Additional Agenda-I for 19 th Standing Committee Meeting on Power System Planning of Eastern Region

Similar documents
Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Bihar: Transmission System Study for 13 th Plan

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Report. the feasibility of

Agenda Note for Standing Committee Meeting of Power System Planning in ER

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

HVDC Systems in India

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore. Status of Powergrid Projects: Transmission Lines. Annexure_I(A)

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

HIGH CAPACITY POWER TRANSMISSION CORRIDOR

2681-IND: Bihar Power System Improvement Project

Bangladesh s Power Sector : At a Glance

2. Member Secretary Eastern Regional Power Committee (ERPC) 14, Golf Club Road, Tollygunge Kolkata

MINUTES OF THE 47 th SLCF MEETING HELD ON

(i) COO (CTU), POWERGRID, Saudamini, Plot No.2, Sector 29, Gurgaon (Haryana)

Indian Power System Framework

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

PRAGATI ENGINEERING COLLEGE

Transmission Corporation of Telangana, Jawaharlal Nehru Technological University Hyderabad

132 kv Transmission Lines in BSPTCL

Agenda Note for Long Term Open Access Applications of New Generation in Southern Region

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Thereafter, the agenda items were taken up.

Transmission Line Survey

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Odisha Power Transmission Corporation Ltd. Bhubaneswar.

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

DFO STATEMENT OF NEED REPORT

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

100 MW Wind Generation Project

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Overview of Indian Power Sector. February 29, 2008

CUSTOMER/ TWIN ARROWS PROJECT

Interconnection System Impact Study Report Request # GI

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

STATE LOAD DISPATCH CENTRES (SLDC)

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

MILLIGAN SOLAR PROJECT

Agenda of 11 th System Studies Meeting in NER

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Black StartDrill in Eastern Regional Power System-Case studies

Before the. Case No. 106 of 2009

Reliability Analysis Update

The Electric Power System

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

RFP Corrigendum No. 01

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

15 Nelson-Marlborough Regional Plan

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Agenda for 6th Standing Committee Meeting on Power System Planning of NER

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Need Assessment Document (NAD) DDUGJY

~ ~ ~1~ctJ'{UI. 2 ~ ~, 9 ct>1~4i<'1ct> ~ (~~~I~~), ~, ~ 1iif, ~ ~\j\)~q~'1 ~ ct>1~~~, ~-8, ~-24, ~ ~ ~ ~ ~.

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

Enhancement of Power Transfer Capability of Existing 400kV Transmission Lines

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

No.66/5/~9-SP&PA/ Dated:

Merger of the generator interconnection processes of Valley Electric and the ISO;

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

Distribution lines Overload Control to Increase Reliability and Power Loss Reduction

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Feasibility Study Report

The SAARC Power Grid Nepal s Perspective

B kv T&D GAS INSULATED SWITCHGEAR

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Power Transformers in BSPTCL

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

New 115 kv Disconnect Switches at Bloomsburg MTS

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Cost Benefit Analysis of Faster Transmission System Protection Systems

15 Nelson-Marlborough Regional Plan

Load Side PV Connections

Transcription:

1

2

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER Additional Agenda-I for 19 th Standing Committee Meeting on Power System Planning of Eastern Region 1.0 Upgradation of 132kV bus arrangement at 400/220/132kV Malda S/s of POWERGRID 1.1 POWERGRID has proposed the following: 1.1.1 Presently, Single Main & Transfer (SMT) scheme is functional at 132kV level and Double Main & Transfer (DMT) scheme at 400kV & 220kV levels at Malda S/s. 1.1.2 The transformation capacity at Malda S/S at 220/132kV is being upgraded from 370MVA (2x160MVA+1x50MVA) to 480MVA (3x160MVA) under ERSS-XX. The Malda 132kV main bus is of Single Moose Conductor. Due to increased loading at 132kV level, problems in the main bus are being encountered more often. Malda (POWERGRID) Malda (WBSETCL) 132kV D/c line has been reconductored from Panther (ACSR) to Casablanca (ACCC) by WBSETCL, thereby increasing current carrying capacity from 366A to 1120A per circuit. In the 18 th ER-SCM, it was agreed that WBSETCL may terminate Malda (WBSETCL) Samsi 132kV S/c line at Malda (POWERGRID) as an interim measure before summer of 2017 to relieve the loading on Malda (POWERGRID) Malda (WBSETCL) 132kV D/c line. 1.1.3 Malda is an important substation in northern part of West Bengal which remains critically loaded at 132kV level. With SMT scheme, complete shutdown of 132kV bus is required for maintenance works in the main bus. Thus, keeping in view the importance of Malda S/s and in order to improve reliability at 132kV level, bus arrangement including switchgear are proposed to be upgraded to Double Main (DM) scheme by POWERGRID, in a similar manner as being implemented at Siliguri and Birpara 132kV level under other schemes. Due to space constraints, the upgradation work needs to be carried out through GIS bays. 1.2 CEA s observations on the above proposal are: 1.2.1 Approved Gazol sub-station is about 14km from existing Malda 400/220/132kV substation (POWERGRID). Gazol 220/132kV Sub-station (2x160MVA) with the LILO of Malda-Dalkhola 220kV D/C line of POWERGRID was approved in 2 nd -2013 meeting of the Standing Committee on Power System Planning of Eastern Region(15 th SCMPSP-ER) held on 27.08.2013. Proposed and existing power map of Malda district is at Annexure- 1.1. Therefore reliability of power supply increases in Malda district with the commissioning of Gazol Sub-station with associated lines. 1.2.2 Bus maintenance is not required frequently and requires few hours of shutdown, which can be planned during off-peak hours and during that period the power could be supplied to Malda district through Gazol sub station. 3

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER 1.2.3 SMT scheme is having advantage of carrying out breaker maintenance without shutdown/outage of corresponding load/ict, which is not possible in the proposed DM (Double Main) Bus scheme. 1.3 Members may deliberate. 2.0 Modification under 13 th Plan scheme: Agenda by BSPTCL 2.1 BSPTCL has informed that to meet the future demand of Bihar by 2021-22, Sitamarhi, Chandauti and Saharsa (New) substations were approved under ISTS in the 18 th ER-SCM held on 13-06-2016. The scheme is being implemented through TBCB under ERSS-21 (under bidding stage). Therein scope of Sitamarhi (New) & Saharsa (New) S/s inter alia includes following: 2.2 Sitamarhi(New) S/s: 400/220/132kV, 2x500MVA + 2x200MVA (a) Darbhanga Sitamarhi(New) 400kV D/c (Triple Snowbird) (b) Sitamarhi(New) Motihari 400kV D/c (Triple Snowbird) (c) Sitamarhi(New) Motipur 220kV D/c (d) Sitamarhi (New) Sitamarhi 132kV D/c (Single Moose) (e) Sitamarhi(New) Pupri 132kV D/c 2.3 Saharsa (New) 400/220/132kV S/s: 2x500MVA + 2x200MVA (a) LILO of Kishanganj Patna 400kV D/c (Quad) at Saharsa (New) (b) Saharsa (New) Begusarai 220kV D/c (c) Saharsa (New) Khagaria (New) 220kV D/c (d) Saharsa (New) Saharsa 132kV D/c (Single Moose) 2.4 However, due to space constraints for additional line bays and unavailability of corridor some modifications are required in the 13 th plan scheme. A joint load flow study has been carried out with POWERGRID and following modification is proposed in the intra-state portion (under scope of BSPTCL): Sl. No. 400/200/132 kv New Sub-station Original Scope Proposed Modification Justification 1 Sitamarhi (New) Sitamarhi (New) Sitamarhi 132kV D/c (Single moose) Sitamarhi (New) Runnisaidpur 132kV D/c Space is not available for new line bay as well as corridor is not available for line termination at 132kV Sitamarhi (old) GSS. Sitamarhi (New) Pupri 132kV D/c LILO of Benipatti - Pupri 132 kv S/c at Sitamarhi (New) Severe ROWs and Densely populated area around Grid Substation, Pupri No corridor available at entry point of 220/132kV GSS Hajipur and severe ROW problems due to dense population. 2 New Line Vaishali Hazipur 132kV D/c Vaishali Chapra (New) (Amnour) 132kV D/c 4

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER Sl. No. 400/200/132 kv New Sub-station Original Scope Proposed Modification Justification 3 Saharsa (New) Saharsa (New) Saharsa 132kV D/c (Single Moose) Stringing of 2 nd circuit of Saharsa (Old) Sonebarsa (formed after LILO of Madhupura Sonebarsa 132kV S/c on D/c line at Saharsa (Old)) 132kV S/c on D/c line section LILO of Saharsa (BSPTCL) Banmankhi 132kV S/c line at Saharsa (New) 400/220/132 kv LILO of Saharsa (BSPTCL) Udakishanganj 132kV S/c line at Saharsa(New) 400/220/132 kv LILO of one of the circuit of Madhupura Sonebarsa 132kV D/c line at Saharsa(New) 400/220/132 kv [one circuit is already being LILOed at Saharsa (BSPTCL), the other circuit is to be LILOed at Saharsa (New) 400/220/132 kv] As reported by field office, Space is not available for new line bay at 132/33 kv Saharsa (old) GSS of BSPTCL as well as corridor is not available 4 Stringing of 2 nd Circuit Stringing of 2nd circuit of Muzaffarpur SKMCH 132kV S/c on D/c Reconductoring of 132kV S/c Muzaffarpur SKMCH lines with HTLS of 240MVA (1050A ampacity) The existing 132kV Muzaffarpur SKMCH Tr. Line is single circuit single strung. 2.5 Scope to be deleted 1. Sitamarhi (New) Sitamarhi 132kV D/c (Single Moose). 2. Sitamarhi (New) Pupri 132kV D/c. 3. Vaishali Hazipur 132kV D/c. 4. Stringing of 2 nd circuit of Muzaffarpur SKMCH 132kV S/c on D/c. 5. Saharsa (New) Saharsa 132kV D/c (Single Moose). 6. Stringing of 2 nd circuit of Saharsa (Old) Sonebarsa (formed after LILO of Madhupura Sonebarsa 132kV S/c on D/c line at Saharsa (Old)) 132kV S/c on D/c line section. 7. Nos. of 132 kv Line bays at Saharsa (New) S/s: 2 nos. [2 no. for Saharsa (New) Saharsa 132kV D/c (Single Moose) line] 2.6 Scope to be Added 1. 400/220/132 kv Sitamarhi (New) Runnisaidpur 132kV D/c. 5

