Installation Instructions 500 A Current Sensor Kit for F1 F4/F8 F13 Enclosure Sizes VLT Series FC 102, FC 202, and FC 302

Similar documents
Installation Instructions 300 A Current Sensor Kit for D1h/D3h/D5h/D6h Enclosure Sizes VLT Series FC 102, FC 103, FC 202, and FC 302

Installation Instructions 500 A Current Sensor Kit for D2h/D4h/D7h/D8h Enclosure Sizes VLT Series FC 102, FC 103, FC 202, and FC 302

Control Card VLT FC Series

Installation Instructions In-bottom/Out-back Cooling Kit for E4h Drives VLT FC Series FC 102, FC 103, FC 202, and FC 302

Installation Guide. VLT Real-time Clock MCB 117 VLT HVAC Drive FC 102, VLT Refrigeration Drive FC 103, VLT AQUA Drive FC 202, VLT AutomationDrive

Installation Instructions Bus Bar Kit for 6-pulse, 4-drive System VLT Series FC 102, FC 202, and FC 302. Description. Kit Part Number.

Installation Instructions In-back/Out-back Cooling Kit for D5h/D6h and D7h/D8h Enclosures VLT Series FC 102, FC 202, and FC 302

INSTRUCTIONS INSTALLATION OF LOAD-SHARE TERMINALS FOR VLT DRIVES

Changing pistons APP and APP 16-22

MAKING MODERN LIVING POSSIBLE. UniLynx Indoor Installation Manual. ULX 1800i ULX 3000i ULX 3600i ULX 5400i SOLAR INVERTERS

Installation Guide. DEVIreg 527. Electronic Time Regulator.

ReadyLIFT (Part# , ) Honda Pilot FWD/4WD Installation Instructions

Disassembling and assembling PAH , PAHT and PAHT G

Disposal declaration Frequency Converters Frame Size: D1, D2, D3, D4, D5, D6, D7 and D8 (New Generation) Production Place: USA and India

ReadyLift (Part# T6-2059) (04-11) Ford F-150 2WD, (04-11) 4WD (All cabs) 2.0 Leveling Kit exc. Heritage & SVT Raptor

Altivar 61/71 Adjustable Speed Drives Plastic Kits and Power Terminal Kit

ReadyLift (Part# ) Installation Instructions Toyota Tacoma Pre-Runner/ 4WD

Disassembling and assembling isave 21

Installation Instructions. PowerFlex 700 Drive - Frame 8 Components Replacement

ReadyLift (Part# ) Lift Kit, Installation Instructions Toyota Tundra New Body Style 2WD & 4WD

TOYOTA PRIUS XM SATELLITE RADIO Preparation

Turbo Upgrade Kit Installation for Ford F-150 PN s , ,

HP10251 KIT. Chevrolet Silverado WD / 4WD * GMC Sierra WD / 4WD * 1.5" / 2.25" Leveling Kit L6401_REV3_ECN1-1963

SERVICE INSTRUCTIONS

Allen-Bradley Motors. NRU Diode Bridge Assembly Replacement ( A DC) REPLACEMENT KIT INSTRUCTIONS. Contents. What This Kit Contains

SonoSensor 30 Ultrasonic flow meter for heating and cooling applications

Chevrolet Camaro (Gen6) Installation Guide PN 11920, 11921, 11924, 11925, 11926, 11927, 11930, 11931

Installation Bulletin Number: IB-5111 Rev: A Date: Feb 2014 Affected Parts: K

Table of Contents. 1.0 INFORMATION 1.1 Introduction. 1.2 Product Information. 2.0 INSTALLATION 2.1 Pre-Installation. 2.2 Component Installation

Thank you for purchasing a Borla Performance Stainless Steel Header.

