TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES TWIN AL59 CONDUCTOR FOR TRANSMISSION LINE

Similar documents
TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES ACSR MOOSE CONDUCTOR FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS FOR HARDWARE & ACCESSORIES -ACSR DOG CONDUCTOR FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-AL 59 CONDUCTOR FOR 220 KV TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-ACSR PANTHER CONDUCTOR FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES ACSR MOOSE CONDUCTOR FOR 400 KV TRANSMISSION LINE WITH QUAD ACSR MOOSE

TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE

SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE

TECHNICAL SPECIFICATIONS

026-2 : 1996 CEB STANDARD

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

SUSPENSION 04 CLAMPS

Overhead transmission lines Spacers

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 110 V, 100 Ah / 250 Ah & 220 V, 250 Ah / 350Ah TUBULAR LEAD ACID BATTERY SETS

: DGVCL/11KV D.O.FUSE/SPECIFICATION : : 11KV DROP OUT FUSE CUTOUTS :

TECHNICAL SPECIFICATION FOR 11 KV DROP OUT (D.O.) FUSE with Polymeric Insulators:

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

Dakshin Gujarat Vij Company Limited

SPECIFICATIONS FOR 50 V, 600 AH LEAD ACID BATTERY

023 : 2006 CEB STANDARD. 12kV & 36kV LOAD BREAK SWITCHES CEYLON ELECTRICITY BOARD SRI LANKA

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES :

MATERIAL FOR FIBRE OPTIC LINES. General C-bracket HSU trunnion type, forged, for aluminium based OPGW conductors...

045 : 2000 CEB STANDARD

MGVCL//11KV D.O.FUSE/SPECIFICATIONS -:11KV DROP OUT FUSE CUTOUTS:-

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

Technical Specifications

شركة كهرباء محافظة القدس المساهمة المحدودة

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

66 kv SF6 CIRCUIT BREAKER (SPRING OPERATED)

SPACERS AND SPACER DAMPERS

TECHNICAL SPECIFICATION FOR 11 KV AIR BREAK (A.B.) SWITCHES:

12-SDMS-02 REV. 05 ( )

Technical Specification for 33 KV 200 AMPs,H.G,Fuse set.

UNITED STATES COAST GUARD OCEAN ENGINEERING DIVISION WASHINGTON, D.C. JANUARY 2011 SPECIFICATION FOR THE MANUFACTURE

Overhead transmission lines Tension clamp

EARTH WIRE FITTINGS 08

SPECIFICATIONS OF REWIRABLE KIT KAT FUSES

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

TEKNISK RIKTLINJE TR05-10E

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Product Specifications for Phase Over Phase GOABS(r)

CENTER BREAK GROUP OPERATED AIR BREAK SWITCHES RATED 15.5kV THROUGH 170kV EFFECTIVE DATE: 10/25/16 REV B

ASSEMBLY TOOLS FOR BOLTS & NUTS. Part 3: Insulated Wrenches

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

31-SDMS-02 REV. 01 SPECIFICATIONS FOR

Volume-III : Section-I 370 Technical Specifications

Annexure B (1)- Engineering Instructions for Installation of Aerial OFC

TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY.

34-SDMS-01 SPECIFICATIONS FOR

Technical Specification of 11KV 200Amp. (3-Pole/2-Pole) Air Break Switch Scope Description of the materials Standards Insulator make

TENSION CLAMPS AND JOINTS. General Wedge tension clamp without jumper guide, for aluminium based conductors... 79

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENT AND QUANTITIES

TECHNICAL BID T 3627

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

SUSPENSION 04 CLAMPS

Section V DC Nickel Cadmium Alkaline BATTERY

PROCUREMENT SPECIFICATION FOR CNP19 CHERRY RIVETLESS NUT PLATE

Technical Specification

TITLE: SPECIFICATION FOR BENCH VICE & BENCH GRINDER TABLE OF CONTENTS. 0.1 Circulation List. 0.2 Amendment Record

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS FOR 220 V BATTERY CHARGER

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

Armor Rods. Armor Rods NOMENCLATURE GENERAL RECOMMENDATIONS

Technical Specification for 12kV Powder Filled Current Limiting Fuse-Links for Use in Switchgear (In Oil)

ov-lifting_bolts_divider - Updated Lifting Bolts

SPECIFICATIONS FOR MOTOR OPERATED VALVES

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

WESTERN ELECTRICITY SUPPLY COMPANY OF ORISSA, WESCO. GUARANTEED TECHNICAL PARTICULARS 1 of 2

THERMOLIGN Products for 3M Aluminum Conductor Composite Reinforced (3M ACCR)

017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA

Overhead transmission lines Vibrationdampers

Product Specifications for Aluminum Vertical Break Switches

Guideline No.: E-04(201610) E-04 GENERATORS. Issued date: October 28,2016. China Classification Society

Conductor Protection. results

TECHNICAL SPECIFICATIONS FOR STEEL PLATES

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

MIL-STD-883G METHOD LEAD INTEGRITY

S. K. Industrial Corporation

43-SDMS-01 SPECIFICATIONS FOR

Standard Compression Dead End for ACSR and ACSS Conductor CAUTION: ACSR Dead Ends Cannot Be Used on ACSS HT Conductor

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M

Draft Indian Standard SAFES Part 1 Specification (Fifth Revision)

Technical Specification for 12kV and 24kV Current Limiting Fuse- Links for Overhead Applications

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

TENDER NO. MGVCL / PP / D2 / 4017/Metal LTDB

SCHEDA TECNICA. Sospensione per cavo 13,5 mm MS214A00 Sospensione per cavo 16,5 mm MS220A00. Description: Suspension clamp for cable 13,5mm and 16,5mm

SECTION IV OF ELECTRICAL MATERIALS GROUP -A. Tender Notice No. NESCO Utility/ MR Materials/ 18/13138 Dt

PLASTI-GRIP* Terminals and Splices

EXCLUSIVE AUSTRALIAN DISTRIBUTORS

OPTOFIT CATALOGUE. FITTINGS FOR METALFREE (ADSS CABLES) and METAL ARMOURED (OPGW & OPPW) AERIAL CABLES WITH INTEGRATED OPTICAL FIBRES.

