Notice of proposed amendment to Service Charges for Regulatory Year ending 31 March 2019

Similar documents
Charging Statement for Service Charges

Indicative Gas Transportation Charges from 1 April 2012 for East of England, London, North West and West Midlands Distribution Networks

UK Power Networks Use of System Charging Methodology

PURCHASED GAS ADJUSTMENT RIDER SCHEDULE

Introduction to Charging: Which Parties Pay Which Charges?

Aaren Healy, 20 September 2017 / 1

Charging Statement. Charges effective from 1st April / 17

Transportation Charging Statement

City Transfer Stations: Loading Services and Fees

Direct Energy Regulated Services

Chief Operating Officer. Nigel Bell, Energy Resource Manager

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

For personal use only

Distribution Charging Update

THE PUBLIC UTILITIES BOARD ACT April 22, Graham F. J. Lane, C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B.

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS

FUEL ADJUSTMENT CLAUSE

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017

MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER 2018

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

CMP266 Removal of Demand TNUoS charging as a barrier to future elective Half Hourly settlement

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

CMP294: National Grid Legal Separation changes to CUSC Section 14. CUSC Modification Proposal Form

ROMPCO 120 ( GTA1 ) 2013 (2013 Q2)

MEMORANDUM. TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit. Date: May 24, Summary

Charging Delivery Body. 29 th January 2018

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Southern Electric Power Distribution plc. Metering and Data Services Statement. Effective from 1st April Version 1.0

TORONTO TRANSIT COMMISSION REPORT NO.

Type Acceptance Report

Statement of Expected Price Trends

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Monthly Economic Letter

August 18, 2016 NWN OPUC Advice No A / UG 309 SUPPLEMENT A (UM 1766)

CLS Bank Protocol for FX. Overview

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

MONTHLY NEW RESIDENTIAL CONSTRUCTION, FEBRUARY 2017

MONTHLY NEW RESIDENTIAL CONSTRUCTION, APRIL 2017

MONTHLY NEW RESIDENTIAL CONSTRUCTION, JULY 2017

UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2012 (ADVANCE ESTIMATE)

2017 / 18 Charging Statement

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

November 2017 Customer Switching Report for the Electricity and Gas Retail Markets

CRYPTOCURRENCY MORATORIUM SMALL MINER RATE IMPACT. September 4, 2018

Audit Follow-up. Fleet Fuel Operations (Report #0801, Issued October 18, 2007) As of March 31, Summary. Report #0811 June 20, 2008

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

12042/16 MGT/NC/ra DGE 2

Consolidated Edison Company of New York, Inc.

Group 3: Pricing from 1 April 2018 and load management

National Electric Power Regulatory Authority Islamic Republic of Pakistan

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305

MONTHLY NEW RESIDENTIAL SALES, AUGUST 2017

QUARTERLY REVIEW OF BUSINESS CONDITIONS: NEW MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 2 ND QUARTER 2017

Application of claw-back

In the following letter I would like to share with you the developments we reached in the referred subjects.

COMMISSION REGULATION (EU) No /.. of XXX

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

MONTHLY NEW RESIDENTIAL CONSTRUCTION, NOVEMBER 2017

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM

Director of Finance & Administrative Services

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS

Energetics Gas Limited Metering Charges Statement. From 1 st May Page 1 of 8 Energetics Gas Metering Charges

MONTHLY NEW RESIDENTIAL CONSTRUCTION, AUGUST 2017

GC108: EU Code: Emergency & Restoration: Black start testing requirement

A detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites /

University of Alberta

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

Valvoline Fourth-Quarter Fiscal 2016 Earnings Conference Call. November 9, 2016

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

BIENNIAL REPORT REGARDING FUEL AND FUEL-RELATED CHARGE ADJUSTMENT PROCEEDINGS FOR ELECTRIC UTILITIES. REQUIRED PURSUANT TO G.S

Gross Domestic Product: Third Quarter 2016 (Advance Estimate)

MYPD3 tariff restructuring plan use-of-system charges. Brochure

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Permit Holder. Permitted Equipment

Cost Reflective Tariffs

TRANSPACIFIC CUSTOMER ADVISORY Implementation of New BAF Formula Effective January 01, 2019

What exactly are next-generation meters?

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

AURORA ENERGY LTD NOTIFICATION OF ELECTRICITY DELIVERY PRICES

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

September 21, Advice No , NEW Schedule 50 Retail Electric Vehicle Charging Rates

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

Transcription:

Jacqui Russell Ofgem 10 South Colonnade Canary Wharf London, E14 4PU Ibex House 2 nd Floor 42-47 Minories London EC3N 1DY cc. SEC Parties 8 June 2018 Dear Jacqui, Notice of proposed amendment to Service Charges for Regulatory Year ending 31 March 2019 Summary In accordance with Condition 19.9(a) and 19.11 of the Licence 1 DCC (Smart DCC Ltd) hereby gives Notice to the Authority of an amendment to DCC Service Charges for RY (Regulatory Year) ending 31 March 2019. We propose that the amended Charging Statement comes into effect on 8 September 2018. This results in a total Notice period of three months. This Notice reflects the following changes to the Charging Statement for RY2018/19: 1. Introduction of new DBCH 2 charges 2. Introduction of new Communications Hub Fixed Revenue category and corresponding changes to Fixed Charges 3. Removal of regional differentiation of charges for Non-Domestic Premises 4. Breakdown of explicit charges for Test Communications Hubs (dual band and instrumented). 1 Smart Meter Communication Licence 2 Dual Band Communications Hubs Page 1 of 6

