Listing of All Equipment and Preventive Maintenance Procedures

Similar documents
Batch Plant Maintenance

Routine Compressor Maintenance

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

ENGINE COOLING SYSTEM

BA440 PISTON. Hydraulic Air Compressor

ENGINE COOLING GROUP CONTENTS RADIATOR GENERAL DESCRIPTION SPECIAL TOOLS THERMOSTAT

Eurovacuum Installations and Operating manual EV Series Vacuum pumps Models

Installation and Operating Manual

Installation,Operation, and Lubrication Instructions SPEED REDUCERS ILDE-00 TYPE DE ENGINEERING SERVICE BULLETIN

TC Series Cooling Systems

FBC CODES AND TRANSLATIONS TRANSLATION

Installation, Operation and Maintenance Manual Stancor SSD & SL Series Pumps

ENGINE COOLING SYSTEM

INSTALLATION and OPERATION BALL WASHER MODEL NO: BW-001N

Maintenance and Repair

Lubrication & Maintenance Schedule

CENTRAL SLURRY SYSTEMS Model 915

CENTRAL SLURRY SYSTEMS Model 911

MODEL "454L" MOBILE HIGH PRODUCTION CENTRAL MIX PLANT

FULL OPERATING AND MAINTENANCE MANUAL

Bulk Feeder Model nd Edition

PRODUCT OPERATING MANUAL

INSTRUCTION MANUAL FOR ESP GROSS BAGGING SCALE MODEL GB-17, GB-25, GB-32, GBAO-21, GBAO-25, GBAO-31 & GBAO-37

Single Stage Rotary Vane Vacuum Pump Installation and Operation Manual RX-40 RX-63 RX-100

INSPECTION AND MAINTENANCE CHECKLIST

Single Stage Rotary Vane Vacuum Pump Installation and Operation Manual RX-10 RX-21 RX-25

OIL CAPACITIES FOR SERIES HP APPROXIMATE CAPACITIES IN QUARTS AND GALLONS

INSTRUCTION AND REPAIR MANUAL MODELS 341A, 342A AND 344A 6

Portable Oil Free Silent Series Compressor Operating Instructions

Aerial Maintenance. Drip less oil or light machine oil is used on control cables, door latches, and hinges.

SL15/20-6 AND SL15/20-10

Tube Producing Conference September 23 rd 2013

GROUP CONTENTS GENERAL DESCRIPTION RADIATOR SPECIAL TOOL THERMOSTAT ENGINE COOLING DIAGNOSIS...

Hanna Daily Preventive Maintenance Schedule

OPERATION SERVICE PARTS TUGIT2. Manually Operated Short Handle Lever Hoist A3140-XXX

#9040 FUEL TANK SWEEPER

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

IMPORTANT INFORMATION

Motion System Components Diagram. Note: #2 Mirror Cover and X-Axis Motor Cover have been removed for visibility. Maintenance.

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

2) Mark wall at 5 10 for center line of bottom bolt-hole in wall brackets on transition box side of floor.

Technical Service Bulletin IOX/DCX Transmitter Maintenance Schedule

INSTALLATION AND OPERATING INSTRUCTIONS FOR FLOODED TUBULAR-HP MOTIVE POWER BATTERIES

ENGINE COOLING SYSTEM

ENGINE COOLING Click on the applicable bookmark to selected the required model year

Disconnect the APP sensor harness connector. See Fig. 4. Remove the accelerator pedal mounting nuts. Remove the APP assembly.

Section 10 Chapter 15

ENGINE LUBRICATION & COOLING SYSTEMS SECTIONLC CONTENTS. ENGINE LUBRICATION SYSTEM...2 Precautions...2

READ AND SAVE THESE INSTRUCTIONS

IMPORTANT INFORMATION

M16, 20, 25, 30 MLB16, 20, 25, 30 OWNERS MANUAL/PARTS LIST

750 Series Press Conveyor Installation and Maintenance Manual

READ AND SAVE THESE INSTRUCTIONS. High Velocity Restaurant-Duty Utility Set Belt Driven for Roof Mounting

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

Owner s Manual. Mortar / Plaster Mixer. Models M785 M1000 M1200

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com W D0446-A 4/1/05 1

Tailgates By THIEMAN WT20, 30 & 40 PLEASE READ AND UNDERSTAND THE CONTENTS OF THIS MANUAL BEFORE OPERATING THE EQUIPMENT. HIEMAN

TT-12 OWNERS MANUAL/PARTS LIST

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference.

