AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS September 2010
AUBURN RIVERSIDE HS & MT. BAKER MS HVAC IMPROVEMENTS PROGRESS: Auburn Riverside High School: New variable speed drives installed at existing mechanical equipment. Compressors replaced at chiller units. New HVAC equipment installed for rooms 200, 202, 308, 801 and 803. New energy management system control equipment partially installed. Mt. Baker Middle School: New air conditioning unit installed at the Telecommunications MC room. PERCENT COMPLETE: 90%
Auburn Riverside HS & Mt. Baker MS HVAC Improvements Auburn Riverside HS: New air handling equipment serving Computer Classroom 801.
Auburn Riverside HS & Mt. Baker MS HVAC Improvements Auburn Riverside HS: New air handling equipment serving Computer Classroom 803.
Auburn Riverside HS & Mt. Baker MS HVAC Improvements Auburn Riverside HS: New air conditioning condensing unit serving Computer Classroom 803.
Auburn Riverside HS & Mt. Baker MS HVAC Improvements Auburn Riverside HS: One of two chiller units that received new compressors and equipment upgrades.
Auburn Riverside HS & Mt. Baker MS HVAC Improvements Auburn Riverside HS: Computer Classroom 801 with new heating, ventilation and air conditioning system.
ALPAC ELEMENTARY MECH. & ELEC. IMPROVEMENTS PROGRESS: Upgrades to the HVAC control system partially complete. New water saving plumbing fixtures installed. New HVAC unit installed for the gymnasium. New energy-efficient hot water heating tanks installed. Commissioning of the HVAC system in progress. New energy efficient light fixtures installed in classrooms and gymnasium. Additional exterior lighting partially installed. PERCENT COMPLETE: 85%
Alpac Elementary Mech. & Elec. Improvements Trench work and light pole bases for new light poles and added illumination at north parking lot.
Alpac Elementary Mech. & Elec. Improvements New low-flow water efficient toilets in student restroom.
Alpac Elementary Mech. & Elec. Improvements New low-flow water efficient toilet in student restroom.
Alpac Elementary Mech. & Elec. Improvements Gymnasium with new energy-efficient and brighter light fixtures.
Alpac Elementary Mech. & Elec. Improvements Classroom with newly installed energy-efficient light fixtures.
AUBURN HIGH SCHOOL THEATER ELECTRICAL PROGRESS: New wire terminations installed and existing electrical circuits labeled at three light battens in the Theater. Electrical cable protection installed at fly loft work deck above stage. All work substantially completed September 1, 2010. Project accepted as complete on September 17, 2010. PERCENT COMPLETE: 100%
Auburn High School Theater Electrical Light batten #3 where new electrical connections and circuit labeling was provided.
Auburn High School Theater Electrical Existing electrical box at light batten #2 after installation of new electrical connections.
Auburn High School Theater Electrical Existing wiring at electrical box at fly loft deck before new wire terminations installed.
Auburn High School Theater Electrical Electrician installing new wire terminations at electrical box at fly loft deck.
Auburn High School Theater Electrical Electrical box at fly loft after new wire terminations installed.
PAVEMENT MARKINGS & SIGNAGE PROGRESS: Thermo-plastic pavement markings have been installed. New handicap parking signs have been installed. Work continues on parking lot striping and installation of traffic control signs. PERCENT COMPLETE: 85%
Pavement Markings & Signage Removal of existing and worn crosswalk striping at Mt. Baker Middle School.
Pavement Markings & Signage Workers from Julie s Construction Inc. laying out stop bar at Mt. Baker Middle School.
Pavement Markings & Signage New thermo-plastic stop bar and traffic arrow at Mt. Baker Middle School.
Pavement Markings & Signage Repainting fire lane striping at Mt. Baker Middle School.
Pavement Markings & Signage New No Parking signage and traffic arrows at Washington Elementary School.
Pavement Markings & Signage New stop bar and Stop sign at parking lot adjacent to Auburn Memorial Stadium.
Pavement Markings & Signage New handicap parking stall, handicap parking signs, wheels stops and crosswalk at Cascade Middle School.
Pavement Markings & Signage Four new handicap parking stalls, handicap parking signs and wheel stops at the Administration Building.