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER ALLOY GATE, GLOBE AND CHECK VALVES FOR WATER WORKS PURPOSES ACCORDING TO IS 778:1984

TECHNICAL SPECIFICATION

ov-lifting_bolts_divider - Updated Lifting Bolts

Transcription:

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES TWIN AL59 CONDUCTOR FOR TRANSMISSION LINE GETCO/E/TS HW017-AL59/R0 DT. JUNE 2015 Page 1 of 24

SPECIAL INSTRUCTIONS TO BIDDER Please read following instructions carefully before submitting your bid. 1. As this is specialize high current carrying capacity conductor, bidder should have Design, manufactured & tested all hardware which can carry same current that of Conductor & should submit design calculations to purchaser. 2. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in AutoCAD format and manuals in PDF format, for offered item shall be submitted. Also the hard copies as per specification shall be submitted. 3. The bidder shall submit Quality Assurance Plan for manufacturing process and Field Quality Plan with the technical bid. 4. The bidder shall have to submit all the required type test reports for the offered item. In case of non-submission of type test reports, the evaluation shall be carried out accordingly. 5. The bidder must fill up all the point of GTP for offered item/s. Instead of indicating refer drawing, or as per IS/IEC, the exact value/s must be filled in. 6. All the points other than GTP, which are asked to confirm in technical specifications must be submitted separately with the bid. 7. The bidder is required to impart training in view of manufacture, assembly, erection, operation and maintenance for offered item, at his works, to the person/s identified by GETCO, in the event of an order, free of cost. The cost of logistics will be borne by GETCO. 8. Please note that the evaluation will be carried out on the strength of content of bid only. No further correspondence will be made. 9. The bidder shall bring out all the technical deviation/s only at the specified annexure. 10. The bidder should indicate manufacturing capacity by submitting latest updated certificate of a Chartered Engineer (CE) Page 2 of 24

Bidder to satisfy the following requirements. QUALIFYING REQUIREMENT DATA (For Supply) 1) The bidder shall be Original Equipment Manufacturer (OEM). The offered equipment have to be designed, manufactured and tested as per relevant IS/IEC with latest amendments. 2) The minimum requirement of manufacturing capacity of offered type, size and rating of equipment shall be 7 times tender / bid quantity. The bidder should indicate manufacturing capacity by submitting latest updated certificate of a Chartered Engineer (CE). 3) Equipment proposed shall be of similar or higher rating (suitable for twin ACSR Moose conductor & dead end of AL59 conductor) and in service for a minimum period of THREE (3) years and satisfactory performance certificate in respect of this is to be available and submitted. 4) The bidder should clearly indicate the quantity and Single Value Contract executed during last FIVE (5) years, for the offered equipment/ material and/or similar or higher strength rating. Bidder should have executed one single contract during last five years for the quantity equivalent to tender / bid. The details are to be submitted in following format, Sr. No ITEMS SUPPLIED TO ORDER REFERENCE No. & DATE ITEMS QUANTITY ORDER FULLY EXECUTED. YES/NO STATUS, IF ORDER UNDER EXECUTION REMARK 5) Equipment offered shall have Type Test Certificates from accredited laboratory (accredited based on ISO/IEC Guide 25 / 17025 or EN 45001 by the National accredition body of the country where laboratory is located), as per IEC / IS / technical specification, Type test reports shall not be older than SEVEN years and shall be valid up to the expiry of the validity of the offer. Page 3 of 24

SECTION I GENERAL TECHNICAL REQUIREMENTS FOR INSULATOR HARDWARE FOR 400 KV TRANSMISSION LINES WITH TWIN AL-59 CONDUCTOR 1.1 Scope: 1.1.1 This section of specification covers design, manufacture, testing at manufacturer s work before dispatch, supply and delivery of complete suspension and tension insulator hardware for power conductor for transmission lines. 1.2 Standards: 1.2.1 The hardware shall comply in all respect with the provisions of IS: 2486, Part-I, II and III/ 1974 (with latest amendment) for insulator fittings. 1.3 Particulars of the Power System: 1.3.1 The particulars of power system, in which the hardware required to be used, are given in section II of this specification. 1.4 Material and design: 1.4.1 The materials offered should be of first class quality, workmanship, well finished and of approved design. All castings shall be free from blow holes, flaws, cracks or other defects and shall be smooth, close, grained and of true forms and dimensions. 1.4.2 The Ball & Socket designation must be 20 mm for Suspension & Tension clamps. 1.4.3 Minimum thickness of the any portion of the forged steel part shall be not less than 12 mm. 1.5 Insulator hardware: 1.5.1 Suspension and Tension Clamps: 1.5.1.1 The clamps offered should be light in weight free from corona formation, high corrosion resistant and shall have low power loss. The design, finish and shape of the clamps and the components, shall be such as to avoid all hot spots, kinks, cuts, grooves or projections which are likely to injure the conductor, insulator or fittings or lead to localized pressure. The clamps, body and keeper pieces (wherever required) shall be made of high strength cast aluminum alloys having matching / same Chemical Composition to AL 59 conductor, while cotter pins, cotter bolts, U bolts, eye hooks, twisted shackles, ball eyes and clevis, chain links etc. shall be made of forged high carbon steel hot dip galvanized. Split pins of minimum 4 mm diameter and suitable strength, made of brass shall be used. The security clips shall be R type made of phosphor bronze having 7 mm width or R-clip of stainless steel and compliant to relevant standard. 1.5.1.2 The suspension clamp shall be preferably Forged Steel hanger type. The clamps shall have sufficient contact surface to minimum damage due to fault currents. The clamps shall be suitable for use with conductor indicated in Section-II, when wrapped with Preformed Armour rods. Clamps shall permit the conductor to slip before failure of the conductor occurs and shall have a sufficient slipping strength to resist conductor tension under broken wire conditions. The slipping strength and the minimum failing loads of the Page 4 of 24

