HOOK UP LAYOUT FOR HEAT GENERATION AND FUEL TANK SYSTEM

Similar documents
PIPE SUPPORTS IRANIAN PETROLEUM STANDARDS COVER SHEET B A REV. DRAWING No. DATE DATE IPS-D-AR-012 DESCRIPTION

DETAIL OF DUCT FABRICATION & SUPPORTS

AWWA Grooved Fittings

CORDER PARK SEWER PUMPING STATION NELSON

CALL HEIGHT CARD READER TOP OF MONITOR FRONT SIDE CONCRETE SURFACE TO BE FLAT AND LEVEL IN AREA OF UNIT

HORIZONTAL SLIDER - NON-IMPACT

CLAMP-CLOSED PIPE-STL BLK 1/2" (540) CLAMP-GROUNDING,PIPE CLAMP-CLOSED CLAMP-CLOSED

VB-7000 Series. Selection Guide. Applications. Applicable Literature. Selection Guide Contents

450DIA STATION BY-PASS CONNECTION c/w 450DIA KNIFE GATE ISOLATION VALVE AND BLIND FLANGE C.L. OF PUMP REMOVAL MONORAIL BEAM OPENING ABOVE

4: YR WSEL= :1 7'X18' TYPE M SOIL RIPRAP 2D50=24" % 4:1 4.0%

CASEMENT - LARGE MISSILE IMPACT

POWER TRIM. Table of Contents. Section 5B - Trim Cylinders

CS 5700 LOBBY CASH DISPENSER REAR LOAD - 15" DISPLAY OR 19" DISPLAY TYPICAL ACCESS TO LEVELING LEGS - RANGE (2) EACH SIDE OF SAFE CEN I SAFE ONLY * *

STANDARD CONSTRUCTION DETAILS STORM DRAINAGE REVISED - MAY 2017 DEPARTMENT OF ENGINEERING

PROPOSED BUILDING PLINTH AREA sq.m.

CS 7700 FULL FUNCTION LOBBY TERMINAL REAR LOAD - 15" OR 19" DISPLAY

SSAB Water mains PIPES AND FITTINGS

FUEL SYSTEM. Section 3A Pulse Crankcase Driven Fuel Pump. Model 200/225 DFI. 1. Fuel Pressure/Vacuum Gauge (0-15 psi) (Obtain Locally)

FUEL SYSTEMS 5 A FUEL DELIVERY SYSTEMS AND FUEL PUMPS

Lippman Park Suspended Bridge Wawarsing, NY

[1200mm] 5" [125 mm] 2 3/4" [70mm] [2600mm] [450mm]

MOORHEAD. City of Moorhead M I N N E S O T A. Right-of-Way Details and Standards

SOUTHWEST OILFIELD PRODUCTS, INC.

AWWA Grooved Fittings

D1.0 CRABTREE ROHRBAUGH & ASSOCIATES - ARCHITECTS GENERAL DEMOLITION NOTES: GENERAL ALTERATION / RENOVATION NOTES: WILSON MIDDLE SCHOOL ADDITIONS

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

ALUMINUM ENTRANCE DOORS

HYDRANT & GATE VALVE INSTALLATION

Summary 0163EN. Chapter 5 - Couplings A70 Double Jacket Brass Coupling A70 Single Jacket Brass Coupling 37 A71 Forestry Coupling 37

N2-GEN. TL SERIES Nitrogen Generators. Arc Suppression System. Transmission Line Pressurization. South-Tek

GROCERY OUTLET (SHELL PACKAGE)

Solenoid Pilot Operated Directional Control Valve

INSTALLATION INSTRUCTIONS FOR DOUBLE AND TRIPLE STATION SENSOR ACTIVATED SOLID SURFACE LAVATORY SYSTEMS

152mm (6") DIA. POINT TO POINT SYSTEM PVC OR STEEL TUBE SYSTEM TYPE I AND TYPE II OVERHEAD UNITS TYPE I OVERHEAD UNIT TYPE II OVERHEAD UNIT NOTES:

MINI-CRETA 3 ARCHITECTURAL

Brazed heat exchanger XB

CASEMENT - LARGE MISSILE IMPACT

POWER BUTTON: 25mm (1") CONDUIT X 3048mm (10'-0") LONG TO HOUSE POWER AND CONTROL CABLES (SUPPLIED BY DIEBOLD)

SOUTHWEST OILFIELD PRODUCTS, INC.

