MOD. MASTER METER INSTALLATION OPERATION AND MAINTENANCE. PETROL INSTRUMENTS S.r.l APRILIA (LT) - ITALY

Similar documents
Sheet n 1 of 20 Doc. n WDMM/02/E MOD. WDMM INSTALLATION, USE AND SERVICE MANUAL. PETROL INSTRUMENTS S.r.l APRILIA (LT) - ITALY

PETROL. Double Case PD Flowmeters. Trust in us Our Quality Counts. Technical Bulletin. PETROL Instruments S.r.l.

OVAL GEAR FLOWMETER MECHANICAL MODEL 075 (3 )

OVAL GEAR FLOWMETER MECHANICAL MODEL 012 (½ )

PETROL INSTRUMENTS S.r.l. - ITALY P D F L O W M E T E R S L P G M E T E R I N G I N D E X

DEUBLIN. DEUBLIN Unions H57 H67 H87

DEUBLIN. Installation Instructions DEUBLIN Unions H57 H67 H87

Ph: (07) Fax: (07) Pump Manual

PRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS

Positive Displacement Flowmeters GM020 series instruction manual

Positive Displacement Flowmeters GM007 series instruction manual

PRODUCT SERVICE MANUAL. BK6DHZ(C)-250, 275, 312 and 400 PUMPS

POSITIVE DISPLACEMENT FLOWMETERS

INSTRUCTION MANUAL INTERNAL GEAR PUMP TITAN G-4124A SERIES=> FLANGED TITAN G-124A SERIES => FLANGED MODELS:

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS

Positive Displacement Flowmeters GM020 series instruction manual

US - UP2/OIL 12V US - UP2/OIL 24V

OVAL GEAR FLOWMETER MECHANICAL MODEL 012 (½ )

ProFlow TO BE REALLY SURE. Vane Meters. Experience in flow measurement. Introduction

OVAL GEAR FLOWMETER ELECTRONIC MODEL 019 / ¾

User Guide IM/TORBAR-EN Rev. D. Averaging pitot tubes

Operating Instructions for Oval Wheel Flowmeter. Model: DOC

POSITIVE DISPLACEMENT FLOWMETERS

IMPORTANT!!!! Read this manual before attempting any installation, wiring or operation.

PRODUCT SERVICE MANUAL

INSTALLATION AND OPERATION

FPD1001 thru FPD1003, FPD1102 and FPD1103, FPD1201 thru FPD1203 (includes -R Option) Positive Displacement Flowmeters

2.- HANDLING OF VALVES BEFORE ASSEMBLY 3.- FITTING THE VALVE TO THE REST OF THE ASSEMBLY 5.- PERIODICAL INSPECTION OF THE VALVE AND MAINTENANCE

OVAL GEAR FLOWMETER ELECTRONIC MODEL 006/009 (¼ )

Product Service Manual For DLH12DHT SERIES PUMPS

Maintenance Information

Crispin Valves Operating Guide. Crispin

THREE PHASE AND SINGLE PHASE ASYNCHRONOUS ELECTRIC MOTORS OPERATION AND MAINTENANCE BOOKLET Rev

Industrial Turbo Meters, Sizes 2" through 6"

FPD1001B thru FPD1003B, FPD1102B and FPD1103B, FPD1201B thru FPD1203B SERIES LOW FLOW Positive Displacement Flowmeters

SERIES PC INSTRUCTION AND OPERATION MANUAL

PRODUCT SERVICE MANUAL FOR. F312XICR-312_, 325_, 400_ and 437_ Pumps. For Solar Turbines

RUN ACCUM. TOTAL STOP BAT LOW HIGH

INSTRUCTION MANUAL AND PARTS LIST FOR 3E CANNED MOTOR PUMPS

DIAPHRAGM PUMPS: Instruction Manual

US - UP3-R 12V US - UP3-R 24V

INSTRUCTION AND MAINTENANCE MANUAL

The experts in fluid technology

FPD1000-HP SERIES HIGH PRESSURE Positive Displacement Flowmeters

LM-200 MECHANICAL LUBE METER Owner s Manual

Constant Flow Valves ASAHI AV VALVES H-V019-E-6. Contents. Serial No. User s Manual