clamps shall not be less than specified in Section-II of this specification. All bolts and U bolts shall be provided with check nuts. 1.5.1.3 The tension clamps shall be of the compression type. The tension clamp shall not permit slipping or damage or failure of the conductor at a load less than 90% of the ultimate strength of the conductor. The mechanical efficiency of the tension clamp shall not be affected by any method of erection. The compression sleeve & jumper cone shall be made from extruded aluminum tube with aluminum alloy matching / same Chemical Composition to AL 59 conductor. The aluminum alloy flat matching / same Chemical Composition to AL 59 conductor shall be provided with adequate bolts and nuts as well as check nuts for rigid connection and to avoid the jumper connection becoming loose during service. In absence of steel core in conductor, steel sleeve of dead end shall have sufficient length to provide mechanical strength. Compression zone & direction of compression shall be clearly marked on compression sleeve. The same shall be clearly indicated in drawing also. 1.5.1.4 Sag adjustment plate shall be provided in Twin Tension hardware. The details of the minimum and maximum adjustment possible and the steps of adjustment shall be clearly indicated in the drawing. An adjustment of 100 mm minimum in 5/6 steps of equal interval of shall be possible with the sag adjustment plate. 1.5.2 Arcing Horns & Corona control rings for Suspension and Tension Clamp: 1.5.2.1 Each hardware assembly shall be provided with arcing horns on the line side of suspension and tension strings. 1.5.2.2 In the approach spans, up-to a distance of 1.6 km from the sub-station adjustable arcing horns on line and tower end sides shall be provided with suitable gap, so as to give better insulation co-ordination and ensure effective operations under actual conditions. The range setting of arcing horns should be given in the bid. 1.5.2.3 Each Hardware assembly shall be provided with corona control ring on line side of Suspension and Tension assembly. Design of corona control ring shall be such that voltage stress can be reduced across insulator string and shall improve corona & RI performance, having adequate strength. 1.6 Galvanization: 1.6.1 All ferrous parts of insulator hardware of power conductors shall be galvanized in accordance with IS: 2629/1966 (with latest amendment) Recommended practice for hot dip galvanizing of iron and steel. The method for testing weight, thickness and uniformity of coating of hot dip galvanized articles shall be in accordance with IS: 2633/1972 (with latest amendment). The hardware shall have Zinc coating of 610 gm/m 2. 1.6.2 The Zinc used for galvanizing shall conform to grade Zn of IS: 209 - Relevant extract from IS: 209 (with latest amendment). 1.6.3 The threads in nuts and tapped holes shall be cut after galvanizing and shall be well lubricated or greased. All other threads shall be cut before galvanizing. The bolt threads shall be undercut to take care of increase in diameter due to galvanizing. 1.6.4 Spring washers shall be electro-galvanized. 1.7 Inspection of lot offered: Page 5 of 24

1.7.1 The firm may offer the lot of hardware for inspection at his works prior to dispatch. The minimum lot size shall be 100 Nos. or the full quantity of the order, whichever is less. The firm shall give minimum 15 days advance notice to the purchaser to enable the purchaser to depute his representative for witnessing the Acceptance Tests. 1.7.2 Depending upon the lot size offered, number of samples may be selected randomly as per Appendix A of IS under reference. 1.7.3 On each selected sample, all the acceptance tests mentioned in clause No. 1.7.4 shall be carried out in accordance with the provisions of IS: 2486 (Part-I/1971) with latest amendments and GETCO specifications. 1.7.4 Acceptance Tests: The following acceptance tests may be carried out: (i) Visual examination (ii) Dimensional check (iii) Galvanizing test (iv) Mechanical test for clamps and fittings (v) Electrical resistance test (Only for Tension clamps) (vi) Slip strength test (vii) Chemical Composition Test (viii) Magnetic Particle Inspection (NDT) test for forgings as per ASTM E 709 (viii) Any other test as per latest relevant IS 1.7.5 The above acceptance tests are to be carried out either at the firm s works or at Govt. Approved laboratory (in case of adequate testing facilities are not available at the firm s works) in the presence of inspector deputed by the GETCO. However, all the testing charges for such testing shall be borne by the firm only. Unless the acceptance tests are successfully completed and approval thereof is issued by the GETCO or waiver of inspection is obtained in writing from GETCO by the firm, the firm shall not dispatch any material to GETCO. For performing Chemical Composition Test and Magnetic Particle Inspection test on forging, sampling plan will be 1 number minimum each type on offered lot of inspection. 1.7.6 Routine Tests: 1.7.6.1 The firm shall for the following routine tests shall test all the hardwares offered in the lot: (i) Visual examination test (ii) Routine mechanical test 1.7.6.2 The firm may keep ready the certificates for routine tests for handing over the same to the inspector deputed during inspection of lot. 1.8 Hot Line Maintenance: 1.8.1 The hardware fittings, offered shall be suitable for employing hot line maintenance techniques, with requisite speed, ease and safety. 1.9 Submission of Drawings and Type Test certificates: 1.9.1 The Bidder shall submit full detailed dimensional drawings indicating the materials of each part and test certificates thereof for the materials composition for the items of Page 6 of 24

