PT3 Rotational Inspection and Alignment Procedure

Similar documents
Adjusting the PRS Z-Axis Bearings

A special Tool for the inspection of brake components and diagnosis of difficult to identify cases of vibration.

70001 and Clutch Rebuild Instructions

Electric motor testing

INSTRUCTION MANUAL IM-422 For HTC/COUPLING ASSEMBLY HC-8088

SACHS Clutches The Intelligent Choice for the Long Haul

How to Calibrate WIPS

AMAYA XT/BRAVO X-Cable Tension Gauge User Instructions

Hilde - Wireless Indoor Positioning Systems calibration

I N F O R M A T I O N

Model 3770 WARNING. Failure to comply with the safety information in these instructions could result in serious injury or death.

2002 F-Super Duty /Excursion Workshop Manual

Flashstream 2800F - Lever Socket Actuator Universal Pressure Plate System

DELTA STYLE 9500 CARTRIDGE SPLIT SEAL INSTALLATION INSTRUCTIONS INTRODUCTION:

RTI TECHNOLOGIES, INC.

Loose Components. VetPro 5000 Wall / Cabinet Mount Installation. Applies to Models:

REMOVAL & INSTALLATION

FRONT & 4 REAR GM WD LOWERING KIT

6. Pre-print checks. 3D Touch

FlexJet Carriage Circuit Board (PCB) Replacement

CHAPTER 7 FRONT AXLE

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

Driveline Service & Maintenance

RT404-FLEX II ROTARY TABLE OPERATING MANUAL

20 TONNE HYDRAULIC PRESS MODEL NO: CSA20FBT

M Ring and Pinion Installation

Part # SuperFlow 450 Regulator Parts Upgrade Kit

FRONT FORK 2.16 GENERAL REMOVAL HOME. 4. See Figure Loosen upper and lower fork clamp pinch fasteners (1, 4).

Product Customization Guide TSE Brakes, Inc.

OVERHAUL. 1. INSPECT 1ST GEAR THRUST CLEARANCE (a) Using a feeler gauge, measure the 1st gear thrust clearance.

Precision Degree Wheel Kit

LEXUS LC/LCh CARBON FIBER LOWER GRILLE Preparation

Dresser TM Meters and Instruments Field Installation: Cartridge Replacement & Conversion; 1M/3M740/1480 HPC

Rekluse Motor Sports. The z-start Clutch CRF 250X. Installation Guide Copyright 2002 Rekluse Motor Sports z-start Revision RMS116 CRF 250X

ISSUER: WRC 10/29/10 ENGINEERING: PROD/MTL: QA APPROVAL: REVISION HISTORY

1.28 ACCESSORY DRIVE. Accessory Drive Assembly Related Parts (Former Design) SERIES 60 SERVICE MANUAL. 1. Locknut 8. Drive Gear

WARNING: Only perform this installation if you are experienced, fully equipped mechanic.

INSTALLATION INSTRUCTIONS

10. ALTERNATOR/STARTER CLUTCH

OVERHAUL. 1. INSPECT 1ST GEAR THRUST CLEARANCE (a) Using a feeler gauge, measure the 1st gear thrust clearance.

Assembly Instructions

11. FRONT WHEEL/SUSPENSION/

CL - Clutch Replacement

Gear Measurement. Lecture (7) Mechanical Measurements

12. FRONT WHEEL/FRONT BRAKE/

Installation Instructions for BMR Lowering Springs Performance ( Mustang GT)

SECTION steering mechanism

Ocean Side-Feed Applicators

Next, chase the threads in the lower A-arm mounts with the 5/8-18 tap and blowout any remaining particles.

2000 F-150 Workshop Manual

SERVICE INFORMATION 11-1 FRONT WHEEL/SUSPENSION/ STEERING XL FRONT WHEEL 11 7 FORK STEERING STEM 11 18

BOTTOM END SERVICE TOOLS SERVICE PRODUCTS ENGINE, CVT AND GEARBOX Subsection 10 (BOTTOM END)

First, check and record the camber and caster readings, they will be adjusted later.

