UNCLASSIFIED R-1 ITEM NOMENCLATURE

Similar documents
UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

Exhibit R-2, RDT&E Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Airborne SIGINT Enterprise (JMIP) FY 2012 OCO

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: RQ-4

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-5. FY-10 FY-11 FY-12 FY-12 OCO FY-12 Total FY-13 FY-14 FY-15 FY-16

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-135

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: End Item Industrial Preparedness Activities FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #30

From: Arthur Canafe, P.E. Approved by: /s/ General Manager

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Qty (Each)

Air Force Operational Energy

UNCLASSIFIED CLASSIFICATION: EXHIBIT

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 17 R-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 P-1 Line #51

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Exhibit R-2, RDT&E Budget Item Justification

Washington Metropolitan Area Transit Authority

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Tactical Unmanned Aerial Vehicles FY 2012 OCO

UNCLASSIFIED UNCLASSIFIED

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 24 R-1 Line #7

Selected Acquisition Report (SAR)

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #22 Page 1 of 39

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Combat Vehicle and Automotive Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Transcription:

Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) Years FY 212 FY 213 # Base PE 23752A: Aircraft Engine Component OCO ## FY 215 FY 216 FY 217 FY 218 To Program Element -.8.898.315 -.315.387.37.331.145 Continuing Continuing 16: A/C COMPON IMPROV PROG -.8.898.315 -.315.387.37.331.145 Continuing Continuing # FY 213 Program is from the FY 213 President's Budget, submitted February 212 ## The OCO Request will be submitted at a later date Note The Aircraft Engine Component (CIP) is included in the RDTE budget vice procurement appropriations in accordance with congressional direction. The majority of CIP funding has been reallocated to PE 273744 beginning in FY7. A. Mission Description and Budget Item Justification Aircraft Engine Component (CIP) develops, tests, and qualifies improvements to aircraft engine components to correct service-revealed deficiencies, improve flight safety, enhance readiness and reduce operating and support (O&S) costs. In addition, CIP provides the test vehicles for the testing and qualification efforts required as a part of the Army's Critical Safety Item (CSI) program. CIP is included in the RDTE budget vice procurement appropriations in accordance with congressional direction. The majority of CIP funding has been reallocated to PE 273744 beginning in FY7. Non-program specific Auxiliary Power Unit (APU) as well as Unmanned Aerial Vehicle (UAV) safety and readiness issues will continue to be addressed under this PE. B. Program Change Summary ($ in Millions) FY 212 FY 213 Base OCO Previous President's Budget.822.898.423 -.423 Current President's Budget.8.898.315 -.315 Adjustments -.22. -.18 - -.18 Congressional General Reductions - - Congressional Directed Reductions - - Congressional Rescissions - - Congressional Adds - - Congressional Directed Transfers - - Reprogrammings - - SBIR/STTR Transfer -.22 - Other Adjustments 1 - - -.18 - -.18 PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 1 of 9 R-1 Line #165

Exhibit R-2A, RDT&E Project Justification: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) 16: A/C COMPON IMPROV PROG Quantity of RDT&E Articles Years FY 212 FY 213 # Base PE 23752A: Aircraft Engine Component PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 2 of 9 R-1 Line #165 16: A/C COMPON IMPROV PROG OCO ## FY 215 FY 216 FY 217 FY 218 To -.8.898.315 -.315.387.37.331.145 Continuing Continuing # FY 213 Program is from the FY 213 President's Budget, submitted February 212 ## The OCO Request will be submitted at a later date Note The Aircraft Engine Component (CIP) is included in the RDTE budget vice procurement appropriations in accordance with congressional direction. The majority of CIP funding has been reallocated to PE 273744 beginning in FY7. A. Mission Description and Budget Item Justification Aircraft Engine Component (CIP) develops, tests, and qualifies improvements to aircraft engine components to correct service-revealed deficiencies, improve flight safety, enhance readiness and reduce operating and support (O&S) costs. In addition, CIP provides the test vehicles for the testing and qualification efforts required as a part of the Army's Critical Safety Item (CSI) program. Non-program specific Auxiliary Power Unit (APU) as well as Unmanned Aerial Vehicle (UAV) safety and readiness issues will continue to be addressed under this PE. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 212 FY 213 Title: T7 Engine Description: Majority of funding for this program has been reallocated to PE 273744. Previously, this program addressed flight safety and readiness problems that arise in the field by providing timely engineering support, continued the development of the T7-GE-71D, provided engineering support of fielded engines to enhance war fighting capability and improve durability and reliability while reducing cost of ownership. FY 212 Accomplishments: Continued the overspeed and burst qualification test effort and finished the heat rejection report for the T7-GE-71D engine. Started the qualification report effort for the Improved Durability (Ruggedized) Blisk which will increase engine time on wing. FY 213 Plans: Will start efforts to perform an instrumented engine test to measure gas generator turbine hardware metal temperatures. Will evaluate clean air combustor shield hardware for redesign effort Plans:.321.349.1