Section 1.0 Warnings Section 2.0. Section 3.0. Section 4.0. MCD3000 Inside Delta Connection Kits. Contents

Directional Control Valve

HP10253 KIT Ford F-150 2WD / 4WD 2" Leveling Kit

FLOODLIGHT unit IMPORTANT WARNING! RRAC055/RRAC059. INSTALL TIME: 30 mins

Changing pistons APP 21-43

SCION XB SUBWOOFER ENCLOSURE Preparation

EasyStart 364 (ASY-364-X20-IP) Installation Instructions for the Coleman / Airxcel Air Conditioners

ATEX instruction for APP / PAH PAHT G 2-90 / PAH Tech

TOYOTA YARIS XM SATELLITE RADIO Preparation (Sedan & Hatchback)

FLÄKTGROUP PM-MOTOR WITH INTEGRATED FC 106 FREQUENCY CONVERTER

WINCH MOUNT KIT FOR POLARIS RANGER P/N ASSEMBLY / OWNERS MANUAL. Application WINCH KIT NO. 25-9xxx

ReadyLift (Part# ) Ford F-350 4WD Leveling Kit Installation Instructions

Integrated Valve with Presetting for Manifolds in Two-Pipe Heating Systems

9200 Revenue Meter. Model Certification Current Inputs. Complies with the accuracy requirements of the ANSI C Revenue Metering Standard

"Engineered to Ride, Built to Last "

ATEX instruction APP S 674 pumps APP S , APP S and APP S

TOYOTA COROLLA ILLUMINATED DOOR SILLS Preparation

"Engineered to Ride, Built to Last "

TOYOTA COROLLA ILLUMINATED DOOR SILLS Preparation

RUN/BRAKE/TURN AUXILIARY LIGHTS J

ReadyLift (Part# ) Installation Instructions

Header Installation For Jeep Wrangler

Alcatel-Lucent 7310 DC Metro Cell AWS (B4) Kit MC-DBR1, MC-DBR2, MC-DBR3, MC-DBR4, MC-DBR5. Installation Manual

INSTALLATION INSTRUCTIONS

E.S.P. Embedded Sensing Probes for Motor Brushes

Please compare the parts in the box with the bill of materials provided to assure that you have all the parts necessary for this installation.

INSTALLATION CLAMP-ON FORK MOUNTED DRIVING LIGHTS 5015

COOPER POWER SERIES. Quick Connect Assembly (QCA) Retrofit Kit, General Electric Installation Instructions. Voltage Regulators MN225075EN

MAKING MODERN LIVING POSSIBLE. Quick Setup VLT FCM 300 Series. Phone: Fax: Web: -

Maneurop reciprocating compressors MT - MTZ - NTZ

TOYOTA TACOMA INTERFACE KIT FOR IPOD Preparation

PowerFlex 700 Drive - Frame 8 Components Replacement

MOUNT KIT Ford F-150 4X

"Engineered to Ride, Built to Last "

LEXUS RC 350/RC-F ILLUMINATED DOOR SILLS Preparation

SCION FR-S FOG LIGHTS

Floor heating system, heating circuit with FHV-A in flow.

Marine Annex covering all VLT Drives Note

Pump Operating and Maintenance Manual - Models

Table of Contents. 1.0 INFORMATION 1.1 Introduction About This Manual Helpful Hints and Warnings Service and Product Support

Servicing the APU Generator Belt. Determining if a belt adjustment or replacement is required

Ford Mustang GT Long Tube Header Installation

RMK HANDLEBAR KIT P/N ; ; APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

TOYOTA RAV INTERFACE KIT FOR IPOD Preparation Part Number: PT

"Engineered to Ride, Built to Last "

IMPORTANT SAFEGUARDS READ AND FOLLOW ALL SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS!

Instruction Manual. Harmonic Filter AHF 005/010. Drives Solutions

LEXUS CT 200h ILLUMINATED DOOR SILLS Preparation

TOYOTA TACOMA HANDS FREE BLU LOGIC Preparation. Item 5 Item 6 Item 7 Item 8. Item 4. General Applicability Note: Recommended Tools

PAHT pump PAHT X

Inverter / Charger Accessory for Steca Solarix PLI Phase / Parallel Kit. Installation and operating instructions Z01 17.