hardwares offered. In absence of the same, the offer shall be out rightly ignored. The approved drawings set must be submitted in soft copy in Auto CAD format. 1.9.2 The Bidder shall submit with Technical Bid the type tests certificates (along with certified copy of dimensional drawing of hardware tested) for the entire type test as listed below issued by independent Govt. approved laboratories. 1.9.2.1 Type tests for clamps a) Visual examination b) Verification of dimensions c) Slip strength tests d) Ultimate strength tests e) Electrical resistance test (for tension clamps only) f) Heating cycle test with AL 59 conductor (for tension clamps only) g) Temperature rise test with AL59 conductor (@1250 Ampere for Tension clamp only) h) Galvanizing / electroplating tests i) Chemical Composition test j) Corona inception/extinction k) RIV test In case of piece meal of Type Tests, tests mentioned as a) & b) above shall be repeated every time. 1.9.2.2 Type tests on insulator string fittings except clamps a) Visual examination b) Verification of dimensions c) Mechanical tests d) Galvanizing tests e) Chemical composition test f) Corona inception/extinction g) RIV test h) Vibration test (as per Annx. A) 1.9.2.3 Type tests on non-tension components a) Visual examination b) Verification of dimensions c) Mechanical tests 1.9.3 In case of non-submission of type test reports, the evaluation shall be carried out accordingly. 1.9.4 The purchaser reserves the right to ask the supplier to arrange type tests on samples selected from any of offered lot for inspection in presence of GETCO representative. The testing charges for the same shall be borne by the GETCO if the sample withstands the tests successfully otherwise Bidder have to bear the same. 1.9.5 Quality Assurance Plan (QAP) The bidder shall invariably furnish following information along with his offer, failing which his offer shall be rejected. i) Statement giving list of important raw materials names of sub suppliers for the raw materials, list of standards according to which the raw materials are tested, list of tests normally carried out on raw materials in presence of supplier's representative and as routine and / or acceptance during production and on finished goods, copies of test certificates. Page 7 of 24

ii) Information and copies of test certificates as in (i) above in respect of bought out accessories. iii) List of manufacturing facilities available. iv) Level of automation achieved and lists of areas where manual processing exists. v) List of areas in manufacturing process, where stage inspections are normally carried out for quality control and details of such tests and inspections. vi) List of testing equipment available with the Supplier for final testing. vii) The GETCO reserves the right for factory inspection to verify the facts quoted in the offer. If any of the facts are found misleading or incorrect the offer of that Bidder will be out rightly rejected and he may be black listed. viii) Special features provided to make it maintenance free. 1.10 Interchangeability: 1.10.1 Corresponding parts of hardwares should be made to gauge or jig and shall be interchangeable in every respect. 1.11 Marking: 1.11.1 The item shall be legibly and indelibly marked with following details on each of main component of hardware. (a) Name or Trademark of the manufacturer (b) GETCO 1.11.2 The packages containing fittings may also be marked with ISI certificates and mark. 1.12 Packing: 1.12.1 All hardware and accessories shall be supplied in strong wooden boxes/ crates with steel hoop and hands to withstand rough handling during the transits and transportation. However, the Stores may be packed in double gunny bags with proper packing filters if delivered by road transport on door delivery basis. The gross weight of wooden packing shall not normally exceed 500 Kg. Different fittings with the accessories shall be packed in different packings. All nuts should be hand tightened to the maximum possible point. 1.12.2 All parts shall be adequately and clearly marked for safe delivery and proper identification at destination. 1.13 Guaranteed Technical Particulars (GTP): 1.13.1 The Bidder shall fill in the guaranteed technical particulars of accessories given in Schedule A, Section III of this specification. All the columns must be filled in clearly. Tenders incomplete in this respect shall be out rightly ignored. 1.14 ISI Mark: Page 8 of 24

1.14.1 Materials having ISI mark shall be preferred. 1.15 Note to the Bidders: 1.15.1 The purchaser reserves the right to award contract item-wise basis or to reject the offer without assigning any reasons. 1.15.2 The offers without samples will be out rightly rejected. The samples submitted shall not be returned back. If desired, the GETCO will carry the testing of sample at GETCO s cost as per relevant IS before accepting the offer. 2.1 Scope: SECTION: HARDWARE II SPECIFIC TECHNICAL REQUIREMENT 2.1.1 This section covers the specific technical particulars, requirement and desired delivery etc. for the insulator hardware for 4000 KV transmission line with twin AL-59 conductor. The equipment shall also conform to the general technical requirements covered under section-i of this specification. 2.2 System and Climatic Particulars: (i) Line voltage: 400/420 KV (ii) Frequency: 50 c/s (iii) No. Of Circuits: Single Circuit and Double Circuit (iv) Tower Configuration: Barrel type (v) Normal Span: 400 Mts. (vi) Wind Pressure on: 150 kg/m 2 on 2/3 rd projected area Conductor and Earth Wire (vii) Temperature Range: (a) Minimum: 0 0 C (b) Maximum: 95 0 C (c) Everyday: 32 0 C 2.3 Technical Particulars: 2.3.1 Conductor: (i) Type: AL 59 (61/3.50) having equivalent weight to ACSR Zebra (ii) Stranding & Wire Dia.: (a) Aluminum : 61/3.50 mm (b) Steel : N.A. (iii) Overall Diameter : 31.50 mm (iv) Approximate Total : 1621 Kg/km. Weight (v) Ultimate Strength : 14395 Kg. 2.3.2 Insulators hardware: (Ref. Drg. No.GETCO/E/4L-STD/HW-041/AL-59/001, GETCO/E/4L-STD/HW- 041/AL-59/002, GETCO/E/4L-STD/HW-041/AL-59/003) Page 9 of 24

