WAYNE COUNTY CAPITAL PLAN SUMMARY

Similar documents
COUNTY OF MONTGOMERY CAPITAL PLAN 2012 CAPITAL FUND BUDGET. Adopted April 19, 2012

Township of Scugog 2017 Capital Budget; Capital Projects for Consideration in Future Budgets

2015 Capital Improvement Plan

CITY OF BELLEVILLE 2017 Capital Budget

2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description

WAYNE COUNTY HIGHWAY DEPARTMENT 2012 ANNUAL REPORT

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

Fixed Asset Allocations by Budget Unit for FY

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

2019 CAPITAL BUDGET HIGH LEVEL RECAP

CAPITAL IMPROVEMENT PROGRAM COMMITTEE RECOMMENDATION

Organization Name Location Unit No. Career Field Rochester Pet Sitting Monroe County Post 444 Animal Careers Lollypop Farm Fairport Post 99 Animal

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000.

Total $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

OHIO DEPARTMENT OF TRANSPORTATION RURAL PUBLIC TRANSIT ARRA PROJECTS BY ODOT DISTRICT

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020

HENRY COUNTY GOVERNMENT CAPITAL IMPROVEMENT PLAN DISCUSSION

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

Port of Grays Harbor Capital Improvement Plan

2013 Capital Budget Capital Improvement Program

Capital Improvement Plan

Capital Improvement Plan

Claremont Capital Improvement Program Summary Matrix

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

2016 DECISION PACKAGES

BOE Facilities Capital Project Priority List FY 17/18 Fut. Yr. Total Proj. Overall Amount Amount Project Priority Priority

Presented to Council November 7, :30 p.m. More images

Delaware County Engineer s Office

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

FREQUENTLY ASKED QUESTIONS

Burlington Capital Improvement Plan: FY FY 2023

CTA Capital Construction Update May 17, 2007

ROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN

Village of Bensenville CY2017 Community Investment Plan

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets.

BOE Facilities Capital Project Priority List

Infrastructure Capital Improvement Plan (ICIP)

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS

ROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN

East Allen County Schools Facilities History Calendar Years October 5, 2015

FREQUENTLY ASKED QUESTIONS

Informational Pre-Budget and CIP Council Workshop

FOR SALE OR LEASE EBERHARDT & BARRY INC.

CAPITAL IMPROVEMENT PROGRAM

Caldwell County, North Carolina Capital Improvement Plan BUILDING A BETTER FUTURE FOR THE CITIZENS OF CALDWELL COUNTY

Capital Improvement Plan Review

NORTHERN INDIANA COMMUTER TRANSPORTATION DISTRICT TIP - FINAL - DECEMBER

MILES. Penfield Town Hall Lot, Off Jackson Rd, just North of Rt 286 A M

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

CAPITAL IMPROVEMENT PLAN FISCAL YEARS

TOWNSHIP OF UPPER ST. CLAIR PROPOSED CAPITAL IMPROVEMENT PROGRAM

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

February 17, 2015 File:

CITY OF EDEN PRAIRIE CAPITAL IMPROVEMENT PLAN

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:

2040 Metropolitan Transportation Plan -- Table XVII-1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

PUBLIC FACILITIES DIRECTORY

Summary of Approved Funding Sources

EMERGING REQUIREMENTS

Recommended Transportation. Capital Improvement Program

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

Capital Improvement Program (CIP) Fiscal Years 2017/ /2021

FY-15 FY-16 FY-17 CIP - CATEGORY/DESCRIPTION

City of Grand Forks Staff Report

NO. 11 Page 1. May 24, 2018 WEB SITE

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish

REMINISCING ABOUT WELLAND. Courtesy of the. City of Welland Heritage Advisory Committee. and the. Welland Historical Museum

Appendix C: Project Tables and Maps by PennDOT District

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SCHEDULE OF CAPITAL PROJECTS BY FUND

Middle Georgia Regional Investment List

GENERAL GOVERNMENT ~ Municipal Buildings

CITY OF NORWALK, CONNECTICUT

Highlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024

HURON COUNTY ENGINEER S OFFICE

INCORPORATED VILLAGE OF ROCKVILLE CENTRE ADOPTED BUDGET

PARTIAL PROGRAM OF PROJECTS FFY

Business Advisory Committee. July 7, 2015

NEW HAVEN HARTFORD SPRINGFIELD RAIL PROGRAM

Metropolitan Council Metro Transit Project Description Budget Year

Watauga County Schools Capital Improvement Plan 2015

COUNTY ROAD FUND ESTIMATED ENDING UNRESERVED FUND BALANCE 2,132, ESTIMATED ENDING RESERVED FUND BALANCE 0

Supplementary Estimates

2018/9 Capital Improvement Plan Building on our strong foundation

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

AMHERST ISLAND WIND ENERGY PROJECT - RENEWABLE ENERGY APPROVAL AMENDMENT MODIFICATION REPORT #4. Appendix A: Figures

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

TABLE OF CONTENTS SPEED LIMITS ORDINANCE WOOD COUNTY ORDINANCE # Chapter PURPOSE

Transcription:

WAYNE COUNTY CAPITAL PLAN SUMMARY 2019-2023 7/10/2018 TOTAL PROJECT TOTAL NON-LOCAL TOTAL COUNTY COUNTY DEPARTMENT COSTS FUNDING COSTS Buildings and Grounds 7,065,000 0 7,065,000 Highway (Equipment) 395,000 0 395,000 Highway (Roads) 4,405,000 4,405,000 0 Information Technology 500,000 0 500,000 Emerg Mgt Communications 739,450 466,325 273,125 Nursing Home 200,000 0 200,000 2019 TOTALS 13,304,450 4,871,325 8,433,125 Buildings and Grounds 1,200,000 0 1,200,000 Highway (Equipment) 425,000 0 425,000 Highway (Roads) 4,455,000 4,455,000 0 Emerg Mgt Communications 486,250 486,250 0 E911 170,000 170,000 0 Nursing Home 285,000 0 285,000 2020 TOTALS 7,021,250 5,111,250 1,910,000 Buildings and Grounds 2,200,000 0 2,200,000 Highway (Equipment) 410,000 0 410,000 Highway (Roads) 4,600,000 4,600,000 0 Emergency Mgt Office 299,000 299,000 0 Emerg Mgt Communications 500,000 500,000 0 E911 110,000 110,000 0 Mutual Aid 200,000 0 200,000 Nursing Home 100,000 0 100,000 2021 TOTALS 8,419,000 5,509,000 2,910,000 Buildings and Grounds 1,150,000 0 1,150,000 Highway (Equipment) 400,000 0 400,000 Highway (Roads) 4,800,000 4,800,000 0 Emerg Mgt Communications 374,250 374,250 0 E911 170,000 170,000 0 Mutual Aid 100,000 0 100,000 Nursing Home 200,000 0 200,000 2022 TOTALS 7,194,250 5,344,250 1,850,000 Buildings and Grounds 600,000 0 600,000 Highway (Equipment) 370,000 0 370,000 Highway (Roads) 4,500,000 4,500,000 0 Nursing Home 200,000 0 200,000 2023 TOTALS 5,670,000 4,500,000 1,170,000 Buildings and Grounds 12,215,000 0 12,215,000 Highway (Equipment) 2,000,000 0 2,000,000 Highway (Roads) 22,760,000 22,760,000 0 Information Technology 500,000 0 500,000 Emergency Mgt Office 299,000 299,000 0 Emerg Mgt Communications 2,099,950 1,826,825 273,125 E911 450,000 450,000 0 Mutual Aid 300,000 0 300,000 Nursing Home 985,000 0 985,000 County Clerk 0 0 0 Planning 0 0 0 Public Safety 0 0 0 GRAND TOTALS 41,608,950 25,335,825 16,273,125

BUILDINGS AND GROUNDS County Courthouse (26 Church St) Window Replacement 300,000 300,000 Elevator Replacement 350,000 350,000 Interior Improvements 250,000 250,000 County Museum (21 Butternut St) Roof Replacement 250,000 250,000 County Clerk/DMV (3 Pearl St) Generator Installation 150,000 150,000 Building Renovation 1,550,000 200,000 1,350,000 County Jail K-Building Replacement Concept/Design 350,000 350,000 County Office Building #4 (16 William St) Building Renovation & Roof Replacement 6,400,000 6,400,000 Hall of Justice Generator Installation 250,000 250,000 HVAC Replacement (25yrs) 850,000 850,000 Social Services Generator Installation 250,000 250,000 Fire Training Building Building Expansion for Equipment Storage 140,000 140,000 Building & Grounds and Highway Sewer Screening Plant Generator 125,000 125,000 Roofs at Wallington & Macedon Barn 500,000 250,000 250,000 County Parks Multiple Locations Driveway/Parking Lot Paving Improvements 500,000 250,000 250,000 SUBTOTAL 0 12,215,000 7,065,000 1,200,000 2,200,000 1,150,000 600,000 TOTAL COUNTY COST 12,215,000 7,065,000 1,200,000 2,200,000 1,150,000 600,000 TOTAL COST 12,215,000

HIGHWAY EQUIPMENT Tracked Excavator-50K lbs 230,000 1 230,000 Dump Truck-10 Wheel - #28 165,000 2 165,000 Vacuum Truck -#67 275,000 1 275,000 Dual Drum Roller-#50 150,000 2 150,000 Wheel Loader-#64 230,000 1 230,000 Dump Truck - 10 Wheel - #32 180,000 2 180,000 Motor Grader -#43 250,000 1 250,000 Dozer -#29 150,000 2 150,000 Rubber Tired Excavator -#44 220,000 1 220,000 Dual Drum roller - #54 150,000 2 150,000 SUBTOTAL 0 2,000,000 395,000 425,000 410,000 400,000 370,000 TOTAL COUNTY COST 2,000,000 395,000 425,000 410,000 400,000 370,000 TOTAL COST 2,000,000

