SSC Case Study V Container Ship Recurring Failure of Side Longitudinal Passing through a Web Frame

Similar documents
Side Structures in Single Side Skin Bulk Carriers

Examples of the application of Permanent Means of Access to Tankers

IMO Guidelines for Maintenance and Repair of Protective Coating. Naoki Takahashi Survey Department

GUIDELINES ON THE MEANS OF ACCESS TO STRUCTURES FOR INSPECTION AND MAINTENANCE OF OIL TANKERS AND BULK CARRIERS (SOLAS REGULATION XI-1/2)

Plate Girder and Stiffener

Flexible Wellen Flexible Reach Rods. Technical Information. ARMATUREN tramistec is a brand of

Section 4 SURVEYS SPECIAL SHIP TYPES

RO-PAX FERRY April 28 th, Gabriel, Shaun, Timothy

Special Periodical Survey No.1

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels ships

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS

SURVEY PROGRAMME for Chemical Tankers

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional ships

2. Runway & Crane System

Sept. 3, 1968 P. C. DAHAN 3,399,645 TANKER CONSTRUCTION. Ya N QV INVENTOR, Aal// C /OO/O/7. "7474ai?) Afforney

PART 8 MACHINERY INSTALLATIONS

Enhanced Survey Programme (ESP) For OIL TANKERS. Preparation for Special Survey (Planning Document) Including the Survey Planning Questionnaire

Bodyshell...2 New features of body structure...2

Purlins and Girts. A division of Canam Group

A Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk

An Integrated Framework for Conceptual Design Stage Structural Optimisation of RoRo & RoPax Vessels. Master Thesis EMSHIP WEEK 2018, La Spezia


INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD

Analysis Methods for Skewed Structures. Analysis Types: Line girder model Crossframe Effects Ignored

USER INFORMATION, CURRENT RULE CHAPTERS AND INDEX

The single-hoist crane picks a single 20, 40, or 45 container, or two end-to-end 20 containers (twin-20s), under a single spreader.

LNGreen. GREEN4SEA Forum. LNG carrier of tomorrow - Joint development project. 06 April George Dimopoulos, PhD DNV GL R&D and Advisory, Greece

Subframe design. More information on chassis frames is found in the document Chassis frames.

APPENDIX G. Towing Survey for Concrete Floats

type r remote drive for auxiliary

Railway Technical Web Pages

LOW EMISSION HIGH SPEED FERRY THE GREEN MACHINE

Uncontrolled copy not subject to amendment. Airframes. Revision 1.00

Piston Engine Room Free Efficient Containership

NOTICE. The above identified patent application is available for licensing. Requests for information should be addressed to:

AIR LUBRICATION SYSTEM INSTALLATION

Corrosion, Inspection and Maintenance of Oil Tankers

Technical Information PTFE-Hoses

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors

DESIGN OF MACHINE MEMBERS - I

TRADE OF VEHICLE BODY REPAIR

Torsionally rigid bodywork 6. Contents TORSIONALLY RIGID BODYWORK 3. VAN BOXES AND CONTAINERS 4 Mounting van boxes and containers 5

TEST REPORT. Ceram Reference: (QT21489/2/SL)/Ref: 1.0A. Tensile and Frictional Tests on the Fast Fit BeamClamp Systems.

Weatherdeck Hatch Covers Hydraulic Folding Types

FLUSH SEAT DESIGN GUIDE FOR USE WITH ECOSPAN COMPOSITE JOISTS. economy THROUGH ecology. v1.3

UT Lift 1.2. Users Guide. Developed at: The University of Texas at Austin. Funded by the Texas Department of Transportation Project (0-5574)

Failures of Rolling Bearings in Bar and Rod Mill

IACS UR s and Panel Responsible

INSTALLATION INSTRUCTIONS

Bow Doors and Inner Doors

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG CEG

Skim the Waves. in this motor-driven paddle board

NOTICE. The above identified patent application is available for licensing. Requests for information should be addressed to:

GUIDANCE ON SHIPBOARD TOWING AND MOORING EQUIPMENT

GlaStar / Sportsman Service Bulletin 64- MANDATORY

The gear boxes can be run at the same speeds as the actuator models. Do not exceed torque ratings.

SECTION 11 INTERMODAL EQUIPMENT

1 HAMMAR MRRS MANUAL REMOTE RELEASE SYSTEM. Product Information. Revision 1

Simulating Rotary Draw Bending and Tube Hydroforming

GB NDT AXLE TESTING & DEFECT TYPES FOUND

FMC COMMANDER-15 CONTAINER/PALLET LOADER

FRm ENGINEERING I:ABORATORY LIBRARY

Table of Contents. Page EXECUTIVE SUMMARY Introduction 2

HARD TRI-FOLD COVER SPECIAL BOLT ON SIDE RAIL INSTRUCTIONS 2016-ON TOYOTA TACOMA 6 BOX

COMPRESSED GAS, EXPANDED OPPORTUNITIES.