(i) Slipping Strength : (a) Suspension Clamps : 8 to 15% of ultimate strength of conductor i.e. 2160 Kg. (b) Tension Clamps: 90% of ultimate strength of conductors i.e. 12956 Kg. (ii) Minimum Failing Load: (a) Suspension Fittings: 50% of ultimate strength of conductor i.e. 7197 Kg (b) Tension Fittings: 90% of ultimate strength of conductor i.e.12956 Kg (iii) Type: (a) Suspension Clamps: Forged Steel Hanger free center type without bolt only (b) Tension Clamp: compression type (iv) Material: As stated in Drg. Enclosed (v) Ele. Resis. At 20 0 C: 75% of measured resistance of equal length of conductor (vi) Ferrous Parts: (vii) No. Of insulators to be used: Hot dip galvanized 23 for Suspension 24 x 2 for Tension Page 10 of 24

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 GUARANTEED TECHNICAL PARTICULARS FOR HARDWARE TWIN AL-59 CONDUCTOR Page 11 of 24

Hardwares: SECTION III BIDDING SCHEDULES (To be filled in and signed by Bidder) SCHEDULE A SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS (i) Item/Part Materials: (ii) 1) Ball hook 2) Socket eye 3) Arcing horn on line side 4) Arcing horn on tower side (fixed or adjustable) 5) Suspension clamp 6) Tension clamp 7) Eye hook 8) Clevis 9) Yoke 10) Ball clevis 11) Socket clevis 12) Clevis eye 13) Horn holder ball hook 14) Anchor shackle 15) Ball link 16) Horn holder ball link 17) Twisted shackle 18) Chain link 19) R type security clip and split pin 20) Sag adjustment plate 1) Minimum failing load 2) Weight 3) Slipping strength (iii) Angle of inclination of clamp to jumper terminal (iv) Electrical conductivity of clamp (a) Results of heating cycle test carried out (b) Value of electrical resistance (v) Power loss of clamps (vi) Make of bolts and nuts used (vii) Specification/Standard to which galvanizing conforms Signature of the Bidder: Name: Designation: Date: Authorized common rubber Page 12 of 24

Stamp / seal of the bidder: SECTION: ACCESSORIES I GENERAL TECHNICAL REQUIREMENTS FOR POWER CONDUCTOR ACCESSORIES FOR 400 KV TRANSMISSION LINES WITH AL-59 CONDUCTOR 1.1 Scope: 1.1.1 This section of specification covers design, manufacture, testing at manufacturer s works before dispatch, supply and delivery of complete accessories for power conductor for transmission lines. 1.2 Standards: 1.2.1 The accessories for ACSR conductor for overhead line with the provisions of IS: 2121/1981 and IS:10162-1982 (with latest amendment, if any). 1.3 Particulars of the Power System: 1.3.1 The particulars of power system, in which the accessories are required to be used, are given in section II of this specification. 1.4 Materials and Design: 1.4.1 The material offered should be of first class quality, workmanship, well finished and of approved design. All castings shall be free from blow holes, flows, cracks or other defects and shall be smooth, close, grained and of true forms and dimensions. 1.5 Accessories for Power Conductors: 1.5.1 Compression type Mid span Straight Joints: 1.5.1.1 Compression type mid-span straight joints offered should be suitable for making joints in the AL-59 conductor, details of which are given in Section-II of this specification. The joints offered should conform to IS: 2121/1981 (with latest amendment). 1.5.1.2 The joint shall be so designed, that when installed, no air space is left within the finished joint. The joint shall have conductivity as specified but the mechanical strength shall not be less than 90% of the ultimate tensile strength of the conductor. 1.5.1.3 The conductor does not contain steel wire core. The Aluminum sleeve shall be made from high strength extruded aluminum alloy tube of aluminum alloy having matching / same chemical composition with AL 59. 1.5.1.4 Compression zone & direction of compression shall be clearly marked on compression sleeve. The same shall be clearly indicated in drawing also.. 1.5.2 Repair Sleeve: 1.5.2.1 Compression type repair sleeves shall be offered to provide reinforcement of conductor with broken or damaged aluminum strands. The repair sleeves shall be designed to make good a conductor, of which not more than 1/6 th of the strands, in the outermost layer, are damaged or severed. The repair sleeves after compression should present a Page 13 of 24