PRODUCT SERVICE MANUAL SERIES 4U AND 6U SERIES 4T AND 6T ROTOR SIZES

COMPANY. Liquid Flow Meters Installation, Operating & Maintenance Manual AW-Lake Company. All rights reserved. Doc ID:FLOWLIQUIDMETERMAN082516

Heavy duty slurry pumps

Opti Line ACG8 Screw pump Maintenance & Start up Instruction

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

1. General Description

TECHNICAL MANUAL MT064

Gerotor pump, fixed displacement volume

INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D_-187, 218, 250 and 312 SERIES PUMPS

High Accuracy Mechanical Fuel meter FM-100

INSTALLATION, OPERATION AND MAINTENANCE Threaded and Wafer Style Flowmeters

OVAL GEAR FLOWMETER ELECTRONIC MODEL 025 / 1

TR-QS Wafer-Style Turbine Flow Meters Installation, Operating & Maintenance Manual

COMPANY. Pneumatic Flow Meters Installation, Operating & Maintenance Manual AW-Lake Company. All rights reserved. Doc ID:PNEUMAN082516

Fluid-O-Tech ROTOFLOW ROTARY VANE PUMP REBUILD MANUAL

Installation & Operation Manual. IMPORTANT: This manual contains important information. READ AND KEEP FOR REFERENCE.

TECHNICAL SERVICE MANUAL GENERAL PURPOSE BRACKET MOUNTED PUMPS SERIES 115 MODELS G, GX2, H and HX4

MidFlow _ 135. Sliding Vane Meters DN (1-2 ) Model PT / Fuel Oil Flowmeters135. Product Bulletin

Model 1100 Turbine Flow Meter

BUTTERFLY VALVE WITH WELDED ENDS INSTALLATION AND MAINTENANCE MANUAL

Repair Manual. General Pump is a member of the Interpump Group. Ref Rev.A 09-13

HM860 FLOWMETER OPERATOR S MANUAL DO NOT USE OR OPERATE THIS EQUIPMENT UNTIL THIS MANUAL HAS BEEN READ AND THOROUGHLY UNDERSTOOD

EZ-IN Series Turbine Flowmeter

Butterfly Valve Type 58 (PDCPD)

INSTRUCTION MANUAL AND PARTS LIST FOR 3SIC AND 4SIC SERIES PUMPS

INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D-275 SERIES PUMPS (Idler Cup and Hydrostatic Thrust Designs)

For any information please contact: ASCO Pompe srl Control Division Tel.: (+39 02) (switchboard) Fax: (+39 02)

MX06 - MX100 OVAL GEAR FLOWMETER SERIES APPROVED FOR USE IN HAZARDOUS AREAS

HORIZONTAL INCLINOMETER PROBE. User Manual

Maintenance Information

Maintenance Information

DISC BRAKE/DUAL MASTER CYLINDER CONVERSION. Tools, Equipment and Supplies Needed:

Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

FLOWMETER (SMALL CAPACITY) METER SIZE 80, 81

4. LUBRICATION SYSTEM

Positive displacement flowmeter for continuous flow measurement

KE-M02 configuration Configuratie documentatie documentation KE-M02

Sachs shock manual. ( ) 2 & 4 Stroke RR Enduro. ( ) RS Dual Sport

Maintenance Information

OWNER S TECHNICAL MANUAL

Maintenance Information

1. General Description

INSTRUCTION MANUAL MN7 series

LABORATORY MICROMOTOR HP35 ON-OFF

POMPE AUTOADESCANTI SELF-PRIMING ELECTRO PUMP ACM DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR MULTISTAGE SELF-PRIMING PUMPS

MODEL 1100 TURBINE FLOW METER

INSTALLATION/OPERATION/MAINTENANCE INSTRUCTIONS FOR ARCHON MODELS WD2010L, WD2010, WD2010H WASHDOWN STATIONS. ARCHON Industries, Inc.