IN-VEHICLE SERVICE. Engine Components

Section 10 Chapter 17

SECTION 4 - FUEL SYSTEMS AND CARBURETION

INSTRUCTION MANUAL: Industrial Series Piston Air Compressor. Model Number: V Part Number: L001128KNA

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

WARNING Carefully Read These Instructions Before Use

Operating & Maintenance Manual For Steam Conditioning Valve

450 Series Belt Driven Live Roller Curve Conveyor Installation and Maintenance Manual

WEBER CARBURETOR TROUBLESHOOTING GUIDE

SERVICING INSTRUCTIONS

VACUUM PUMP SERIES VP & VPC SINGLE - DUAL STAGE VACUUM PUMPS OPERATION MANUAL

MANUAL CONTROL / SEMIAUTO TEMPERATURE CONTROL HEATING, VENTILATION AND AIR CONDITIONING SYSTEM

COLDFUSION. Operator s Manual

ENGINE COOLING GROUP CONTENTS GENERAL INFORMATION SERVICE SPECIFICATIONS COOLANT SEALANT THERMOSTAT...

AJV8 Engine Assembly. AJV8 Engine Assembly

AIR/HYDRAULIC INJECTION GUN MODEL INSTRUCTIONS

COMPACT BAGHOUSE COLLECTOR

Engine. Special Tool(s) Compressor, Piston Ring 303-D032 (D81L-6002-C) or equivalent. Compressor, Valve Spring (T93P-6565-AR)

6. Document tasks performed during visit and report any observations to the appropriate

Water Treatment Plant Maintenance Considerations. Operation and Maintenance. Types of Maintenance 5/1/15

SECTION AIR INTAKE SYSTEM

ATTENTION! READ BEFORE ATTACHING THE AIR HOSE

VACUUM PUMP. Please read the operating manual carefully before using.

Hydraulic Hand Pallet Trucks

ENGINE COOLING GROUP CONTENTS GENERAL INFORMATION SERVICE SPECIFICATIONS COOLANT SEALANT THERMOSTAT...

TWO-STAGE HYDRAULIC PUMP. RWP55-IBT-Air

ENGINE COOLING SYSTEM

Installation Operation and Maintenance Manual

Maximum operating temperature for standard motors = 110 C. Shut down temperature in case of a malfunction = 115 C.

FULL BORE PERFORMANCE EXHAUST MANIFOLDS F-150 ECOBOOST 3.5L

2014 Dodge Challenger R/T. The water pump (1) is mounted directly to the timing chain cover and is equipped with a non serviceable integral pulley.

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

X-Tractor Series. Cutters INSTRUCTION MANUAL

Installation and Operating Instructions

ENGINE COOLING SYSTEM

ENGINE COOLING SYSTEM

MODEL MA4210 Installation and Operation Manual Important:

Models

The American Road Machinery Company 17, 25, 30 CUBIC YARD CHASSIS OR ROLLOFF MOUNT LEAF COLLECTOR June 2015

Seabee Annual/100-Hour Inspection

HOT WASHER MODEL NO: KING 125 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS1009

Transcription:

1 - General Area This covers the general concerns of the plant. 2 - Outside Perimeter Mnerva Care should be taken to keep this area clear of weeds and debris. The area can harbour pests. Any spilled raw materials should be cleaned up to eliminate attracting feed for pests. Any exterior damage should be repaired to eliminate points of entry for pests. Main Access Gate Compactor General service. Control panel Inspect and check operations. Turn off main gate power and implement lock-out. Check wire connections. Inspect and grease idler roller. Remove guard and check condition of motor. Check and oil pull-chain. Check and clean sensor and reflector. Replace guard Remove lock-outs and restore power. Check operations. General Service Inspect and Service Shut off main power and lock-out the power supply

Compactor General Service Grease all bearings Inspect all hydraulic hoses for cracks and wear. Check hydraulic fluid level Inspect all moving parts for wear. Remove lockout and restore power. Corn Silo Soya Silo Nitro bulk tank Nitrogen exhaust vent house Nitrogen exhaust vent Drag conveyor Garbage area Propane bottle storage Lard Tank Agitator Lecithin Intake Pipe Outdoor water hose tap Plant vacuum cleaner

Rooftop Air conditioners (2) The roof area holding the air conditioners has access through Maintenance Service Area #1 General Issues Do this every 7 days Inspect and clean Shut off main power and lock-out the power supply Remove all panels Remove screens and filters Inspect main drive v-pulley belt and replace if necessary Wash unit thoroughly Replace screens and filters Replace all panels Ensure that the unit and area are safe and restore power to the unit. 3 - Compressor Room It is important to recognize this area as a potential point of entry for pests. Care should be taken to maintain the cleanliness and integrity of this remote location. Air Compressor #1 General Service Inspect and service Shut off main power and lock-out the power supply Remove panels Remove filters, inspect and replace if necessary. Inspect cooling fans and belts Blow out cooling coil with air and wash if necessary Inspect discharge lines for leaks