Changes 1, 2 and 3 reflect the changes made by BEIS to the Charging Methodology (Section K of the SEC 3 ) which came into effect on 31 May 2018 (SEC v5.16) 4. These changes are set out in the draft revised Charging Statement for RY2018/19 (Issue 1.1, see enclosed), which we provide to the Authority as part of this Notice and in accordance with Condition 19.13 of the Licence. Background We set charges for one year at a time, and these are usually refreshed in April each year. The Charging Statement currently in effect for RY2018/19 was published on 29 March 2018 5, which reflects the Charging Methodology 6 in effect at that time. In 2017, BEIS consulted on three key changes to the charging methodology (Sections K of the SEC). BEIS concluded on these proposals on 27 March 2018, at which time they were laid in parliament before they took effect on 31 May 2018. These SEC changes result in an in-year amendment to the Charging Statement. We are also now including an indicative breakdown of Explicit Charges relating to Test Communications Hubs for both dual band and instrumented. Charging Statement amendments We are proposing to implement all three changes in a single in-year amendment to the RY18/19 Charging Statement. A summary of the changes to the Charging Methodology and the resulting impact on the Charging Statement is set out in Table 1 in Appendix A. The key factor that has led us to conclude that an additional amendment is necessary is that Section K of the SEC was been amended by BEIS and formally came into effect on 31 May 2018. The reason we could not take account of the above, when giving Notice in December 2017, to implement the annual refresh of charges, is because that Notice was given before the changes to the SEC had taken effect. In addition, we are providing further clarity on Explicit Charges for Test Communications Hubs, which was not available to us in December 2017 7. We set out further detail on the three key changes below. 1.1.1 DBCH Charges In this revised issue of the Charging Statement we are including the new Fixed DBCH Charge as required under Section K6A of the SEC. This will be charged per 3 SEC - Smart Energy Code 4 SECAS, 31 May 2018, SEC 5.16 : https://smartenergycodecompany.co.uk/download/6810 5 DCC, 29 March 2018, Charging Statement RY1819 Issue 1.0 : https://www.smartdcc.co.uk/media/454705/charging_statement_ry1819_-_issue_1.0 final_.pdf 6 DCC, 28 September 2016, Charging Methodology-Issue 4.0 : https://www.smartdcc.co.uk/media/405466/2016_08_18_sec-4-15-section-k---charging-methodology.pdf 7 Under Licence condition 19.11 (a) DCC must state the factors that have led it to conclude that an additional amendment is necessary, explaining in particular why it did not (or could not) take account of those factors when giving Notice under paragraph 19.9 with respect to the immediately preceding amendment of Service Charges. Page 2 of 6

Enrolled Smart Metering System similar to the Fixed SBCH 8 Charge. For each Enrolled Smart Metering System, customers will pay either a SBCH or a DBCH charge, not both. The new Fixed DBCH Charges for RY2018/19 are set out in Table 3 of the draft revised Charging Statement for RY2018/19 (Issue 1.1, see enclosed). In July 2017, we stated that DBCH units would cost approximately 16-18 more than a SBCH unit (excluding finance costs and indexation), which is still the case for RY18/19. However, over time this difference increases because the SBCH unit cost will decrease more than DBCH as unit prices vary from year to year due to volumes discounts and financing periods coming to an end earlier than DBCH. There may also be additional Fixed DBCH Charge volatility reflecting potential exchange rate fluctuation, the premium for which was removed by the CSP as we considered it to be more economic and efficient for that risk to be borne by customers. Appendix B sets out the whole life unit costs for both SBCH and DBCH. We will shortly be publishing the indicative Fixed DBCH Charge for RY2019/20 in the July 2018 issue of the indicative Charging Statement, which will provide the forecasted Fixed DBCH Charge for next year. 1.1.2 CH Fixed Revenue The recent changes to the SEC now require DCC to publish a new sub-category of External Costs that relate to CH fixed costs i.e. not unit costs. It also amends the Fixed Charge methodology such that the CH Fixed Revenue is recovered from Charging Groups 1, 2 and 3 only. This change does not adjust the total DCC costs for RY2018/19. On a like for like 9 basis, the net effect of this change is: an increase to the Fixed Charges for Import Suppliers (Charging Group 1) of 0.002 no change to the Fixed Charges for Import Suppliers (Charging Group 2) an increase to the Fixed Charges for Gas Suppliers (Charging Group 3) of 0.002 an decrease to the Fixed Charges for Electricity Distributors (Charging Group 4) of 0.004 no change to the Fixed Charges for Import Suppliers (Charging Group 5). The updated Fixed Charges are set out in Table 1 of the draft revised Charging Statement for RY2018/19 (Issue 1.1, see enclosed). 8 Single Band Communications Hub 9 When comparing against the original RY18/19 Fixed Charges after removing the regional differentiation Page 3 of 6

