OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Similar documents
Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

100 MW Wind Generation Project

Feasibility Study Report

MILLIGAN SOLAR PROJECT

PSE Attachment K Puget Sound Area Transmission Meeting

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CUSTOMER/ TWIN ARROWS PROJECT

Sub Regional RTEP Committee Western Region ATSI

Feasibility Study Report

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

Interconnection System Impact Study Report Request # GI

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

15 Nelson-Marlborough Regional Plan

Feasibility Study Report

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Illinois State Report

New Mexico Transmission Expansion Concepts For Wind Resources

The Green Line Project

Supplemental Report on the NCTPC Collaborative Transmission Plan

SPS Planning Criteria and Study Methodology

DFO STATEMENT OF NEED REPORT

Reliability Analysis Update

System Impact Study Report

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Falcon-Midway 115 kv Line Uprate Project Report

Appendix D Black Hills Project Summary

Sub Regional RTEP Committee Mid-Atlantic

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

3 Existing National Grid

15 Nelson-Marlborough Regional Plan

South Dakota 890 Study

North Oregon Coast Area Study. Adam Lint

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

New Jersey State Report

Sub Regional RTEP Committee South

New 115 kv Disconnect Switches at Bloomsburg MTS

Sheffield-Highgate Export Interface SHEI. VSPC Quarterly Meeting October 18, 2017

TRANSMISSION PLANNING CRITERIA

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Q85 Generation Interconnection

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

ATTACHMENT Y STUDY REPORT

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

SERTP rd Quarter Meeting

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Project #148. Generation Interconnection System Impact Study Report

May 11, Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box Lansing, MI 48909

Western Area Power Administration Sierra Nevada Region

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Key to Status Fields in the Project List

Sub Regional RTEP Committee South

National Grid s 2017 Local Transmission Plan

ATTACHMENT - DFO STATEMENT OF NEED

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

LOCAL TRANSMISSION PLAN

Seabrook Substation Reliability Improvement Project

2013 ANNUAL PROGRESS REPORT

Sub Regional RTEP Committee Mid-Atlantic

Interconnection Feasibility Study Report GIP-222-FEAS-R3

REDACTED. Eastside Needs Assessment Report Transmission System King County. Redacted Draft. October 2013 Puget Sound Energy

Impact of Distributed Energy Resources on Transmission System Reliability

SERTP rd Quarter Meeting

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

APPENDIX E: Project Need and Description

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Status of PNM s Completed Transmission Construction Projects 11/30/2017

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Overview of ISO New England and the New England Wholesale Power Markets

Reliability Analysis Update

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. System Planning

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

ENERGY STORAGE AS AN EMERGING TOOL FOR UTILITIES TO RESOLVE GRID CONSTRAINTS. June 18, 2015 E2Tech Presentation

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

SPP Notification to Construct

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Western Area Power Administration Sierra Nevada Region

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Interconnection Feasibility Study Report GIP-369-FEAS-R1

Guideline for Parallel Grid Exit Point Connection 28/10/2010

PG&E s 2012 Request Window Proposals

National Grid s 2018 Local Transmission Plan

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

Sub Regional RTEP Committee Mid-Atlantic

Minnesota Biennial Transmission. Zone Meeting 8

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

Midway/Monument Area TTC Study

Q87 Generation Interconnection

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Transcription:

OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC R2

Purpose of Local System Plan (LSP) Per Appendix 1 of Attachment K of the ISO-New England OATT The LSP is an annual report that: Describes non-ptf transmission system reliability needs Reflects Local system planning studies Proposed solutions Identifies Local planning process Criteria, Data and Assumptions Gives opportunity for input Local needs and solutions Public Policy needs 2

LSP Communication LSP is communicated via Transmission Owners Planning Advisory Committee (TOPAC) meeting following an ISO-New England PAC meeting The material is posted prior to the TOPAC meeting (via the ISO-New England PAC posting system) Transmission Customers and Stakeholders have 30 days after TOPAC presentation to provide written comments for consideration by Emera Maine 3

LSP Communication (continued) Emera Maine Contact: Dave Norman PO Box 932 Bangor, Maine, 04402-0932 (207) 907-7324 David.Norman@emeramaine.com EM LSP is located at: http://www.emeramaine.com/about-us/transmissiondevelopment/local-system-plan.aspx 4

Local System Planning Process The process is Needs Assessment followed by Solutions Proposals Local system needs can result from: Load growth Sub-area reliability assessments Point of delivery request from customers Generation interconnection requests (in accordance with appropriate generator interconnection procedures) Public Policy Requirements Asset Condition Local System Plan consists of: Summary of needs assessment results Listing of criteria, data and study assumptions Identification of proposed alternatives Solution study results and selection of preferred alternative 5