HIGHWAY ROADS AND BRIDGES Capital Improvement/Purchase Locations Funding Cost Priority 2019 2020 2021 2022 2023 County House Road Project Lyons 200,000 1 200,000 Mill Street, Marion (Main Street to Smith Rd) Marion 900,000 2 900,000 Owls Nest Rd Recycle + Culverts + Paving Marion 400,000 3 400,000 Wolcott Rd Reconstruction (Hamlet of Rose) Rose 650,000 4 650,000 Furnace Road Recycle + Paving (104 to Trimble) Ontario 400,000 5 400,000 Woods Rd Bridge Williamson 200,000 6 200,000 Maple Avenue Culvert Replacement Sodus 180,000 7 180,000 Lake Road Culvert Replacement Sodus 120,000 8 120,000 Lake Road Culvert Replacement Williamson 300,000 9 300,000 Travell Knapps Corners Road Culvert Replacements Galen 300,000 10 300,000 Surface Treating (County Wide) Various 325,000 11 325,000 Guiderail Replacement Various 80,000 12 80,000 Smaller Culvert Replacements - Multiple (County Wide) Various 350,000 13 350,000 Mill Street (South Main Street to Pembroke Drive) Marion 25,000 1 25,000 Wolcott Rd Reconstruction (Hamlet of Rose) Rose 50,000 2 50,000 Walworth Road Recycle (CSX Tracks to 31) Macedon 400,000 3 400,000 Travell Knapps Corners Road Recycle + Paving Galen 300,000 4 300,000 Townline Rd Reconstruction (Ridge to 104) Williamson 600,000 5 600,000 South Centenary Rd (Main Street to Joy Road) Sodus 300,000 6 300,000 Minsteed Rd Recycle and Pave (Hydesville to Decker Rd) Arcadia 650,000 7 650,000 East Port Bay Rd Recycle + Pave (Brown Rd to North End) Wolcott 650,000 8 650,000 Culvert Replacements - Multiple Various 300,000 9 300,000 Surface Treating Various 300,000 10 300,000 Ridge Road Reconstruction (350 to Knickerbocker Rd) Ontario 800,000 11 800,000 Guiderail Replacement Various 80,000 12 80,000 South Main Street, Marion + Repave Marion 500,000 1 500,000 Marion East Williamson Recycle + Pave Skinner to Ridge) Mar & Will 600,000 2 600,000 Kenyon Rd Recycle Williamson 250,000 3 250,000 Surface Treating Various 300,000 4 300,000 Culvert Replacements - Multiple Various 300,000 5 300,000 East Port Bay Rd Recycle (Village to Brown) Wolcott 300,000 6 300,000 Mill & Paving Project - Hamlets Various 600,000 7 600,000 Guiderail Replacement Various 100,000 8 100,000 Large Culvert Project Various 350,000 9 350,000 Ridge Road Reconstruction (Furnace Rd to Arbor Rd) Ontario 600,000 10 600,000 Butler Conquest Rd Recycle Butler 400,000 11 400,000 Paving Project - Mill & Fill (Various) Various 300,000 12 300,000 Ridge Road (350 to west end of hamlet) Ontario 700,000 1 700,000 Fifth Rd (Hamlet Portion in Rose) Rose 800,000 2 800,000 Mill & Fill Contractor Paving Various 300,000 3 300,000 Guiderail Project Various 100,000 4 100,000 Townline Road reconstruction with drainage (Ridge to NY 104) Williamson 700,000 5 700,000 Gananda Parkway Paving Mac / Wal 600,000 6 600,000 Culvert Replacements - Multiple Various 300,000 7 300,000 Surface Treating Various 300,000 8 300,000 Woods Road Recycle + Pave Williamson 250,000 9 250,000 Lincoln Road Recycle & Paving Project (Plank Rd to Ridge Rd) Ontario 400,000 10 400,000 Large Culvert Project Various 350,000 11 350,000 Westbury Rd / Hogback Intersection Butler 250,000 1 250,000 Furnace Rd Reconstruction (Ridge to 104) Ontario 500,000 2 500,000 Lakes Corners Rose Valley Culvert Rose 400,000 3 400,000 Wayne Center Rose Rd Culvert Rose 400,000 4 400,000 Lake Road Recycle (Jay Street to Townline Rd) Williamson 500,000 5 500,000 Large Culvert Project Various 350,000 6 350,000 Guiderail Project Various 200,000 7 200,000 Surface Treating Various 300,000 8 300,000 Wayne Center Rose Hamlet Rose 650,000 9 650,000 South Geneva Rd & Preemption Rd Paving Project Lyo / Sod 400,000 10 400,000 Bridge Membrane & Paving - Bay Bridge Sodus 200,000 11 200,000 Ridge Road Union Hill Culverts Ontario 350,000 12 350,000 SUBTOTAL 22,760,000 0 4,405,000 4,455,000 4,600,000 4,800,000 4,500,000 SUBTOTAL NON-LOCAL REVENUE 22,760,000 4,405,000 4,455,000 4,600,000 4,800,000 4,500,000 TOTAL COUNTY COSTS 0 0 0 0 0 0 TOTAL COSTS 22,760,000

