RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016

Similar documents
355,100 Sq. Ft. Manufacturing/Warehouse Facility

BUILDING PERMIT FEES BUILDING VALUATION DATA

INSTALLATION GUIDE. Model #PP1 Pumpout Port Kit For Use with Grease Interceptors Models GB1, GB2 and GB3. Contents

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia

Harding Steel Tri-Lift

Chapter 8 - Special Rooms and Spaces

Design of Parking Facilities. Design of Parking Facilities. Location of Parking Facilities

GREASE INTERCEPTOR REQUIREMENTS Lakeway Municipal Utility District

Public Works & Utilities Department Memorandum

150 OFF-STREET PARKING AND LOADING REGULATIONS

Solid Waste Service Company Review and Collection Space Standards

CHAPTER V RESIDENTIAL WIRING

PowerAir Compressor Installation

Keycodes Inspection Agency PO Box 391 Bethlehem, Pennsylvania

STANDARD DRAWING INDEX

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

CITY OF VANCOUVER GARBAGE AND RECYCLING STORAGE AMENITY DESIGN SUPPLEMENT ENGINEERING SERVICES WASTE MANAGEMENT & RESOURCE RECOVERY

GREASE INTERCEPTOR REQUIREMENTS

METAL STUDS. TOTAL COST (Labor+ Material) UNIT COST (Labor+ Material) ITEM # DESCRIPTION QUANTITY UNIT TRADE COST GENERAL REQUIREMENTS

1100 Wilson Boulevard Approximately 4,000 USF. Restaurant. mondayre.com

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

FARRAGUT NORTH AND FARRAGUT WEST PEDESTRIAN PASSAGEWAY TUNNEL STUDY

ClassicSeries Compressor Installation

Health Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)

Shelter: Primary Shelter Secondary Shelter Respite Site Only Client Service Center Pet Shelter

SIDEWALK CAFE GUIDELINES

Streetcar and Light Rail Design Differences. March 2015

INSTALLATION GUIDE. Model #GB1 20/25 GPM Grease Interceptor For Indoor Use. Contents

Home Maintenance Schedule

South Carolina Department of Motor Vehicles Specifications for 44 Gooseneck trailer with two expandable slide outs with CAD Drawings

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

Composite PEX-AL-PEX Tubing

GB2 35/50 GPM Grease Interceptor for Indoor Use

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

MOTOR VEHICLE ORIENTED BUSINESSES.

General Purpose Walk-In Fume Hood

PACIFIC FAIR ACCESS STATEMENT. Using this document. Facility Summary. Facility details

Parking and Loading. Page 1 of 7

OFFSHORE VOYAGER 33' - 35' 10' 6" BEAM

APPENDIX B TRAINING MANUAL

OFF-STREET PARKING AND LOADING

Problem 14 Space for Parking E212 - Facilities Planning and Design

Commercial and Multi-Family Developments WASTE MANAGEMENT DESIGN GUIDELINES

7.5. On-Premise Signs-TC and MU Districts. A. Freestanding Identification Signs. 1. Type.

CreekSide XVI & XVIII

ANDERSON PROPERTY SITE ANALYSIS

General Purpose Walk-In Fume Hood

OFF-STREET PARKING. A. Parking facilities for each use shall be provided in accord with the minimum requirements set forth in Table 9-1.

SIDEWALK CAFE AND PARKING PATIO GUIDELINES

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS

INSTALLATION GUIDE. Model #GB2 35/50 GPM Grease Interceptor For Indoor Use. Contents

Fee Schedule for Whitehall Township

MODEL ERH-40J171 2 BEDROOM, 1 BATH NOMINAL SIZE: 28 X40 TOTAL AREA: 960 SQ. FT.

ACCESSIBLE COMMUNITY BUILDER CHECKLIST

GB-250. Submittal Specifications Installation Application Specific Details

Off-Street Parking Information

Facility Solid Waste Handling Equipment

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE MARKHAM CAMPUS MARKHAM, ONTARIO

Breezair TBA 550 Installation Manual

REQUEST FOR QUOTATIONS

A B C D E F 113' - 2" 22' - 6" 22' - 6" 22' - 6" 22' - 6" 23' - 2" A A A3.11 A3.