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER 2. LILO of Benipatti - Pupri 132 kv S/c at Sitamarhi (New) 400/220/132 kv. 3. Vaishali Chapra (New) (Amnour) 132 kv D/c. 4. Reconductoring of 132kV S/c Muzaffarpur SKMCH lines with HTLS of 240MVA (1050A ampacity). 5. LILO of 132/33 kv Saharsa (Old) BSPTCL Banmankhi 132kV S/c line at Saharsa (New) 400/220/132 kv. 6. LILO of 132/33 kv Saharsa (Old) BSPTCL Udakishanganj 132kV S/c line at Saharsa (New) 400/220/132 kv. 7. LILO of one of the circuit of Madhupura Sonebarsa 132kV D/c line at Saharsa (New) 400/220/132 kv. [one circuit is already being LILOed at Saharsa (BSPTCL), the other circuit is to be LILOed at Saharsa (New) 400/220/132 kv] 8. Nos. of 132 kv Line bays at Saharsa (New) S/s: 6 nos. [2 no. for LILO of each of the following 132kV lines at Saharsa (New): i. LILO of Saharsa (BSPTCL) Banmankhi. ii. LILO of Saharsa (BSPTCL) Udakishanganj. iii. LILO of one circuit of Madhupura Sonebarsa.] 2.7 BSPTCL informed that after above modification 6 nos. 132 KV bays are required at Saharsa (New) Substation (400/220/132 KV, 2x500+2x200 MVA) whereas 2 nos. of 132 KV bays were approved at the Saharsa (New) Substation. Therefore, BSPTCL requested RECTPCL (Bid Process Coordinator for ERSS-XXI) to include the 6 nos. of 132 KV bays instead of 2 nos. of 132 KV bays at Saharasa (new) and accordingly scope of work could be modified. 2.8 Members may deliberate. 3.0 To provide one additional 500MVA transformer at Patna (PG): Agenda by BSPTCL 3.1 BSPTCL has informed that the power demand of Patna and surrounding area is increasing very fast. The load requirement of central and eastern Patna is substantial due to presence of various commercial, institutional & educational establishments, and dense urban population. The load demand is largely fed by Patna (PG) with the installed capacity of 1X500 MVA + 1X315 MVA (to be changed by 500 MVA). The connected load to the above GSS is as follows:- (a) 220/132 KV GSS Gaurichak 1X160 + 2X150 MVA = 460 MVA (b) 220/132/33 kv GSS Khagaul 4X100 MVA = 400 MVA (c) 220/132/33 kv GSS Fatuha 5X100 MVA = 500 MVA (d) 220/132/33 kv Bihta (New) 2X160 MVA = 320 MVA (Likely to be commissioned at the end of 2017). 3.2 The capacity of Patna (PG) is very critical. The average load at present on Patna (PG) is 550 MW and the peak load is 650 MW, which may increase to 820MW in the coming year so it is not fulfilling N-1 criteria. As it happened on 6

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER 03.07.2017, one 500MVA transformer tripped on fault, as a result another 315 MVA transformer also tripped on overload and the major part of the state capital faced total blackout on that day. 3.3 In view of the above facts, CEA is requested to look upon this issue of installation of additional 1X500MVA power transformer at Patna (PG) under N-1 scheme to ensure uninterrupted power to state capital in the event of outage of one of the transformer. 3.4 Members may deliberate. 4.0 Bus and Bay strengthening at Purnea (PG): Agenda by BSPTCL 4.1 BSPTCL has informed that recondutoring of 132 kv Purnea (PG) Purnea (BSPTCL) (T/C) transmission line from Panther to HTLS conductor has already been completed and line is charged. Now each circuit capacity is 1000 Amp i.e. 200 MW. 4.2 It has been planned to test the line for its loading, which requires compatibility of 132 kv main bus bar, bay etc. at both Purnea (PG) and Purnea (BSPTCL) GSS ends. 4.3 In BSPTCL for Purnea GSS end, order has been awarded for R&M of GSS, which includes the work of bus bar & bay strengthening. These works are expected to be completed by 31.08.2017. 4.4 For drawing optimum power from Purnea (PG) end, bus & bay equipment must be capable to sustain load. The matter was discussed in 134 th OCC meeting held on 11.07.2017 at ERPC, Kolkata also. 4.5 POWERGRID vide its letter dated 10-08-2017 has clarified that, in order to improve reliability of 132kV system at Purnea (POWERGRID) 220/132kV S/s, the 132kV bus scheme along with switchgear is already being upgraded under ERSS-XII scheme from Single Main & Transfer (AIS) to Double Main (GIS) with 132kV bay equipment and bus bar capable of handling 1250A and 2000A respectively. 4.6 Members may note. 5.0 Limiting fault current level at 400kV bus at Farakka TPS (NTPC). 5.1 CTU had intimated that three phase fault level at Farakka TPS (NTPC) at 400kV bus is found to be exceeding the designed short time current rating of equipment of 40kA. In this regard, a meeting was held on 13.06.2017 at CEA, New Delhi. 5.2 In the meeting, representative of CTU stated as follows: 5.2.1 The three phase fault level at Farakka TPS (NTPC) at 400kV bus is found to be exceeding the designed short time current rating of equipment of 40kA. Presently, the fault level is about 46kA. Accordingly, system studies have been performed to propose measures to limit the fault current level by adopting various technical options like - bus splitting, switching arrangement, 7

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER bypassing of lines, which were terminating at the specific substation or installation of series reactor or installation of fault current limiter etc. Moreover, the fault level of Farakka generation switchyard in 2021-22 timeframe is expected to be about 57.6kA. The expected power flow and fault current at Farakka bus is shown below: Power Flow 8

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER Fault Current 5.2.2 To limit the fault current level at Farakka, it is proposed to bypass Durgapur Farakka (150km) 400kV D/c and Farakka Kahalgaon (95km) 400kV 1st D/c (ckt-1 & 2) lines outside the switchyard so as to form Durgapur Kahalgaon 400kV D/c line. With this arrangement fault level at Farakka reduces to 47kA from 57.5kA in the timeframe of 2021-22. 5.2.3 In order to further reduce the fault level, it was proposed to sectionalise the Farakka 400kV bus and install a 12 ohm series reactor between the two bus sections as per arrangement shown below. With this proposed rearrangement the fault level of the two bus sections viz. Farakka-A and Farakka-B comes down to 33.5kA and 37.5kA respectively. Study results 9

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER showing feeder wise power flow and fault current contribution (with and without series reactor) is shown below: Power Flow Fault Current 10

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER Power Flow Fault Current 5.3 From above study results, it may be observed that power flow on the transmission lines connected at either sections of Farakka bus is within acceptable limits. 5.4 Representative of NTPC informed that the Auxiliary power supply system for the entire Farakka generating station is derived from a common 33kV system which is fed from the generation voltage level through Two number tie transformers connected in Section-A and One number tie transformer connected in Section-B. Further, presently there is no provision of segregation of Auxiliary power supply system (at 33kV Level) between the units connected on Bus section-a (Units#1, 2, 3 and 4) and Bus section-b (Units#5 and 6) 11

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER respectively. As such in case of voltage and angle difference between the Two 400 kv Bus sections, huge amount of unintended power may flow may occur through the station 33 kv supply system risking the reliability and safety of the system and may lead to interruptions in the station Auxiliary power supply. 5.5 ERPC had informed over telephone that Farraka STPS (Unit 1 to 5) has been identified under projects considered for retirement as per new environmental norms (thermal station units without space for FGD installation and shall attain age of 25 years on 01/01/2022 ) 5.6 Based on the above discussions, following were agreed: (i) Keeping in view the present fault level of 46kA at Farakka substation, it was opined that initially only Durgapur Farakka (150km) 400kV D/c and Farakka Kahalgaon (95km) 400kV 1 st D/c (ckt-1 & 2) lines may be bypassed outside the switchyard so as to form Durgapur Kahalgaon 400kV D/c line by POWERGRID. With above modified arrangement the fault level at Farakka in present time-frame reduces to about 35kA (provided Kahalgaon 400kV bus is split by NTPC as planned, otherwise the fault level at Farakka substation would be about 36.5kA). (ii) CTU would study for the maximum voltage and angle difference between the 400kV bus sections between of Farakka-A and Farakka-B and the report would be shared with NTPC and CEA. (iii) NTPC would study the proposal of series reactor in detail and submit their comments/observations, if any. (iv) Based on comments/study results mentioned at (ii) & (iii) above, the proposal of bus splitting and installation and implementation of series reactor at Farakka Generating station would be reviewed in a special meeting at CEA along with NTPC and POWERGRID. 5.7 Members may deliberate. 6.0 Commissioning of Rajarhat S/s and terminating lines proposed under ERSS-V scheme: Agenda by POWERGRID 6.1 POWERGRID has informed that, Eastern Region Strengthening Scheme-V (ERSS-V) which inter-alia includes Rajarhat 400/220kV, 2x500MVA S/s in West Bengal along with LILO of Jeerat - Subhasgram 400kV S/c line at Rajarhat and Rajarhat - New Purnea 400kV D/c (Triple Snowbird) line (one circuit via Gokarna and other via Farakka) is being implemented by them. Almost 99% works at Rajarhat S/s has been completed, however, works at / around Rajarhat had to be stopped in Jan 2017 due to local unrest. POWERGRID was advised by the West Bengal administration to stop all works and withdraw all working personnel including security guards. After intense efforts by POWERGRID and with cooperation of state administration, security personnel have been deployed at site, however, construction work could not be started because of continued local protest. Now, during 12

