CUR REFURBISHING WASTEWATER TREATMENT PLANT FOR RS HQ RS HQ, KABUL, AFGHANISTAN

Similar documents
ROTAMAT Sludge Acceptance Plant Ro 3

Appendix B-6. Mechanical Equipment Design Calculation

Belt Filter Press & Gravity Thickener series.

Next generation high-performance cationic dewatering flocculants. Kemira Superfloc XD series

RAS & WAS Pumps (FLYGT Pump)

INCLINED SLUDGE PRESS SLUDGE DEWATERING SIMPLIFIED. Water l Science l Technology

Getting the Grit Out! At

Inclined plate settlers

APPENDIX B FUNCTIONAL DESIGN SPECIFICATIONS (Sequence of Operation)

Stone Food Machinery Ltd 14 North Main Street Wexford IRELAND Tel

Influent Sewage Pumping Station (5 pumps) C of A (page 2 and page 5)

SLUDGE TREATMENT. Do we have a problem?

The City of Sturgis Wastewater Treatment Plant Septage Waste Receiving Facility Operating Plan

Index. 1 Mmakgoge Group Structure. 2 Industrial Cleaning Industrial Cleaning and Waste Removal Dry Ice Cleaning Storage Plant Cleaning and Rehab

Saving aeration costs

City of Grand Island Tuesday, October 10, 2017 Council Session

Secondary Digester Cleaning to Meet Ohio Sludge Rules. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Medical Waste Transporters

Metropolitan Council Metro Transit Project Description Budget Year

Water Residuals Management Presented by Michael F. Graves, PE CP&Y Co-Authors Larry L. Hare, PE Oklahoma City J. Dustin Segraves Oklahoma City

City of Grand Island Tuesday, February 13, 2018 Council Session

Municipal Water Treatment, Supply and Distribution

Our Company. Markets Municipal Mining Food and Beverage Chemical Oil & Gas Pulp & Paper Industrial Processes System Integrators Biomass gasification

Watertreatment. Landbased Farming. Weedfilter. Catvis WATER I NTAKE R ECIRCULATION S YSTEM

GBT TM Gravity Belt Thickener and Rotary Drum Concentrator

Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility

LAMELLA SETTLERS -optimal sedimentation on a minimal footprint

Introduction. Introduction. Introduction. Sludge handling in small and mid-size treatment plants. - Introduction

Introduction. Applications. Materials of Construction

CITY OF OMAHA CLASS SPECIFICATION

GBT TM Gravity Belt Thickener and Rotary Drum Concentrator

CITY OF OMAHA CLASS SPECIFICATION

MDQ MULTI-DISC SCREW PRESS DEHYDRATOR

Co-treatment of Septage with Municipal Wastewater in Medium Sized Cities in Vietnam

Sludge Management EENV Overview of Sludge Treatment & Disposal

WSB clean: Installation Manual

Waste Water Treatment

Centrifuges for Dewatering and Thickening. Annual Class III & IV Workshop for Water & Wastewater Operators July 25 & 26, 2018

Royce Total Suspended Solids Systems. Water & Wastewater

Viavent OVERHEAD SYSTEMS FOR CONVEYING AND PROCESSING CHIPS AND COOLANT. Viavent : the new generation

SLUDGE DEWATERING. The costs for trucking sludge to the ultimate disposal site become substantially lower when sludge volume is reduced by dewatering.

Turbidity and Suspended Solids Transmitter

Water Treatment Plant Maintenance Considerations. Operation and Maintenance. Types of Maintenance 5/1/15

Viking s helical gear reducers are available in three basic sizes, each size offering several gear ratios.

TREATMENTOF PETROCHEMICAL WASTEWATERS

Viking Helical Gear Reducers

Southerly WWTC Getting the Grease Out. OWEA Plant Operations Workshop Grease Unloading Station

APG NX BLOWER COMPARISON TO ABS HST BLOWER

Belt Press KD 12. The presses are high-technology quality products, based upon the experiences from the larger belt press series KD10 og KD11.