ACCESSORIES. Table of Contents. Section 8A - All Models

Model 1001/1001HPS Drinking Fountain

TRIMBLE PUMP STATION UPGRADE CULLMAN COUNTY WATER DEPARTMENT CULLMAN COUNTY, ALABAMA

SOUTHWEST OILFIELD PRODUCTS, INC.

Transmission and Driveline. Section 2A - Transmission and Driveline

Aluminium Floor Outlets - Trapped Outlets

NARROW GAUGE ELECTRIC LOCO OF THE MIX NITZ-ST. ERHARD LOCAL RAILWAY SCALE 1:5.6 TRACK GAUGE 180mm (7") GENERAL ARRANGEMENT & PARTSLIST

CURRIES Technical Manual FireRatedProducts Section. Revised September, 2017

Low Pressure Domestic Burners

Solenoid Pilot Operated Directional Control Valve

76" MAX. FRAME WIDTH 72" MAX. DOOR OPENING 36" MAX. LEAF WIDTH 30 3/8" MAX. D.L.O. A 4 36" MAX. LEAF WIDTH 30 3/8" MAX. D.L.O. F 5

ROPER MOUNTAIN SCIENCE CENTER

330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT. 330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT TYPICAL ACCESS TO LEVELING 15

B E CORE OPENING DIMENSION PRINT, KD KW SCALE CEK KW ALTERNATOR FRAME SIZE KH04830TO4D KH05520TO4D KH03850TO4D

INSTALLATION INSTRUCTIONS FOR SOLIS SOLAR-POWERED SENSOR-ACTIVATED CONCEALED FLUSHOMETERS

SEE PAGES 3 AND 4 OF 7 FOR 3700 CASH RECYCLER THROUGH THE WALL WITH VESTIBULE TRIM KIT REFERENCE FRONT EDGE OF BEZEL FOR DEPTH DIMENSIONS

NEW BEDFORD CITY HALL EXTERIOR RESTORATIONS 133 WILLIAM STREET CITY OF NEW BEDFORD 133 WILLIAM STREET NEW BEDFORD, MA

DIEBOLD 3700 LOBBY CASH RECYCLER- FRONT LOAD 15" DISPLAY OR 19" DISPLAY CEN I, CEN III GAS, CEN IV GAS or CEN IV GAS EX SAFES

SOUTHWEST OILFIELD PRODUCTS, INC.

864293A02 4.3L (262 CID) MANIFOLD CONVERSION

FUEL SYSTEM. Table of Contents. Specifications. Section 3A Electric Fuel Pump FUEL SYSTEM. Fuel Recommended Gasoline Recommended Oil

AMENDMENT NO C-300

* * * DIEBOLD 3700 LOBBY CASH RECYCLER- FRONT LOAD 15" DISPLAY OR 19" DISPLAY CONSUMER ACCESS DIMENSIONS PLAN VIEW 19" DISPLAY FRONT ELEVATION

00083FAB-DC DRAWN BY DATE CHK SCALE SIZE

PANEL ASM-VALANCE XXX ANGLE CHT(2) SCREW 000G U(6) 000G U(7) BF BG TRIM-FEATURE CHT SCREW

SHEET 1 OF 6

SOUTHWEST OILFIELD PRODUCTS, INC.

