Instructions for installation, operation and maintenance of: GATE VALVE

Similar documents
Instructions for installation, operation and maintenance of: SWING CHECK VALVE CSEN CSBS CAPS CSWEN CSWAPI. TERMOVENT SC Temerin Republic of Serbia

INSTRUCTIONS FOR INSTALLATION, OPERATION AND MAINTENANCE OF

INSTRUCTIONS FOR INSTALLATION, OPERATION AND MAINTENANCE OF

USERS MA UAL Bellow sealed valve Fig.229, 230, 234, 235 Edition: 1/2008

GT-200 GATE VALVES PN16, Screwed end

Installation and operating manual Quick closing valve (Bellow sealed) LK product no:

Operating & Maintenance Manual For Steam Conditioning Valve

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Guide

Storage, operating and maintenance instructions for AZ plug valves and Standard valves

Operating Instructions

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

KEYSTONE OPTISEAL F14/16-15/17 AND BREWSEAL BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

APCO CRF-100A RUBBER FLAPPER SWING CHECK VALVES

Mounting and Operating Instructions EB 8097 EN. Type and Type Pneumatic Control Valves

Mounting and Operating Instructions EB 8039 EN. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve

BUTTERFLY VALVE WITH WELDED ENDS INSTALLATION AND MAINTENANCE MANUAL

IMOI 2010 Rev 0

FIVC. Static Balancing Valve. Technical data. Dimensions

T R A N S L A T I O N Declaration of Conformity as per Directive 2014/68/EU

Declaration of Conformity as per Directive 97/23/EC

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation and operating manual

BCV30 DN20 - Blowdown Control Valve Installation and Maintenance Instructions

DeZURIK KUL KNIFE GATE VALVES

AVK SERIES 55 AND 06 GATE VALVES, DN 450/500/600

Installation, Operation, and Maintenance Manual Full Port Y-Pattern, Bolted Bonnet, Globe and Check Valves

APCO CSV-1600 SURGE CHECK VALVE

Mounting and Operating Instructions EB 8222 EN. Type 3310/AT and Type 3310/3278 Pneumatic Control Valves. Type 3310 Segmented Ball Valve

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

Mounting and Operating Instructions EB 8053 EN. Series 250 Type and Type Pneumatic Control Valves

DeZURIK 2 20" BOS BUTTERFLY VALVES

ONYX VALVE CO MODEL DAC-ADA Installation & Maintenance

Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

Installation & Operation Manual

Series 250 Pneumatic Control Valves Type and

Crispin Valves Operating Guide. Crispin

back to main page Type: Butterfly valves Instructions and Operation Manual Warning! Warning! Danger for life! 1. Intended use Danger for life!

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

VB VALVES & AUTOMATION

Mounting and Operating Instructions EB 8048 EN. Type and Type Pneumatic Control Valves Type 3249 Aseptic Angle Valve

Mounting and Operating Instructions EB 8111/8112 EN. Valve Series V2001 Globe Valve Type 3321

Valve Series V2001 Three-way Valve Type 3323

INSTALLATION, OPERATION & MAINTENANCE MANUAL MODEL BC.

CSA products for waste water. Combination air valve. Mod. SCF 2

Operating Guide SBFV (PN16/25) ENGLISH Steel butterfly valve SBFV Page 2. Danfoss VI.IX.A1.02 1

PN9000 Series Pneumatic Actuators Installation and Maintenance Instructions

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil

ONYX VALVE CO MODEL DAC-PFO Installation & Maintenance

APCO ASR-400/450 SEWAGE AIR RELEASE VALVES

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

Installation, Operation, and Maintenance Manual

J Flow Controls Model Numbering

DeZURIK 2-24 (50-600mm) KGN-RSB BI-DIRECTIONAL CAST STAINLESS STEEL KNIFE GATE VALVES

FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL

Gate valves Gate valve 700 HJ/JJ (GA PN 10-40) PN DN

DeZURIK KSV CL150 & CL300 BONNETLESS KNIFE GATE VALVES

73000 Series Masoneilan* Sweep Angle Control Valves Models XX-73471

Operating Instructions

Maintenance instruction

In combination with an actuator, e.g. a SAMSON Type 3271 or Type 3277 Pneumatic Actuator

These installation and maintenance instructions must be read in full and completely understood before the installation!