Two Sludges One Belt Press Waste Activated Sludge and Lime Sludge Handling

Sludge Thickening. Wastewater Treatment Review. Gravity Thickening

Pumping Stations Design For Infrastructure Master Program Engineering Faculty-IUG

IMPLEMENTING A WASTEWATER TREATMENT FACILITY UPGRADE/ EXPANSION USING IFAS AT WEST HAVEN, CT

AECOM Water. Sludge Dewatering Improvements at Gulf Coast Waste Disposal Authority s Bayport Facility

Flygt TOP 65, 100 and 150. Turnkey pump stations

(a) Administrator means Clearwater's Public Works Administrator or his or her designee.

Sewerage Service Regulation, Fees and Charges Bylaw

CENTRAL MARIN SANITATION AGENCY CAPITAL IMPROVEMENT PROGRAM ACCOUNT / PROJECT DESCRIPTIONS PROPOSED FY 12 BUDGET AND 10 YEAR PROJECTION

Wastewater Treatment Facilities: A Source of Oil for Producing Biodiesel Rafael Hernandez and Todd French Mississippi State University Dave C.

CHAPTER 1 DESCRIPTION OF THE CENTRIFUGE

Tender No: /HTC/35 (Price Bid)

Below are details for liquid waste haulers on the process for discharging domestic wastewater at SA Water septic waste disposal stations (SWDS).

WATER and WASTE WATER Treatment

PORTER TOWNSHIP CASS COUNTY, MICHIGAN PUBLIC WORKS SECTION PART 60 SEPTAGE RECEIVING ORDINANCE ORDINANCE #

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

PRE-DEWATERING BELTS

WATER & WASTE WATER INDUSTRIES

American Water College 2010

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

Electric submersible dewatering pumps

Relax. Just DO It! No pressure. Resist the Surge. Josh Johnson and Emil Voges

Troqueer WwTW is located on the banks of the River Nith and serves the market town of Dumfries. The works

Sludge dewatering technology. From waste to nature

KWT GALLEY WATER WASH HOOD GALLEY WATER WASH HOOD KWT. With supply air and Capture Jet technology

Widethroat W Range W ᓔষ

MANSON ENGINEERING INDUSTRIAL LTD. SERVICE MANUAL FOR SPS-9400

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations

Cake Pump Maintenance Made Easy!

ANGLIAN WATER SERVICES LTD. Great Billing Wastewater Treatment Works Odour Management Plan

MANSON ENGINEERING INDUSTRIAL LTD. SERVICE MANUAL FOR SPS-9400

Dragflow srl Via Pasubio, Vil afranca (VR) Italy tel fax products catalogue

POC JET - Cartridge Air Filtration System

VARIO. VARIO Separation of fine dust particles. The VARIO series is particularly suitable for separation of fine dust.

PCM Moineau TM. EcoMoineauTM M. The first Eco-Design progressing cavity pump. Simplified maintenance. Reduced foot-print. Reduced Life Cycle Costs

JEFFERSON COUNTY ENVIRONMENTAL SERVICES DEPARTMENT GREASE CONTROL PROGRAM FOOD SERVICE FACILITY GREASE CONTROL PROGRAM PERMIT APPLICATION

CONTRACT TERM: APRIL 28, 2018 THROUGH APRIL 27, 2020 RES. NO

Screw Compactor without feeding device

Septage Treatment at Small Wastewater Treatment Plants

FILTER PRESS DRACO, FILTER PRESS. Draco offers maximum dewatering and dry solids production.