Exhibit R-2A, RDT&E Project Justification: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army PE 23752A: Aircraft Engine Component 16: A/C COMPON IMPROV PROG B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 212 FY 213 Will continue an instrumented engine test to measure gas generator turbine hardware metal temperatures. Will evaluate clean air combustor shield hardware for redesign effort. Title: T55 Engine Description: Provide timely support to field users, applying engineering effort to resolve unanticipated flight safety problems revealed in the field. Continue the engineering support of fielded engines to enhance war-fighting capability, improve durability and reliability while reducing CH-47 engine cost of ownership..299.349.1 FY 212 Accomplishments: Continued the 1553 ECU effort for F Model incorporation. FY 213 Plans: Will continue ECU Software Block Update to improve ECU functionality and address field software issues Plans: Will complete ECU Software Block Update to improve ECU functionality and address field software issues Title: GTCP36 Auxiliary Power Unit (APU).3.3.15 Description: Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs). FY 212 Accomplishments: Addressed service revealed deficiencies that affect safe operation of the GTCP 36 series APUs. FY 213 Plans: Will coontinue formulating correlation factors to published life limits and will address service revealed deficiencies that affect safe operation of the GTCP 36 APU Plans: Will complete formulating correlation factors to published life limits and will address service revealed deficiencies that affect safe operation of the GTCP 36 APU. Title: T62 Auxiliary Power Unit (APU).3.3.2 PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 3 of 9 R-1 Line #165

Exhibit R-2A, RDT&E Project Justification: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army PE 23752A: Aircraft Engine Component 16: A/C COMPON IMPROV PROG B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 212 FY 213 Description: Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs). FY 212 Accomplishments: Finished the qualification tests for the Flex Fuel Manifolds. Address service revealed deficiencies affecting safe operation of the T-62T series APUs. FY 213 Plans: Will continue to address service revealed deficiencies affecting safe operation of US Army APUs Plans: Will continue to address service revealed deficiencies affecting safe operation of US Army APUs. Title: UAV Shadow Engine.7.6.2 Description: UAV Shadow Engine Investigation at U.S. Army Research Laboratory (ARL) Cleveland: US Army Vehicle Technology Directorate (VTD) at ARL Cleveland. Provide research to support airworthiness, reliability and performance improvements of the Unmanned Aerial Vehicle (UAV) shadow engine. Investigate and research the technology challenges (i.e. engine performance, engine durability, engine life, and engine modifications) for reliable engine operation using JP-8 fuel and readily available MIL-spec lubricants. FY 212 Accomplishments: Continued to research improvements to address service related deficiencies. FY 213 Plans: Will continue to research improvements to address service related deficiencies to improve safety and reduce O&S costs. Plans: Will continue to research improvements to address service related deficiencies to improve safety and reduce O&S costs. Title: In-House Support.5.8.6 Description: In-house support for the CIP engineers. ing support for CIP contracts. FY 212 Accomplishments: PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 4 of 9 R-1 Line #165