Long Tube Header Installation For Ford Mustang GT

Advanced efficiency, precision cooling Design an HVAC system like no other

Installation Instructions: Memory-Dimmable SEP T8 Tube Lamps

INSTRUCTIONS Servicing PAH

INSTALLATION MANUAL SWS

Installation Guide Smart-UPS 1200/1500 VA 100/120/230 Vac Rack-Mount 1U

Advanced efficiency, precision cooling Design an HVAC system like no other

Ladder READ ME! IMPORTANT WARNING! ENG

Assisted lift operated 2/2-way solenoid valves Type EV251B

RU SERIES UPGRADE TempAssure Compatible

Installing the Boxer fan upgrade kit

TOYOTA TUNDRA SKID PLATE Preparation

SCION xa AUTO-DIMMING MIRROR Preparation

"Engineered to Ride, Built to Last "

Installation Instructions: External-Driver SEP T8 LED Tube Lamp

Transfer Case Indexing Ring Kit - GAS. Dodge Dodge Part#:

4000 SYSTEM OPERATING MANUAL

INSTALLATION CONSTELLATION DRIVING LIGHTS 5009

Replacing the Batteries in the Fortress LI 660

Transcription:

1.1 Description The 500 A current sensor kit is designed for F1 F4 and F8 F13 enclosure sizes in the power ranges shown in Table 1.1. To identify the power rating, see Illustration 1.1. Product group and series Voltage rating Power rating VLT HVAC Drive FC 102 and (T4) 380 480 V 315 1000 kw (450 1350 hp) VLT AQUA Drive FC 202 (T7) 525 690 V 450 1400 kw (450 1550 hp) (T5) 380 500 V 250 800 kw (350 1200 hp) VLT AutomationDrive FC 302 (T7) 525 690 V 355 1200 kw (400 1350 hp) 1 Product group and product series 2 Power rating 3 Voltage rating (phases and mains) Illustration 1.1 Nameplate for a VLT AQUA Drive FC 202 Table 1.1 Applicable Power Range for 500 A Current Sensor Kit This 500 A current sensor kit contains all components required to upgrade the current sensors in F1 F4 and F8 F13 enclosure sizes. 1.1.1 Identifying the Power Rating To find the frequency converter power rating, use the following steps: 1. Obtain the following information from the nameplate, which is on the frequency converter. Refer to Illustration 1.1. 1a Product group and product series (characters 1 6) 1b Power rating (characters 7 10) 1c Voltage rating (phases and mains) (characters 11 12) 2. Check that the power rating is in Table 1.1. 1.2 Kit Part Number Part number 176F3747 Kit description Current sensor kit for F1 F4/F8 F13 enclosures Table 1.2 Part Number for the Current Sensor Kit 1.2.1 Items Supplied The 500 A current sensor kit for F1 F4 and F8 F13 enclosure sizes contains the following parts. Quantity Item description 3 500 A current sensors 3 Busbars 1 Wire harness 3 Cable ties 6 Hex nuts (M4) and washers Table 1.3 500 A Current Sensor Kit Parts List Danfoss A/S 10/2016 All rights reserved. MI92R102