Air Compressor #1 General Service Check oil level and top up if necessary Check and record running hours Grease applicable areas Replace panels and filters Remove lock-outs and restore power Let unit run and restore full pressure Recheck oil level Check and record pressure gauge and temperature gauge Do this every 92 days Running hours maintenance Turn off power and lock-out Remove and replace air filter Remove and replace oil filter Drain oil and dispose of. Fill oil to proper level Remove lockout and restore power Observe operation, recheck oil and record hours, pressure Air Compressor #2 General service Inspect and service Shut off main power and lock-out the power supply Remove panels Remove filters, inspect and replace if necessary. Inspect cooling fans and belts Blow out cooling coil with air and wash if necessary Inspect discharge lines for leaks

Air Compressor #2 General service Check oil level and top up if necessary Check and record running hours Grease applicable areas Replace panels and filters Remove lock-outs and restore power Let unit run and restore full pressure Recheck oil level Check and record pressure gauge and temperature gauge Do this every 92 days Running hours maintenance Turn off power and lock-out Remove and replace air filter Remove and replace oil filter Drain oil and dispose of. Fill oil to proper level Remove lockout and restore power Observe operation, recheck oil and record hours, pressure Air Dryer Oil separator General service Inspect and clean Shut off main power and implement lock-out Open bypass valve. Close inlet valve and outlet valve. Drain excess air.

Air Dryer General service Remove filter, inspect and clean or replace if necessary. Check out discharge. Clean fan blades and cooling coil. Slowly open outlet valve and inlet valve and pressurize unit. Close bypass vlave. Remove lock-outs and restore power. Run unit and note temperature and running hours if applicable. Compressed air holding tank General service Do this every 7 days Inspect piping for leaks Lard tank control panel Drain tank and inspect Inspect piping for leaks Open bypass valve and close inlet valve and outlet valve Open drain valve and drain tank. Observe and note water content. Close drain valve and slowly open inlet valve to pressurize tank. Open outlet pipe. Close bypass valve. A/C drive for fat blending tank agitator Electrical distribution panel #1 single phase 100 amp Electrical distribution panel #2 single phase 100 amp 60 amp 600 volt subservice

60 amp 600 volt subservice 100 amp 600 volt subservice Exhaust fans Reverse acting thermostat controlled exhaust fan 600 volt, 30 amp welding electrical outlets inside 600 volt, 30 amp welding electrical outlets outside Maintenance equipment 4 - Hand Add Make sure this area is cleaned regularly. Scale Dust collectors Slide valves Between 2 and 3 Elevator Electric motor Bench scale Hopper

Hopper Auger to scale 6 - Dumping Station # 1 4 tanks 1 through 4 4 Electric motor 5 hp 4 augers Dust collectors Chain operated diverter Slide valves Elevator Crane hoist #1 Dumping area 8 - Bagging Area Holding hopper above scale feed hopper

Whirly Cleaner Whirly Cleaner Auger Slidell Elevator Transfer augers Slidell Bagger Scale Feed Hopper Slidell Bagger General Issues General Service Issues Frequent inspection for loose nuts, bolts and set screws should be made. Loose fasteners can cause serious damage to the equipment and possible injury to plant personnel as well as poor performance. Routine maintenance should also include equipment wipe down to eliminate build-up of material on the frame and moving parts. Touch-up of painted parts where chips and scratches have appeared should also be done. Nonpainted parts should be treated with a corrosive inhibitor that leaves a thin film residue. Lubrication. All gear reducers are filled to the proper level prior to shipment with the appropriate grade of oil for operation in the industrial environment. The oil level should be checked prior to operation using the oil level plug provided for that purpose. The oil in the new gear reducer should initially be drained (using the drain plug provided)at the end of 240 hours of operation. (30 days for 8 hour per day service, 15 days for 16hour service, 10 days for 24 hour service). When changing oil for any reason, it should be remembered that oils of various types may not be compatible. Therefore, when changing to a different oil, it is recommended that the housing should be completely drained and thoroughly flushed with a light flushing oil prior to refilling with the appropriate lubricant.