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER discussion with Govt. of West Bengal, it emerged that efforts for recommencement of construction activities can be made only if general public is assured that no more transmission lines would be constructed at and around Rajarhat. 6.2 Further, it may be noted that LILO of Jeerat - Subhasgram 2 nd 400kV line is proposed at Rajarhat under ERSS-XVIII, which is being implemented through TBCB route by M/S POWERGRID Medinipur Jeerat Transmission Ltd. 6.3 Members may deliberate. 7.0 Evacuation system for Talcher-III (2x660MW) project of NTPC 7.1 NTPC vide letter dated 30-01-2017 has indicated that they propose to establish a 2x660MW generating plant within the existing Talcher Thermal Power Station Complex in Odisha. Accordingly, they have requested for finalisation of evacuation voltage level and evacuation system for the Talcher-III generation project. 7.2 Accordingly, a meeting regarding evacuation system of Talcher-III project of NTPC and other issues of transmission system of Odisha was held on 18.08.2017 at CEA. In the meeting following were discussed: 7.3 Representative of CTU stated as following: i. 50% power of the Talcher-III generation project has been allocated to Odisha, 35% to various ER beneficiaries (Bihar, West Bengal, Jharkhand and Sikkim) and 15% is unallocated. Beneficiary Quantum Percentage Odisha 622.05 5% Bihar 139.31 11.20% West Bengal 196 15.75% Jharkhand 82.7 6.65% Sikkim 17.4 1.40% Unallocated 186.64 15.00% 1244.1 100% ii. Talcher-III project is located at about 20km from Angul (ISTS substation) and 10km from Meramundali/Meramundali-B (OPTCL substations). Accordingly, load flow studies have been performed for evolving evacuation system for Talcher-III project considering following two alternatives: (a) (b) Talcher-III Angul 400kV D/c (Triple Snowbird) line Talcher-III Meramundali-B 400kV D/c (Triple Snowbird) line iii. Major load centres of Odisha are located near Angul, Meramundali, Khuntuni, Pandiabil, Paradeep, Duburi, Mendhasal and Bhadrak areas. In the Base Case study results i.e. without Talcher-III generation project, the said load centres of Odisha mainly draws about 1225MW power from Angul and 225MW from Baripada ISTS substations. 13

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER iv. Study results with two alternative systems has been discussed below: A. Talcher-III Angul 400kV D/c (Triple Snowbird) line : ISTS system Three cases have been studied for this alternative. Case-A1: Base case with Talcher-III Angul 400kV interconnection In this situation, power flow on Angul Meramundali 400kV D/c line is about 1500MW and that on Meramundali Khuntuni 400kV D/c line is about 1300MW, which violates the N-1 criteria on these corridors. Moreover, Meramundali-B Khuntuni line is lightly loaded. Further, the fault level at Meramundali and Angul is about 48kA and 64kA respectively, which is beyond the rated capacity of the respective bus. Case-A2: Case-A1 along with by-passing of 400kV LILOs of Talcher Meramundali and Meramundali Bolangir at Angul In this situation, power flow on Meramundali Khuntuni 400kV D/c line is about 965MW and Meramundali-B Khuntuni 400kV D/c line is about 145MW. There is highly uneven loading on these corridors. With disconnection of 400kV load centres of Odisha from Angul, power is supplied to load centres through Sundargarh Rourkela Talcher Meramundali and Jamshedpur Baripada Dubri Pandiabil Medhasal corridors. However, the fault level at Meramundali reduces to about 26kA, which is within permissible limits. Case-A3: Case-A2 along with LILO of Meramundali Angul/Bolangir at Meramundali-B In this situation, power flow and fault levels are within permissible limits. Moreover, power distribution on Meramundali Khuntuni and Meramundali-B Khuntuni lines is quite balanced. B. Talcher-III Meramundali-B 400kV D/c (Triple Snowbird) line : Intrastate system (by OPTCL) Three cases have been studied for this alternative too. Case-B1: Base case with Talcher-III Meramundali-B 400kV interconnection In this situation, power flow on Meramundali-B Khuntuni 400kV D/c line is about 1210MW, which violates the N-1 crieteria on this corridor. Moreover, power distribution on Meramundali Khuntuni and Meramundali-B Khuntuni lines is uneven. Further, the fault level at Meramundali is about 47.5kA, which is beyond its rated capacity. Case-B2: Case-B1 along with by-passing of 400kV LILOs of Talcher Meramundali and Meramundali Bolangir at Angul In this situation, power flow on Meramundali-B Khuntuni 400kV D/c line is about 1220MW, which violates the N-1 crieteria on this corridor. Power distribution on Meramundali Khuntuni and Meramundali-B Khuntuni lines is 14

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER still uneven. However, the fault level at Meramundali is reduced to about 27kA, which is under permissible limits. Case-B3: Case-B2 along with LILO of Meramundali Angul/Bolangir at Meramundali-B In this situation, power flow and fault levels are within permissible limits. Moreover, power distribution on Meramundali Khuntuni and Meramundali-B Khuntuni lines is quite balanced. v. Study results are summarised below: Talcher III Study Results Case No. 0 Base Case (without Talcher III) A A1 A2 A3 B B1 B2 B3 Talcher III Angul Case A1 + Angul LILO bypass A2 + LILO of Mera Boln at Mera B Talcher III Meramundali B B1 + Angul LILO bypass B2 + LILO of Mera Boln at Mera B Angul Meramundali (L1) 1225 (N 1: 1000) 1500 (875+625) Tlch Ang Mera 175 Tlch Mera 300 Mera Boln 240 Tlch Mera 335 Tlch Angl Mera 190 Mera Mera B 695 Mera B Boln 230 640 (373+268) Tlch Mera 115 Tlch Angl Mera 65 Mera Boln 280 Tlch Mera 65 Tlch Angl Mera 40 Mera Mera B 340 Mera B Boln 290 Power Flow (in MW) Meramundali Khuntuni (L2) 1235 (N 1: 1000) 1300 (N 1: 1050) Meramundali B Khuntuni (L3) Angul Meram undali Meram undali B 125 142 58 46 8.1 120 155 63.8 48 11.7 L1 and L2: N 1 violation Meramundali: SC violations Unbalanced loading on L2 and L3 L1: Base Case & N 1 violation L2: N 1 violation Angul & Meramundali: SC violations Unbalanced loading on L2 and L3 965 145 171 44.4 25.4 10.8 Unbalanced loading on L2 and L3 610 550 169 44.4 27 26.5 415 235 1210 (N 1: 1105) 1220 (N 1: 1115) Odisha Loss (in MW) Talcher III Angul 400kV D/c line Talcher III Meramundali B 400kV D/c line Fault Current (in ka) 150 59 47.5 17.8 151 38.6 27 16.9 705 670 145 38.6 33 32.6 Remarks Sufficient to meet system requirement Higher system losses compared to Case B3 Unbalanced loading on L2 and L3 L3: N 1 violation Meramundali: SC violations Unbalanced loading on L2 and L3 L3: N 1 violation Sufficient to meet system requirement Lower system losses compared to Case A3 vi. From the above study results it may be inferred that, 400kV LILOs of Talcher Meramundali and Meramundali Bolangir at Angul needs to be by-passed to control the fault level at Meramundali S/s under normal operating condition even without Talcher-III. The necessary arrangements to effect this is already under implementation wherein provision has been kept to connect the LILO lines at Angul bus as and when required particularly in case of grid incidents like outage of lines, generations etc. vii. After bypassing the LILOs under normal operating condition, Odisha would be devoid of ISTS power from Angul which was earlier feeding the load centres at Meramundali, Mendhasal and Duburi etc. Thus, in order to feed these load centres and new emerging load centres like Khuntuni, Narendrapur, Bhadrak and Paradeep, Talcher-III project may be connected to Meramundali-B. This would strengthen the Odisha grid, improve voltage 15

