RE: PRESSURE MAINTENANCE WATERFLOOD ORDER AMENDMENT #8 EAGLE WEST FIELD - BELLQY A POOL

Similar documents
EXAMINERS' REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

COMMERCIAL SCHEME Approval No

JTC ENERGY GROUP, LLC. Jarmon #1D

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Penn West Petroleum Ltd. Well Blowout W5M August 17, 2010

ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL

OIL AND GAS DOCKET NO

MARITIME AND PORT AUTHORITY OF SINGAPORE ACT (CHAPTER 170A) MARITIME AND PORT AUTHORITY OF SINGAPORE (PORT) (AMENDMENT) REGULATIONS 2004

Schedule A to the Memorandum of Understanding. Between the Oil and Gas Commission and British Columbia Safety Authority

NYISO Tariffs. New York Independent System Operator, Inc. Document Generated On: 2/27/2013

ISOLATION/UNIVERSAL TOOLS

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change.

Technical Report. Statistical Handbook for Canada s Upstream Petroleum Industry October/

Section 5. Crude Oil and Natural Gas Resource Development

Inactive Well Compliance Program (IWCP)

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil

Update on EPA Draft Guidance for Permitting Oil and Gas Hydraulic Fracturing Activities Using Diesel Fuels

BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI DOCKET NO ORDER NO FINAL ORDER

Annual Performance Review of In Situ Oil Sands Scheme Approval 9404W

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

OIL AND GAS DOCKET NO. 8A

Shareholders Agreement 49% RIPIANO HOLDING LTD 99% License holder of Sosnovskoe oil field Yuzhno-Tyebukskoe oil field

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

FRAC STACKS stingercanada.com

Water Consumption Statistics Report

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Comparison of Electricity Prices in Major North American Cities. Rates in effect April 1

The Debrosse Memorial Report 2017 Oil & Gas Activity in Ohio

National Routing Number Administration p-ani Activity and Projected Exhaust Report

specifying the applications each has before the AER and the AER licences and approvals such licensee or approval holder holds.

Solar Power. Michael Arnold, LEED AP. ACI-NA Environmental Committee Meetings June 27, 2011

Currant Lake Transmission Project

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

659 December 3, 2018 PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

GT GAS-TIGHT SERIES ELIMINATOR. Addressing your wellbore isolation and cement needs through an ISO V0-rated stage-cementing package

STAFF REPORT. Consideration of Request Submitted by Athens Services for Rate Adjustment SUMMARY

The North American Electric Reliability Corporation ( NERC ) hereby submits

2012 Water Consumption Statistics Report. Water Services Department

Frequently Asked Questions

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

History. Wyoming CO2 Pipeline Network

SPE MS Articulating Rotational Mast Improves Operational Efficiency for Coiled Tubing Operations on Multi-Well Pads

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

IRP Webinar International Non-Apportioned

Supplement of Model simulations of cooking organic aerosol (COA) over the UK using estimates of emissions based on measurements at two sites in London

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

Kettle River Transmission Project

Interruption Requirements

Licence Application Decision

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Coalspur Mines (Operations) Ltd.

The owner notification will commence in late July, 2006, approximately one week after the dealer notification.

Brion Energy Corporation

The Debrosse Memorial Report 2015 Oil & Gas Activity in Ohio

ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL

This page is intentionally left blank.

MISSOURI SERVICE AREA

Included in this Stakeholder Information Package:

EXAMINER'S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

RE: PETITION OF DENBURY RESOURCES INC. FILED FOR REGUK

On May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4.

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

The City Council will consider revising the City' s parking code to distinguish between enforcement of on- street and off-street parking meter spaces.

THE CORPORATION OF THE DISTRICT OF SAANICH BYLAW NO OIL BURNING EQUIPMENT AND FLAMMABLE LIQUID AND COMBUSTIBLE LIQUID FUEL TANK BYLAW

Building & Expanding the Ula WAG

Semiannual Report Of UST Performance Measures End Of Fiscal Year 2018 (October 1, 2017 September 30, 2018)

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.