Report No.: Name of Ship: Plans referred during Initial Survey:

High Load Capacity Cylindrical Roller Bearings

Design. Model Tests for the DP System of a Drilling Semi-Submersible

Section 03 Marine and Mooring Equipment - Sales Item

Abstract. 1 Description of the Problem

Introduction. Lubrication Related Failures. Gear Couplings. Failure Analysis All Types (Page 1 of 7)

Mark 2 Water Witch Special Build Technical Specification

F.A.S.T. Anchoring System

M673LD3 / M673L3. Soundshield Assembly Instructions. East Coast Branch th Avenue. 15 Aegean Dr. Northwest. Suite 4 Seattle, WA 98107

1 Variable spring supports Design Instructions

Technical Information

PIPINGSOLUTIONS, INC.

Packaging Information Reels

ANNEX 9. RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6)

Excerpts from the ASME PVP 2017 technical paper

IACS UR s and Panel Responsible

DAVINCH Lite Chamber Design By Analysis and Full-Scale Testing CWD 2014 London, United Kingdom June 4-6, 2014

Riverhawk Company 215 Clinton Road New Hartford NY (315) Free-Flex Flexural Pivot Engineering Data

PRESS RELEASE TEU ULTRA LARGE CONTAINER VESSEL

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG

Tank Maintenance and Renovation. Statoil Refining Denmark Kalundborg Refinery

Modification Method of Back-up Roll Bearing by Replacing Oil Film Bearing with Rolling Bearing

ALTERNATE COMPLIANCE PROGRAM

FUSELAGE ASSEMBLY SECOND SECTION (of three)

P-899 WINMOS SUB-ACTIVITY 2.3

VW Surface-Mount Strain Gauge

4.5 COMPOSITE STEEL AND CONCRETE

Commissioning & Maintenance Instructions. for. COBRA linear stepping motors

Plastic Hinging Considerations for Single-Column Piers Supporting Highly Curved Ramp Bridges

HARD TRI-FOLD COVER SPECIAL BOLT ON SIDE RAIL INSTRUCTIONS 2016-ON TOYOTA TACOMA 5 BOX

7. PRELIMINARY DESIGN OF A SINGLE AISLE MEDIUM RANGE AIRCRAFT

Convertible with unique safety features

ABSTRACT INTRODUCTION

Steam Car Developments Engineering Research and Development Precision Engineering

B300BTPAPL Fender Mounting Instructions for MIN300, MIN318 & 1021/302/202 Fenders

Transcription:

SSC Case Study V Container Ship Recurring Failure of Side Longitudinal Passing through a Web Frame Contents: Vessel Particulars Summary of Structural Failure Background Detailed Description of Structural Failure End Result Acknowledgements 1/8

Vessel Particulars Length: (LBP) 810.00' Beam: 105.75' Depth: 66.00' Designed Draft: 29.00' Scantling Draft: 35.00' Shipyard: U.S. Class: ABS Date Built: 1980 Vessel Type: Container Ship Framing Convention: Longitudinally framed from hold 1 through hold 6; transitioning to transverse framing at ends Arrangement: Accommodations forward and machinery three-quarters aft. Four holds (9 container bays) forward of and two holds (4 container bays) aft of the machinery space. Hull Material: XH-36 high strength steel throughout (longitudinal and transverse material) Arrangement and Construction Details: From hold 1 through hold 6, including the machinery space, the double bottoms are used for saltwater ballast. Throughout this same length wing tanks, extending from the tank top up to the underside of the longitudinal box girder or second deck, are dedicated to either fuel oil or saltwater ballast. In the longitudinally framed portion of the hull (from hold 1 through hold 6) the web frame spacing is 11.00'. The longitudinals are spaced 33" apart in the wing tanks and consist of angles and channels cut to angles. Beginning below the box girder the shell and bulkhead longitudinals increase in size from 6" x 4" x 3/8" to 8" x 6" x 1/2" angles before switching to 13" x 4" x 35# cut channel, as shown in Figure 1. For convenience during construction the web frame cutouts for longitudinals were made clear all around as shown in Figure 2 instead of the more normal type of cutout detail indicated in Figure 1. The longitudinal bulkhead which forms the inner boundary of the wing tanks follows the approximate slope of the outer shell as the ship lines fine up in the forward portion of the cargo space. The resulting wing tanks are sloped, narrow and are very difficult to access for inspection. 2/8

Figure 1. Wing Tank Longitudinal Stiffeners 3/8

Figure 2. Original Cutout Detail for L24 to L26, 8" x 6" x 1/2" Longitudinals Summary of Structural Failure Progressive failure occurred beginning with the fracture of a web frame flat bar stiffener attachment to the longitudinal, buckling of clips between the web frame and longitudinal, fracture of the longitudinal, fracture of the longitudinal weld to the shell and finally fracture of the shell leading to a fuel oil leak. In some instances a similar fracture occurred in the longitudinal bulkhead. 4/8