OVAL GEAR METERS MANUAL

Service Manual #67. Installation and Service Instructions 6000, 7000 & 8000 Series Magnetically Coupled Pumps

Instruction Manual RZ POSITIVE DISPLACEMENT FLOWMETERS 2AU

Maintenance Information

TECHNICAL SERVICE MANUAL GENERAL PURPOSE JACKETED PUMPS SERIES 230 MODELS HX4, KK, LQ, Q, M, N

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL RBK FRP FAN

This manual presents installation, servicing, troubleshooting, and maintenance for M PUMPS CM MAG-M SERIES Information that may be required regarding

Transcription:

Page n 1 of 23 MASTER METER MOD. (HORIZONTAL VERSION) 110-112 INSTALLATION OPERATION AND MAINTENANCE PETROL INSTRUMENTS S.r.l. - 04011 APRILIA (LT) - ITALY

Page n 2 of 23 INSTALLATION OPERATION AND MAINTENANCE MANUAL ED. 03 REV. 06 P.O. No. Mod. Ser. No. C. 2001 Petrol Instruments S.r.l. - Via della Tecnica, 5-04011 Aprilia - Latina It is forbidden any reproduction of this document, even partial, without a previous written approval by Petrol Instruments S.r.l. Petrol Instruments S.r.l. has the right to make all the necessary changes to this documents without any advance notice.

Page n 3 of 23 1. General 4 2. Construction 5 3. Application Limits 6 4. Installation Instruction 7 5. Start-up and Operating Instructions 10 6. Failures Analysis 11 7. Inspection Procedures 12 8. Inner Housing Ass y Maintenance 13 9. Spare Parts 16 10. Storage 17 11. Troubleshooting table 18 12. Drawings 20 A. Spare Parts List 22

Page n 4 of 23 1 General The PETROL Master Meter is a very reliable and repeatable flow meter giving reproducible results, to be used to prove another meters as alternative to tank provers of special capacity "PETROL" Master Meter is instruments capable of measuring the volume of flowing liquids with a standard accuracy of ± 0,1% of reading. PETROL Master Meter must not be mechanically compensated for gravity or temperature, its readout must indicate units of volume without corrections and must have a direct output from the measuring element to the pulse generator or the register. PETROL Master Meter will be supplied complete with sealing to prevent unauthorized adjustment. PETROL Master Meter calibration certificate has to be renewed every 100 calibration and in any case every 2 years. This manual has been prepared for people responsable of their installation and, at the same time, for people responsable of their maintenance and service. INVOLVED PERSONNEL ARE KINDLY REQUESTED TO READ THROUGHLY THE PRESCRIPTIONS CONTAINED IN THIS MANUAL, SPECIALLY THOSE RELEVANT TO MASTER METER INSTALLATION BEFORE THEIR START-UP.

Page n 5 of 23 2 Construction Master Meters are mainly composed of the measuring unit ass'y and of the indicator unit (see dwg.1). The indicator unit, available in different models, is that required for the specific application. The measuring unit ass'y is composed of three main sub-ass'y, namely: the outer housing; the inner housing ass'y; the coupling ass'y. The outer housing is the part that withstands the liquid pressure and its construction is in accordance to max. expected pressure of flowing liquid. The inner housing ass'y is the part through which the flowing liquid volume is accurately metered through the revolutions of the rotors. (roots type mechanism). The coupling ass'y is the part through which the number of rotors revolutions is transmitted to the indicator unit where are displayed the volumes metered.

Page n 6 of 23 3 Application Limits Master Meter must be used only within the limits specified in the name-plate, i.e. only for the liquid, the flowrate, the temperature, the max pressure and the viscosity specified in the name-plate (see dwg. 1) and in the relevant certificate. If it is in portable service, it should be protected against damage during transportation, installation and handling. IT IS THEREFORE REQUESTED TO ACCURATELY CHECK THE NAME-PLATE BEFORE FLOWMETER START-UP.