Department of the Environment. Moving Away From Stage II Vapor Recovery

EUROPEAN PARLIAMENT. Session document ***II COMMON POSITION

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, 2011

August 1, Amended Attachment S under Southern Companies Open Access Transmission Tariff, effective January 1, 2014

in Major North American Cities

COMMERCIAL VEHICLE ENFORCEMENT

4 64c hit. Wm % 41/7/4$1 The undersigned has the honour to r epor t. Mr. Mr. Approved and ordered this 18th day of August, A.D

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

Vehicle Replacement Policy - Toronto Police Service

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

For Region 5 and Region 7 Regional Response Teams Meeting April 22, 2015 St. Charles, Missouri via video/teleconference

Contact: Michael Parks, Manager, Traffic Engineering Services (905) Council has directed staff to report on implementing a site-specific

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, ,0272

P.L. 2007, c.348 Approved January 13, 2008

COMPREHENSIVE OVERVIEW

Department of Market Quality and Renewable Integration November 2016

CALENDAR OF FILING DEADLINES AND SEC HOLIDAYS

Bohn to Kettle River Transmission Project

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

SPE Abstract. Mechanical Design. Conclusion References

Renewable and Low Carbon Fuel Requirements Regulation Summary:

PLATEAU PIPE LINE LTD.

ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP

Re: 233 Armstrong Street Residential Condominium Traffic Brief

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

Transcription:

June 4, 2018 3445-6200-59240-09 Brittany Jorgensen, P.Eng. Exploitation Engineer Canadian Natural Resources Limited 2500, 855 2nd Street SW Calgary, AB T2P 4J8 Dear Mrs. Jorgensen: RE: PRESSURE MAINTENANCE WATERFLOOD ORDER 80-09-002 AMENDMENT #8 EAGLE WEST FIELD - BELLQY A POOL The Commission has reviewed the application dated April 6, 2018 requesting approval of an additional injection well in the Eagle West field Belloy A pool, by converting well CNRL et al W Eagle 6-2-85-19 (WA 5062) to water injection services. A review of reservoir performance confirms earlier indications that the Belloy formation is highly compartmentalized, with significant pressure variation between wells. Waterflood operation has shown limited overall oil recovery enhancement for the pool. Amendment#? to the subject order requested a reservoir pressure from well CNRL et al W Eagle 16-12- 85-19 (WA 4453). This pressure was higher than expected; injection service was suspended in October 2017. Prior to commencing water injection, the Commission requires the confirmation that the reservoir pressure is below the specified limit set in condition 2(d) of the order. The review of the integrity of well, CNRL et al W Eagle 6-2-85-19 (WA 5062), revealed the presence of casing corrosion and cement squeezed perforation interval 1305.0-1310.5 mkb. Condition 2(c)(iii) outlines the measures required prior to commencing injection services. The injector, well 6-2, is adjacent to two producers but it is unclear at this time what the reservoir pressure value is in the area. A stable reservoir pressure must be obtained prior to injection start as per order 2(c)(iv). The following Orders are attached; 1) Order 80-09-002 Amendment #8 designating Pressure Maintenance Waterflood within the Eagle West field - Belloy A pool, as a Special Project under section 75 of the Oil and Gas Activities Act, and 2) Order 80-09-002 Amendment #8 - OTN approving Other Than Normal Spacing under section 65.1 of the Petroleum and Natural Gas Act for the subject area and formation. This amended approval includes a maximum wellhead injection pressure, conditions of operations for the new injector, an ultimate pool pressure limit, restriction of injection for the purpose of oil recovery, and the submission of a packer isolation test. Also included is a requirement for annual reservoir pressure tests on the injectors and the observation wells. This approval will be re-evaluated upon review of the requested pressure tests. Please note that, as per section 75 of the Drilling and Production Regulation, a record of the volume of water injected must be included on a Monthly Injection or Disposal Statement (BC-S18). This statement must be submitted to the Commission no later than the 25th day of the month in which activity occurred. Reservoir Engineering Department #300-398 Harbour Rd. Victoria BC V9A 0B7 T 250.419-4400 F 250.419-4402 www.bcogc.ca

Should you have any questions, please contact Petra Kriescher-Trudgeon at (250) 419-4415 or the undersigned at (250) 419-4421. Sincerely, Vice President, Reservoir, Field Attachments Page 2 of 2