Installation, Operation, and Maintenance Manual

Fig.01 Fig.02 Fig.03. Disassembly & Reassembly Instructions SBV-HP - Page 3

DeZURIK 2-24 (50-600mm) KGC ES or HD KNIFE GATE VALVES

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

Installation, Operation, and Maintenance Manual. Gate, Globe, and Check Valves

Installation and Operating Instructions

Nor East. Instructions Safety Messages. Inspection. Parts. DeZURIK Service. Type 05 Pneumatic Actuator Used With Globe Valves

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

series BUTTERFLY VALVE DOUBLE ECCENTRIC FLANGED FAF 3800 PRODUCTION STANDARDS DN100 DN2000 PN Design EN 593 EN ISO Flanged

Installation Operation Maintenance. LSSN Butterfly Valve AGA Approved 50MM - 150MM. QAD#IM6055.REVA

INSTALLATION & MAINTENANCE MANUAL

OPERATION AND MAINTENANCE MANUAL 2-66 SERIES 2500 RESILIENT WEDGE GATE VALVE

Operating Instructions: Hand-operated, PTFE-lined butterfly valves, Series 22/23

Operating and installation instructions

USER INSTRUCTIONS. Kämmer SmallFlow / / SP Low and Micro Flow Valves. Installation Operation Maintenance

26 Series Stainless Steel 2-way Ball Valves

Mounting and Operating Instructions EB 5894 EN. Electric control valves with jet pump. Flanged version of valve with jet pump

Pressure Reducing Valve Type 2114/2415

Operating and installation instructions

INSTRUCTION MANUAL. for BUTTERFLY VALVES

Danfoss Butterfly Valve

Globe Valve Type Fig. 1 Type 3241 Globe Valve. Mounting and Operating Instructions EB EN

Mounting and Operating Instructions EB 8111/8112 EN. Series V2001 Valves Type 3321 Globe Valve

GL Ludemann Y-Strainers

ONYX VALVE CO MODEL CAR, CAP-PFO Installation & Maintenance

Operating Instructions Garlock Butterfly Valves DN : mm / 2-24

Serie 2003/2013. Three-way Control Valve, mixing/diverting. Wörth am Main. Service. Control Valve Division

Company Standard Mounting Instructions for Type Valves with Type AT Actuator

NAF-Torex butterfly valves Maintenance and installation instructions List of spare parts

CSA products for waste water. Anti water hammer combination air valve. Mod. SCF-RFP

Baumann 24000F Wafer Control Valve

CAST IRON GATE VALVE WITH THREADED END DN25-50 PFA bar

In combination with an actuator, e.g. a SAMSON Type 3271 or Type 3277 Pneumatic Actuator

ONYX VALVE CO MODEL CHR & CHP Installation & Maintenance

Operating Instructions ROCO Butterfly Valve with SKG Slider-crank Mechanism, with Electric Multi-turn Actuator

INSTALLATION, OPERATION & MAINTENANCE MANUAL. 0.- Description Handling Installation Actuators Maintenance...

Transcription:

Instructions for installation, operation and maintenance of: GATE VALVE GEN GAC GAF/GENF TERMOVENT SC Temerin Republic of Serbia

Instruction for installation, operation and maintenance: Table of Contents 1. General safety information s... 3 2. Product description... 3 3. Transport and storage... 5 4. Installation and start-up... 5 5. Usage and maintenance... 6 6. Service and repair... 7 7. Possible malfunctions and solutions... 8 8. Guarantee... 9