1.3 Safety Instructions 1.4 Disassembly Guidelines CAUTION TRAINING REQUIRED Only certified technicians trained by Danfoss are allowed to replace the parts described in these installation instructions. Installation work done by non-qualified personnel can result in personal injury or equipment damage. Make sure to read and save these instructions. WARNING ELECTRICAL SHOCK HAZARD VLT frequency converters contain dangerous voltages when connected to mains voltage. Improper installation, and installing or servicing with power connected, can cause death, serious injury, or equipment failure. To avoid death, serious injury, or equipment failure: Only use qualified electricians for the installation. Disconnect the frequency converter from all power sources before installation or service. Treat the frequency converter as live whenever the mains voltage is connected. Follow the guidelines in these instructions and local electrical safety codes. NOTICE The current sensor kit includes an extra set of fasteners in case any fasteners are missing or unusable. To make the disassembly/reassembly process easier, use these general guidelines: 1. Follow the disassembly instructions for each component. 2. Keep the component together with the removed fasteners. 3. Replace the old components with the new components provided in the kit. 4. If any fasteners are stripped or lost, replace with similar fastener from the kit. 5. Follow the installation instructions for replacing and securing each component. WARNING DISCHARGE TIME The frequency converter contains DC-link capacitors, which can remain charged even when the unit is off. High voltage can be present even when the warning indicator lights are off. Failure to wait a minimum of 20 minutes after power is removed before performing service work can result in death or serious injury. 1. Stop the motor. 2. Disconnect AC mains and remote DC-link supplies, including battery back-ups, UPS, and DC-link connections to other frequency converters. 3. Disconnect or lock PM motor. 4. Wait 20 minutes for the capacitors to discharge. 5. To verify full discharge, measure the voltage level. 2 Danfoss A/S 10/2016 All rights reserved. MI92R102

1.4.1 Removing the Cover Plate To remove the cover plate from the inverter module, use the following procedure. Refer to Illustration 1.2. 1. Remove the inverter module from the frequency converter. Refer to the installation guide. 2. Remove 4 nuts (M6), 1 from each corner of the cover plate. 3. Lift the cover plate from the module. 1 Cover plate 3 Lower capacitor bank assembly 2 Upper capacitor bank assembly 4 Current sensor Illustration 1.2 Inverter Module MI92R102 Danfoss A/S 10/2016 All rights reserved. 3

1.4.2 Removing the Lower Capacitor Bank Remove the lower capacitor bank assembly using the following procedure. Refer to Illustration 1.3. NOTICE CAPACITOR ASSEMBLY WEIGHT The lower capacitor bank weighs approximately 9 kg (20 lb). 1. Disconnect the cables from the following gatedrive card connectors: 1a MK100 1b MK102 1c MK103 1d MK104 1e MK106 1f MK105 (if the unit has a brake option) 2. Remove the 6 recessed connection nuts (M5) that secure the capacitor bank assembly. These nuts are found in the gap between the upper and lower capacitor banks. 3. Remove the 4 retaining nuts (M6) securing the lower capacitor bank assembly. The gatedrive card can remain in place on the assembly. 4. Lift the capacitor bank assembly from the unit. 1 Upper capacitor bank assembly 4 Power card 2 Recessed connection nuts (M5) 5 Retaining nut (M6) 3 Lower capacitor bank assembly 6 Gatedrive card Illustration 1.3 Capacitor Bank Assembly, F1 F2 4 Danfoss A/S 10/2016 All rights reserved. MI92R102

1.4.3 Removing the Current Sensor Wire Harness Remove the current sensor wire harness using the following procedure. Refer to Illustration 1.4. 1. Unplug the 16-pin cable from the MK102 connector on the power card. 2. Remove the screw (M5) attaching the ring terminal ground to the power card. 3. Detach the cable from the 3-pin connector on the high frequency card. 4. Detach the wire from each current sensor. 5. Detach any cable ties that secure the wire harness in the unit. 6. Lift the wire harness from the unit. 1 Power card 4 3-pin connector 2 16-pin cable connector (MK102) 5 High frequency card 3 Ring terminal ground (M5) Illustration 1.4 Power Card MI92R102 Danfoss A/S 10/2016 All rights reserved. 5