smooth surface. The repair sleeves offered should conform to IS: 2121/1981 (with latest amendment). 1.5.3 Preformed Armour Rods: 1.5.3.1 Helically twisted formed Armour rods offered, shall be suitable for AL-59 power conductor, the details of which are given in Section-II of this specification, to provide rigidity and protection to the conductor at all suspension points, as also to eliminate the fatigue on the conductor due to vibration. 1.5.3.2 Armour rods shall be made of aluminium alloys, the Armour rods shall be marked in the center, to facilitate its identification and application on conductor. No joint shall be permitted in the rods, except those made in base rods before drawing. 1.5.3.3 The preformed Armour rods shall be capable of being fixed by hand on the conductor, without the aid of any tools or implements. The direction of spiral shall be same as that of conductor outer layer. The wire of the outermost layer of aluminium strands of the conductor shall have right-hand lay. The loading stress of Armour rods on the conductor shall be evenly distributed over the entire length and there shall be no tendency of loosening at the ends. The preformed Armour rods shall not loose their resilience, even after two or three applications. The rods should be capable of providing high selfretaining strength and protection against vibration, damage, fatigue and failure of conductor. The ends should be properly ball ended so that the danger of corona formation is avoided. 1.5.3.4 The surface of the Armour rods when fitted on the conductor shall be smooth and free from projections, cuts and abrasions etc. 1.5.4 Spacer cum Dampers: 1.5.4.1 Offered Spacer cum damper shall confirm to IS:10162. 1.5.4.2 Suitable spacer dampers for twin bundle of AL-59 conductor with 450 mm. conductor spacing per phase for 400 kv (Twin AL-59) line shall be offered. The spacer damper covered by this specification shall be designed to maintain the bundle spacing of 450 mm. under all normal operating conditions and to effectively control Aeolian vibrations as well as sub span oscillation and to restore conductor spacing after release of any external extraordinary load. The nominal sub conductor spacing shall be maintained within ±5 mm. 1.5.4.3 The design offered shall be presented as a system consisting of spacer dampers and their staggering scheme which shall ensure most satisfactory fatigue performance of the line for spans ranging from 100 m to 1100 m. Necessary support documents/test certificates/calculations shall be attached in support of the same. No sub span shall be greater than 70 m and no end sub span shall be longer than 40 m. Also the number of spacer dampers for a nominal ruling span of 400 m shall not be less than six. 1.5.4.4 The rubber components involved in the design such as damping elements shall be made with rubber compound selected specifically for that particular application. The Bidder shall submit a complete list of physical and mechanical properties of the elastomer used. This list shall make reference to all applicable ASTM standards. It shall be capable of operation at 95 C without damage of its property. 1.5.4.3 The Spacer cum Dampers shall be of approved design. The clamp of the damper shall be made of aluminum alloy so designed as to prevent any damage to or chafing of the conductor, during erection or continued operation. Page 14 of 24

1.5.4.4 Clamping bolts shall be provided with self-locking nuts designed to prevent corrosion of the threads. The spacer damper involving ferrous material shall not have magnetic power loss more than that stipulated in the relevant standard. 1.5.4.5 The spacer damper assembly shall have electrical continuity. The electrical resistance between the sub-conductors across the assembly in case of spacer damper involving elastomer surfaced clamps shall be suitably selected by the manufacturer to ensure satisfactory electrical performance and avoid deterioration of elastomer under service conditions. 1.5.5 Rigid Spacers for Jumpers 1.5.5.1 Offered Rigid Spacer shall confirm to IS:10162 1.5.5.2 Jumpers at tension points shall be fitted with spacers so as to limit the length of free conductor and to maintain the sub conductor spacing of 450 mm. It shall meet all the requirements of spacer used in line except for its vibration performance. Spacers requiring retaining rods shall not be quoted for jumpers. 1.5.5.3 Spacer shall restore normal spacing of the sub conductors after displacement by wind, electromagnetic and the electrostatic forces under all operating conditions including the specified short circuit level without permanent deformation damage either to conductor or to the assembly itself. They shall have uniform grip on the conductor 1.5.5.4 The spacer assembly shall not have any projections, cuts, abrasions etc. or chattering parts which might cause corona or RIV. Spacer assembly shall be suitable to Hot Line maintenance. 1.6 Galvanization: 1.6.1 All ferrous parts of accessories for power conductors shall be galvanized in accordance with IS: 2629-1966 (with latest amendment) Recommended practice for hot dip galvanizing of iron and steel. The method for testing weight, thickness and uniformity of coating of hot dip galvanized articles shall be in accordance with IS: 2633-1972 (with latest amendment). The hardware and accessories shall have Zinc coating of 610 gm/m 2. 1.6.2 The Zinc used for galvanizing shall conform to grade Zn of IS: 209- relevant extract from IS: 209. 1.6.3 The threads in nuts and tapped holes shall be cut after galvanizing and shall be of well lubricated or greased. All other threads shall be cut before galvanizing. The bolt threads shall be under cut to take care of increase in diameter due to galvanizing. 1.6.4 Spring washers shall be electro-galvanized. 1.7 Tests: 1.7.1 The Bidder shall submit with Technical Bid the type tests certificates (along with certified copy of dimensional drawing of accessory tested) for all the type tests as listed below issued by independent government approved laboratory. Preformed Armour Rod a) Visual examination. b) Verification of dimension c) Tensile strength test d) Electrical resistance test. Page 15 of 24