INFORMATION TECHNOLOGY County wide phone system upgrade (part 2) 500,000 500,000 SUBTOTAL 0 500,000 500,000 0 0 0 0 TOTAL COUNTY COST 500,000 500,000 0 0 0 0 TOTAL COST 500,000

Emergency Management Office Pictometry Flyover Contract (2 flyovers) (a) 299,000 1 299,000 SUBTOTAL 0 299,000 0 0 299,000 0 0 TOTAL COUNTY COST 299,000 0 0 299,000 0 0 TOTAL COST 299,000 (a) In the previous contract, Pictometry offered six years of interest free financing for the flyovers, payable annually. If itnterest free financing is offered again, the annual cost would be $124,760 for year 2021, $87,120 for year 2022; $87,120 for year 2023; $124,760 for year 2024; $87,120 for year 2025 & $87,120 for year 2026. If Pictometry again offers interest free financing, only the costs for years 2021 and 2024 will be included in the capital plan. The cost for years 2022, 2023, 2025 & 2026 will be added to the operating budget.

Emergency Communications Firegrounds Operations Channels- Voted Receive 153,200 1 153,200 Macedon Tower - Transmit 112,000 2 112,000 Wolcott Tower - Construction and Receive (a) 187,375 186,875 3 374,250 Relocate Radio System Transmitter Control (b) 13,750 86,250 4 100,000 Ontario Tower - Transmit and Receive 486,250 5 486,250 Fire Service Repeaters 230,000 6 230,000 Wolcott Tower - Transmit 112,000 7 112,000 Radio Interoperability with Monroe County 158,000 8 158,000 Radio Interoperability with Ontario, Seneca, Cayuga Counties 374,250 9 374,250 SUBTOTAL 1,826,825 273,125 739,450 486,250 500,000 374,250 0 SUBTOTAL NON-LOCAL REVENUE 1,826,825 466,325 486,250 500,000 374,250 TOTAL COUNTY COST 273,125 273,125 0 0 0 0 TOTAL COST 2,099,950 (a) Local cost of $186,875 already funded in H1934 project account (b) Partial local cost of $36,007.35 already funded in H1934 project account; $50,242.65 potential additional county contribution (b) Final county contribution (if any) will be adjusted annually as previous project work is completed, as actual costs may come in under or over budget.

E 911 Computer Aided Dispatch System Hardware Refresh - Primary and Backup 170,000 0 1 170,000 Verint Recorder System Hardware Refresh - Primary and Backup 911 Centers 110,000 0 2 110,000 Emergency CallWorks 911 Call Taking System Hardware Refresh - Primary and Backup 911 Centers 170,000 0 3 170,000 SUBTOTAL 450,000 0 0 170,000 110,000 170,000 0 SUBTOTAL NON-LOCAL REVENUE 450,000 170,000 110,000 170,000 TOTAL COUNTY COST 0 0 0 0 0 0 TOTAL COST 450,000

MUTUAL AID / FIRE COORDINATOR Mobile Cascade System (purchased 2006) (a) 200,000 1 200,000 Stationary Cascade System 100,000 2 100,000 SUBTOTAL 0 300,000 0 0 200,000 100,000 0 TOTAL COUNTY COST 300,000 0 0 200,000 100,000 0 TOTAL COST 300,000 (a) Mobile Cascade System may have residual value which is difficult to predict at this time.

NURSING HOME Replace carpeting, tile and linoleum flooring 100,000 1 100,000 Paving creating addt'l parking Paving resurfacing 110,000 2 60,000 50,000 Replace HVAC control software 200,000 4 200,000 Replace windows on North end of building 200,000 7 200,000 Replace windows on South end of building 200,000 7 200,000 Cooling Coils for Air Handlers 100,000 5 100,000 Cameras for Public Safety 40,000 3 40,000 Boiler Controls/Software 35,000 6 35,000 SUBTOTAL 0 985,000 200,000 285,000 100,000 200,000 200,000 TOTAL COUNTY COST 985,000 200,000 285,000 100,000 200,000 200,000 TOTAL COST 985,000