Page n 7 of 23 4 Installation Instruction PRECAUTIONS The majority of Master Meters failures are caused by infiltration of solid particles from the outer housing flanges during "inoperative conditions". It is therefore very important: to remove the flanges protections only immediately before the instrument installation; to absolutely prevent the entering of solid particles into the measuring unit ass'y during installation. INSTRUCTIONS 1. During Master Meter installation avoid that deformation and/or stresses are induced into the outer housing from the connecting pipes. IF THE PD FLOWMETER IS EQUIPPED WITH ANCHORING PLATES, BOLT THEM STRONGLY TO AVOID VIBRATIONS. 2. Check that actual flow direction is the same indicated by the arrow on the flowmeter outer housing and/or in accordance to the "in" and "out" name-plates attached to the inlet and outlet flanges of the flowmeter. 3. The Master Meter must be mounted with the rotor shafts in horizontal position and the counter dial must be in a vertical position (see dwg. 1a). In any case, on the glass of the counter is gluded a label which clearly show the correct mounting position of the Master Meter. In case the counter dial is required to be positioned horizontally or inclinated at 45, the Master Meter will be equipped with a proper 90 or 45 angle adaptor.

Page n 8 of 23 INSTALLATION ON HORIZONTAL PIPES dwg.1a 4. It is recommended to provide enough space on the rear side of Master Meter (i.e. on the opposite side of the reading unit) for rear-cover removal as well as for inner housing assembly removal. 5. The same accessories that are connected when the Petrol Instruments Master Meter is proved must be connected when it is used to prove another meter.

Page n 9 of 23 dwg.2 - Installation Examples

Page n 10 of 23 5 Start-up and Operating Instruction 1. To start-up Master Meter open first the inlet valve and then open slowly the outlet valve. AVOID TOO HIGH FLOW RATES AS WELL AS TOO SHORT OPENING AND/OR CLOSING CYCLES.

Page n 11 of 23 6 Failure Analysis Failures of the Master Meter reading unit may be caused by: 1. Solid particles inside the inner housing ass'y; 2. Rotors interference due to excessive wear of bearings and of timing gears; 3. Failure of coupling ass'y due to excessive wear of fork-type coupling. 4. Failure of reading unit. In case of Master Meter reading unit failure it is necessary to inspect the instrument following step by step the maintenance procedures, replacing, where needed, damaged parts with new parts.

Page n 12 of 23 7 Inspection Procedures To check the inner housing ass'y it is at first necessary to control whether the rotation of timing gears is regular or not. It is therefore necessary to remove the front cover of PD flowmeter outer housing (see dwg. 1) un-screwing the relevant fixing bolts and nuts. The front cover of the outer housing may be removed together with the counter unit. During such an operation particular care must be used to avoid any damage of the "fork type" coupling system existing between the inner housing ass'y and counter unit itself. Once removed the front cover, the timing gears of the inner housing ass'y may be inspected and their rotation may be checked by hands or with an adeguate wrench. Should the rotors rotation be normal or uniform it is necessary to check the movement transmission system between inner housing ass'y and counter unit. The transmission system components are integrally mounted with the front cover and in the actual situation may be easily inspected without particular instructions. Should the rotors rotation be not normal or uniform it is necessary to pull-out the inner housing ass'y from the outer housing to proceed to relevant inspection and maintenance.

Page n 13 of 23 Inner Housing Ass y Maintenance 8 The inner housing ass'y is shown in dwg. 2 as an ass'y and in dwg. 6 as exploded view. The numbers printed in the two (2) above mentioned drawings, are those identifying the components listed in the legenda of drawing 6. To disassembly the rotors it is recommended to proceed in the following way. 1. remove the front cover (50), side timing gears, taking-out the relevant fixing screws (66). 2. remove the shaped rotors plate (48) taking-out the relevant fixing screws (64). 3. mark the relative position of timing gears by making a recognizing sign on them. Such marking is necessary for the correct re-assembly of rotors. 4. pull-out the rotors from inner housing ass'y, using the timing gears as pullers.

Page n 14 of 23 8 Inner Housing Ass y Maintenance Once rotors have been removed the actual conditions of the rotors themselves and the wear conditions of the timing gears and of the bearings may be properly evaluated. It is just the case to mention that the rear cover is disassembled following the same procedures mentioned under item 1). TIMING GEARS The purpose of timing gears is to synchronize the rotors and their relative position is established by the centering pins (34). Should timing gears be replaced, it is recommended to use particular care in the re-positioning of the new gears. The timing gears are removed by unscrewing the relevant fixing screws (37). BEARINGS Should be necessary to replace the bearings (22, 59), those must be removed from relevant covers together with the bearing holders (23, 60). To facilitate such an operation it is recommended to mount a screw on the threaded holes of the bearing holders and to use them to remove the system bearing/bearing-holder. Inner housing unit re-assembly procedures are just the reverse of rotors disassembling procedures above mentioned. However the utmost care and attention must be placed to the following points.