Clearline. fusion. Installation. t<45mm Universal Roofing Kit F16 T F16 L. viridian. solar. v

CONSTRUCTION NO. NEW STREET, HOUSE, ADDRESS ASHFIELD ROAD, NORTON, IP31 3ND DINING 05 UTILITY 04 STUDY 03 SITTING ROOM HALLWAY WC 07 KITCHEN 06

POWER STEERING PUMP 10 A

Installation Instruction

2/2, 3/2 and 4/2 directional poppet valve with solenoid actuation

SYSTEM FITTINGS FOR OUTWARD OPENING WINDOWS AND DOORS

KANSAS STATE UNIVERSITY EQUINE PERFORMANCE TESTING CENTER

RETAINING BLOCKS Reinforcing Steel R-5236HC 52" (1,320 mm) Hollow Core Retaining Block

Cable Ties. Nylon Cable Ties

ELECTRICAL SYSTEM 4 D INSTRUMENTATION

SRX IVL LANDFILL PUMP BOTTOM LOADING

Solenoid Pilot Operated Directional Control Valve

JET PUMP R1 JUNE 1996 JET PUMP

SOUTHWEST OILFIELD PRODUCTS, INC.


POWER STEERING 7 A PUMP

SOUTHWEST OILFIELD PRODUCTS, INC.

CEMENTBOARD LAP SIDING - HARDIEPLANK HZ5 COLOR TBD 3/4" T&G PLYWOOD SUBFLOOR L1 853' -8 1/8" 11 7/8" TJI 110'S 16" O.C.

ELECTRICAL SYSTEM 4 D INSTRUMENTATION

Application Examples of Air-piloted Valves

INTERNAL ELECTRIFICATION & EXTERNAL CABLE WORKS BOQ SUMMARY SHEET. S.NO DESCRIPTION OF ITEMS AMOUNT IN Rs. LOW SIDE ELECTRIFICATION WORKS

INSTALLATION INSTRUCTIONS FOR OPTIMA SYSTEMS SENSOR ACTIVATED ROYAL CONCEALED and EXPOSED URINAL FLUSHOMETERS

Electrically controlled directional control poppet valve type UREZ6

DIEBOLD 3750 CASH RECYCLER TERMINAL. 13mm ( 2") UL SAFE - 15" OR 19" DISPLAY THROUGH THE WALL 330mm (13") PLAN VIEW FRONT ELEVATION SECTION

Cast Stainless Steel Butt-Weld Outlet Connection Data

OPTIONAL 178mm (7") SPACER AVAILABLE FOR WALL THICKNESSES UP TO 152mm (6") 330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT

Appendix E D791 and T791 Head and Valve Holddown Assembly Details

REAR AXLE LIQUID LINE HOSE ASM # CLAMP (6) 15 REAR AXLE BRACKET-A/C B SCREW

TLE OF ONTENTS PVING PVING SETIONS ND STREET LYOUTS WITH MEDIN DETILS 00 MONOLITHI MEDIN NOSE PVEMENT JOINTS ND RIDGE PPROH SL DRIVEWY TURNOU

Table of Contents. How to Select a Winch

REAR AXLE LIQUID LINE HOSE ASM # CLAMP (6) 15 REAR AXLE BRACKET-A/C B SCREW

SOUTHWEST OILFIELD PRODUCTS, INC.

SECTION A-A

3700 LOBBY CASH RECYCLER. REAR LOAD 13mm ( 2") UL SAFE - 15" DISPLAY OR 19" DISPLAY WITH DETAILS FOR OPTIONAL VESTIBULE INSTALLATION

Transcription:

HOOK UP LYOUT FOR HET GENERTION ND FUEL TNK SYSTEM DESRIPTION IRNIN PETROLEUM STNDRDS NO REVISION PERMITTED UNLESS PPROVED Y STNDRD ORGNIZTION OVER SHEET DRWING No. IPS-D-R-018 SHT 1