1. General safety information s Instructions for installation, start-up and maintenance during the period of exploitation of valves manufactured in the TERMOVENT SC should be used as a manual intended for all personnel directly or indirectly involved in dealing with the aforementioned goods. These instructions are only related to GATE VALVES. Operators in charge of installation, operation and maintenance of gate valves during the period of use, should be fully trained for the correct / optimal performance of these tasks. If gate valves are equipped with mechanical actuators, the operator should be trained for the adequate operation of such valves. Before the service or reinstallation of the gate valves, the plant or installation should be taken out of operation (pressure 0 bar, temperature of valves should be the same temperature as the environment). Because valves in working conditions have hot parts (handwheel, body and bonnet) and may cause burns, the operator has an obligation to undertake all necessary precautions to avoid such by using protective facilities. These products are recyclable. No ecological hazard is anticipated with the disposal of these products providing due care is taken. 2. Product description The main purpose of the gate valves is to isolate fluid flow through pipeline. If anything is unclear at the time of installation, start-up or during use, and not covered in these instructions, the departments of the TERMOVENT SC should be contacted directly in order to obtain the required support. All gate valves manufactured in TERMOVENT SC are marked with following marks: Identification of manufacturer ( TERMOVENT SC logo); Nominal diameter of gate valve DN (mm) or NPS (inch); Nominal pressure PN or Class rating (#); Material designation of body and bonnet; Body and bonnet melt identification/heat number; Trim identification- material grade for stem, wedge and seat; Unique serial number; Date of manufacture (month and year) ; Maximum allowable pressure at maximal temperature The product standard designation : i.e. EN 1984, API 600 ili API 602 Pipe ends flanges and body/bonnet flanges grooved for ring joints and the rings to be used with them shall be marked with corresponding ring number; CE marking (if it is manufactured in accordance with PED 97/23/EC (PED 2014/68/EU) or API marking (if it is manufactured in accordance with API Specification) Other marks in accordance with customer request or product standard. Page 3 of 9

Fig. 1 Part name Table 1. Pos. Part Name Quantity Spare Parts 1 Body 1 2 Bonnet 1 3 Wedge* 1 4 Stem 1 5 Stem Nut 1 6 Stud bolts ** 7 Nuts ** 8 Bonnet gasket 1 YES 9 Stem gasket 1 set YES 10 Gland Bolts 2 11 Gland Nuts 2 12 Handwheel 2 13 Yoke 1 * 3a- split wedge, 3b-solid wedge ** Quantity depend from DN and PN or Class Page 4 of 9

3. Transport and storage Transport and storage of valves should be performed at a temperature between -20 C to +60 C and should be protected against outer and atmospheric influences, as well as protecting painted surfaces against damage. The purpose of painted surfaces is to protect valves against corrosion during transport and storage. The basic version of valves are protected with particular/special paints applied to the outer parts and protective preservatives inside. As such, any corrosion is prevented for a period of 6 months. Protection for special conditions is applied only with prior agreement. It is recommended to store the valves in closed, dry and ventilated storage facilities and to protect valves against any atmospheric influence. In order to avoid the appearance of corrosion before the expiry of protection it is necessary to store the valves on a pallet/crate or other appropriate place. You must not lift the valves using the connection flange holes or the handwheel you should use lifting straps to secure the valves to the lifting equipment; You must not remove the protection covers from the valve connection ends; It is not advisable to store the valves in the open position - store them in the closed position. 4. Installation and start-up Gate valves are delivered with their wedge in the closed position and they are ready for use. After the removal of the protection covers it is necessary to thoroughly clean inside the gate valve with compressed air without first opening the valve. Closure of a valve is performed by turning the handwheel in a clockwise direction. On the handwheel is an arrow and the letter C indicating the closing direction, and another arrow and the letter O indicating the opening direction. When installing gate valves with flanged ends it is necessary to take into consideration the selection of adequate bolt material and the appropriate type of gasket depending on the type of working fluid, pressure, temperature, and the type of flange facing. It is necessary to install gaskets strictly in accordance with instructions given from the manufacturer of the gaskets. Gate valves with welding ends should be welded onto the pipeline by an expert and with appropriate WPS. After welding, if necessary, local normalization should be performed and the inside of the pipeline should be cleaned to remove possible welding remains. At the moment of installation the influence of the load of the pipeline on the gate valve should be reduced. The same also applies for temperature oscillation, hydraulic impact and similar. The gate valve should not be used as a support for a pipeline. Each product after assembling is hydraulically tested leading to wetting the sealing of the package. As a result, before installation, may be difficult manipulation with hand wheel. This phenomenon does not affect the functionality of the product. It is possible after the installation, start-up and operating parameters are set to detect a leakage on the stem packing. In this case it is necessary to tighten the gland nuts equally. The tightness should not exceed more than necessary to allow comfortable manipulation of the valve (opening / closing). If it is necessary, new stem packing rings of the same quality should be added to the packing. Page 5 of 9

