Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Similar documents
TransCanada US Contractor Covered Task List Last updated 9/27/2018

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018

DCP Midstream Contractor Covered Task List Last updated 7/11/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Williams Contractor Covered Task List Last updated 11/7/2017

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017

Appendix A Kinder Morgan Operator Qualification Program List of Covered Tasks - Natural Gas - Part 192 Revised 12/13/2017

ASMECourseCatalog.

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS

Operator Qualification (OQ) Report

Florida City Gas Contractor Covered Task List

PIPELINE CORROSION CONTROL

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER

PHMSA Office of Pipeline Safety Dave Mulligan Western Region

Highway Crossings - Cased or Uncased

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION

New UST Installation Inspection Checklist

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc.

Bolting QA/QC Bulletin

CONTENTS. Foreword...iii. 1. Introduction...1

Official Journal of the European Union L 298/39

Monitoring Cathodic Protection of Natural Gas Pipelines

SPCC Regulation Integrity and Leak Testing Methods

Cathodic Protection for AST s. Why is Cathodic Protection Important?

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES

This article discusses a tank

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.:

PIPELINE INSPECTION SURVEY QUESTIONNAIRE

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

No Infrared Refrigerant Leak Detector

Monthly Checklist For Depot

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair

GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007

The Gradient Control Mat (GCM)

PIPELINE PIGS types of mechanical pigs. Pig length (inches) = 1 and ½ pipeline diameters.

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

Methodologies and practices for non-piggable lines Andreas Landsteiner Integrity Department - Transalpine Pipeline (TAL)

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016

ANNUAL UST SYSTEM INSPECTION CHECKLIST

Client Success Story Sheri Baucom Senior Advisor II

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA

Report of Inspection

PENNSYLVANIA ABOVE GROUND STORAGE TANKS

LINE STOPPING. Extending and modifying your existing pressurized system while it s under full operating conditions.

FUNDAMENTALS OF INSERTION TURBINE METERS Les Bottoms Thermo Electron Corporation, Flow Systems

First Quality Solutions

An Introduction to Constructing and Maintaining Cathodic Protection Systems

Northeast Ohio AWWA October 26, 2017

LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification

Hot-Tap Machines. Specification Sheet TBL Bulletin nº: SPECIFICATION FOR TBL-0322 TAPPING MACHINE Tapping Range 1 through 6

OIL-FREE, ROTARY SCREW AIR COMPRESSORS Two-stage, Air-cooled and Water-cooled Fixed Speed or VFD

24-48 HP250II Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #: 2448HP250OOOM Revision Date: 1/10/11

Daikin Steam Coils. Installation and Maintenance Manual IM 901. Types HI-F5, HI-F8, & E-F5. Group: Applied Air. Part Number: IM 901

Oil & Gas Custody Transfer Data Sheet

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER AUTOMATIC INSERTION PROBE

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE

HOT TAPPING & PLUGGING SOLUTIONS

Baumann Sanitary Diaphragm Angle and Inline Control Valve

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total

2" - 24" OS Series Butterfly Valves. Operation and Maintenance Manual. Job Name: Contractor: Date:

LAR Training. Series 8000 Pneumatic Safety Shut Off Valves Mark Lampe May,

Installation Instructions

Water Connection Repair Method and Techniques

Provides the perfect seal, protects flanges, valves and pipelines against corrosion whilst improving safety and reducing the risk of fire.

Type B (Extruded Branch) Sizes 4 through 30

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com

Biogas safety control equipment

Broetje-Automation Company Standard Structural component specification for welded parts

Transmate. Installation & Operating Manual. Thank you for your purchase of the InsertaValve.

ABB Automation. Variable Area Dial Flow Indicator Series 10A2227. Series 10A2227 Variable Area Dial Flow Indicator

PEI/RP Recommended Practices for Installation of Bulk Storage Plants

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

INSTALLATION INSTRUCTIONS

SITRANS AS 100. Instruction Manual September 2001 ITRANS AS 100

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Installation & Operation Manual

Inline Inspection Technology Overview

GALLI&CASSINA. Plug Valves. Conical

Have you previously been a supplier member? Yes No If yes, most recent year:

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INFLOW ACE CRUDE OIL SAMPLER TELESCOPING INSERTION

Transcription:

001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428 006 Inspection of Breakout Tanks 195.432 Oral and Certificate 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 009 Movement and/or Relocation of Liquid Pipelines 195.424 010 Routine Visual Inspection of Breakout Tanks 195.432 011 Inspect, Test and Maintain Computational Pipeline Monitoring (CPM) Sensing Devices 012 Inspect, Test and Maintain Liquid Leak Detection Flow Computers 013 Inspect, maintain and Test Tank Gauges for CPM Hazardous Liquid Leak Detection 014 Maintain/Prove Flow Meters for CPM Hazardous Liquid Leak Detection 015 Inspect, Test and Maintain Gravitometers/Densitometers for CPM Hazardous Liquid Leak Detection 195.444 195.444 195.444 195.444 195.444 016 Purging - Hazardous Liquids 195.402(c)(10) 018 Inspect Navigable Waterway Crossing 195.412(b) 020 Pump Stations/Units - Startup, Operation and Shutdown 195.402(c)(7) 195.402(c)(8) 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 201 Abnormal Operating Conditions Related to Welding on Pipelines 195.452(h) 192.225 192.227 192.715 192.717 192.713 192.245 195.222 195.214 195.230 195.224 195.226 Oral Page 1 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 26

202 Monitoring of Welding Process 192.241(a) 192.241(c) 192.231 192.235 192.245 203 Visual Inspection of Welds not Non-Destructively Tested 192.241(b) 192.241(c) 204 Non-Destructive Testing (Dye Penetrant) 192.243 205 Non-Destructive Testing (Mag Particle) 192.243 206 Non-Destructive Testing (Ultrasonic) 192.243 207 Non-Destructive Testing (X-Ray) 192.243 213 Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections 192.271 192.273 217 Small Diameter Metal Tubing and Fitting Installation 192.271 192.273 401 of Buried Pipelines When Exposed 192.459 404 Protection of Coating When Backfilling and From Below Ground Supports 192.461(d) 192.614(c)(6) 192.461( c ) 192.319(b) 195.204 195.224 195.228 195.234 Oral 195.204 Oral 195.126 195.569 Oral 195.252 195.422 405 Protection of Coatings From Above Ground Structures 192.461(d) 406 Conduct Test to Determine Cathodic Protection Current Requirements 192.465(a) 407 Perform Cathodic Protection Survey 192.465(a) 192.465(e) 192.328(e) Oral 195.571 195.573(a) 408 Inspect Cathodic Protection Rectifier 192.465(b) 195.573( c ) 409 Inspect Interference Bonds 192.465(c) 195.573( c ) 410 Clear Shorted Casing 192.467(c) 195.401(b)(1) 195.575(a) 411 Inspect/Test to Assure Electrical Isolation is Adequate 192.467(d) 195.575 412 Install CP Leads on Pipeline Using Exothermic Weld 192.471 195.567 413 Anode Installation on Submerged Pipeline or Facilities 192.471 Page 2 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 26

414 Inspect for Internal Corrosion Whenever Pipe is Removed 192.475(b)(1) 415 Monitoring for Internal Corrosion with Probes and Coupons 192.477 192.620(d)(5) 416 Monitoring for Internal Corrosion with Gas Samples 192.477 195.579(c) 195.579(b) 417 Atmospheric Corrosion Monitoring 192.481 195.581 418 General and Localized Corrosion Measurement (Remedial Measures) 192.485(a)(b) 419 Cathodic Protection Potential Measurement 192.465(a) 192.620(d)(8) 195.585(b) 195.587 195.573(a) 420 Soil Resistivity 421 Measurement of Depth of Pitting with Pit Gage 192.485 195.569 195.585 422 Assessment of Pipeline Segments Using Long Range Guided Wave UT 423 Perform Direct Current Voltage Gradient (DCVG) Survey 192.490 192.620(d)(7) 424 Perform AC Current Attenuation (ACCA) Survey 192.490 192.328(e) 192.620(d)(7) 425 Perform Alternating Current Voltage Gradient (ACVG) Survey 192.112(h)(3) 192.620(d)(7) 195.588 195.588 195.588 428 Pin Brazing to Install CP Leads on Pipeline 192.471 195.567 436 Perform Close Survey 192.328(e) 192.465(e) & (7) 195.573(a) 437 Perform Hot Spot Survey 192.465(e) 195.573(a) 480 Apply Approved Coating by Hand Application 192.461(a) 195.557 195.559 195.581 482 Apply Approved Coatings by Mechanical Spray and Hand Application Methods 192.461(a) 195.557 195.559 195.581 484 Apply Approved Coatings by Wrap Application 192.461(a) 195.557 195.559 195.581 Page 3 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 26