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER profile in these areas and reduce losses in the Odisha system. Moreover, it is recommended to LILO Meramundali Bolangir line at Meramundali-B so as to enable even loading of Meramundali Khuntuni and Meramundali-B Khuntuni lines. Therefore, it may be concluded that the Case-B3 is a preferable scenario. Additionally, in the Case-B3 Odisha grid losses are about 25MW less compared to a similar case viz. Case-A3. viii. Thus, the final evacuation system for Talcher-III project is proposed as follows: (i) Talcher-III Meramundali-B 400kV D/c (Triple Snowbird) line (ii) LILO of Meramundali Angul/Bolangir 400kV line at Meramundali-B (iii) By-passing of 400kV LILOs of Meramundali Bolangir and Talcher Meramundali at Angul (by operation of already under implementation switching arrangement for bypassing 400kV LILOs) 7.4 Representative of NTPC stated that 50% power of the Talcher-III generation project has been allocated to Odisha, 35% to various ER beneficiaries as per the Gadgil formula (Bihar, West Bengal, Jharkhand and Sikkim) and 15% is unallocated. Suppose Talcher-III is connected to Odisha STU then other states will have to pay STU charges in addition to ISTS charges. In case Talcher-III is connected to ISTS, Odisha has to pay the ISTS charges. 7.5 Representative of NTPC further requested to connect one 400kV circuit from Talcher-III to Meramundali and another to Meramundali-B so that reliability of Talcher-III evacuation improves (considering substation outage). During the meeting the proposal was studied and it was observed that power flow parameters are in limits. 7.6 In view of the above, following was decided in the meeting: (a) By-passing of 400kV LILOs of Meramundali Bolangir and Talcher Meramundali lines at Angul by operation of already under implementation switching arrangement for bypassing these LILOs as and when the scheme is implemented so as to limit fault current at Meramundali. (b) LILO of Meramundali Angul/Bolangir 400kV line at Meramundali-B by Odisha under intra-state scheme (c) Talcher-III Meramundali-B 400kV D/c (Triple Snowbird) line (one circuit terminated at Meramundali and other circuit terminated at Meramundali-B) 7.7 Representative of Odisha stated that implementation of Talcher-III has been deffered in a high level meeting of Odisha Government. Accordingly, it was decided that evacuation system for Talcher-III may be planned after finalization of its implementation schedule as the state of grid changes from time to time. 7.8 Members may deliberate. 16

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER 8.0 Approval for construction of 2 nos. 400/220kV substation at Bhadrak and Paradip by OPTCL with revised connectivity: Agenda by OPTCL 8.1 OPTCL informed that, in the 18 th standing committee meeting held on 13 th June 2016 at Kolkata, in principle approval were given for two nos. of 400/220kV Substations at Bhadrak & Paradip in 13 th Plan period that is by 2021-22. The connectivity plan needs to be revised. 8.2 The revised connectivity plan for 400/220kV Bhadrak and Paradip Substation is given below. The 400kV Pandiabil Baripada (Kuchei) to be made LILO at 400/220kV S/S at Bhadrak. 220kV Duburi - Bhadrak D/c line will be LILOed at Bhadrak. A 400kV D/c line from 400/220kV S/s at New Duburi will be connected to 400/220kV S/s at Paradip A 220kV D/c line will be from 400/220 kv Paradip to 220/132 kv Pratapsasan 8.3 The above proposed 400/220kV substations at Bhadrak and Paradip with 400kV and 220kV connectivity may be approved for implementation under intra-state scheme by OPTCL. 8.4 OPTCL may update on the transformation capacity being planned at these substations. 8.5 PART-B: the future plan (for information only) 8.5.1 A 400/220kV sub-station at Dhamara with separate 400kV D/c lines from 400/220kV sub-stations at Bhadrak and Paradip. 8.5.2 The 400/220kV sub-station at Paradip to be connected with 400/220kV substation at Pandiabil. 8.5.3 OPTCL may update on the transformation capacity being planned at Dhamara substation. 8.6 Members may deliberate. 9.0 Approval for connectivity of 400/220kV sub-station at Narendrapur to 400/220kV Jaynagar (PG) with a 400kV D/c line in place of 400kV Angul- Narendrapur Gazuwaka D/c line: Agenda by OPTCL 9.1 OPTCL informed that, in-principle approval was given for construction of 400/220 kv S/S at Narendrapur (intra-state) in the 18 th CEA standing committee meeting held on 13 th June 2016 at Kolkata. The connectivity planned in the standing committee may please be revised and approved as follows: 400kV D/c line Pandiabil (PG) to Narendrapur. 17

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER 400kV D/c line from Narendrapur to Jeypur PG to be LILOed at 400 kv Switching Station at Theruvali. The Theruvali Switching Station to be converted to a 400/220kV S/S when the demand grows. 9.2 In the 18 th standing committee meeting, Angul-Narendrapur-Gajuwaka link was considered as an additional link to Jeypore - Gajuwaka link for enhancement of export to Gajuwaka up to 1000MW. But with the commissioning of Angul-Srikakulam link, an additional path to Gajuwaka has been created through Angul Srikakulam Vemagiri Gajuwaka. 9.3 Moreover, Odisha is proposing to evolve evacuation plan for M/s OTPCL in (Agenda no. 10) comprising of 400kV connectivity viz. Khuntuni Begunia Narendrapur. Then the Narendrapur Jaynagar (PG) link will improve the fault level at Jaynagar (PG) in the southern region of Odisha. Hence the Angul Narendrapur Gazuwaka ISTS link may be dropped and Narendrapur Jeynagar (PG) intra-state link which is the proposal of Odisha, may be approved. 9.4 Members may deliberate. 10.0 Proposed evacuation Plan of 3x800MW Power Plant of M/s OTPCL (Odisha Thermal Power Corporation Ltd.) at Kamakshyanagar, Odisha: Agenda by OPTCL 10.1 OPTCL informed that M/s OTPCL plans to establish a 3x800MW generating plant at Kamakshyanagar by the Year 2021-22. OPTCL has planned to evacuate full power with the following transmission elements, to be implemented under intra-state scheme by OPTCL. 765kV Connectivity The 765 kv Switching Station of Kamakhyanagar to be connected with Angul PG, with 765kV D/c line. A 765/400kV Sub-station at Begunia with 765kV D/c line from Kamakhyanagar to Begunia. 400kV Connectivity at 765/400kV Begunia 400kV D/c Line Mendhashal Khuntuni to be LILOed at 765/400 kv Begunia. 400kV D/c Line Pandiabil Narendrapur to be LILOed at 765/400 kv Begunia. 10.2 Power generated at OTPCL will be transferred to Begunia at 765kV to facilitate seam less transfer of power. It will be stepped down to 400kV at Begunia. Begunia will be further connected to LILO of Mendhashal - Khuntuni D/c & LILO of Pandiabil - Narendrapur D/c 400kV lines for evacuation of power to the load centres at Mendhashal, Khuntuni, Narendrapur, Pandiabil 18

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER and Duburi. The connectivity with Angul will add stability to the evacuation plan. Hence two line bays at 765kV may be allotted at Angul to OPTCL. 10.3 The detail single line diagram of the Proposed Plan with distance of Transmission line is at Annexure-10.1, Single line diagram of 765kV and 400kV transmission network with load flows of Odisha State for 2021-22 is at is at Annexure-10.2. 10.4 Odisha may indicate, if the entire power is to be consumed by the state. If Odisha desires to transfers power outside the state, then M/s OTPCL would need to apply for LTA for transfer of surplus power through ISTS. 10.5 In the meeting regarding evacuation system of Talcher-III project of NTPC and other issues of transmission system of Odisha held on 18.08.2017 at CEA the items mentioned at Agenda no. 7 to 10 were discussed among CEA, POWERGRID (CTU), POSOCO, OPTCL and GRIDCO. Thus, system studies were performed after the meeting as per the deliberation in the meeting and Odisha s various proposals. The study results (load flow, observations and fault current) are at Annexure 10.3. 10.6 Members may deliberate. 11.0 Evacuation of power from 2x660MW project of OPGC: Agenda by OPTCL 11.1 OPTCL informed that the 2x660MW generating plant of OPGC is in advance stage of commissioning. The evacuation plan envisaged was as follows: 11.1.1 Out of 2 units of OPGC, one unit was meant for STU and the second was for ISTS. Accordingly, bus split was planned at OPGC. One 400kV D/c line was planned to be connected to Lapanga from state allocated unit and another unit was proposed to be connected to Sundargarh (Jharsuguda) through 400kV D/c (triple snowbird) ISTS line. The ISTS line is already under implementation through TBCB and is in advanced stages of commissioning. 11.2 In the changed scenario, OPTCL is planning for evacuation of full quantum of power from OPGC as it is envisaged that entire power of OPGC may be allocated to Odisha. The matter was discussed at a meeting held at CEA on 18-08-2017. Therein, Odisha mentioned that since Odisha is going to avail the entire power, the OPGC Jharsuguda 400kV D/c (Triple Snowbird) ISTS line may be transferred from M/s Odisha Generation Phase-II Transmission Limited to M/s OPTCL. Thus, it will be a STU line and Odisha would not have to bear ISTS charges for drawl of its share of power. It was decided that the matter may be taken up for discussion in the SCM. 11.3 Members may deliberate. 12.0 Connectivity of Railways TSS with ISTS Network for Ludhiana-Delhi- Sonnagar routes 12.1 Indian Railways is planning to connect its TSSs between Ludhiana-Delhi- Sonnagar routes of Railways by way of construction of associated 19