e) Slip strength test. f) Bend test g) Resilient test Mid Span Joint & Repair Sleeve a) Visual examination. b) Verification of dimension c) Failing load test d) Electrical resistance test. e) Heating cycle test with AL 59 conductor.(mid Span Joint only) f) Chemical Composition test g) Temperature rise test with AL59 conductor(msj only) (@1250 Ampere) Rigid Spacer / Spacer cum Damper a) Visual examination b) Verification of dimension c) Movement test d) Clamp slip test e) Assembly torque test f) Tensile load test g) Compression & pull off test h) Vibration test i) Corona test j) RIV test k) Power loss test l) Galvanizing test m) Log decrement test 1.7.1.2 In case of non-submission of type test reports, the evaluation shall be carried out accordingly. 1.7.1.3 The purchaser reserves the right to ask the supplier to arrange type tests on samples selected from any of offered lot for inspection in presence of GETCO representative. The testing charges for the same shall be borne by the GETCO if the sample withstands the tests successfully otherwise Bidder have to bear the same. 1.7.2 Acceptance of Lot: 1.7.2.1 The firm may offer a lot of 100 nos. of the items or ordered quantity, whichever is less for inspection. The firm may give minimum 15 days advance notice to the purchaser so as to facilitate the purchaser to depute his representative for witnessing the acceptance tests at the firm s works. 1.7.2.2 All the acceptance tests mentioned in subsequent clause No. 1.7.2.4 shall be carried out by the firm at his works in the presence of GETCO s representative on the samples selected as per the sampling criteria of relevant IS. In case the testing facilities are not available at the firm s works, and then the firm has to arrange for the same at govt. approved laboratory. However, such testing charges shall be borne by the firm only. 1.7.2.3 Unless the materials are inspected and all acceptance tests are completed satisfactorily and approval thereof is given in writing, the materials shall not be dispatched by the supplier. 1.7.2.4 Acceptance Tests: Page 16 of 24

1.7.2.4.1 Acceptance Tests of MS Joints, Repair Sleeves: The following acceptance tests shall be carried out on MS joints and Repair sleeves as per IS: 2121 (part-ii)/ 1981 (with latest amendment). (i) (ii) (iii) (iv) (v) (vi) Visual examination Dimensional verification Failing load test Galvanizing test Electrical resistance test Chemical Composition Test 1.7.2.4.2 Acceptance Tests for P. A. Rods: The following acceptance tests shall be carried out on P.A. rods as per IS: 2121 (part- I)/1981 (with latest amendment). (i) (ii) (iii) (iv) (v) Visual examination Verification of dimension Tensile strength test Electrical resistance test Slip strength test 1.7.2.4.3 Acceptance Tests for Spacers / Spacer cum Dampers The following acceptance tests shall be carried out on Spacer/Spacer cum dampers as per IS:10162 1982(with latest amendment) (i) Visual examination (ii) Verification of dimensions (iii) Movement test (iv) Clamp slip test (v) Assembly torque test (vi) Tensile load test (vii) Compression and pull off test (viii) Galvanizing test 1.7.3 Submission of Routine Test Certificates: The firm has to carry out specified routine tests on all the items offered by him in the lot and submits the certificates thereof to the Inspector deputed by GETCO at the time of inspection of lot. 1.8 Hot Line Maintenance: 1.8.1 The accessories for power conductor offered shall be suitable for employing line maintenance techniques, with requisite speed, ease and safety. 1.9 Drawings: 1.9.1 The Bidder shall submit full detailed dimensional drawings to scale indicating the materials used for the construction of each part along with the test certificates for the materials. The offer will be liable to be rejected if the drawing dimensions along with materials composition certificates are not submitted along with the offer. The drawing should indicate the parts on which identifying markings will be embossed. The approved drawings set must be submitted in soft copy in Auto CAD format. Page 17 of 24

1.10 Interchangeability: 1.10.1 Corresponding parts of power conductor accessories should be made to gauge or jig and shall be interchangeable in every respect. 1.11 Marking: 1.11.1 Each item to be supplied shall be legibly and indelibly marked with trademark of the manufacturer and suitable identification mark along with the word GETCO. 1.12 Packing: 1.12.1 All hardware and accessories shall be supplied in strong wooden boxes/ crates with steel hoop and hands to withstand rough handling during the transits and transportation. However, the Stores may be packed in gunny bags with proper packing filters if delivered by road transport on door delivery basis. The gross weight of wooden packing shall not normally exceed 500 Kg. Different fittings with the accessories shall be packed in different packings. All nuts should be hand tightened to the maximum possible point. 1.12.2 All parts shall be adequately and clearly marked for safe delivery and proper identification at destination. 1.13 Guaranteed Technical Particulars (GTP): 1.13.1 The Bidder shall fill in the guaranteed technical particulars of accessories given in Schedule A, Section III of this specification. All the columns must be filled in clearly. Tenders incomplete in this respect shall be out rightly ignored. 1.14 ISI Mark: 1.14.1 Materials having ISI mark shall be preferable. 1.15 Note to the Bidders: 1.15.1 The purchaser reserves the right to award contract item-wise basis or to reject the offer without assigning any reasons. 1.15.2 The offers without samples will be out rightly rejected. The samples submitted shall not be returned back. If desired, the GETCO will carry the testing of sample at GETCO s cost as per relevant IS before accepting the offer. Page 18 of 24