Criteria, Data, and Assumptions Loads are based on the New England specific area as provided in the ISO-New England MOD case, Emera Maine specific forecasts and local customer needs are used to refine this Studies use relevant assumptions regarding transmission, generation and demand resources found in the latest ISO-New England Regional System Plan Criteria follows ISO-New England as well as TPL criteria or local planning criteria as appropriate Local criteria listed at the end of this presentation 6

LSP Project List The LSP project list is a cumulative listing of proposed transmission solutions intended to meet local needs Similar to the ISO-New England PTF RSP, the LSP contains the status of each project Concept Project is under consideration as a solution to a partial needs assessment Proposed Needs assessment completed and project proposed as a solution, but not formally budgeted Planned Formally budgeted and, if necessary, PPA/I.3.9 approved by ISO-New England Under Construction Significant engineering and internal approvals in process and project is being implemented In-Service Project used and useful 7

LSP Concept Need Reliability Needs Assessment Condition Service Area Name Status Washington County Reliability Condition Northern Line 21 Part 2 Line 84 Rebuild Part 3 Concept Concept Potential Solutions 34.5kV Line 21 partial rebuild 46kV L84 Rebuild In-Service Need 2020 2020 8

LSP Proposed Need Needs Assessment Service Area Reliability Condition Northern Reliability Condition Bangor Project Name Status Solution Stanford Capacitor Circuit Sw. Line 80 Partial 46kV Rebuild Part 2 Proposed Proposed Replace Existing Circuit Switch Project In- Service 12/2019 Line 80 Partial 46kV Targeted Rebuild 12/2019 Reliability Condition Bangor/East ern Reliability Condition Northern Reliability Condition Northern Line 1 Partial Rebuild Part 2 Lincoln Capacitor Circuit Sw. Lincoln 8502 Breaker Replacement Proposed Proposed Line 1 Partial 46kV Targeted Rebuild Replace Existing Circuit Switch 12/2019 6/2019 Proposed Replace Breaker 12/2019 Reliability Condition Northern L86 Rebuild Proposed L86 Partial Rebuild 6/2019 Reliability Transmission Capacity Bangor Tibbetts L8 Link Proposed Line 8 Protection Upgrade 12/2019 Reliability Condition Washington County L21 Rebuild Proposed 2.6Mi Due to Structure Cond. 12/2019 9

LSP Planned Need Needs Assessment Service Area Project Name Status Solution Project In- Service Reliability Loading Eastern Relocate Chester T1 to replace Boggy T1 Planned 115/46kV Transformer Replace 12/2019 Reliability Condition System Wide Numerous 34.5kV & 46kV Transmission Targeted Rebuilds Planned Targeted Rebuild 12/2019 Reliability Reconfiguration and Condition Washington County T3L WCS Breaker replacement Planned Remove transformers T1 and T2, reconfigure, replace T3L Bkr 12/2019 Reliability Reconfiguration and Condition Eastern Youngs Corner Sw. Station Planned Rebuild and Reconfigure 12/2019 Reliability Condition Northern L84 Rebuild Planned Part 2 12/2019 10

LSP Under Construction Need Project In-Service Service Area Project Name Status Reliability 12/2018 Northern Reliability 12/2018 System Wide Chester 46kV T2L Breaker Numerous 34.5kV and 46kV Transmission Targeted Rebuilds (2018 phase) Under Construction Under Construction 11

LSP In-Service Need Project In-Service Service Area Project Name Status Reliability 10/2017 Bangor Reliability 12/2017 Eastern L75 (46kV) Phase 2 rebuild with distribution underbuild MDI Reliability expansion and reconfiguration of local transmission In-Service In-Service Reliability 05/2018 Washington County Cutler New Load In-Service Reliability 12/2017 Bangor Reliability 12/2017 Bangor/Eastern Reliability 12/2017 Washington County Line 80 Partial 46kV Targeted Rebuild Line 1 Partial 46kV Targeted Rebuild Line 25 Partial 34.5kV Targeted Reconductor and Tap to Line 16 In-Service In-Service In-Service Reliability 12/2018 Northern L89 Rebuild (46kV) In-Service Reliability 12/2018 Washington County Line 20 Partial Rebuild In-Service 12

13 Maine and Emera Maine Bangor Hydro District - Major Transmission System

Emera Maine Bangor Hydro District Detailed System 14

Descriptions - Concept Line 21 Rebuild Part 2 34.5kV WCS to Cutler. Condition of existing transmission facilities Line 84 Rebuild Part 3 46kV Mattawamkeag to Medway. Condition of existing transmission facilities 15