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER infrastructure including transmission lines and bay extension work at ISTS points preferably at 220 kv. 12.2 Railway Board vide its letter no. 2012/Elect (G) /150/1 Pt II dated 28.12.2016 has requested for connectivity to railways from various ISTS points. Power requirement of Railways from the nearby proposed ISTS points is as follows: CONNECTIVITY SCHEME OF TSS ALONG LUDHIANA - DELHI- SONNAGAR ROUTE Sl. No PGCIL GSS Connectivity required at (kv) Railway TSS to be supplied Grid Voltage at TSS (kv) 1 Jagadhari-I 220 2 Jagadhari-II 220 Abdullapur 220 3 Tapri 132 4 Muzaffarnagar 132 5 Jarauda Nara 132 6 Hapur 132 Meerut 220 7 Gulaothi 132 8 Wair 132 9 Durgaoti 132 10 Deoria 132 11 * Pasauli Chandiapur 132 220 12 (Sasaram) Gadhion 132 13 Jeonathpur 132 14 Chunar 132 Tentative load requirment (MW) 50 50 75 12.3 M/s POWERGRID is requested to furnish the information regarding the availability of space for 220kV bays and margins in transformation capacity at Pasauli (Sasaram). 12.4 A meeting regarding Connectivity of Railways TSS with ISTS Network at Abdullapur, Meerut and Sasaram for Ludhiana-Delhi-Sonnagar route was held in CEA on 21.07.2017 (Copy of MoM enclosed as Annexure 12.1). The following were decided in the meeting. (i) As no representative from Bihar was present in the meeting no decision could be taken in respect of connectivity to Railways TSS at Sasaram substation. (ii) Railways would utilize existing two number of 220 kv bays at Abdullapur substation (presently used for 220 kv supply to Jagadhari TSS) to meet their additional traction load requirement. The required technical upgradation of the 220 kv line (presently only two phases has been strung) would be carried out by Railways subject to fulfilment of all the existing agreements of HVPNL with Railways for this line. (iii) Two nos. of 220 kv (GIS) bays at Meerut 400/200kV substation along with establishment of 220/132kV, 2x100 MVA GIS in the premises of Meerut 400/220 kv substation was agreed for providing connectivity to Railways. The cost of above works shall be borne by Railways. Railways to implement 132 kv D/c interconnection from Meerut (PG) to their 132 kv substation. 20

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER 12.5 Members may deliberate. 13.0 Additional outlets from Darlipalli STPP and North Karanpura STPP for mining activities ( Agenda by NTPC) 13.1 NTPC informed that the Associated Transmission System of Darlipali STPP stage-i (2x800MW) project was finalized in 13 th ER Standing Committee Meeting and LTOA meeting held on 12 th February 2012 with the following Evacuation system: Darlipali Jharsuguda (Sundergarh Pool) 765kV D/c line 13.2 Coal for the project is planned to be sourced from Dulanga captive coal mine allocated to NTPC by GoI which is located at a distance of 10km from the project. 13.3 NTPC had approached OPTCL for power supply to Dulanga mine as HT consumer however it has been asked by GRIDCO to draw the power for this mine from GRIDCO share of power in Darlipali directly from the generation switchyard in view of vicinity to the generation project. As such suitable arrangement has been made in the auxiliary power supply system of the project for providing 15 MVA power to the linked mine at 33kV voltage level. 13.4 Further, GRIDCO has also allotted additional 15MVA of power for Manoharpur coal mine of OCPL(in vicinity of Dulanga mines) and has asked them to draw power directly from DSTPP generation switchyard as being done in case of Dulanga mines. 13.5 It may be noted that these load centres are radially fed from the generation switchyard. 13.6 Further, for meeting the power supply requirement of captive Chati Bariatu & Kerandari and Pakri Barwadih coal mines, 2 nos. 220kV feeder from North Karanpura project has been planned. Power from NKSTPP to mines also shall be drawn in radial mode. 13.7 Power supply scheme indicated the above arrangements is at Annexure-13.1 13.8 In view of the above it is requested that above drawls may be considered as drawl by GRIDCO/ Jharkhand from their share of allocated power from Darlipalli and North Karanpura projects. Also required interface energy meters shall be installed by CTU. 13.9 Members may deliberate. 14.0 Interim arrangement for power evacuation from Nabinagar TPP (3X660MW) 14.1 The 1 st unit of Nabinagar TPP (3x660MW) is in advance stage of completion and anticipated to be synchronized in Oct' 17. The scheduled commissioning of this unit is in Nov' 17. The evacuation system for Nabinagar TPP includes Nabinagar - Gaya 400kV D/C (Quad) transmission line awarded by 21

Additional Agenda I for 19th Standing Committee Meeting on Power System Planning of ER POWERGRID in Apr'16 with commissioning schedule as 38 months. However, POWERGRID agreed to complete the line on best effort basis matching with commissioning of the 1 st unit of the generation project. The anticipated date of completion of the line is Dec'17. The progress of construction of line is slow. It seems that construction progress of this line is not matching with commissioning date of 1 st unit of Nabinagar TPP. It is therefore requested that interim arrangement of evacuation of power for Nabinagar TPP may be evolved. 14.2 Member may discuss. 15.0 Revision in capacity of 4 th 220/132kV ICT at Rangpo S/s under ERSS-XX 15.1 In the 18 th Standing Committee Meeting of ER, installation of 4 th 220/132kV, 160MVA ICT at Rangpo S/s was planned under ERSS-XX in order to meet the N-1 reliability criteria. About 250MW power from three generation projects viz. Chuzachen (99MW), Bhasmey (51MW) and Dikchu (98MW) would be injected at 132kV level at Rangpo S/s. 15.2 POWERGRID has informed that 220/132kV, 160MVA ICT which is about 89-109MT cannot be transported to Rangpo S/s, as the maximum load bearing capacity of the bridge en-route Siliguri to Rangpo is only about 80MT. Thus, it is proposed that 220/132kV, 100MVA ICT may be installed at Rangpo in place of 220/132kV, 160MVA ICT as the 4 th ICT under ERSS-XX. As such, the 220/132kV, 4x100MVA transformation capacity would be enough to meet the N-1 security criteria. 15.3 Member may approve. 22

23 Annexure-1.1

24

Annexure-10.1 765/400kV Angul S/s OTPCL 62 kms 765kV Sw. Stn at OTPCL, Kamakhyanagar 100kms 765/400kV Begunia S/s Mendhasal 32 kms 40.5 kms Pandiabil Khuntuni Narendra pur 25