"(DN0) FILL FUEL OIL GUGE MOUNTED ON MEHNIL ROOM WLL GRDE 1 1/"(DN40) SOUNDING @600 ESS MNHOLE 10 (DN0) RIGID STEEL ONDUIT TO FUEL OIL GUGE INSTLLTION NOTES LENGTH SEE SHEDULE SIDE ELEVTION 10 600 MIN. ONDUIT FOR FUEL OIL GUGE FUEL OIL SUTION ND RETURN PIPING 1 1/"(DN40) SOUNDING Ø00 I.D. MNHOLE WITH WTER TIGHT FLNGED OVER "(DN0) FILL TOP VIEW 600 MIN. 1 1/"(DN40) SUTION ND RETURN PIPING SUTION ND RETURN PIPING SEE SHEDULE FOR SIZE 1 1/"(DN40) OPENING IN UILDING WLL MINIMUM 91 OVER SEE SHEDULE OR DETIL THIS PLTE FOR SIZE MXIMUM mm. ON PPROVED WTERPROOF P ONRETE PD T FILL ND SOUNDING FILL OXES 47x47x10 FILL ND SOUNDING S TO E TERMINTED IN WTER TIGHT LOKING TYPE FILL OX T GRDE GRDE DIMETER 10 "Y" "X" STEEL PIPE OUPLING WELD LL ROUND INSIDE ND OUTSIDE OF TNK DETIL OF ONNETIONS MINIMUM 74mm. OVE GRDE NY UILDING FOOTING MINIMUM 300mm. SEE SITE PLN MXIMUM SLOPE 1:1 END SETION VIEW FUEL OIL TNK GUGE FUEL OIL SUTION ND RETURN S TO HETING UNIT 1. OIL STORGE TNK SHLL E SUITLE FOR UNDERGROUND INSTLLTION ND SHLL E OTED IN ORDNE WITH IPS--TP-74 ND IPS-E-TP-70. SUTION S SHLL E VUUM TESTED TO 100 MIRONS FTER INSTLLTION. RETURN S SHLL E PRESSURE TESTED TO 3. Kg/cm FTER INSTLLTION. 3. LL UNDERGROUND STEEL PIPING SHLL E WELDED EXEPT FOR ONNETION TO TNK. 4. LL DIMENSIONS RE IN MILLIMETER. SHEDULE FOR THE LIGHT OIL STORGE TNK TNK SIZE DIMETER LENGTH RETURN PIPE SIZE SUTION SIZE FILL SIZE IRNIN PETROLEUM STNDRDS NO REVISION PERMITTED UNLESS PPROVED Y STNDRD ORGNIZTION DRWING No. SHT IPS-D-ME-018 DESRIPTION DETILS OF THE INSTLLTION OF THE LIGHT OIL STORGE TNK, UNDERGROUND

VENT PIPE MNHOLE WLL REMOVED IN THE EVENT EXTENSION REQUIRED MNHOLE MNHOLE " (DN0) 1 1/"(DN40) FILL (S REQUIRED) 1/"(DN1) SHUT-OFF VLVES 1 1/4" (DN3) " (DN0) 1/" (DN1) (DN0) 1/" 1 1/4" 1 1/" 1/" 1 1/4" 1/" " " TO & FROM OILER ROOM FUEL OIL TNK FUEL OIL TNK 1"(DN) DRIN VLVE PITH DRIN VLVE DRIN VLVE LL HEK VLVE LL HEK VLVE NOTE: 1- WSTE WTER WELL SHOULD NOT E LESS THN 6m. DEPTH. - ONE ENTRNE DOOR TO E MDE T ORNER. 3- TNK ROOM SLOPE TO E TO WELL. 4- SHUT-OFF VLVE SHOWN THUS. - SHOWN THUS. 6- DISTNE OF "" SHLL E DETERMINDED S PER SITE PLN & ONDITION. 600mm. WSTE WTER WELL DESRIPTION IRNIN PETROLEUM STNDRDS NO REVISION PERMITTED UNLESS PPROVED Y STNDRD ORGNIZTION DRWING No. SHT INSTLLTION OF TWO OR THREE FUEL OIL TNKS TOGETHER (00~3000 LITERS) IPS-D-R-018 3