Ford 9 XD Aussie-Locker Install Instructions.

Desktop 5.5 Z Axis Retrofit

MACHINE SENSORS CONTROL PANEL CONVEYOR SYSTEM SYSTEM SENSORS...

CIRRUS AIRPLANE MAINTENANCE MANUAL

1999 F-150/250 Workshop Manual

ISOBUS Down Force Hydraulics Kinze

Embedded Rack Slide-out System

Wheel Angle Sensor Kit Installation

Rekluse Motor Sports. The z-start Clutch CRF 250R. Installation Guide Copyright 2002 Rekluse Motor Sports z-start Revision RMS112 CRF 250R

Output Shaft Assembly COMPONENTS

SERVICE PROGRAM SP NOVEMBER 2007 SERVICE MANAGERS / PARTS MANAGERS NOTE:

Techcon Systems TS5000 Series Rotary Valve

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

CRANE TESTING REQUIREMENTS FOR PERFORMANCE TESTS

12. FRONT WHEEL/FRONT BRAKE/

FlexJet - Flex Cable Replacement

Updated gear lash procedures for the compact gear train assembly have been added to the Series 60 Service Manual.

On-A-Roll Lifter Instruction Manual for Standard Models Read Before Use!

FOR INSTALLATION ON DRIVER'S SIDE ONLY

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: August 2013 SUBJECT: VALVE LASH ADJUSTMENTS ADDITIONS, REVISIONS, OR UPDATES

Final Assembly Instructions: Runaround Cruiser

18. REAR WHEEL/SUSPENSION

SECTION Front Drive Axle/Differential

Torque Module Installation and User Guide for model 250i Motorcycle Dynamometers.

Detroit Speed, Inc. Electric Headlight Door Kit Corvette P/N: &

Final Assembly Instructions Portside Cruiser

1995 Mitsubishi Montero LS. Ensure timing marks are aligned. Mark timing belt direction of rotation.

STEERING LOCATION INDEX

MP and MP Diaphragm and Seal Kits for MP8000 Series Actuators

TR-1 Gold. Cylinder and Bracket Mounting Instructions

DIAGNOSIS AND TESTING Procedure revision date: 06/21/2000

Gearbox Assembly 101. Introduction. Before Beginning. By Mark Schutzer 4/13/06

CHAMBER CUSTOMIZATION GUIDE TSE

Next, set the bar level and tighten it down. Do this on both the driver and passenger sides.

INSTALLATION GUIDE. Kawasaki KLR Manual Revision:

CAUTION: Do not clean, wash or soak transmission seals in cleaning solvents. Dry all parts with compressed air.

KHR Series Regulators

Tidland Air Brake. Installation, Operation, and Maintenance. Models 200, 250, 305, 380, 460, 610

REMOVAL & INSTALLATION

./#0#. 1"&." 1994 ELECTRICAL Suzuki of America Corp. - Starters. Swift

We recommend installing the TRS Racebars first as we have done

Safety - Installation and Operation:

DELTA O-RING CARTRIDGE SEAL ASSEMBLY AND INSTALLATION INSTRUCTIONS INTRODUCTION:

255 Cartridge Dual Seal

Stacker Belt Tensioning

Installation Instructions

Butterfly Valve Type 57P

Transcription:

PT3 Rotational Inspection and Alignment Procedure Document No.: TR10955 Revision: 1.0 Date November 21, 2013

Revision History Revision Version Date Author Description 1.0 11/20/2012 T.Ojalehto Created document Page 2

Approvals Troy Ojalehto Date Tim Wright Date Page 3

Table of Contents 1 Purpose... 5 2 Required Tools... 5 3 Concentricity Check... 7 4 Adjustment... 12 5 Final Check... 18 Page 4