HIGH PROFILE RETAIL SPACE ON ICONIC GREEN BAY ROAD

Public Health Services San Joaquin Co.

NH 3. Evaporator. Ammonia Applications Tons MANP

Permitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

The Ultimate Home Value with Quality, Durability & Flexibility in Design

WPS SERVICE MANUAL. Section 7 Clearances. 7-1 Basic Electric Clearances - Services Miscellaneous Clearances Antenna Clearances...

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

INFORMATION BULLETIN / PUBLIC - ZONING CODE REFERENCE NO.: L.A.M.C A5 Effective: DOCUMENT NO.: P/ZC Revised:

REAR +/- 94' 20' 10' 10'-4" 9'-6" 10'-3" 10' 20' 13'-2" Private Office 25. Private Office 23 Private Office 24 7'-1" Open Space 3 14'-7"

Q6SD Series 13 SEER, Three Phase, Packaged Heat Pump with R-410A 3-5 Ton Units

Metropolitan Council Metro Transit Project Description Budget Year

ADA Became Law In 1990

Integrated PowerStation. Advanced Power Solution for Reactor 2

Building Integrity Property Services

Spring Test 10 due 05/11/2013

MAINTENANCE AND TESTING OF ENTITY WORKS, ELECTRICAL INSTALLATIONS AND ELECTRICAL EQUIPMENT CS-OHS-32

Expedition vehicle TC54 pickup comfort

Transit Hub Case Study: Owings Mills Metro Station. By: Kathleen Cary Rose, J. Luke Byrne and Catherine Buhler

Resolution No RECYCLING AND WASTE ENCLOSURE STANDARDS AND GUIDELINES

CENTRIFUGAL UPBLAST ROOF EXHAUSTERS Model VRBK

CPC Commercial. 15- & 20-Ton, Three-Phase Packaged Air Conditioner. 20-Ton Cooling Capacity: 240,000 BTU/h

Pro Island Ventilation Hoods

M-1.0 FILE NAME: CAFE BIZOU CLIENT: CATHERINE MCKENNA PROJECT: PROJECT NO. REV DESCRIPTION DATE PLAN CHECK

BASE CAMPS COMPLETE CAMP PACKAGE

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

East Allen County Schools Facilities History Calendar Years October 5, 2015

CURVED CC5 CC5 RF6 CC5 RF9 CC5 RF12 CC5 RF15 CC5 HT6 CC5 HT9 CC5 HT12. Page 1. Download C.A.D models or contact us on COSSIGA.COM

Definitions of and have been revised. a. automatic b. nonautomatic c. none of the above d. both a and b

Site and Building Program

P6SD Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS

Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL

GSX 16 SEER Condensing Units

CURVED CC5 CC5 RF6 CC5 RF9 CC5 RF12 CC5 RF15 CC5 HT6 CC5 HT9 CC5 HT12. Page 1. Download C.A.D models or contact us on COSSIGA.COM

UNDERGROUND SERVICES - SECONDARY

IMPROVEMENT CONCEPTS

Application for Service Residential Subdivision / Development

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Creating An Accessible World XPRESS II. Inclined platform lift for straight stairways.