JHARSUGUDA-1 [4307003] (7.65) 240 MVAr (-219.83) 272 km 248.66 (132.20) JHARSGUDA-1 [4304095] (12.86) 468.18 (11.05) -470.23 (-6.18) 468.18 (11.05) 50 km -470.23 (-6.18) 603.90 (-66.08) 240 MVAr 248.66 (352.03) OPGC (IB) (1X660 MW) 125 MVAr (-219.83) 336.57 (78.43) 1083.12 (-138.73) -1088.08 (39.65) (-112.91) NTPC Darlipalli (4X800 MW) -1464.11 (150.35) 1462.97 (-115.29) 1083.12 (-138.73) 27 km -1088.08 (39.65) 619.89 (5.75) -622.16 (38.62) Ind-Bharat (2X350+1X660 MW) -336.57 (-78.43) 63 km 603.90 (-66.08) IB [4304101] (15.64) -133.66 (72.25) 35 km 133.52 (-54.25) 156 km 2x1500MVA 765/400kV 619.89 (5.75) -622.16 OPGC (IB) (1X660 MW) DHARAMJAYGARH [2107001] -1464.11 (150.35) 1462.97 (-115.29) -5589.50 (243.63) () () (38.62) -133.66 (72.25) 133.52 (-54.25) 11.5 km Lapanga [4302878] (10.27) DHARAMJAYGARH [2107001] 149 km JHARSUGUDA-2 [4307002] 1.01 (-0.80) Sterlite (1X600 MW) -274.51 (-27.50) 274.36 (32.05) 2x315 MVA 400/220 kv () 549.03 (54.99) 2x1500MVA 765/400kV -274.51 (-27.50) 274.36 (32.05) 125 MVAr -221.57 220.63 (10.17) () (-28.91) (-114.13) () () -1798.11 (438.06) 161.54 (-4.17) -161.73 (23.29) 161.54 (-4.17) 38 km -161.73 (23.29) 1646.91 (236.30) Lapanga [4304098] 1.01 (15.07) 240 MVAr 322.64 (-74.40) -323.09 (65.41) () 38 km -221.57 220.63 (10.17) 322.64 (-74.40) (-28.91) (-222.87) -323.09 (65.41) Sterlite (3X600 MW) 161.54 (-4.17) -161.73 (23.29) () -723.01 (-197.44) 1299.43 (164.24) JHARSGUDA-2 [4304094] (0.74) 38 km 161.54 (-4.17) -161.73 (23.29) Sterlite CPP load 25 km 18 km 50 km -100 (-329.46) -186.31 (51.12) 240 MVAr -723.01 (-197.44) 1299.43 (164.24) (-222.87) STERLITE [4304086] (1.47) -186.31 (51.12) 14km (-222.87) 240 MVAr 722.87 (4.46) 285 km HVDC to Maharani bagh/badrapur (NR, Delhi) 722.87 (4.46) SUNDERGARH NEW [4307009] 1.01 (-1.08) 3x1500MVA 765/400kV -2796.00 () () () () MERAMUNDALI-B [4304084] (11.53) RAIPUR [2197004] { -1154.49 (363.51) () () 343 km SUNDERGARH NEW [4304079] 1.01 (-1.08) -149.04 (-6.54) 148.78 80MVAr -1154.49 (363.51) () () (1.45) 1463.81 (-323.03) MERAMUNDALI-B [4302889] (9.58) 2x500 MVA 400/220 kv () -5.76 (-33.18) (-72.94) 2195.43 (-412.91) -149.04 (-6.54) 148.78 (1.45) -8.00 (50.57) 18 km 18 km GMR (1X350 MW) -295.88 (21.18) 8.5 km -2196.30 (476.93) ORISSA_UMPP_1 [4307010] 1.01 (-0.53) -320.25 (-45.23) 320.09 (48.13) -295.88 (21.18) 240 MVAr (-242.92) 2196.30 (-234.01) { 3X800 MW } 35 km () () 187 km () 1464.20 (-155.93) { 2X800 MW JSPL TSTPS Expansion (6x135 MW) (1X660 MW) -9.93 (-28.08) -9.93 (-28.08) -301.89 (34.12) 301.68 (-19.32) 25 km -301.89 (34.12) 301.68 (-19.32) () -1464.20 (398.96) 0.5 km 240 MVAr () () (-243.03) Raigarh [2104010] MERAMUNDALI [4304083] (10.96) { ORISSA_UMPP_2 [4307011] 1.01 (-0.71) () () ORISSA_UMPP [4304081] 1.01 (-0.71) () 2x1500MVA 765/400kV () MERAMUNDALI [4302885] 0.99 (8.10) () -131.70 (-25.13) 131.36 185.12 (40.10) 63MVAr BISRA [4304078] 0.97 (0.52) BISRA [4302126] 0.97 (1.48) (18.33) 66.96 (-25.18) -67.03 (23.93) () MERAMUNDALI [4302145] (8.43) () 2x315 MVA 400/220 kv 185.12 (40.10) 225 km 225 km (-59.45) -546.07 2x500 MVA 400/220 kv 116.48 (10.56) -116.74 (-15.81) (55.42) -546.07 63MVAr (-63.32) (-4.03) 66.96 (-25.18) -67.03 (23.93) -546.07 (55.42) 63MVAr (-59.45) () JITPL (1X600 MW) -274.64 (27.27) 273.94 (-7.22) -250.69 (17.49) 50 km -274.64 (27.27) 273.94 (-7.22) -250.69 (17.49) -546.07 (-4.03) 456.53 (44.83) 80MVAr (-68.47) 50MVAr 168.03 (21.78) 51 km -168.30 (3.53) 456.53 (44.83) 125MVAr (-42.79) 168km 50MVAr (-45.35) 264.30 (28.04) (-106.98) 360.80 (86.07) -463.44 (-76.80) 360.80 (86.07) -463.44 (-76.80) 207.86 (5.50) 50MVAr 143 km (-45.35) (-106.98) 125MVAr (-42.79) 120 km STPS [4304077] (9.95) STPS [4302117] (8.92) 76.5 km 207.86 (5.50) 81 km STPS_G [4300056] 1.02 (16.00) 50MVAr (-42.79) 2x315 MVA 400/220 kv { CHAIBASA [4204006] 50MVAr { RANCHI [4204010] -276 (-654.28) 2744.82 (350.77) -47.44 (-6.78) 47.39 (5.90) Khuntuni [4304085] (8.69) () () 249.80 (15.00) -205.59 249.80 (15.00) 31.5MVAr () () RENGALI [4304075] 0.99 (9.33) -47.44 (-6.78) 47.39 (5.90) (-37.50) 205.08 (27.45) 294.57 (9.10) () -184 () -32.57 (0.36) 32.55 (-0.78) HVDC to Kolar Khuntuni [4302906] 0.99 (5.97) 2x500 MVA 400/220 kv () 294.57 (9.10) 62 km 157.43 (132.93) -157.70 (-116.72) 35 km -205.59 157.43 (132.93) -157.70 (-116.72) (-37.50) 205.08 (27.45) 356 km RENGALI [4302120] 0.99 (8.61) -253.50 (25.01) () 2x315 MVA 400/220 kv -253.50 (25.01) -32.57 (0.36) 32.55 (-0.78) (-44.43) LANCO (1X660 MW) -301.94 (30.55) 301.44 (4.70) 68.30 (63.29) 60 km -301.94 (30.55) 301.44 (4.70) -386.71 (-16.31) DVC [4204016] JAMSHEDPUR [4204001] 80MVAr -103.86 (10.03) 103.64 (-14.43) 125MVAr 50 MVAr (-68.37) -386.71 (-16.31) 125MVAr (-111.08) (-106.83) () 2x315 MVA 400/220 kv 125MVAr KEONJHAR [4302881] 0.97 (3.07) 116 km 98 km 141 km (-111.08) -103.86 (10.03) 103.64 (-14.43) 96 km -318.03 (-107.73) 100 km 316.00 (-61.72) (76.65) () 150.11 (33.88) 384.00 (38.49) 63 MVAr 61.72 (22.41) 107.88 (-44.40) 156 km -108.28 (78.48) KEONJHAR [4304097] 0.97 (5.48) 384.00 (38.49) KUCHEI [4304080] 0.98 (3.30) (-43.62) 50MVAr KUCHEI [4302148] 0.98 (1.37) () -81.81 (0.20) 81.67 (-2.96) -85.76 (-25.08) -119.79 (-18.64) -114.88 (113.55) () 85.61 (21.96) () 119.62 (15.15) () Paradeep_400kV [4304076] 0.97 (1.26) -49.94 (-6.56) -251.29 (-5.39) 250.67 2x500 MVA 400/220 kv () 49.91 (5.95) Annexure-10.2-81.81 (0.20) 81.67 (-2.96) 51km (25.86) 250.67 2x500 MVA 400/220 kv DUBURI [4302152] 0.98 (2.34) -85.76 (-25.08) 85.61 (21.96) -251.29 (-5.39) -119.79 (-18.64) 119.62 (15.15) -72 (25.86) KHARAGPUR [4504010] () PCPIR load (-232.48) () -141.15 140.91 (-5.11) -85.76 (-25.08) 85.61 (21.96) (0.35) 125MVAr 2x315 MVA + 1x500MVA 400/220 kv 3x315 MVA 400/220 kv Duburi [4304087] 0.99 (4.25) Bhadrak [4304088] 0.98 (2.69) Bhadrak [4302725] 0.98 (1.06) -49.94 (-6.56) 49.91 (5.95) (-70.63) 80 MVAr () () Paradeep_220kV [4302724] 0.97 (0.57) -130.88 (-7.21) 90 km 130.57 (51.42) 279.37 (71.38) () -130.88 (-7.21) 130.57 (51.42) 110 km 279.37 (71.38) 52.73 (53.31) 150 km -52.81 140 km (-109.05) (26.09) 44.68 (53.60) 125MVAr 47.21 (38.62) 300 km (-109.05) 63MVAr (-54.96) BOLANGIR [4304099] 0.97 (8.06) 105.83 (-26.15) 80 MVAr -106.06 (21.46) (-68.93) () 125 MVAr 2x315 MVA 400/220 kv (-107.71) BOLANGIR [4302711] 0.98 (5.62) -106.06 (21.46) 105.83 (-26.15) 137.67 (61.76) () 50 MVAr 74.45 (71.96) 288 km (-43.08) 50 MVAr (-43.08) 213 km ANGUL-3 [4304090] (11.51) -138.56 (0.70) 5.75 (-25.88) -201.41 (92.31) 7.99 (-40.61) -201.41 (92.31) -264.95 (-7.52) 240MVAr (-222.51) 792.59 (-111.31) 50 MVAr -248.99 (61.31) -248.99 (283.82) -792.59 (111.31) (-46.31) 50 MVAr 220km ANGUL-1 [4307004] 1.01 (9.51) 3x1500MVA 765/400kV (-46.31) 547.24 (24.31) 85 km -549.31 (-9.49) 330MVAr 419.74 (-60.68) -420.48 (45.91) 547.24 (24.31) -549.31 (-9.49) JITPL (2X600 MW) 240MVAr (-305.95) -420.48 419.74 (45.91) (-60.68) 419.74 (-60.68) -420.48 (45.91) 479.77 (22.68) 31 km -480.42 (-10.91) (-220.71) 125 MVAr 479.77 (22.68) -480.42 (-10.91) 601.22 (-202.51) MONNET (2X525 MW) (-114.34) 601.22 (-202.51) -1963.67 (547.88) 125 MVAr (-220.71) (-114.34) ANGUL-1 [4304091] (11.51) 125 MVAr (-114.34) 50 MVAr () 240MVAr 1963.67 (-547.88) (-45.71) ANGUL-2 [4307001] 1.01 (9.51) () -1308.84 (279.89) 3x1500MVA 765/400kV ANGUL-2 [4304092] (12.93) 301.75 (-18.74) 24 km -301.95 (33.01) -1308.84 (279.89) 720.02 (-93.86) 301.75 (-18.74) -301.95 (33.01) LANCO (1X660 MW) -722.19 (50.58) 720.02 (-93.86) -722.19 (50.58) -480.39 479.93 (52.11) (-43.91) 22 km -722.19 720.02 (50.58) (-93.86) 479.93 (-43.91) -480.39 (52.11) GMR (3X350 MW) 62 km 330MVAr -753.03 (269.39) -753.03 (269.39) 276 km (-269.09) } Srikakulam-AP 301.61 (-13.22) -301.90 (34.03) 35 km 301.61 (-13.22) -301.90 (34.03) TSTPS Expansion (1X660 MW) -601.65 (118.53) OTPCL_765kV [4307006] 1.01 (10.55) -601.65 (118.53) 2196.30 (-233.97) { -496.50 OTPCL (3X800 MW) (-1.55) -496.50 (-1.55) Begunia_400kV [4304070] (6.81) 240MVAr () 240MVAr 100 km 240MVAr (-217.52) 240MVAr (-217.52) 495.99 (7.80) 252.76 (0.92) 494.97 (-12.70) -495.99 (-7.80) 495.99 (7.80) 252.76 (0.92) 494.97 (-12.70) -495.99 (-7.80) 2x1500MVA 765/400kV Begunia_765kV [4307012] (9.18) -342.40 (-63.22) -27.61 (97.47) 143 km -342.40 (-63.22) -27.61 (97.47) -377.71 (-22.47) 32 km -377.71 (-22.47) 341.67 (72.58) 155.79-156.29 (-35.44) (25.50) 341.67 (72.58) 63MVAr () -156.29 (-35.44) 155.79 (25.50) (-56.14) () MENDHASAL [4302713] 0.98 (2.03) 40.5 km -107.24 (-19.41) -156.29 (-35.44) 155.79 (25.50) -107.24 (-19.41) (-56.14) 3x315 MVA 400/220 kv () 63MVAr 40 km MENDHASAL [4304714] 0.99 (5.52) 107.14 (-15.97) 376.62 107.14 (-15.97) (32.54) Pandiabil [4304102] 0.99 (4.99) 376.62 (32.54) () 80MVAr -156.63 (-29.01) 156.33 (23.09) -281.09 (-31.65) -281.09 (-31.65) () 2x500 MVA 400/220 kv Pandiabil [4302867] 0.98 (2.90) -44.74 (21.63) -156.63 (-29.01) 156.33 (23.09) -47.35 (66.54) () JEYPORE [4304071] (10.54) 137.49 (-6.99) -137.87 (-0.46) 125 MVAr () (-114.25) 4x315 MVA 400/220 kv () 31.5 MVAr JEYPORE [4302105] 1.01 (13.64) 63 MVAr (-63.48) 137.49 (-6.99) -137.87 (-0.46) (-73.12) -74.85 (-36.56) () 137.49 (-6.99) -137.87 (-0.46) () 137.49 (-6.99) -137.87 (-0.46) () 194.02 (0.79) -334.57 (120.73) 220 km -334.57 (120.73) { GAZUAKKA 72km -194.52 (33.74) -68.63 (38.82) 131.57 (-36.28) INDRAVATI-PG [4304072] (12.20) 131.57 (-36.28) 4 km -131.59 (38.36) 131.59 (18.76) -131.92 (-25.43) -131.59 (38.36) () 125 MVAr 131.59 (18.76) -131.92 (-25.43) (-114.23) () INDRAVATI [4304073] (12.27) 2x315 MVA 400/220 kv INDRAVTI [4302108] 1.01 (15.06) -159.27 (-49.66) 158.96 (43.45) 2x500 MVA 400/220 kv () 27.50 (-18.58) 27.50 (-18.58) -159.27 (-49.66) 158.96 (43.45) Narendrapur-New-220kV [4302138] (4.23) () (-74.66) 80MVAr -67.95 (92.60) 290 km { 199.72 (12.96) -67.95 (92.60) GAZUAKKA 199.72 (12.96) Narendrapur-New-400kV [4304074] 1.01 (6.26) Bus Voltage 765 kv 400 kv 220 kv 33 kv Colour code Display Notation Injection into the bus : +ve Drawl away from the bus : -ve Voltage Mag/(Ang) in PU /degree Flows in MW and (Mvar) APPROVED REVEIWED CHECKED R3 09.02.2017 R2 21.07.2016 LFA R1 26.04.2016 DRAWN DESCRIPTION R0 REV 18.12.2015 DATE: REMARKS Load Flow study results Single line diagram of 765kV and 400kV transmission network - Odisha State 2021-22 condition 26 Orissa Power Transmission Corporation Ltd., Registered Office: Janpath, Bhubaneshwar-751022 Phone: (0674)-2541320/2542320 PO details: CP-12/2015/10043(8)/epc dated 17 October 2015. DRAWN IN : MiPower Power Research & Development Consultants Pvt. Ltd., #5, 11th Cross, 2nd Stage, West of Chord Road, Bangalore- 560086, INDIA Ph : +91-080-2319 2209,2159 Fax: +91-080-2319 2210 E-mail : prdc@vsnl.com TM DWG. NO : LFA\2021-22\765-400kV-Basecase