ORDER 80-09-002 AMENDMENT #8 1 Under section 75(1 )(a) of the Oil and Gas Activities Act, the Eagle West field - Belloy A pool is designated as a Special Project for the recovery of oil utilizing pressure maintenance waterflood within the following area; DLS Twp 84 Rge 18 - S/2 & NW/4 Sect 19, NE/4 Sect 29, Sect 30, 31, 32, N/2 & S W 14 Sect 33 Twp 84 Rge 19 - N/2 Sect 24, NE/4 Sect 23, Sect 25, 36, E/2 Sect 26, 35 Twp 85 Rge 18 - W/2 Sect 4, Sect 5-7, SW/4 Section 8 Twp 85 Rge 19-Sect 1,2, 11, 12, S/2 Sect 14. 2 Under section 75(2) of the Oil and Gas Activities Act, I specify the following: a) The project unadjusted daily oil allowable (UDOA) is 1572.3 m3/d. b) All associated produced gas must be conserved. c) Water may be injected into the injection wells CNRL et al W Eagle 16-12-85-19 W6M (WA 4453) and CNRL et al W Eagle 6-2-85-19 (WA 5062). i) For wells injecting other than fresh water, inject only through tubing with a packer set as near as is practical above the injection interval. ii) Not exceed an injection pressure, measured at the wellhead of 21,000 kpa or the pressure required to fracture the formation, whichever is lesser. iii) Prior to commencement of injection, well CNRL et al W Eagle 6-2-85-19 (WA 5062) must have a continuous pressure monitoring system installed on the production casing as well as a Pressure Safety Valve (PSV) located at the surface of the production casing set at 4 MPa or lower. iv) Prior to injection start, obtain a reservoir pressure measurement from both injection wells to confirm that wells listed in (c) are below the specified limit. v) Submit annual reservoir pressure test on the injectors and the observation wells to the Commission within 30 days of the completion of the test. d) Not exceed an average pool pressure of 20,120 kpaa measured at 1,168 meters subsea. e) Cease injection immediately for the well listed in (c) and notify the Commission if hydraulic isolation is lost in the wellbore or formation. f) Include the injection hours and the maximum injection pressure value for wells listed in (c) on the monthly BC-S18 form. g) Injection must cease upon termination of production from the pool.

ORDER 80-09-002 AMENDMENT #8 Page 2 Advisory Guidance for Order 80-09-002 AMENDMENT #8 I. A production packer must be set above the injection interval and the space between the tubing and casing filled with corrosion and frost inhibiting fluids, as per section 16(2) of the Drilling and Production Regulation. II. III. IV. Annual packer isolation tests are required to be submitted, as per section 16(3) of the Drilling and Production Regulation. Injected fluids must be metered and the injection pressure measured at the wellhead, as per section 74 of the Drilling and Production Regulation. A monthly injection statement must be submitted to the Commission not later than the 25th day of the month following the reported month, as per section 75 of the Drilling and Production Regulation. V. Seismic events must be reported and injection operations suspended as per section 21.1 of the Drilling and Production Regulation. v ioc r i cbiuci il, rxc^civun, riciu DATED AT the City of Victoria, in the Province of British Columbia, this day of June 2018.

ORDER 80-09-002 AMENDMENT #8 1 Under Section 65.1 (2) of the Petroleum and Natural Gas Act, Other Than Normal Spacing is approved within the Eagle West field - Belloy A pool within the following area; DLS Twp 84 Rge 18 - S/2 & NW/4 Sect 19, NE/4 Sect 29, Sect 30, 31, 32, N/2 & S W 14 Sect 33 Twp 84 Rge 19 - N/2 Sect 24, NE/4 Sect 23, Sect 25, 36, E/2 Sect 26, 35 Twp 85 Rge 18 - W/2 Sect 4, Sect 5-7, SW/4 Section 8 Twp 85 Rge 19-Sect 1, 2, 11, 12, S/2 Sect 14. 2 Under section 65.1 (3) of the Petroleum and Natural Gas Act, I specify the following: a) the target area for an oil well completed within the project area is not nearer than 100 m to the sides of the Other Than Normal Spacing area, b) an oil well completed outside the target area specified in paragraph (a) may be subject to an off-target production penalty, c) oil wells drilled within the specified project area are not subject to spacing requirements. Richard Slocomb, M.A.Sc., P.Eng. Vice President, Reservoir, Field