Background The ships in question (a class of three) were in regular transpacific service and operated at an essentially constant draft East and West bound. The fractures have been common on all three ships of the class. Because they occur in fuel oil tanks that are not subject to frequent interior inspection, the failures are first discovered when a sheen or oil is seen on the water around the forward end of the ship or when a fuel oil leak is visually detected in the cargo holds. The cause of these failures is poor detail design, incorporating the large open cutout for the longitudinals and the highly eccentric 8" x 6" angle longitudinals, in an area of the ship subject to repetitive impact loading from waves. Figure 2 illustrates how the longitudinal is not adequately supported. Detailed Description of Structural Failure After detecting a fuel oil leak, the fuel oil tank in question was emptied, cleaned and gas freed to allow inspection and subsequent repair. Most of these failures begin when the web frame flat bar stiffener on one of the shell longitudinals, L24 through L26, fractured at the longitudinal or the lap weld of the stiffener to the longitudinal. With the stiffener no longer providing support all of the loading on this "wind and weather" strake longitudinal is transferred to the web frame through the poorly proportioned clips on the 8" x 6" angle. The clips buckle under the load. The buckled clips combined with the 10" of unsupported shell in way of the web frame cutout allow the longitudinal to flex in bending and torsion at what should be a rigid support at the web frame. This lack of support combined with the large web frame spacing and the load induced twist in the eccentric 8" x 6" angle raises the stress level in the longitudinal causing it to fracture about 12" from the web frame at a drain hole in the angle. After the longitudinal fractures, a fracture forms in the weld of the longitudinal to the shell plating that travels a short distance back toward the web frame. As this fracture lengthens toward the web frame the stress in the shell plating increases and, when combined with the elevated shell plating stress in way of the large longitudinal cutout, causes the shell to fracture. The shell fracture is in the form of a small half moon centered over the longitudinal's web near the edge of the cutout. Fuel oil then leaks from this half moon shell fracture. It is believed that the initial web frame flat bar stiffener and weld fractures occur because the angle type longitudinals twist as they bend under the load of wave impacts on the shell. This twist is exaggerated in an angle with eccentric proportions of 8" x 6". The twist puts a torsion load on the connection of the longitudinal to the web frame. For this detail the connection consists of only the flat bar stiffener and the two poorly proportioned clips. Such a connection does not resist torsion loads well leading to fatigue failure of the weakest link, the 6" x 3/8" flat bar stiffener or its weld. The same pattern of failure occurred over a period of years but was always confined to longitudinals L24 through L26, the 8" x 6" angles. The failures occurred in the four forward wing tanks although most were in the forward most tank where the "wind and weather" loads were the greatest. There were also instances where these failures occurred 5/8

on the longitudinal bulkhead in way of the 8" x 6" longitudinals leading to fuel oil leaks into the cargo holds. End Result For many years the damaged shell (or longitudinal bulkhead) plating was removed and inserted, a section of the 8" x 6" longitudinal was replaced extending forward and aft of the web frame, the clips were repaired or replaced and the flat bar stiffener was repaired, inserted or replaced. But, no changes were ever made to the design detail or to the scantlings. When the ships were taken over by a new owner, he decided to tackle this persistent problem. The wing tanks were visually inspected where various stages of the failure could be observed. The failure scenario above was developed from these observations. Based on the failure scenario a design modification was developed and turned into a drydock repair specification. After making repairs to and/or replacements of damaged material and welding the following modifications were carried out. The original clips attaching each longitudinal to the web frames were replaced with larger chocks, which were fitted against the shell plating. The modified chocks are shown in Figure 3. These chocks provide more weld attachment of the longitudinal to the web frame, provide a torsionally stiff end condition for the longitudinal, and provide support for the shell plating across the gap of the large cutout. New brackets were also added between the web frames and the longitudinals as shown in Figure 4. These chocks are aligned with the existing flat bar stiffeners on the opposite side of the web frame and provide additional support for the longitudinal and reduce the stress in the flat bar where it attaches to the longitudinal and where this type of failure begins. These modifications were carried out at the new owner's first drydocking in the forward three fuel oil wing tanks in way of the 8" x 6" longitudinals, L24 to L26. The same modifications will be carried out in other wing tanks at future drydockings as those tanks are opened up for inspection. 6/8

Figure 3. Modified Cutout Detail for L24 to L26, 8" x 6" x 1/2" Longitudinals v 7/8

Figure 4. Plan View of Modified Web Frame Stiffener Bracket Acknowledgements Author: William A. Wood, Seaworthy Systems, Inc., 800 Cooper Road, Voorhees, NJ 08047 Mr. Wood is the chief Naval Architect and a Vice President of Seaworthy. He has over 30 years of experience in ship design, structural analysis, failure investigation, shipbuilding and ship repair. SSC Structural Failure Home Page : http://www.shipstructure.org/case_studies.shtml This web site was developed by: JMS Naval Architects & Salvage Engineers http://www.jmsnet.com/ 8/8