Transcription:

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016 Overview The following requirements outline the guidelines for designers and project delivery teams in the planning, design and infrastructure requirements for the retail base building. Typologies Retail Offerings: The following retail models are new models to be incorporated as part of net new Stations in Design: 1- Click and Collect Grocer (C&C) 2- Quick Serve Restaurant (QSR) 3- ATM Bank Machines (ATM) Retail Models within the Offerings: 1a - Click & Collect Grocer- Full Service and Collect Depot 1b - Click & Collect Grocer - Click and Collect Trucks 1c - Click & Collect Lockers 2a - Quick Serve Restaurant with remote baking 2b - Quick Serve Restaurant with baking 2c - Quick Self - Serve Kiosk 3 - ATM Machine Retail Model Selection Matrix: Note: Contact the Customer Care and Non Fare Revenue office for appropriate guidance on retail model selection. Building Type Large Medium Small Building Size >500 m2 300-500 m2 <300 m2 Retail/Concession model 1a X 1b X X X 1c X X X 2a X X 2b X X 2c X X X 3 X X X

- 2 - Design Requirements for each retail typology 1a- Click and Collect Grocer: Full Service and Collect Depot: Full service retail model for grab and go meals. Customers will pick-up their orders from a designated staging area. Following base building retail requirements below: Provide 14 clear ceiling height Provide loading capabilities for receiving garbage pick-up truck (tbd) Provide structural loading in Retail Area at 150 lbs/sq. ft. Provide structural loading in Service Areas at 250 lbs/sq. ft. Underside of concrete deck above leased premises forming retail areas to be capable of supporting 15 lbs/sq.ft. live load to allow Grocer to suspend bulkheads, mechanical ducts etc Reinforce structural slab as required to accommodate miscellaneous specified items by Grocer (??) Provide separately metered services to the demised premises to be located by retailer Provide 60 amp, 600/347V 3 Phase 4 wire, separately metered and terminated in main switchboard. Provide 1 domestic water supply. If water supply pressure is greater than 80 PSI to the premises, GO transit to provide Pressure Reduced Valve set to 65 PSI. If less than 50 PSI, GO Transit to provide a booster pump. Provide Gas Service (separately metered) Provide Phone and data (separately metered) Provide HVAC; 300sq. ft/tonne of AC and adequate Heating Provide life and safety requirements to include Sprinkler System and Fire Alarm Provide 2-6 sanitary gravity connections terminated at mutually agreed location Provide 1-6 connection for washroom plumbing from food store including all floor penetrations for the Grocer Provide connections between the Grocer s floor penetrations and GO Transit supplied sanitary connections Provide minimum 2-3 plumbing vents to exterior Provide cast in place, hub drains and floor drains complete with drain bodies, strainer and accessories in compliance with Grocer s specifications. Slope floor as required to drain locations a per the Grocer supplied layout (??) Provide temporary power for construction purposes in a single mutually agreed location. Service for construction purposes to be 200Amp, 208/120V 3 phase 4 wire. Floor, Ceiling and Wall Finish (TBD) Signage(tbd)

- 3 - Locate retail within station building footprint Provide direct access to retail from exterior for off hours access Ensure sight lines to waiting area are maintained 1b- Click and Collect Trucks This is an exterior model where the customers pick-up their orders from a dedicated Click & Collect fully equipped truck, in a designated area. Full-Service interaction will be featured at the truck with retailer customer service attendant and mobile point of sale. Provide a dedicated space in parking lot for truck (approximate length of truck 40 length) Provide loading capabilities for receiving garbage pick-up truck as required Provide safe pedestrian fully accessible walkways and vehicular path of travel Provide flat surface for parking, asphalt/concrete??, loading (tbd) Ensure passage in and out of parking lot is clearly demarcated Provide adequate parking lighting levels Signage(tbd) Do not locate in Kiss and Ride Area, Bus Loop (tbd) Do Locate in parking lot. Do Maintain site lines 1c- Click & Collect Lockers Self-serve model where customers pick up their order from dedicated lockers at the Station using a one-time code. Lockers are set up for the storage of abient, cold, and frozen products. This model may be offered outside and inside the station. For Exterior Application If lockers are situated outside the station, locate in such a way that the customer would drive up to be attended to by the customer service attendant without having to get out of the car similar to a drive through. This requires careful consideration when designing the parking lot. (Specific dimensions will have to be provided once a retailer is onboard to allow for proper allocation of space when parking lot is being designed) If lockers are located inside, locate within platform access area

