The Project North West Electrification Programme

Similar documents
Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

Council of the European Union Brussels, 18 July 2014 (OR. en)

Guidance on the Energy TSI

POSITION PAPER Version 3.0

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

(Non-legislative acts) DECISIONS

(Text with EEA relevance)

ENE Standards Committee Chairman s presentation. Presented by David Knights 25 th January 2018

Research Brief. Simulation and verification of results from 125mph current collection modelling for two pantographs. T841 - January 2011.

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

Deviation from a Railway Group Standard

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 ENERGY

Guide for the application of the CR ENE TSI

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding

Low Voltage Power Supplies in Electrified Areas

High Speed Passenger Rail Interoperability in North America

Research Brief. Feasibility study into raising and lowering pantographs while trains are in motion. T778 - July Overview. Aims.

(Non-legislative acts) DECISIONS

Compatibility Between Electric Trains and Electrification Systems

Guidance for Low Voltage Electrical Installations

IALA Guideline No The Reporting of Results of e-navigation Testbeds. Edition 1. December 2013

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

Rail Safety and Standards Board

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

DRAFT RECOMMENDATION N. 006REC1072

Controlling the Speed of Tilting Trains Through Curves

INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY

COMMISSION REGULATION (EU) / of XXX

QUESTION / CLARIFICATION

HyLAW. HyDrail Rail Applications Assessment. Main Author(s): [Dainis Bošs, Latvian Hydrogen association] Contributor(s):

National technical rules for vehicles Related Control Command and Signalling Requirements

Guideline for Parallel Grid Exit Point Connection 28/10/2010

THE ISSUE AND USE OF SECTION 10B PERMITS FOR ROAD PASSENGER TRANSPORT AND MINIBUS DRIVING IN NORTHERN IRELAND

ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions

(Text with EEA relevance)

Requirements for the Application of Standard Vehicle Gauges

Official Journal L 104. of the European Union. Legislation. Non-legislative acts. Volume April English edition. Contents REGULATIONS

Microgeneration Installation Standard: MCS 023

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Investigation into the Department for Transport s decision to cancel three rail electrification projects. Report. Department for Transport

A personal insight to some of the issues with Tram Train

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0

Data Link Services Airworthiness and Conformance to Commission Regulation (EC) No 29/2009

Development of Smart Grids in Europe

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7)

COMMISSION REGULATION (EU) No /.. of XXX

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem

Application Guide for the European Register of Authorised Types of Railway Vehicles (ERATV)

Control, Safe Use and Operation of Road-Rail Plant

QUESTION / CLARIFICATION QC-ENE-001

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Mechanical Trainstop Systems

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

CEN and CENELEC Position Paper on the European Commission s proposal for a Directive on the deployment of alternative fuels October 2013

Modernising the Great Western railway

Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Estimation of electrical losses in Network Rail Electrification Systems

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

VOLUNTARY CODE OF PRACTICE FOR ELECTROMAGNETIC COMPATIBILITY (EMC) OF MOTOR VEHICLES (13 October 2014)

DG CLIMA studies on CO2 emissions from vehicles

GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT

The SHIFT2RAIL Joint Technology Initiative Presentation to the Rail Forum Europe 15 November 2011

Fast track to Sustainable Mobility. SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE

Guide for the application of the CR WAG TSI

Lineside Signal Spacing and Speed Signage

Risk Management of Rail Vehicle Axle Bearings

KBA Kraftfahrt-Bundesamt

ISSUANCE OF CURRENT-PERMITS

Soft copies of working templates, procedures, compliance manuals and checklists.