Each product after assembling is hydraulically tested the result of which is wetting of the sealing package. As a result, may be difficult manipulation with handwheel before installation. This do not effect on the functionality of product and this phenomenon will be eliminated after installation gate valve on the pipeline; You must not lift the gate valves using the connection flange holes or the hand wheel at the moment of the installation the gate valve on the pipeline you should use lifting straps to secure the valves to the lifting equipment; Before installation the impurities should be removed from the pipeline or from the appliance; Remove protecting covers from the gate valve ends, degrease and clean the inside of the gate valve, and in case of a flanged connection, carefully clean the sealing surfaces; Confirm that the marks on the gate valve correspond to the projected parameters of the plant (e.g. size, pressure, material etc.) and installation is according to allowable flow direction; Confirm that the velocity of the fluid at the place of the installation is in range of the recommended velocity; During the installation check if there is enough space for normal and safe manipulation; At the moment of testing of a pipeline or an installed appliance valve; take care about the predicted maximal differential pressure. 5. Usage and maintenance It is convention during usage of the gate valves that all minor defects, if operating conditions allow, should be repaired on the spot. If not, the gate valve should be dismantled from the site in order to perform a full repair. If the gate valve is severely damaged it should be replaced with a new one. Such repairs protect gate valves against further deterioration, being permanently out of work and being the cause of severe accidents in the plant. The valve stem packing should be the subject of particular attention as it is important for the qualitative maintenance of tightness and should be periodically checked. If leakage at the stem packing is detected, the gland nuts should be tightened slowly (Fig. 2). When gland nuts are tightened, if the gland falls down more than twice the packing ring height, new packing rings should be added to the stem packing. Fig. 2 Stem packing gland tightening After a longer period of use, the valve stem packing becomes rigid and unusable so a replacement should be done. When the replacement of stem packing is performed, remains of the old packing should be removed carefully and the sealing chamber Page 6 of 9

should be thoroughly cleaned before the new packing is installed. The packing rings of the new stem packing should be identical in quality as before, especially for valves with high working parameters. Individual packing rings should be used for stem packing (Fig. 3) and arranged in a manner that the connection of one ring is at angle of 90 to the connection of next one. Fig. 3 Stem packing ring In case of leakage through gaskets between gate valve connection flanges or between the bonnet and body, it is necessary to make replacements of the gaskets as soon as possible to prevent damage of the sealing surfaces due to erosion. During usage, leakage of the fluid between wedge and seat may appear. Leakage of fluid through the body or bonnet (decrease of homogeneity which is result of hidden mistakes on cast parts) may appear. Causes for loosening of the disc may be: foreign particles, erosion, abrasion, cavitation, corrosion, etc. In cases of any nonconformity, please contact manufacturer. The gate valves equipped with grease nipple should be lubricated every month, or twice a year, if they are rarely used. It is recommended to replace the grease in bushes during every general overhaul or during the pipeline revision. The type of grease depends on the temperature in the plant. Remote controls, bushings and gearboxes should be lubricated depending on how frequently they are used, every six or twelve months. During usage gate valves must be completely in an open or closed position; If, when a gate valve is overhauled, a decrease of wall thickness of more than 30% is detected at any of the ports (due to erosion) the valve should stop being used; Any time when a gate valve is dismantled or reinstalled the gaskets should be replaced with new ones with the appropriate quality; Control of the gate valve, opening and closure, by the handwheel should be done only by hand, without the use of auxiliary means such as a rod or similar Gate valve maintenance and manipulation during use should be done only by experts and persons well trained for such purpose; At the moment of installation of the plant sudden and extreme change of pressure and temperature should be avoided; A Strainer being installed before the valve will increase its reliability and proper working. 6. Service and repair Only authorized persons should perform service and repair with appropriate tools and, if it is possible, using original spare parts. Personal protection should be applied in accordance with valid regulations and legalizations. Attention should always be paid to the reliability of the valves and parameters of the working implementation / plant, and only materials which can successfully replace those originally installed should be used. For highly reliable gate valves (valves which work with high temperatures, high pressures or with dangerous fluids) any service, repair or replacement should be done Page 7 of 9