Annexure 10.3 Odisha Proposal with 765kV strengthening, Angul-Narendrapur-Gazuwaka, Talcher-III (2x660MW) and Kamakhayanagar (3x800MW) A. Base case The base case has been prepared (with low hydro in southern Odisha) bypassing of 400kV LILOs of Talcher Meramundali & Meramundali Bolangir at Angul (to limit fault level of Meramundali) and with LILO of Meramundali Angul/Bolangir at and Meramundali-B Khuntuni lines). Meramundali-B (for even loading on Meramundali-Khuntuni B. Case A + Narendrapur Theruvali Jeypore 400kV D/c (Triple Snowbird) To strengthen the Gazuwaka HVDC system presently operating at 650MW to its full capacity of 1000MW, intrastate system of Narendrapur Theruvali Jeypore 400kV D/c (Triple Snowbird) has been studied. The power flow on this line is observed to be about 150MW. The fault level of Gazuwaka bus is about 4.8kA. B. Case A + Angul Narendrapur Gazuwaka 400kV D/c (triple Snowbird) To strengthen the Gazuwaka HVDC system presently operating at 650MW to its full capacity of 1000MW, ISTS system of Angul Narendrapur Gazuwaka 400kV D/c (Triple Snowbird) has been studied. In this scenario, Narendrapur gets connected to two 400kV S/s for reliable supply of power. The power flow on Narendrapur - Gazuwaka is observed to be about 550MW. The fault level of Gazuwaka bus is about 7.4kA. C. Case B + Angul Begunia 765kV D/c (Hexa Zebra) In the absence of 400kV LILOs of Talcher Meramundali and Meramundali Bolangir at Angul, major load centres of Odisha (Meramundali, Duburi, Pandiabil and Mendhasal) are fed through long lines from Lapanga and Baripada. To relieve the loading of these lines, Odisha s proposal of Angul Begunia 765kV D/c line (via Kamakhyanagar - however without generation) has been studied. A new 2x1500MVA 765/400kV S/s has been created at Begunia with Angul Begunia 765kV D/c line along with LILO of Pandiabil Narendrapur 400kV D/c line and Khuntuni Mendhasal 400kV D/c lines. About 1500MW of power flows from Angul to Begunia, out of which about 450-500MW flows to each Pandiabil and Mendhasal and about 600-650MW flows to Narendrapur. With this power 27

flow further increases on Narendrapur Theruvali Jeypore 400kV D/c line to about 300MW. D. Case C + Talcher-III System The evacuation system of Talcher-III is Talcher-III Meramundali/ Meramundali- B 400kV D/c (triple Snowbird) line (one circuit terminated at Meramundali and other circuit terminated at Meramundali-B). In this case, there is no power evacuation problem from Talcher-III and loading on the corridors are within safe limits. E. Case D + 3x800MW Kamakhyanagar generation of Odisha Odisha is setting up 3x800MW generation at Kamakhyanagar. The evacuation system of Kamakhyanagar generation as proposed by Odisha is LILO of Angul Begunia 765kV D/c line at generation switchyard. In this case, about 700MW of power flows towards and Angul and about 1500MW flows towards Begunia. About 300MW power is observed to flow from Theruvali to Jeypore. The fault level of Gazuwaka is expected to be about 5.1kA. E. Case E with Angul Narendrapur Gazuwaka system in place of Narendrapur Theruvali Jeypore As compared to case E, about 550MW power is observed to flow from Narendrapur to Gazuwaka. The fault level of Gazuwaka is expected to about 7.8kA (compared to 5.1kA in previous case). E. Case E with Rourkela Talcher Behrampur Gazuwaka system in place of Narendrapur Theruvali Jeypore In case the Reliance system revives, case E with Rourkela Talcher Behrampur Gazuwaka 400kV has been studied. About 450MW power is expected to flow from Behrampur to Gazuwaka and the fault level of Gazuwaka is expected to about 6.7 ka. 28

Fault Current (in ka) Case A Case B Case B' Case C Case D Case E Case E' Case E'' Base case Case A + Theruvali Case A + Angul Gazuwaka Case B + Angul Begunia Case C + Talcher III Case D + kamakhyanagar Case E + Angul Gazuwaka minus Theruvali Case E + Talcher Behrampur minus Theruvali 400 kv JEYPORE 6.8 8.7 9.1 9.5 9.6 9.7 9.5 8.9 JHARSUGUDA 40.5 40.5 40.5 40.6 40.7 40.9 40.9 41.1 ANGUL 38.6 38.6 42.1 41.0 41.2 43.7 46.2 43.6 BEGUNIA 27.0 28.0 29.3 30.9 28.3 MERAMUNDLI 26.9 27.0 28.6 31.3 37.3 37.6 38.2 38.3 MERAMNDLI B 26.4 26.4 28.0 30.6 36.5 36.9 37.5 37.5 JHARSU SPLI 47.8 47.8 47.9 47.8 48.2 48.6 48.6 48.7 GAZUWAKA ER 4.2 4.8 7.4 5.0 5.1 5.1 7.8 6.7 TALCHER III 30.9 31.1 31.5 31.5 NARENDRAPUR 6.2 8.4 13.8 11.3 11.5 11.6 16.4 9.2 765 kv ANGUL 26.8 26.8 27.9 30.4 30.7 35.0 35.3 34.9 JHARSUGUDA 36.9 36.9 37.1 37.4 37.5 38.2 38.3 38.3 BEGUNIA 16.7 17.0 19.2 19.2 18.9 KAMAKHYANAG 22.2 22.4 27.9 27.9 27.8 JHARSU SPLI 29.3 29.3 29.4 29.7 29.8 30.5 30.5 30.5 29

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case RANCHI ADHUNIK MAITHON MEJIA DTPS DURGAPUR TO DJ'GARH(WR) CHAIBASA JAMSHEDPUR JMSD'PUR-DVC ROURKELA TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER PARADEEP MONNET JINDAL GODACHAK DUBURI DHENKANAL 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) TIME FRAME: 2021-22 GAZUWAKA(SR) 30

