOR. S SHT R00 FOR ONTINUATION.. NW " INSULATD STL PIP ONNTD TO ISTING STUDIO RINK RTURN PIP AND NW " RTURN PIP WITH T AND GAT VALV ON AH SID OF T.. " INSULATD STL SNOW MLT SYSTM TRANSMISSION MAINS ROUTD OVRHAD TO/FROM SNOW MLT PIT.. " SH. 0 STL SNOW MLT OIL PIP @ " O.. WITH " HIGH STL SUPPORTS @ '-0" O.. MIN. 0. ISTING " INSULATD STL VITAULI PIPS FOR STUDIO RINK.. '-0" HIGH HAIN-LINK FN WITH GATS AS SHOWN. RFR TO SPIFIATION FOR FN MATRIAL, FOUNDATIONS, AND PAVMNT PATHING.. ISTING STRUTURAL STL STRAND TIS. DO NOT DISTURB. FILD VRIFY DPTH AND ADJUST PIP LVATION AS NSSARY TO ROUT PIPING UNDR STRANDS.. ISTING UNDRGROUND LTRIAL LINS. US TRM AUTION WHN AVATING FOR ONRT QUIPMNT PAD AND FN POSTS.. TND ISTING FLOOR DRAIN PIP UP '-0" ABOV BOTTOM OF PIT.. SAL ALL PIP PNTRATIONS IN WALL WITH LIK MATRIALS. (TYP.). GAT SIGN. (TYP. OF ) S DTAIL -. RFRIGRATION SYSTM ARA PLAN SAL: /" = '-0" No. Description RFRIGRATION SYSTM ARA PLAN R0 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

PRIMTR ONRT L. VARIS T.O. URB L. '-" O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - BOTTOM OF TRNH L. '-" WINDOM ARNA SYSTM RPLAMNT NW RINK FLOOR STION 0 TH AV, WINDOM, MN 0 PRIMTR ONRT L. 00'-0" T.O. URB L. '-" NOT FOR BOTTOM OF TRNH L. '-" 00-- //0 " INSULATD POLYTHYLN TRANSMISSION MAINS ONRT INFILL. S DTAIL -. NW LTRIAL ONDUIT FROM TO SORRS BO. S SHT 00. PRIMTR ONRT L. 00'-0" NW RINK FLOOR STION '-" No. Description '-" LAN SAND ISTING STRUTURAL STL STRAND TIS. **DO NOT DISTURB**. SUB GRAD '-" " SH. 0 PV ONDUIT AND WIR FOR RINK FLOOR AND SUBFLOOR TMP. SNSORS. (TYPIAL) RINK STIONS AND DTAILS PIP TRNH STION R00 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

HAMFR DG OF RINK FLOOR O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - 0 HADR PIP DTAIL HADR PIP ONNTION DTAIL RINK PIP AND RBAR SUPPORTS PANSION JOINT DTAIL RINK PIP DTAIL WINDOM ARNA SYSTM RPLAMNT ONRT OR MU ASSMBLY -/,,AND HR RATING 0 TH AV, WINDOM, MN 0 ONRT OR MU ASSMBLY,, AND HR RATING BAKR ROD F.S. AULK F.S. AULK MIN " THIK WITH " INSUL. MIN " THIK WITH -/" OR LSS INSULATION NOT FOR 00-- TMPRATUR SNSOR DTAIL GAT SIGNAG DTAIL PIP PNTRATIONS AT FLOOR OR WALL PIP MARKINGS DTAIL //0 VRIFY WITH SKID MANUFATUR " " ONRT SLAB-ON-GRAD # RBAR " O.., W, T&B " WID BITUMINOUS PATH (TYP. ALL SIDS) No. Description " " " " " STRUTURAL FILL. OMPATD TO % RLATIV OMPATION IN " LIFTS MA. ISTING SUBGRAD " RINK STIONS AND DTAILS TYPIAL SNOW MLT PIT STION 0 ONRT QUIPMNT PAD DTAIL TYPIAL ONRT INFILL DTAIL ONRT URB DTAIL R0 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

QUIPMNT SHDUL: R-A PAKAGD SYSTM O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - INSULATION SHDUL WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 PANSION JOINT PRIMTR RINK PIP NOT FOR BND PIP IN RADII TO ALLOW FOR MAIMUM PIP OVRAG 00-- //0 No. Description TYPIAL RINK PIPING DTAIL @ RADIUS RINK DTAILS AND SHDULS R0 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD

SIT GLASS T- SIT GLASS T- T- SIT GLASS RFRIGRATION PAKAG O'NIL ROAD HUDSON, WI 0 () - () -0 FA: () - P- P- P- WINDOM ARNA SYSTM RPLAMNT 0 TH AV, WINDOM, MN 0 NOT FOR P- 00-- //0 RFRIGRATION PAKAG GNRAL NOTS No. Description SONDARY RFRIGRANT FLOW DIAGRAM R00 STVNS NGINRS, IN. 0, ALL RIGHTS RSRVD