501 Conduct a Pressure Test 192.505 192.507 192.513 192.328(d) 502 Conduct Pressure Test on Pipe that is to be Operated at a Pressure <100 psig 601 Start-up/Shut-down of Pipeline to Assure Operation Within MAOP / MOP 192.509 192.511 192.513(b) 192.605(b)(5) 602 Monitoring Pipeline Pressure 192.605(b)(5) 192.619 603 Compressor Units: Startup, Operation, Shutdown and Purging Before Returning to Service 604 Locate, Mark, and Remediate Exposed Pipelines in the Gulf of Mexico 192.605(b)(7) 192.605(b)(6) 195.304 195.305 195.306 195.402 195.406 195.402( c )(9) 195.406 Oral 192.612(b) 195.413 606 Locate and Mark Submerged Pipelines 192.614(c)(5) 607 Damage Prevention: Observation of Excavating and Backfilling 192.614(c)(6) 192.319(b) 195.252 195.442(c)(6) 608 Damage Prevention for Blasting Near a Pipeline 192.614(c)(6) 195.442(c)(6) Oral 609 Inspect and Maintain Odorization Equipment 192.625(e) 610 Monitor Odorant Concentration 192.625(f) 611 Hot Tap (Steel Pipe) 192.627 612 Hot Tap (Plastic Pipe) 192.627 613 Purge Pipeline Facilities With Gas 192.629(a) 614 Purge Pipeline Facilities With Air or Inert Gas 192.629(b) 195.422 195.402(c)(10) Oral 616 Atmospheric Monitoring during Hot Work Operations 195.402( c )(11) 617 Locate Buried Facilities with an Electro-magnetic Device 192.614(c)(5) 195.442(c)(5) 618 Install Temporary Marking of Buried Pipeline 192.614(c)(5) 195.442(c)(5) 619 Damage Prevention during Vacuum Excavation and Backfilling Activities 192.614(c)(6) 195.442(c)(6) Oral Page 4 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 26

661 Launching and/or Receiving Internal Devices (Pigs) 192.937(c) 192.476 192.620(d)(5)(iv ) 192.620(d)(9) 701 Patrolling Pipeline and Leakage Survey without Instrument 192.705 192.613 192.706 192.620(d)(4) 192.721 195.426 195.412(a) Oral 702 Leakage Survey with Leak Detection Device 192.706 703 Placing/Maintaining Line Markers 192.707 195.410(a) 195.410(c) 704 Permanent Field Repair by Grinding 192.713 195.226 195.230 705 Permanent Field Repair Using Composite Materials (Clockspring) 706 Permanent Field Repair Using Composite Materials (Armor Plate) 192.713 195.422(a) 195.585(a)(2) 192.713 195.422(a) 195.585(a)(2) 707 Permanent Field Repair Using Bolt-On Clamp/Sleeve 192.717 195.422(a) 195.585(a)(2) 708 Permanent Field Repair Using Full Encirclement Weld Sleeve 709 Inspection and Testing of Relief Devices (Compressor Stations, Meter Stations, Regulating Stations) 710 Inspect/Test Compressor Station Remote Shutdown Devices (ESD/EBD) 192.717 195.585(a)(2) 195.422(a) 192.731(a) 192.731(b) 192.739 192.743 Oral Certificate and Oral Certificate and Oral 195.428 192.731(c) 711 Inspect, Test, and Maintain Systems 192.731(c) 195.408(b)(1) 195.408(b)(1) 712 Programmable Logic lers 192.731(c) 195.408(b)(1) 195.428(a) 713 Test/Maintain Gas Detection and Alarm Systems 192.736(c) 714 Inspect and Maintain Pressure ing and Regulating Devices 715 Test and Maintain Pressure Switches and Transmitters in Pressure ing and Regulating Service 192.739 192.743(a) 192.619(b) 192.739 192.743(a) 192.619(b) 716 Inspect, Maintain, and Operate Valves 192.745 717 Maintaining Vaults With Pressure Regulating and Pressure ing Equipment 195.428 195.428 192.749 Yes 1:3 1 Page 5 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 26

718 Monitoring for Internal Corrosion with Liquid Samples 192.477 192.620 195.579 725 Aerial Leakage Survey: Transmission 192.706 736 Valve (Pneumatic) Actuator/Operator Inspection, Testing and Maintenance 737 Valve (Hydraulic) Actuator/Operator Inspection, Testing and Maintenance 738 Valve (Electric) Actuator/Operator Inspection, Testing and Maintenance 192.745 192.745 192.745 762 Line Stopping Utilizing a Hot Tap Fitting 900 ROW Observance (Identifying Foreign Facilities) 192.620(c)(6) Oral 901 Hauling, Stringing and Handling Pipe Oral 902 Field Bending of Pipe 192.313 903 Directional Drilling and/or Boring 192.307 192.319 192.325 192.461 192.620(c)(6) Oral 904 Inspection of Material 192. 328(a)(1) Oral 905 Lowering/Installation of Steel Pipe into Ditch 192.328(a) 192.319 906 Rights-of-Way Cleanup 192.317 192.620(d)(4) 907 AC Mitigation 192.328(e) 192.473(a) 908 Installation of Cathodic Protection 192.453 192.620(c)(6) 195.246 Oral 909 Data Collection for As-Built Pipe Location Documentation 910 Inspection of Construction Activities 192.305 192.620(c)(6) Oral Page 6 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 26