Page n 15 of 23 Inner Housing Ass y Maintenance 1) check that the "clearances", i.e., the distance between the rotors and the distance between the rotors and the inner unit body are uniform; 2) check that rotor position is that corresponding to the recognizing marks previously made on the timing gears. The PD flowmeter re-assembly procedures are just the reverse of disassembly procedures above mentioned for inner unit ass'y check. The utmost care must however be placed in re-mounting the front cover to avoid damages to the "fork type" coupling (43, 44, 45) between inner unit ass'y and counter. 8

Page n 16 of 23 9 Spare Parts To order spare parts make reference to the attached exploded-view drawing. When placing the order please specify: a) flowmeter model, printed on name-plate (see dwg. 1) b) flowmeter serial number, printed on name-plate (see dwg. 1) c) item number and description of parts as specified in the attached exploded-view drawing

Page n 17 of 23 10 Storage Master Meter are normally supplied packed inside wooden cases that may be easily handled without damaging the instruments. For cases handling all types of motor machinery and/or hand machinery generally available at storage houses may be used. It is however recommended to avoid the superimposing of cases except in case of equal dimensions and similar gross weight. No special precautions have to be taken for short periods of storage. It is however recommended that cases are possibly stored in a closed warehouse and anyway not left in open areas exposed to rain, sand and wind. In case of long periods of storage, cases must be stored in a closed warehouse. In addition, Master Meter maintenance procedures must be strictly followed immediately after equipment unpacking and/or immediately before their installation and/or start-up. It is in any case imperative that at least the measuring unit is removed from the outher housing and duly checked according to its specific maintenance procedures, before PD flowmeter start-up.

Page n 18 of 23 11 Troubleshooting Table FAILURES FOR PD FLOWMETERS WITH MECHANICAL COUNTER FAILURE CAUSE SOLUTION Check the correct operation Mechanical counter failure of the mechanical counter Connection between Check the correct operation magnetic transmission of the reduction gear and mechanical counter assembly The liquid flows regularly but the PD flowmeter does not count The liquid does not flow through the PD flowmeter The liquid leaks from the junction between the front cover and / or rear and the body Lack of accuracy Connection between PD flowmeter and reduction gear assembly Rotors failure Foreign bodies stuck between the surfaces of the rotors Timing gears blocked Strainer clogged O-ring damaged; cover screws not properly screwed Bushings and / or timing gears worn Check the correct operation of the magnetic transmission Disassemble and inspect the rotors Remove foreign bodies and restore the surface of the rotors. Check the correct operation of the timing gears Clean the strainer Replace the O-ring and tighten the screws of the covers Replace the bushings and / or timing gears

Page n 19 of 23 FAILURES FOR PD FLOWMETERS WITH ELECTRONIC COUNTER FAILURE CAUSE SOLUTION Electronic counter failure Check the correct operation of the mechanical counter Connection between Check the correct operation magnetic transmission of the pulse transmistter and mechanical counter The liquid flows regularly but the PD flowmeter does not count The liquid does not flow through the PD flowmeter The liquid leaks from the junction between the front cover and / or rear and the body Lack of accuracy Connection between PD flowmeter and reduction gear assembly Rotors failure Foreign bodies stuck between the surfaces of the rotors Timing gears blocked Strainer clogged O-ring damaged; cover screws not properly screwed Bushings and / or timing gears worn Check the correct operation of the magnetic transmission Disassemble and inspect the rotors Remove foreign bodies and restore the surface of the rotors. Check the correct operation of the timing gears Clean the strainer Replace the O-ring and tighten the screws of the covers Replace the bushings and / or timing gears

Page n 20 of 23 12 Drawings Drawing n.1

Page n 21 of 23 50 60 59 48 62 Drawing n.2

Page n 22 of 23 A Spare Parts List models 110-112

Page n 23 of 23