Guide for the application of the WAG TSI

European Ageing Systems Coordination Group (EASCG)

Frequently Asked Questions

Certificate of Acceptance

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

National Certificate in Electricity Supply (Line Mechanic Distribution) (Level 4)

Great Western electrification project Frequently asked questions

Compatibility Requirements for Braking Systems of Rail Vehicles

Version / Status V 2.0 Date Author. Wagon Markings

OTIF OTIF. Guide for the application of the UTP LOC&PAS ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

Friends of WALKDEN station MANCHESTER HUB. Response to Network Rail Stakeholder Consultation

Certificate of Acceptance

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP)

Electrification Asset Usage Charge. Presentation to TESG. Matt Skinner, Development Manager 11 th March 2013

Explanatory Note to Decision 2017/017/R

ETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments

Transport System. Telematics. Functioning of Digital Tachograph System in Country of UE

Community Specifications - an EASA Perspective. Bryan Jolly ATM Rulemaking Officer 17 March 2011

GEAR 2030 Working Group 1 Project Team 2 'Zero emission vehicles' DRAFT RECOMMENDATIONS

Signal passed at danger near Ketton, Rutland 24 March 2016

INFORMATION BULLETIN No. 165

MANAGEMENT OF RAILWAY SAFETY PERFORMANCE IN REPUBLIC OF SLOVENIA

Transcription:

Assessment of Technical Specifications for Interoperability on Projects Background The European Union has mandated moving towards interoperable railways to lower boundaries for cross-eu running of trains. European directives have been translated into UK law via the production of a Statutory Instrument, The Railways (Interoperability) Regulations 2011 came into force on the 16th January 2012. The RIR provide for the use of EU Assessment and Authorisation processes on the conventional and high speed parts of UK infrastructure which are not specifically excluded from the RIR thus, the vast majority of the UK mainline railway is subject to the RIR and will increasingly fall under the European Standards know as Technical Standards for Interoperability (TSIs). Projects proceeding under the RIR are subjected to Notified National Technical Rules. An assessment against these NNTRs by a Designated Body will still be required and this can be carried out in a similar manner to that employed under ROGS. The ORR Guidance suggests that where Interoperability Standards (i.e. TSIs) are mandated, the RIR take precedence over ROGS. The Project North West Electrification Programme The North West Electrification Programme (NWEP) will see systems installed on the infrastructure that are currently in service on other parts of the network and also systems that will be installed for the first time, i.e. Series II OLE. Lines to be electrified as part of project include; Liverpool to Manchester (via Chat Moss) Huyton Junction to Springs Branch Junction Manchester to Preston Preston to Blackpool The scope of work carried out includes; New Auto Transformer Feeder Stations and connections to National Grid New AT Distribution sites

Installation of Series II OLE Return Screen Conductor (RSC) adjacent to track cables and additional cross track bonding as required for an AT system AT feeder conductor Fixed Telecom Network fibre Associated signalling works Telecoms immunisation works LV DNO installation/modification to existing supplies Delivery of project scope is set in the following phases; 1 - Castlefield Junction to Earlestown Junction (DSE) 2A - Earlestown to Edge Hill (DSE) 2B - Huyton to Wigan (SBH) 2C - Ordsall Junction to Manchester Victoria (via Salford Central) 3 - Preston to Blackpool (North) 4 - Exuton Junction to Manchester Victoria (via Salford crescent) 5 - Manchester Victoria to Stalybridge, TBC Stalybridge to Guide Bridge and Ashburys to Philips Parks The Product Series 2 Overhead Line Equipment Series 2 was initially developed for the North West Electrification Programme for line speeds up to 100mph. Essentially the design is a development of the existing Mark 3D OLE, incorporating best practices from European railways, introducing several technological innovations and developing components and assemblies in recognition of reliability and performance limiting aspects of current OLE system within the UK. The Series 2 design complies with the requirements of the Conventional TSI. During the design development process there was a conscientious effort to focus on the quality of OLE products, specifically the security and reliability of wiring assemblies. This has resulted in a more robust and reliable system which has a reduced whole life cost compared to legacy OLE systems. The design has also improved construction efficiency, reduced the complexity and required frequency of maintenance intervention by simplifying and standardising assemblies and arrangements.