FILLING P SEE DETIL "D" 00 1800 00 400 DIRT FILL GRDE 400.I. SLEEVE FOR PIPING. INSIDE DIMETER NOT LESS THN 13mm. GRETER THN OUTSIDE DIMETER OF PIPING PSSING THRU. 4"(DN100) FLNGES SEE DETIL "" 00 MSONRY VULT SEE DETIL "" SEE DETIL "" SEE DETIL "" 00 Ø ESS MNHOLE H WITH OLTED WTER PROOF OVER ON EROOF 30 00x6 ND -LYERS ITUMEN ND GUNNEY INSULTION Ø ROD 10 100 ONRETE SE 40 # 4 REINFORING RODS T 10 O.. EH WY FUEL OIL SUTION, RETURN & GGE S-SEE PROJET PLNS FOR SIZE & ONTINUTION SETION - -SEE PROJET DRWINGS FOR SIZE ND ONTINUTION HOOK END OF ROD OVER REINFOREMENT ONRETE ONRETE FOUNDTION OMINTION STRINER & FOOT VLVE T THE END OF SUTION SETION - 600x600 HEVY.I. OX OVER WITH STEEL FRME FILLING P MSONRY RSS P 600 Ø.I. MNHOLE SUMP SEE DETIL "D" 400 4"(DN100) FUEL OIL FILLING PIPE PIPE STONE ND OR RUSHED ROKS TO FROM OX DRIN DETIL "D" NGLE SUPPORT SEE DETIL "" ONRETE FOUNDTION SME LENGTH S TNK PREFERLY 300mm. EYOND TNK ON EH SIDE WELDING NEK FLNGES NOTES : TOP VIEW 1- LL UNDERGROUND PIPING SHLL E WELDED. - LL DIMENSIONS RE IN MILLIMETER. 6 NUT & WSHER (ZIN OTED) 10x100x13x00 LONG 6" DETIL "" TNK SHELL DESRIPTION 00x6 ND 30x90 SLOT 4 Ø ROD THREDED 10mm T END (ZIN OTED) 6 -R 1"(DN) DRIN PIPE T EH SIDE PROVIDE 0.0m 3 (.F.) GRVEL OUTSIDE EH DRIN No. 8 HNNEL. 300x440 LONG 00 RIK WLL 9 38x10 STRPS T 600 O.. IRNIN PETROLEUM STNDRDS NO REVISION PERMITTED UNLESS PPROVED Y STNDRD ORGNIZTION DETILS OF THE INSTLLTION OF THE No. OIL STORGE TNK. (UNDERGROUND) DETIL "" TNK SHELL DETIL "" DRWING No. IPS-D-R-018 SHEET 4