1.4.4 Removing the Current Sensors with Busbars To remove each current sensor and its busbar, use the following procedure. Refer to Illustration 1.5. 1. Remove 6 screws (M6) connecting the busbar to the IGBT module at the IGBT end of the busbar. 2. Remove 3 standoff nuts (M4) from the IGBT end of the busbar. 3. Remove 1 screw (M8) from the opposite end of the busbar where it connects to the output busbar. 4. Remove 2 nuts (M4) that attach the base of the current sensor to the back panel. 5. Remove the busbar and current sensor. NOTICE Retain the nuts and screws for reassembly of the current sensor and busbars. 1 Screw (M6) 4 Nut (M4) 2 Standoff nut (M4) 5 Current sensor 3 Busbar 6 Nut (M8) Illustration 1.5 Current Sensor Assembly 6 Danfoss A/S 10/2016 All rights reserved. MI92R102

1.5 Reassembly Guidelines 1.5.1 Installing the Current Sensor Wire Harness Install the new current sensor wire harness using the following procedure. Refer to Illustration 1.6. 1. Plug the 16-pin cable into the MK102 connector on the power card. 2. Secure the screw (M5) attaching the ring terminal ground to the power card. 3. Attach the cable to the 3-pin connector on the high frequency card. 4. Attach cable ties securing the wire harness in the unit. 1 16-pin cable connector (MK102) 7 Nut (M8) 2 M5 ring terminal ground 8 3-pin connector on high frequency card 3 Power card 9 Upper capacitor bank assembly 4 Screw (M6) 10 Busbar 5 Nut (M4) 11 Current sensor cable connector 6 Current sensor 12 Current sensor wire harness Illustration 1.6 300 A Current Sensors, Busbars, and Wire Harness MI92R102 Danfoss A/S 10/2016 All rights reserved. 7

1.5.2 Installing the Current Sensors with Busbars To install the 3 current sensors and their busbars, use the following procedure. Refer to Illustration 1.6. 1. Slide the new current sensor onto the new busbar and place it in the unit. Position the sensor with the arrow on the sensor facing away from the IGBTs. See Illustration 1.6. 2. Secure the current sensor base to the back panel using 2 nuts (M4). 3. Reconnect the wire harness to the current sensor. 4. Secure the output busbar to the current sensor busbar using 1 screw (M8). 5. Attach the IGBT end of the busbar to the 3 standoffs using 3 nuts (M4). 6. Secure the IGBT end of the busbar to the IGBT module using 6 screws (M6). 7. Repeat steps 1 6 for each current sensor. 1.5.4 Installing the Cover Plate Reinstall the cover plate using the following steps. Refer to Illustration 1.2. 1. Place the cover plate on the module in its original position. 2. Secure 4 nuts (M6), 1 in each corner of the cover plate. 3. Install the inverter module in the frequency converter. Refer to the installation guide. 1.5.3 Installing the Lower Capacitor Bank Reinstall the lower capacitor bank assembly using the following procedure. Refer to Illustration 1.3. NOTICE CAPACITOR ASSEMBLY WEIGHT The lower capacitor bank weighs approximately 9 kg (20 lb). 1. Place the lower capacitor bank assembly in its original position. 2. Secure the capacitor bank assembly using 4 retaining nuts (M6). 3. Secure the capacitor bank using 6 recessed connection nuts (M5). 4. Connect the cables to the following connectors on the gatedrive card: 4a MK100 4b MK102 4c MK103 4d MK104 4e MK106 4f MK105 (if the unit has a brake option) Danfoss can accept no responsibility for possible errors in catalogues, brochures and other printed material. Danfoss reserves the right to alter its products without notice. This also applies to products already on order provided that such alterations can be made without subsequential changes being necessary in specifications already agreed. All trademarks in this material are property of the respective companies. Danfoss and the Danfoss logotype are trademarks of Danfoss A/S. All rights reserved. Danfoss A/S Ulsnaes 1 DK-6300 Graasten vlt-drives.danfoss.com 130R0715 MI92R102 10/2016 *MI92R102*