Slidell Bagger General Issues Under normal conditions, after the initial change, the oil should be changed after every 2500 hours of operation or every 6 months, whichever occurs first. Under severe condifions (rapid temperature changes, moist, dirty or corrosive environment), it may be necessary to change oil at intervals of one to three months. Periodic examination of oil samples taken from the unit will help establish the appropriate interval. If a gear reducer is to stand idle for an extended period of time (such as when used as a spare), it is recommended that the reducer be filled completely with oil to protect interior parts from rust and corrosion due to condensation inside the housing. Be sure to drain the oil to the proper level before placing the reducer into service. If the ambient temperatures are abnormally low or high, the type of lubricant installed at the factory may not be suitable. See the chart below for extreme temperature l~brication recommendations. Gear reducers in normal operation can generate temperatures up to 200 degrees F depending on the type of reducer and the severity of the application (loading duration of service, ambient temperatures). Excessive oil temperatures may be the result of one or more for the following factors. A. OVERLOAD B. OVERFILLING OR UNDERFILLING C. INADEQUATE COOLING Once a month, grease all pivot points where grease zerks are located. The idlers could be lubricated using a spray lubricant. Do not over grease --- this may result in unsightly grease runs and cause entrapment of grit and abrasive materials which can reduce the life of the equipment. Electrical panels and junction boxes must be kept securely closed at all times. Gaskets and seals should be maintained to exclude migration of dust into the enclosure. The use of equipment frame, electrical enclosures, etc., as work platforms or storage areas can be damaging to the equipment as well as a safety hazard for plant personnel. Air supply filters should be checked daily for water and foreign debris. The air supply cannot contain water or oil for proper equipment operation. Do this every day Bag-In-Place sensors should be checked daily for alignment. Photo Eyes should be cleaned and checked daily for alignment. Paper bag sealer belts should be cleaned and checked daily.

Slidell Bagger General Issues Bag Arm clamps should be checked daily for proper bag top opening. Tracking of all conveyor belts should be checked daily. Do this every 7 days All air cylinders should be checked weekly for air leaks and jerky motion. If an air cylinder has jerky motion or an air leak, the seal should be replaced. Check alignment of MC lift post weekly. Check the air lubricator and fill if necessary weekly. Clean MC vee wheels and flat wheel tracks weekly. Check vacuum pump oil weekly. Tension of all drive belts should be checked weekly.(mc infeed belts and MC timing belts), (Transfer arm timing belt), (Bag arm timing belt Auto adjust only) Check for loose bolts. Do this every 14 days Check Spout Clamp rubber biweekly for excessive wear. Check Gusset Gripper rubber biweekly for excessive wear. Check MC Forming Arm rubber biweekly for excessive wear. Check Spout cylinder bracket bolts biweekly for tightness. Air supply filters should be checked biweekly for water and foreign debris. The air supply cannot contain water for proper equipment operation. Skirt 30X60X4 1/2 Once a month, grease all pivot points where grease zerks are located. The idlers could be lubricated using a spray lubricant. Toe-in of the top forming arms should be checked monthly for adjustment. Also, check the top forming arm rubber gripper monthly.

Slidell Bagger Transition Chute Skirt 28.00 X 28.00 X 6.00 X 9.00 Discharge Swing Discharge Chute Grippers, Gripper Arm 5" Clam Jaw 5" Spout Liner 7"Clam Jaw 7" Spout Liner - Bag Arms Gusset Wedge Do this every day Clean bag arm acme threaded rod before making any bag arm width adjustment. Bag Arm Adjust Lift Post, Mc Transfer, Mc Lift Frame General Service Issues Air Lubricating System

Slidell Bagger Lift Frame Air Lubricating System The Slidell-Matic Model 3120 requires a clean and dry air supply. The air system is plumbed for single point hook-up for ease in installation. An air supply shut off valve with a special lock-out feature for safety is provided. The standard SLIDELL- MATIC 3120 bagging system is equipped with a lubricating system that dispenses a small amount of lubrication into the air supply. This lubricates the air cylinders in the system to maintain smooth operation. Use JOHN HENRY FOSTER SYNTHETIC ROTARY SCREW COMPRESSOR FOOD GRADE CP- 4600-46-F or equivalent. The valve control on the lubricator should be opened so that approximately one drop of oil is dispensed every 3 to 5 minutes. Note: Maintenance And Inspection Frequency May Vary Depending On The Product, The Environment And The Number Of Operating Hours. Main Air, Mc Belt Infeed, Plates Belt Infee,D, Drive Belt Infeed, Speed Mc Cam Handle, 17 1/2 Magazine, Transfer Arm Magazine, Swing Tray Magazine, Conveyor Magazine, Bag Adjust Magazine, Main Frame Bag Magazine