INTERMEDITE PRESSURE LOW PRESSURE STEM.S.M.E. PRESSURE RELIEF VLVE RTING EQUL TO TWO FIRST STGE REDUING VLVES-SET 0.3Kg/cm( P.S.I.G.) HIGHER THN NORML OPERTION PRESSURE STEM IN INSTLLTION NOTES: STEM PRESSURE REDUING VLVE LONG TPER ONENTRI STRINER 1- LL STEM ND ONDENSTE PIPING SHLL E THERMLLY INSULTED. THE FLNGES, S OR VLVES SHLL NOT E INSULTED. FOR INSULTION THIKNESS REFERENE IS MDE TO THE SPEIFITION. SUPPORT SDDLE SUPPORT SDDLE - THE STEM PRESSURE REDUING STTION WITH ONNETING PIPING SHLL E SO INSTLLED THT NO TEMPORRY SUPPORTS RE REQUIRED DURING VLVE REMOVLS. PLN VIEW-SINGLE STGE STEM PRESSURE REDUING STTION LOW PRESSURE STEM PITH DOWN TO NEXT DRIP RELIEF PIPE TO TMOSPHERE.S.M.E. PRESSURE RELIEF VLVE RTING EQUL TO TWO FIRST STGE REDUING VLVES-SET 0.3Kg/cm( P.S.I.G.) HIGHER THN NORML OPERTION PRESSURE GLOE VLVE STEM IN PITH DOWN 3- MNUFTURER'S REOMMENDTIONS ND INSTRUTIONS SHLL E FOLLOWED STEP-Y-STEP DURING INSTLLTION OF VLVE ND TRPS. 4- FTER OMPLETION OF WORK, THE SITE SHLL E MINTINED LEN ND TIDY. STEM PRESSURE REDUING VLVE N0.-1 PRESSURE GGE 0-10.Kg/cm (0-10 P.S.I.G.) 10mm.(6") DIL STRINER PRESSURE GGE 0-10.Kg/cm (0-10 P.S.I.G.) 10mm.(6") DIL SDDLE (PROPOSED) SDDLE SHUT-OFF OK LOW-OFF VLVE SHUT-OFF OK SDDLES SDDLES STRINER Y-PSS S STEM PRESSURE REDUING VLVE NO. TEST VLVE TEE WITH LEN- OUT FLNGE FLOOR STND F & T TRP FLOOR HEK VLVE TEE WITH LEN- OUT FLNGE FLOOR STND LOW-OFF OK TO LOW PRESSURE ONDENSTE TO ONDENSTE UKET TRP STRINER LOW-OFF OK LOW PRESSURE STEM RELIEF PIPE TO TMOSPHERE STEM FRONT ELEVTION-SINGLE STGE STEM PRESSURE REDUING STTION PITH DOWN TO NEXT DRIP.S.M.E. PRESSURE RELIEF VLVE RTING EQUL TO TWO FIRST STGE REDUING VLVES-SET 0.3Kg/cm( P.S.I.G.) HIGHER THN NORML OPERTION PRESSURE PITH DOWN TO NEXT DRIP GLOE VLVE LONG TPER ONENTRI S GLOE VLVE STEM IN PITH DOWN PRESSURE GGE 0-10. Kg/cm (0-10 P.S.I.G.) 10mm.(6")DIL SDDLE STEM PRESSURE REDUING VLVE N0.-3 STRINERS SDDLE (PROPOSED) STEM PRESSURE REDUING VLVE N0.-1 STRINER PRESSURE GGE 0-10.Kg/cm (0-10 P.S.I.G.) 10mm.(6") DIL SDDLE SDDLE SHUT-OFF OK Y-PSS SDDLES S SDDLES PRESSURE GGE 0-10. Kg/cm STEM PRESSURE (0-10 P.S.I.G.) REDUING VLVE NO.4 10mm.(6")DIL LOW-OFF VLVE Y-PSS SDDLES S S SDDLES STEM PRESSURE REDUING VLVE NO. LOW-OFF VLVE STRINER TEST VLVE SHUT-OFF OK DESRIPTION IRNIN PETROLEUM STNDRDS NO REVISION PERMITTED UNLESS PPROVED Y STNDRD ORGNIZTION TEE WITH LEN OUT FLNGE FLOOR STND LOW-OFF OK F & T TRP TEE WITH LEN-OUT FLOOR FLNGE FLOOR STND F & T TRP LOW-OFF OK TO INTERMEDITE PRESSURE TO LOW PRESSURE ONDENSTE ONDENSTE FRONT ELEVTION-TWO STGE STEM PRESSURE REDUING STTION HEK VLVE TO ONDENSTE UKET TRP TEE WITH LEN- OUT FLNGE FLOOR STND STRINER LOW-OFF OK STEM PRESSURE REDUING STTION DRWING No. SHEET IPS-D-R-018