professionally and responsibly in accordance with valid regulations for safe working conditions at the plant. Before the service or reinstallation of the valves, the plant or installation should be taken out of operation (pressure 0 bar, temperature of valves should be the same temperature as the environment). Every Gate valve serviced or repaired should be subject to all necessary tests usually performed for a newly produced Gate valve. Bolts for connection between body and bonnet should be tightened evenly and crosswise applying appropriate torque when the Gate valve is in the open position. Possible torques for tightening are listed in Table 2 and the selection of torque depends on the material grade of bolts and nuts used, as well as the quality of the gasket of the bonnet. Table 2. Thread M8 M10 M12 M14 M16 M20 M24 M27 M30 M33 M36 Torque /Nm/ 8 20 15 40 26 65 42 100 64 150 125 300 210 500 305 730 410 1000 550 1350 710 1720 Gaskets between the body and bonnet of the valves should be manipulated with high precautions because they contain stainless steel wire which can cause severe injuries. 7. Possible malfunctions and solutions During the period of usage of the installed gate valve malfunctions may occur. Only experts in the premises of the user should undertake repairs. The most common cause of malfunctions and how to overcome such situations is listed in Table 3. Table 3. Failure Possible cause Resolving Gate valve is in closed position Open the gate valve Absence of flow Remove protection covers from Protection covers are not removed connection ends Reduced or aggravated flow Difficult manipulation Leakage on bonnet gasket Gate valve is not completely open Dirty Gate valve or pipeline Dry stem (Pos. 4)/stem nut (Pos.5) Gland nuts (Pos.11) are too tight Nuts (Pos.7) are not tightened Bonnet gasket (Pos.8) is damaged Gland nuts (Pos.11) are not tightened Open the valve completely with handwheel (Pos.12) Check and clean gate valve or pipeline Grease stem (Pos.4) Slightly loosen Gland nuts (pos.11) with precaution to preserve sealing of the stem packing (Pos.9) Tighten Nuts (Pos.7) Disassemble bonnet (Pos.2) and replace bonnet gasket (Pos.8) with new one Tighten Gland Nuts (Pos.11) Leakage on stem packing Leaking on seat Stem packing (Pos.9) lost own functionality Gate valve isn t completely closed Mechanical damages of seat or wedge Working medium contains solid dirt particles Completely open the valve and carefully add new stem packing rings to original stem packing (Pos.9) or replace whole stem packing (Pos.9) with new one Turn handwheel (Pos.12) in direction indicated for closing without auxiliary means Contact the manufacturer Clean Gate valve thoroughly. (Then, install Strainer before Gate valve) Page 8 of 9

8. Guarantee The Guarantee issued by TERMOVENT SC confirms the safe working of its products under conditions when these products are properly installed in accordance with the instructions in the documentation given to the customer, and usage is in accordance with approved technical conditions and working parameters. The Guarantee is void if inappropriate parts from other manufacturers are implemented, if the user changes construction, or if there is any decline in function or malfunction due to natural wear and tear. Guarantee conditions: The Guarantee is valid for defective parts or defective products, when any such defect is confirmed by an expert engaged by the customer and approved by experts from our company. In such a situation TERMOVENT SC will replace the defective part(s) or defective product(s). Replacement of defective part(s) or defective product(s) with new one(s) should be done only by an expert engaged by the customer upon approval or by instruction of our experts and in accordance with the instructions for installation. The Guarantee period is not valid if installation and manipulation of the valves isn t in accordance with these instructions. The Guarantee period for all replaced parts or product(s) starts from the moment the replacement(s) is/are done. Guarantee is valid only for following storage and maintenance conditions: Crate and pallets with gate valves should be stored indoors in a building with access limited to authorized personnel only. In the case of an inappropriate storage place crates (or pallets) should be stored under an awning and should be protected against rain and moisture with an appropriate waterproof cover, again with access limited to authorized personnel only. Gate valves should only be taken out of a crate or removed from the covering of a pallet just before installation and only quantity to be installed should be taken out / removed. After the gate valves for installation are taken out of a crate (or pallet) the crate/pallet should be closed/covered again. Do not remove the protector covers from gate valves until installation. Gate valves prepared for installation should be manipulated and transported in a careful manner to prevent possible mechanical damage. After detection of mistakes Termovent SC should be informed immediately. Claims must be made in writing. Page 9 of 9