1 Purpose The purpose of this document is to provide a procedure for inspecting and adjusting the runout (concentricity) of the actuators to the R2 rotational axis as defined by the pinch hanger scale. This procedure addresses arc motion test failures due to misalignment of the actuator carriage caused by collisions of the actuator carriage or over-tightening of the Z axis locking wheel. 2 Required Tools 2.1 A 3mm Allen wrench: Page 5

2.2 Dial Test Indicator such as Interapid No. 312b-1: 2.3 Vise-Grip Flexible-Arm Holder such as McMaster-Carr PN 23165A75: Page 6

3 Concentricity Check 3.1 Place the PT3 on a large enough surface so that it may be turned around for access to front and rear with no obstructions. 3.2 Fully retract the Z-Axis and loosen the locking wheel: 3.3 Place an actuator in the cross rail bracket and visually align it as close to center as possible, referencing the scribe marks on both sides of the cross rail bracket and the actuator attachment: Page 7

3.4 Clamp the Vise-Grip Flexible-Arm Holder to the table using two pieces of cardboard to avoid damaging the table and install the indicator in the holder and position as shown: Page 8

3.5 Align the indicator with the actuator shaft approximately as shown and adjust so the indicator is showing at least.03 (.75mm) of reading. The X, Y, and R1 axes can be moved as needed to position the indicator correctly. Once in the correct position the X and Y axes should be lightly secured for testing by gently tightening the lockscrews. Do not tighen the Z Axis lockscrew! Page 9

3.6 Gently spin the actuator shaft with your fingers. The total indicated reading (TIR) should be less than.005 (.13mm). If reading is more than.005 the actuator is bent and must be replaced. Please use a different actuator for this test: Page 10

3.7 After actuator runout has been verified, check the actuator carriage concentricity by gently spinning the R2 axis rotation handle at least two full revolutions making sure the needle is staying in contact with the actuator through the full rotation (not running out of scale): Page 11

3.8 If TIR is less than.03 (.75mm) your PT3 is properly aligned. If it is greater than.03 TIR please proceed to the next step. 3.9 Check the perpendicularity of the cross rail bracket by positioning the indicator as shown and gently spinning the R2 axis rotation handle a full revolution: 3.10 If the TIR from step 3.9 is less than.015 (.38mm) proceed to Section 4 for Adjustment. If TIR is greater than.015 the ball spline shaft or standoffs are possibly misaligned or bent. Please complete the PT3 Large Vertical Alignment Procedure or contact Triex Tech Support if the ball spline or shafts are bent. 4 Adjustment The PT3 must now be adjusted to bring the runout value within spec. Page 12

4.1 Slowly spin the R2 axis handles as in Section 3.7 but now observe the high and low indicator readings in relation to the rotational position of the cross rail bracket. Note the low point and position the rotation with the indicator reading at this low point: Page 13

4.2 With the 3mm Allen Wrench loosen the 4 screws holding the axial block to the rotational stage until they are just loose enough to allow some movement but not so loose as to allow slop: Page 14

4.3 Adjust the runout by placing your hands on the R2 rotation stage and axial block and carefully sliding the axial block towards you until the indicator reads half the amount of the TIR you originally indicated: Page 15

4.4 Gripping only on the micrometer handle as shown, rotate a full revolution to verify that you have brought the system into alignment (.030 TIR max) Page 16

4.5 Repeat steps 4.3 and 4.4 as needed until correct alignment is achieved. 4.6 Being careful not to bump any of the components you just aligned, use a 3mm Allen wrench to lightly tighten the four screws holding the axial block to the rotational stage using an X pattern: 4.7 Repeat step 3.7 to verify runout did not change after tightening screws. Page 17

5 Final Check Verify the following: 5.1 The X,Y, Z, R1, and R2 axes are unlocked. 5.2 The actuator carriage (R2 axis) rotates freely. If not, please refer to the PT3 Large Vertical Alignment Procedure. 5.3 The red handle on top moves the Z axis smoothly up and down and that the Z axis spring rolls and unrolls smoothly. If not, please refer to the PT3 Large Vertical Alignment Procedure. 5.4 The actuator carriage slides freely along the frame. Page 18