16 Descriptions - Concept

Project Descriptions Proposed Stanford Capacitor Circuit Sw. 46kV substation capacitor bank where the controlling circuit switcher has become unreliable Line 80 Partial Rebuild Part 2 46kV Milford to Stanford. Many of the structures have deteriorated to the point they need to be replaced. Line 1 Partial Rebuild Part 2 46kV Veazie to Ellsworth. Many of the structures have deteriorated to the point they need to be replaced. Lincoln Capacitor Circuit Sw. 46kV substation capacitor bank where the controlling circuit switcher has become unreliable 17

Project Descriptions Proposed Lincoln 8502 Breaker Replacement 46kV substation line breaker due to be replaced based on condition. Line 86 Partial Rebuild 46kV Chester to Medway. Many of the structures have deteriorated to the point they need to be replaced. Tibbetts Line 8 Link 46kV Tibbetts St Substation. Reconfigure substation and related protection to allow line normally connected. Line 21 Partial Rebuild 34.5kV WCS to Cutler. Condition of existing transmission facilities. 18

19 Project Descriptions - Proposed

Project Descriptions Planned Relocate Chester T1 to Boggy T1 Relocate 115/46kV Chester T1 to Boggy Brook to increase capacity for the older overloaded Boggy T1. Numerous 34.5kV and 46kV Transmission Targeted Rebuilds Numerous local transmission lines have structure condition issues and need to be partially rebuilt. Condition is based on regular testing of the structures, and the full line(s) do not have to be rebuilt. (Not on map) 20

Project Descriptions Planned (cont.) WCS T3L Breaker Replacement Remove old T1 and T2. Reconfigure facilities associated with the removals. Replace T3L breaker due to condition. Youngs Corner Sw. Station Rebuild Youngs Corner Switching Station to meet reliability needs. Line 84 Rebuild Part 2 46kV Chester to Mattawamkeag. Condition of existing transmission facilities 21

Project Descriptions - Planned 22

23 Chester Remove T1 for Boggy

24 Boggy Brook T1 Change

25 WCS T3L Breaker Replacement

26 Youngs Corner Sw. Station

Project Descriptions Under Construction Chester T2L Breaker Replacement Install new T2L breaker and remove old T1 for reuse at Boggy Brook. Numerous 34.5kV and 46kV Transmission Targeted Rebuilds Numerous local transmission lines have structure condition issues and need to be partially rebuilt. Condition is based on regular testing of the structures, and the full line(s) do not have to be rebuilt. (Not on map) 27

Project Descriptions Under Construction 28

29 Chester T2L Breaker

Local System Planning Criteria Criteria follows ISO-New England as well as TPL criteria or local planning criteria as appropriate The transmission system for purposes of this study is defined as those system facilities that are operated at 34.5kV and above and are not considered to be under ISO-NE planning (in general non-ptf). The standard of service to be provided dictates the need for changes to the existing system. It is necessary to consider the capability of transmission system elements, possible equipment failures, and the impact of failures on the ability to serve area loads. Transmission equipment is designed to operate within certain capabilities. The power that may be transferred over transmission lines depends upon the current carrying capacity of the wire and/or the required clearances of lines above ground. Transformers are limited by their heat dissipation capability. Circuit breakers or switches are designed to sustain a certain continuous amount of current. Also, the operation of customer electrical equipment requires that voltage be maintained within a certain acceptable range. Transmission system facilities are capable of regulating voltage within a limited range by varying reactive power and changing transformer tap settings. 30

Local System Planning Criteria Since all equipment is subject to breakdown, it is necessary to consider the consequence of such failures. One possible outcome could be the overload of other equipment that remains in service. For example, if one of two parallel lines trips, the remaining line may become overloaded. Overload beyond emergency ratings must be avoided due to possible permanent damage to the equipment or for public safety. Another consequence of equipment failure is the loss of power supply to customer load. This could occur with the loss of a radial transmission line or as the result of the cascaded outage of a looped transmission system. The loss of supply is critical to loads such as industrial processing, home heating, and hospitals, and must be considered in the design of the transmission system. 31

Local System Planning Criteria CAPACITY CRITERION No facility is to be loaded in excess of its normal rating for any expected dispatch of system generation at any load level. For any single contingency, no facility is to be loaded in excess of its normal rating for the following load cycle or in excess of its emergency rating immediately following the contingency. Uneconomic generation dispatch may be utilized to maintain power flows within ratings following a contingency. VOLTAGE CRITERION Transmission system voltages are to be maintained between 95% and 105% of operating base voltage under normal system conditions and for any single contingency. Further, voltages on the regulated side of load serving buses are to be maintained between 100% and 105% of operating base voltage under normal system conditions. 32

Local System Planning Criteria LOSS OF LOAD CRITERION No loss of load in excess of 25 MW is to occur for any single contingency. Loss of load less than 25 MW should be resupplied within 24 hours, except under very adverse conditions. MAINTENANCE CRITERION Transmission system planned maintenance is to be possible without exceeding normal voltage and capacity limits and without loss of load. 33

34 Questions?