Slidell Bagger Bag Magazine Bag Rail Bag Bump, Quick Adjust Turnstile Main Air Upper Valve Bank Middle Valve Bank Lower Valve Bank Busch Pump General Service Issues Busch Vacuum Pump Maintenance: (A) Pump Oil - With the pump shut off, make sure that there is a sufficient amount of oil in the pump. The oil level should be observed on a daily basis and be replenished if it drops below the 1/2 full mark. All oil level readings should be done when the pump is not running. Allow the oil to settle before adding any oil. When the pump is running, the oil may appear to be foaming which is a normal phenomenon with aerated oils. Oil can be added to the pump after it has been shut off and the circulating oil has had sufficient time to return to the oil sump. Under normal circumstances, it should not be necessary to add or drain oil from the pump between recommended oil changes. A significant drop in oil level means that there is an oil leak or that an exhaust filter is broken and the pump will be smoking excessively. It is normal for the oil to be foamy and light in color in an operating pump. However, if the oil is milky or dark colored, it is contaminated or burned and must be changed CAUTION: Do not add oil while the pump is running since hot unfiltered oil vapor may escape through the oil fill port. Under normal circumstances, it should not be necessary to add or drain oil from the pump between recommended oil changes. A significant drop in oil level means that there is an oil leak or that an exhaust filter is broken and the pump will be smoking excessively. It is normal for the oil to be foamy and light in color in an operating pump. However, if the oil is milky or dark colored, it is contaminated or burned and must be changed.

Slidell Bagger Busch Pump Busch Vacuum Pump Maintenance: (B) Oil Change - Every three 3 months or 500 operating hours, the oil and filter should be changed. Shut the pump off, remove the drain plug and drain the hot oil from the pump. The oil filter should be changed at the same time as the oil. Busch Vacuum Pump Maintenance: (C) Exhaust Filter - Every nine (9) to eighteen (18) months or when necessary, the exhaust filter element should be changed. The service life of the exhaust filter varies widely with pump application. It is only necessary to change the filter element when it becomes clogged with foreign material or the oil has been burned. If the filter element is clogged, the exhaust pressure gauge will read in or close to the red zone, smoke or oil mist will be coming from the pump exhaust, or higher than normal motor current occurs.to actually test an exhaust filter element, remove it from the pump, allow it to cool, clean the sealing end, put it to your mouth and attempt to blow through it. Your lungs can generate approximately 3-6 psi which is the same as the maximum allowable operating pressure across the filter. So if you can blow through the filter, it is good and can be put back in the pump. If you cannot blow through the filter element, discard it and replace it with a new one. It is not possible to successfully clean a clogged filter element. In the case where the filter element is cracked, discard it and replace it with a new one. Busch Vacuum Pump Maintenance: (D) Vacuum Inlet Filter - The vacuum pump is equipped with a special vacuum inlet filter. These filters should be checked on a weekly basis and changed accordingly. Vacuum Valves Do this every day Vacuum filters should be checked and cleaned daily. Bag arm vacuum cups and transfer arm vacuum cups should be checked daily for excessive wear and replaced if they are defective. Vacuum lines should be checked daily for excessive wear. Expanded Metal Doors Check Weigher Pallet Stacker

Pallet Stacker Reject conveyor Bag Kicker Conveyor Sewing Machine Gluer Printer Roller conveyor Chain Conveyor Bag Flattener Conveyor Stretch Wrapper 10 - Pellet Mill Hand Add Station Elevator #1 Bearing Hanger

Water Tank Mixer Pellet Mill Die assembly Conveyor Cooler Shaker Bulk Release Tubes Fat Tank Premix Tank Air Ducts 11 - Medication Room Special consideration must be given to the guarantee of accuracy of the specialized scales, the cleanliness of the area and the neatnes and organization of the materials stored here. Bench Scale General Issues Do this every 365 days Annual calibration. This is done by KW Brant Scales under contract.

Exhaust Fan 12 - Process Warehouse Dock levelers 13 - Fat Room Fat pump Hoses Piping Valve 1 Valve 2 Valve 3 Valve 4 Valve 5 Lockout for pump

16 - Maintenance Service Area #1 Hot water tank Bell network Modem Air Products Transfer Switch Modem for Slidell 17 - Maintenance Service Area #2 Motor Control Center Feeds pellet mill, batching system, main lighting contact service 200 amp 600 v subservice 2 x 100 amp 120/240 distribution panels 18 - Maintenance Service Area #3

Nitrogen flow meter PLC and AC variable frequency drive Main batching computer CPU Main air manifold with solenoid valves 60 amp 120/240 V distribution panel Batching printer Dual moniter system for computer batching 19 - Maintenance Service Area #4 20 - Use this Area for any Unusual Entries Item, not listed elsewhere.