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case + Theruvali RANCHI ADHUNIK MAITHON MEJIA DTPS DURGAPUR TO DJ'GARH(WR) CHAIBASA JAMSHEDPUR JMSD'PUR-DVC ROURKELA TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER PARADEEP MONNET JINDAL GODACHAK DUBURI DHENKANAL 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) Theruvali ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) TIME FRAME: 2021-22 GAZUWAKA(SR) 31

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case + Angul-Gazuwaka RANCHI ADHUNIK MAITHON MEJIA DTPS DURGAPUR TO DJ'GARH(WR) CHAIBASA JAMSHEDPUR JMSD'PUR-DVC ROURKELA TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER PARADEEP MONNET JINDAL GODACHAK DUBURI DHENKANAL 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) TIME FRAME: 2021-22 GAZUWAKA(SR) 32

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case + Angul-Begunia + Theruvali RANCHI TO DJ'GARH(WR) ROURKELA CHAIBASA MAITHON MEJIA DTPS DURGAPUR ADHUNIK JMSD'PUR-DVC JAMSHEDPUR TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER PARADEEP MONNET JINDAL GODACHAK DUBURI KAMAKHYANGR DHENKANAL 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL BEGUNIA PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) Theruvali ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) TIME FRAME: 2021-22 GAZUWAKA(SR) 33

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case + Angul-Begunia + Talcher-III + Theruvali RANCHI TO DJ'GARH(WR) ROURKELA CHAIBASA MAITHON MEJIA DTPS DURGAPUR ADHUNIK JMSD'PUR-DVC JAMSHEDPUR TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER MONNET JINDAL TALCHER-III GODACHAK (2x660) DUBURI KAMAKHYANGR DHENKANAL PARADEEP 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL BEGUNIA PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) Theruvali ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) TIME FRAME: 2021-22 GAZUWAKA(SR) 34

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case + Talcher-III + Angul - Begunia + Kamakhyangr + Theruvali RANCHI TO DJ'GARH(WR) CHAIBASA MAITHON MEJIA DTPS DURGAPUR ADHUNIK JMSD'PUR-DVC JAMSHEDPUR ROURKELA TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER MONNET JINDAL TALCHER-III (2x660) KAMAKHYANGR (3x800) GODACHAK DUBURI DHENKANAL PARADEEP 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL BEGUNIA PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) Theruvali ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) TIME FRAME: 2021-22 GAZUWAKA(SR) 35

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case + Talcher-III + Angul - Begunia + Kamakhyangr + Angul - Gaz RANCHI ADHUNIK MAITHON MEJIA DTPS DURGAPUR JMSD'PUR-DVC JAMSHEDPUR TO DJ'GARH(WR) CHAIBASA ROURKELA TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER MONNET JINDAL TALCHER-III (2x660) KAMAKHYANGR (3x800) GODACHAK DUBURI DHENKANAL PARADEEP 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL BEGUNIA PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) TIME FRAME: 2021-22 GAZUWAKA(SR) 36

ODISHA TRANSMISSION SYSTEM WITH PROPOSED SYSTEM OF ODISHA Base case + Angul-Begunia + Kamakhyanagar + Talcher-III + Talcher-Gaz RANCHI ADHUNIK MAITHON MEJIA DTPS DURGAPUR JMSD'PUR-DVC JAMSHEDPUR TO DJ'GARH(WR) CHAIBASA ROURKELA TO RAIGARH(WR) TO RAIPUR POOL(WR) IND-BRTH (660) OPGC (660) DRPLI A B B'PADAR SUNDERGARH LAPANGA STERLITE (3x600) (600) KEONJHAR BARIPADA KHARAGPUR KATAPALLI RENGALI BHADRAK TALCHER PARADEEP MONNET JINDAL GODACHAK DUBURI KAMAKHYANGR DHENKANAL 2000MW INDRAVATI ANGUL (2x350) GMR (350) A B MM'DLI-B MM'DLI KHUNTUNI BIDANASI MENDHASAL BEGUNIA PANDIABIL TO KOLAR(SR) JEYPORE BOLANGIR LANCO BBND (660) (660) ASKA SRIKAKULUM (SR) GUNUPUR THERUBALI NARENDRAPUR NARENDRAPUR GAZUWAKA(ER) BEHRAMPUR TIME FRAME: 2021-22 GAZUWAKA(SR) 37

Annexure-12.1..,,,;,,, """' m«f mi.nr Government of India ~+:i~im<..i "' Ministry of Power ~~.:i- Pcn:ro '51Tfu ct;tut '"' Central Electricity Authority Pcnrn 'l:l"'ottm...,.~;::rr l1'. ct ~('<..IT q;-;:r - '!:I",qpr '"' ~ Power System Planning & Appraisal - I Division q;r: J/9/39th/2017/PSPA-I/ 1$ l\ '=, ~ <is" SI Dated: Jgth August, 2017 mnit I To, Executive Director(EEM), COO(CTU) Railway Board, Room No. I 02-A, PGCIL Saudamini, Rail Bhawan, New Delhi-OJ Plot No. 2, Sector 29, Gurgaon-12200 I Director (Technical) HYPNL Shakti Bhawan, Sector-6 Panchkula-134109 Fax-0172-256060640 Managing Director, Bihar State Power Transmission Company, Yidyut Bhawan, Baily Road, Patna-800021 Fax-0612-2504557 Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow - 226 00 I (Fax:0522-2287822 Chief Engineer(PSPA-11), CEA, 3rd Floor, Sewa Bhawan, R K Puram, N.Delhi-66 ~ / Subject: Meeting regarding Connectivity of Railways' TSS with ISTS Network at Abdullapur, Meerut and Sasaram for Ludhiana-Delhi-Sonnagar route Sir/ Ma'm, Please find enclosed the minutes of meeting held on 21.7.2017 in CEA under the chairmanship of Member (Power System), CEA. to discuss the Connectivity of Railways' TSS with ISTS Network at Abdullapur, Meerut and Sasaram for Ludhiana-Delhi-Sonnagar route. Yours faithfully, ( (~~~ /Awdhe h KumarYadav) ~/Director Tele No.26732343 38

Minutes of Meeting held at CEA on 21.07.2017 regarding Connectivity of Railways' Traction Sub Station (TSS) with ISTS Network at Abdullapur, Meerut and Sasaram for Ludhiana-Delhi Somnagar route. List of participants is attached as Annexure-1. I. Member (PS) welcomed the participants. He stated that in line with the decision of the 39 1 " meeting of Standing Committee on Power System Planning in Northern Region, this meeting has been convened to discuss the Connectivity of Railways' TSSs with ISTS Network at Abdullapur & Meerut (in Northern region) and Sasaram (in Eastern Region) for Ludhiana-Delhi-Somnagar Railway route. 2. UPPTCL stated that before taking up the individual cases for discussion, the financial viability of the Railways' proposal of getting connected with ISTS needs to be discussed and same was also deliberated in the previous meeting of Standing Committee ofnr. The switchover/withdrawal from STU network to ISTS has to be gradual, so that STU gets adequate time to plan utilization of their network. In Uttar Pradesh, they had received a number of applications from Railways as DISCOM's HT customer for drawing power from the State network. If all these loads are sanctioned, corresponding augmentation in the Transmission network of UP would also be required to meet the additional load. If Railways takes ISTS connectivity and switches its load from state network to ISTS network, then the network / augmentation in UP network for catering to Railways' load would become idle / underutilized. Therefore, Railways' needs to first decide, either to continue as DISCOM's HT consumer or get connected to ISTS directly. Due to this uncertainty, they were not in a position to take any decision on the load applications submitted by Railways. 3. Indian Railways clarified that they have to meet their traction load requirements, which can be catered either through state network or through open access by getting connectivity with ISTS network. Till the establishment of connectivity with the ISTS network, they would continue to apply' as DISCOM's HT consumer of the respective state for meeting their traction load requirements. Further, since Indian Railways is not getting NoC for Open Access from STU 's, they had been seeking connectivity as DISCOM's HT customer. 4. CEA clarified that in the recently held Standing Committee meeting ofnr on 29'"-30 1 " May 2017, two cases of connectivity to Railways were discussed. First case was connectivity of Railways' TSS with ISTS Network for Delhi - Bharuch route wherein, it was agreed that Railways would once again look into the cost economics of connectivity to ISTS points as number of the States had already granted / were in the process of granting no objection certificate for open access to Railways from their network and would share the same with CEA. The second case was Connectivity of Railways' TSS with ISTS Network for Ludhiana-Delhi-Sonnagar route. This meeting has been called to discuss the ISTS connectivity of Railways at Meerut, Abdullapur and Sasaram ISTS substations for the Ludhiana-Delhi Sonnagar route. The connectivity sought by Indian Railways with lsts Network at Abdullapur, Meerut and Sasaram needs to be viewed in isolation as no STU network exists in parallel from these ISTS points. As far as the overall plan of Railway for getting connectivity is concerned, Railways needs to rework their cost economics in view of the state's willingness to provide open access to Railway. It was stated that in case UP agrees to provide open access to Railways through their intra state transmission system, then the augmentation in intra state Transmission network of UP would be required for providing open access to Railways in their network. 5. After that connectivity to Railways at Meerut and Abdullapur was discussed. 220 kv Connectivity at Meerut 400/220 kv substation: POWERGRID informed that space at Meerut 400/220 kv S/s is available for implementation of only one no. of220 kv bay (AIS) or 2 nos. of 220kV GIS bays. It was also informed that space is available 39