1.1.3 Removal of regional prices The final change is the removal of the requirement to set the Fixed Charge and Fixed CH Charge for Non-Domestic Premises by Region. The charges for Domestic and Non-Domestic Premises will now be identical. This change is shown in Table 1 and 3 of the draft revised Charging Statement for RY2018/19 (Issue 1.1, see enclosed). 1.1.4 Test communications Hubs (dual band and instrumented) In an effort to be more transparent, we are now setting out the indicative Explicit Charges for different types of Test Communications Hubs for both dual band and instrumented units. The draft revised Charging Statement for RY2018/19 (Issue 1.1, see enclosed) now includes indicative Explicit Charges for: Dual Band Test Communications Hubs (DB TCH) Single Band Instrumented Test Communications Hubs (SB ITCH) Dual Band Instrumented Test Communications Hubs (DB ITCH). Next steps The draft revised Charging Statement for RY2018/19 (Issue 1.1) is enclosed with this letter and will take effect on 8 September 2018. As we charge in arrears this means that customers will see the revised charges take effect from the invoices issued from 3 October 2018 onwards. A copy of this Notice will be shared with SEC Parties, pursuant to Licence Condition 19.9(b) and it will also be available to download from the DCC website. If you have any questions on any part of this Notice or the enclosed draft revised Charging Statement please contact finance@smartdcc.co.uk. Yours sincerely, Ekta Sareen, Pricing and Insight Manager, DCC Enclosures: Charging Statement RY1819-Issue 1.1 (DRAFT FOR NOTICE).pdf Page 4 of 6

Appendix A: Summary of Charging Statement changes Table 1 below sets out a summary of the changes to the Charging Statement. Place in document Table 1 Monthly Fixed Charges by Charging Group for RY2018/19 applicable from September 2018 onwards Table 3 Monthly Fixed CH Charges by Charging Group for RY2018/19 from September 2018 onwards Table 4 Set Explicit Charges for RY2018/19 Table 5 Indicative Explicit Charges applicable in RY2018/19 Table 6 Explicit Charges yet to be determined Change Removal of regionally differentiated charges for Non-Domestic Premises Small increase in Fixed Charges for Charging Groups 1, 2 and 3 Small decrease in Fixed Charges for Charging Group 5 Removal of regionally differentiated charges for Non-Domestic Premises Introduction of new Fixed CH Charge for DBCH Introduction of new CH stock level charge (DBCH) Introduction of CH returned and redeployed charge (DBCH) Introduction of CH returned not redeployed charge (DBCH) Test Communications Hubs (TCH) indicative charge is now broken down by the following categories: Single Band Test Communications Hubs (SB TCH) Dual Band Test Communications Hubs (DB TCH) Single Band instrumented Test Communications Hubs (SB ITCH) Dual Band instrumented Test Communications Hubs (DB ITCH) Removal of CH Variant Charge Inclusion of category: Total Communications Hubs Fixed Revenue Table 7 Estimated Allowed Revenue for RY2018/19 Renaming of Communications Hub Revenue to Communications Hub Device Revenue Inclusion of new sub-totals for further clarity Inclusion of category: Regional Communications Hubs Fixed Revenue Table 8 Estimated Fixed Revenue for RY2018/19 Renaming of Communications Hub Revenue to Communications Hub Device Revenue Inclusion of DBCH revenue Inclusion of new sub-totals for further clarity Inclusion of category: Total Regional Communications Hubs Fixed Revenue Table 9 Estimated Fixed Revenue by category for RY2018/19 Renaming of Communications Hub Revenue to Communications Hub Device Revenue Inclusion of DBCH revenue Inclusion of new sub-totals for further clarity Appendix D Worked examples Revised worked examples to reflect changes to charges (see above) Table 1 Summary of Charging Statement amendments Page 5 of 6

Appendix B: Communications Hubs whole life unit costs Tables 2 and 3 set out the whole life unit costs for both SBCH and DBCHs for each year of the DCC Licence. Both include our current assumptions on rollout volume and assume a constant GBP:USD exchange rate. Table 2 below sets out the whole life unit costs for both SBCH and DBCHs, excluding indexation and financing. 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 SBCH /unit 37 35 32 31 30 30 30 30 30 DBCH /unit 53 53 53 52 51 51 51 51 51 Difference 16 18 21 21 21 21 21 21 21 Table 2 CH whole life unit costs excluding indexation and financing Table 3 below sets out the whole life unit costs for both SBCH and DBCHs, including indexation and financing. 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 SBCH /unit 51 47 43 41 40 40 39 39 38 DBCH /unit 72 71 70 68 67 66 66 65 65 Difference 21 24 27 27 27 26 27 26 27 Table 3 CH whole life unit costs including indexation and financing Page 6 of 6