SECTION: ACCESSORIES-II 1 Scope: SPECIFIC TECHNICAL REQUIREMENTS 1.1 This section covers the specific technical particulars, requirement and desired delivery etc. for the accessories for power conductor for 400 KV transmission line. The equipment shall also conform to the general technical requirements covered under section-i of this specification. 2.2 System and Climatic Particulars: (i) Line Voltage: 400/420 KV (ii) Frequency: 50 c/s (iii) No. Of Circuits: Single circuit and double circuit (iv) Power Configuration: Barrel type (v) Normal Span: 400 Mtrs (vi) Wind Pressure on: 150 Kg/m 2 on 2/3 rd projected area Conductor and Earth Wire (vii) Temperature Range: (a) Minimum: 0 0 C (b) Maximum: 95 0 C (c) Everyday: 32 0 C 2.3 Technical Particulars: 2.3.1 Conductor: (i) Type : AL 59 (61/3.50) having equivalent weight to ACSR Zebra (ii) Stranding & Wire Dia.: (a) Aluminum : 61/3.50 mm (b) Steel : N.A. (iii) Overall Diameter : 31.50 mm (iv) Approximate Total : 1621 Kg/km. Weight (v) Ultimate Strength : 14395 Kg. 3.2 Accessories for Power Conductor: 3.2.1 Compression Type Mid-span Straight Joints: (Reference drawing No. GETCO/E/04L-STD/AL-59-MSJ/006) (i) Minimum failing load: 90% of ultimate strength of conductor i.e. 12956 kg. (ii) Material: (a) Outer Sleeve: Extended Aluminium Alloy tube of matching Chemical Composition to AL 59 conductor (iii) Elec. Resist. At 20 0 C: 75% of measured resistance of equivalent length of conductor max. 3.2.2 Repair Sleeves: (Reference drawing No. GETCO/E/04L-STD/AL-59-RS/005) Page 19 of 24

(i) Minimum failing load: 90% of ultimate strength of conductor i.e. 12956 kg. (ii) Material: Aluminium (iii) Elect. Resist. At 20 0 C: 75% of measured resistance of equivalent length of conductor max. 3.2.3 Preformed Armour Rods: (Reference drawing No. GETCO/E/04L-STD/AL-59-PA/004) (i) Type : Preformed (ii) Material : Aluminium alloy (iii) Purity of Aluminium : EC Grade 99.5% (iv) Corona Formation Voltage : 110% of maximum line-to-ground voltage (v) End Condition : Ball ended (vi) Direction of Lay of Rods : Right hand lay (vii) Tensile Strength : 35 kg. /mm 2 (viii) Slip Strength : 25% U.T.S. 3.2.5 Spacer cum Damper: For AL-59 Conductors only (Reference drawing No. GETCO/E/04L-STD/CAC-041/AL-59/001) Page 20 of 24

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 GUARANTEED TECHNICAL PARTICULARS FOR ACCESSORIES AL-59 CONDUCTOR Page 21 of 24

Accessories for Power Conductor: SECTION - III BIDDER SCHEDULE (To be filled in and signed by the Bidder) SCHEDULE A (i) Compression type Mid-span straight joints 1. Suitable for (conductor size): 2. Outside diameter of sleeves: (a) Before compression: (i) Aluminum: (b) After compression: (i) Aluminum: 3. Length of Sleeve: (a) (b) Before compression: (i) Aluminum: After compression: (i) Aluminum: 4. Weight of Sleeve: (i) Aluminum kg. 5. Slipping strength of Mid-span joint: 6. Breaking strength of Mid-span joint: 7. Conductivity of the compression joint: (ii) 8. Resistance as Percentage of Measured Resistance of Equivalent Length of Conductor: Repair Sleeves: 1. Material: 2. Suitable for (conductor size): 3. Outside diameter of sleeves: (a) Before compression: (b) After compression: 4. Length of sleeves: (a) Before compression: (b) After compression: 5. Weight of sleeve: 6. Breaking strength as percentage of: Ultimate tensile strength of conductor 7. Conductivity: 8. Resistance as percentage of: measured resistance of equivalent Page 22 of 24

length of conductor (iii) Preformed Armour Rods: 1. Type: 2. Suitable for (conductor size): 3. Total weight of set of rods (kg): 4. No. Of wire per set: 5. Nominal diameter of wire: 6. Length of wire: 7. Percentage tolerance on: Length and diameter of wire 8. Overall diameter of the conductor: After use of the Armour rod mm 9. End condition: 10. Center marking provided: Yes/No 11. Total weight: 12. Pitch of helix: 13. Direction of lay: 14. Efficiency of damping: 15. Tensile strength: 16. Conductivity: (iv) Spacer cum damper & Rigid spacer: 1. Type of clamp: 2. Material of clamp & body: 3. Type of damping element: 4. Material of damping element & suitable to temperature: 5. Compression & Tension load: 6. Slip strength of clamp before & after vibration test: 7. Max. power loss: 8. Corona & RIV: Signature of the Bidder: Name: Designation: Date: Authorized common rubber Stamp / seal of the bidder: Page 23 of 24

Annexure A Vibration Test : The suspension string shall be tested in suspension mode, and tension string in tension mode itself in laboratory span of minimum 30 metres. In the case of suspension string a load equal to 600 kg shall be applied along the axis of the suspension string by means of turn buckle. The insulator string along with hardware fittings and the sub-conductors if any, each tensioned at 25 % of its UTS shall be secured with clamps. The system shall be suitable to maintain constant tension on each sub-conductors throughout the duration of the test. Vibration dampers shall not be used on the test span. All the sub-conductors shall be vertically vibrated simultaneously at one of the resonance frequencies of the insulators string (more than 10 Hz) by means of vibration inducing equipment. The peak to peak displacement in mm of vibration at the antinode point, nearest to the string, shall be measured and the same shall not be less than 1000/f 1.8 where f is the frequency of vibration in cycles/sec. The insulator string shall be vibrated for not less than 10 million cycles without any failure. After the test the hardware (including clamp) shall be examined for looseness, fatigue failure and mechanical strength test. There shall be no deterioration of properties of hardware components after the vibration test. Page 24 of 24