- 4 - Do not locate in vestibule tunnels or shelters Design of exterior lockers will follow functional and brand standards set out by retailer, and may not be specific to the station building Provide proper lighting levels Do not locate in front of glazing causing view to be blocked Do not locate where it may interfere with sight lines or circulation, customer queuing or waiting area Do not install on an angle or in a location that looks half hazard Allow enough clearance in front for queuing Allow enough clearance in behind for cleaning and servicing 2a- Quick Serve Restaurant with remote baking Full Quick Service Restaurant with a secondary space elsewhere in the station dedicated for remote baking. Patron seating may or may not be offered depending on space availability within the station footprint. Provide 2 spaces: 1 for the Service Kiosk and another remote baking Provide 200-300 amps, 120 /208 volt, 3 phase, 4 wire electrical service Provide 1 water line to unit Provide 3 sanitary main drain line Provide 300 cfm exhaust fan for toaster, 300 cfm exhaust for 1 combi-oven (600cfm if unit is provided with 2 Combi-Ovens). Total exhaust can very between 600 and 900 cfm Area to be mechanically balanced Provide phone line with main demarcation point to new QSR unit Provide conduit for internet line with main demarcation point for new QSR unit Electrical will be divided between the two units will require 1 service with 2 electrical panels, main electrical panel should be located in the remote kitchen, panel will have a large breaker to run panel in the remote kiosk. Engineer to determine loads of each panel. Remote kitchen - locate refrigeration compressor for walk-in cooler and freezer on roof Remote kitchen- provide a 50-100 gal grease interceptor required for triple sink and combi-oven Provide Garbage disposal area. Locate within station building Provide accessible design Provide exterior access to retail

- 5-2b- Quick Service Restaurant with Baking Full Service Restaurant with baking facility all in one. Seating for patrons may or may not be offered depending on space availability within the station footprint. Electrical main increase to 400 amps with additional lighting in the seating area. Engineer to complete a load calculation to determine if required. Additional HVAC required for seating area; area must maintain a comfortable environment for customers. To be determined by the engineer, by calculating the heat gain within the area. 1 water line to unit 3 sanitary main drain line 300 cfm exhaust fan for toaster, 300 cfm exhaust for 1 combi-oven (600cfm if unit is provided with 2 Combi-Ovens). Total exhaust can very between 600 and 900 cfm Area to be mechanically balanced Provide conduit for phone line with main demarcation point to new QSR unit Provide conduit for internet line with main demarcation point for new QSR unit Locate refrigeration compressor for walk-in cooler and freezer on roof Provide 50-100 gal grease interceptor required for triple sink and combi-oven Locate within station building Provide accessible design Provide access to independent access retail from exterior of station 2c- Quick Self Serve Kiosk This model is manned Self Kiosk Provide 200 amps, 120/208 volt, 3 phase, 4 wire electrical service Provide 1 waterline to unit Provide 1 ½ sanitary main drain line for hook up and hand sinks Provide 300 cfm exhaust fan for toaster, exhausting 300 cfm with area Provide HVAC to supply, same quantity of fresh air to unit as exhaust. Will need to keep balanced area Provide conduit for phone line main demarcation point to new QSR unit Provide conduit for Internet line- main demarcation point to new QSR unit Allow enough clearance in front of Kiosk for queuing Provide proper structural floor loading for locker unit

- 6 - Provide accessible design Provide proper lighting Allow space in behind Kiosk Unit for maintenance Do not locate Kiosk where it would be difficult to access 3- ABM Machine Description: This model is a typical bank machine for a financial institution Provide 20 amp service Provide data (separately metered) s Locate within platform access area Provide divider between adjacent ATM units Locate in close proximity to other retail offering Do not locate in vestibule, water closets, in front of seating or queuing area Do not locate in the corner of any space or in a high traffic area Do not incorporate overhead shelter within design if located outdoors Do not install on an angle Specify orientation which is parallel or perpendicular to adjacent architectural features Allow enough clearance in front of unit for barrier free access Allow space in behind unit for maintenance