Exhibit R-2A, RDT&E Project Justification: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army PE 23752A: Aircraft Engine Component 16: A/C COMPON IMPROV PROG B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 212 FY 213 Provided in-house support for the CIP engineers and contracting support for CIP contracts. FY 213 Plans: Will continue to provide in-house support for the CIP engineers and contracting support for CIP contracts Plans: Will continue to provide in-house support for the CIP engineers and contracting support for CIP contracts. C. Other Program Funding Summary ($ in Millions) N/A Remarks Accomplishments/Planned Programs Subtotals.8.898.315 D. Acquisition Strategy Improved designs will be implemented via Engineering Change Proposal (ECP) and follow-on procurement or modification to a production contract to introduce the improved hardware. E. Performance Metrics Performance metrics used in the preparation of this justification material may be found in the FY 21 Army Performance Budget Justification Book, dated May 21. PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 5 of 9 R-1 Line #165

Exhibit R-3, RDT&E Project Analysis: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army Management Services ($ in Millions) Category Item In-house Engineering Method & Type WR Product Development ($ in Millions) Category Item Method & Type Performing Activity & Location AMRDEC:Redstone Arsenal, AL Performing Activity & Location Years FY 212 FY 213 PE 23752A: Aircraft Engine Component Base OCO PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 6 of 9 R-1 Line #165 16: A/C COMPON IMPROV PROG To Target Value of 2.25.5 Dec 211.8 Jan 213.6 Jan 214 -.6 Continuing Continuing Continuing Subtotal 2.25.5.8.6..6 Years FY 212 FY 213 Base OCO To T7 Engine SS/IDIQ GE-Air:Lynn, MA 61.311.321 Feb 212.349 Jan 213.1 Jan 214 -.1 Continuing Continuing Continuing T55 Engine SS/IDIQ Honeywell:Phoenix, AZ APU's SS/IDIQ UAV Shadow Engine Various APU's SS/IDIQ Test and Evaluation ($ in Millions) Category Item T-62T-2B Vibration Test Remarks Not Applicable Method & Type Various Air Force:Kelly AFB, TX ARL-Vehicle Technology Directorate:TBD Air Force:Hill AFB, UT Performing Activity & Location Redstone Technical Text Center:Redstone Arsenal, AL Target Value of 29.262.299 Feb 212.349 Jan 213.1 Jan 214 -.1 Continuing Continuing Continuing 13.647 - -.15 Jan 214 -.15 Continuing Continuing..67.7 Feb 212.6 Jan 213.2 Jan 214 -.2 Continuing Continuing. 2.259.6 Feb 212.6 Jan 213.2 Jan 214 -.2 Continuing Continuing Continuing Subtotal 16.546.75.818.255..255 Years FY 212 FY 213 Base OCO To Target Value of.5 - - - - - Continuing Continuing. Subtotal.5......

Exhibit R-3, RDT&E Project Analysis: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army PE 23752A: Aircraft Engine Component 16: A/C COMPON IMPROV PROG Years FY 212 FY 213 Base OCO Project s 18.846.8.898.315..315 To Target Value of Remarks PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 7 of 9 R-1 Line #165

Exhibit R-4, RDT&E Schedule Profile: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army PE 23752A: Aircraft Engine Component 16: A/C COMPON IMPROV PROG T7 Engine Temperature Survey T55 Engine 1553 Engine Control Unit (ECU) T55 Engine ECU BLock Upgrade Auxiliary Power Units (APUs) UAV Shadow Engine FY 212 FY 213 FY 215 FY 216 FY 217 FY 218 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 8 of 9 R-1 Line #165

Exhibit R-4A, RDT&E Schedule Details: PB 214 Army DATE: April 213 24: Research, Development, Test & Evaluation, Army PE 23752A: Aircraft Engine Component Schedule Details 16: A/C COMPON IMPROV PROG Start End Events Quarter Year Quarter Year T7 Engine Temperature Survey 2 214 2 216 T55 Engine 1553 Engine Control Unit (ECU) 2 212 1 213 T55 Engine ECU BLock Upgrade 2 214 4 215 Auxiliary Power Units (APUs) 1 214 4 214 UAV Shadow Engine 3 214 1 215 PE 23752A: Aircraft Engine Component UNCLASSIFIED Army Page 9 of 9 R-1 Line #165