The introduction of Series 2 OLE is supported by a Generic Application Safety Case (GASC) and associated Hazard Log/SRAC list. The GASC is supported by specific Application Safety Cases for each implementation of the Series 2 equipment, has taken into account specific local requirements of each implementation area. The GASC recognises that the Series 2 OLE has evolved via incorporating European best practice and with cognisance to Technical Standards for Interoperability. Furthermore, document states that design and testing has been carried out in-line with TSI requirements and that a NoBo will be appointed in order to assess interoperability. The requirement for Interoperability/TSI requirement has therefore been built-in to the project from the design stage, which should help to de-risk the project with regards to RIR compliance. On the basis the project was anticipating using a NoBo assessment to gain RIR authorisation. Assessment Methodology applied The GASC states that Series 2 has been designed to be compliant with TSIs. It would be expected that evidence of this to be available e.g. an assessment of Series 2 design against the relevant TSIs. It was noted at the time that the processes for which Type Authorisation given were immature. Vertex suggested that the project liaised with the ORR in order to establish a common position in the manner in which this can be progressed. It was also highlighted that the option for Type approval will not be allowed by ORR. To assist in understanding it s compliance, a gap analysis was undertake of series 2 design against the following TSI s; Conventional Rail Sub system Energy TSI Conventional Rail Loc and Pas TSI In addition, the following Group Standards were also considered to help understand if the TSI requirements have been incorporated; Guidance on Gauging Guidance on conventional rail energy TSI Electrical protective provisions for electrified lines

The following project documentation were provided to allow the review to take place. It must also be noted that at the time of review, the project was yet to complete a detailed design; NWEP Phase 1 and 2 System Design Report Asset Management Plan for Electrical Power Additionally, the following permanent special provisions permitted for UK rail network were also considered as part of the assessment; Sub system Energy TSI, Section 7 Implementation. Clause 7.5.2.7.1 Contact Wire Height Clause 7.5.2.7.2 Lateral Deviation Clause 7.5.2.7.3 Pantograph Gauge Clause 7.5.2.7.5 Protective Provisions of Overhead contact line system The review findings were then inputted into a simple spreadsheet created by Vertex that included the following information to provide a clear picture of where the design was compliant or not against each TSI requirement; TSI parameter and requirement Evidence provided to review compliance against each parameter If Group Standards or National Technical Rules covered the TSI parameter Any known derogations If project scope is compliant or not against TSI parameter What was identified by the analysis It was found at the time that a number of parameters were not able to assess for compliance due to the detailed design not being completed however it was recommended against each of these clauses that the project do take consideration during the development through the Interdisciplinary Design checks and reviews to ensure compliance. One non-compliance was identified by the analysis. The TSI parameter 4.2.17 states that the overhead contact line shall be designed for a minimum of two pantographs operating adjacently having a minimum spacing centre line of the pantograph head as set out in TSI table 4.2.17.

It is permissible for more than one pantograph to be simultaneously in contact with the overhead contact line equipment. The number of pantographs and their spacing shall be designed taking into consideration the requirements of current collection performance. The evidence provided stated that the NWEP/series 2 OLE will allow operation of EMU vehicles at line speeds up to 176 km/h/110 mph, with up to 3 pantographs raised, with distances between pantographs of 75m or greater provided these vehicles are fitted with newer pantograph types with lightweight heads. The conclusion and recommendation was that GEGN8600 provides guidance on compliance to Energy sub-system TSI. This states that minimum distance is 85mt as a requirement and is a potential non-compliance. It was recommended to the project that this will require further investigation by the project to confirm compliance to TSI. How did the analysis help the project to move forward? The recommendations were considered, carried forward and encouraged project, National Certification Body (NCB) and Office of Rail Regulation (ORR) to work in collaboration to address non-compliance and allowed Entry into Service for phase 1 on time. It has also acted as a lessons learnt for all parties and has provided a better understanding with respect to TSI interoperability. As an outcome of the analysis and lessons learnt by the project, each phase of the project (which has now become part of the Northern Hub programme), a project interface manager has been appointed to manage the following tasks; Specific tasks is to address any non-compliances or issues early and proactively to avoid programme slippage and manage CSM process Acts as Liaison with both NCB and the ORR Can the process be applied on other projects? The same Process can be applied for various requirements. This ranges from understanding TSI compliance for a specific project up to compliance of company standards or specifications.

In summary it can provide the following; Early identification of any non-compliances against TSIs will avoid any late show stoppers. Provide regulatory bodies, projects and assessment bodies an understanding of compliance. Can be used as a tracker for an individual project s lifecycle to ensure design and implementation compliance. Provide organisations an understanding of their compliance with respect to Interoperability and identify any short comings within relevant Standards or Specifications