KESSEL-Grease Separator Under sink

1.4.14a Spare Parts and special Tools

SUBMERSIBLE SEWAGE PUMPS WITH SEMI-VORTEX IMPELLER in cast iron

Custom Drive Units. Fluid Primary Drives

ACO Marine product catalogue ACO Clara Waste water treatment plant Sizes 3-240

M2 SERIES SLURRY SEAL AND MICRO SURFACING PAVERS Specification Sheet

Planning for An Uncertain Future: Biosolids Disposal in a Bold New World

Grease Inspection Program

AggreSand 165 SYSTEMS WASHING TECHNICAL SPECIFICATION FEATURES

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Fédération Aéronautique Internationale

Transcription:

CUR 1780 - REFURBISHING WASTEWATER RS HQ, KABUL, AFGHANISTAN CUR Number: 1780 Drawn Checked Approved STAMPS NAME A. BRIZZI, L. FAINELLI F. FREDDI L. MONTESI PHASE 35% DESIGN SECTION OF GEN REV. NO. REV. DESCRIPTION DATE 00 First Issue 04 / 10 / 2016 01 Design review 25 / 11 / 2016 REF. NO.: CATEGORY BOQ DOC TITLE Bill of Quantities SIZE CLASSIFICATION OFFICIAL USE ONLY DOC. N. A4 025 NOME FILE: HB-KBL-1780-035-025-GEN-BOQ-A4-Bill of quantities- R00

HQ KABUL - CUR 1780-35% DESIGN Bill of Quantities A - PRE-TREATMENT SYSTEMS UPGRADE AND BIOLOGICAL TREATMENT SYSTEM RECOVERY A.1 - TANK #1 LIFT STATION A.1.1 Current pumps replacement by new pumps with anticlogging system: N 2 (1+1 redundancy) not-blocking pumps; Single Flow: 35 m3/h; Hydraulic head: 7 m; Single engine power: 2.0 kw disposal of existing pumps included #200 each 2 A.1.2 Hydraulic connection restoration valves, joints and special bits included A.1.3 New panelboard for pumps management IP 65 - Switches and electric connections included Total A.1 - A.2 - FILTRATION SYSTEMS A.2.1 Floodgates relocation disassemby and relocation included #200 each 2 A.2.2 Structure renfoircement for new new screen remover installation for filter upgrade A.2.3 A.2.4 New roto screen remover 3 mm. filter mesh N 1 unit drum fine grid 3 mm; Total Flow max: 750 m3/h Engine power: 1.10 kw New solid waste compactor system N 1 unit Diameter: 185 mm Totale length: 2.910 mm; Total Flow max: max 2 m3/h of waste Engine power: 3.0 kw electric connection included #200 each 1 (to reduce the volume of separated waste and unpleasant smells) - electric connection included #200 each 1 A.2.5 Grit classifier maintenance, test and operations for grit removal correctly #200 each 1 A.2.6 Hydraulic connection restoration with tank #2 valves, joints and special bits included Total A.2 - HB-KBL-1780-035-025-GEN-BOQ-A4-Bill_of_Quantities-R01 1/5

A.3 - EQUALIZATION SYSTEM (Tank#2) A.3.1 Tank #2 cleaning disposal sludge included A.3.2 New installation of a mixing system and an air conveyor system to prevent sedimentation and septic conditions 1 radial jet airing unit Air flow: 44.5 Nm3/h Water flow: 230 m3/h Engine power: 5.9 kw to prevent sedimentation and septic conditions - Electric connection included A.3.3 Existing lift system maintenance, test and operations A.3.4 Hydraulic connection restoration with current biological system valves, joints and special bits included Total A.3 - A.4 - BIOLOGICAL TREATMENT SYSTEM RECOVERY A.4.1 Calibration of existing biological system This work may only be performed by qualified personnel CORODEX who are familiar with the operation of the system A.4.2 Calibration of the final filtering system This work may only be performed by qualified personnel CORODEX who are familiar with the operation of the system A.4.3 Inspection and calibration of the sludge dewatering system This work may only be performed by qualified personnel CORODEX who are familiar with the operation of the system A.5 - ELECTRICAL WORKS A.5.1 New electrical connection to main power line Cables, trenches and ill included l.s. 1 A.5.2 New main panelboard with all switches for new and existing devices IP 65 - Switches and electric connections included l.s. 1 Total A.4 - Total A.5 - A. TOTAL - HB-KBL-1780-035-025-GEN-BOQ-A4-Bill_of_Quantities-R01 2/5

B - WWTP UPGRADE WITH CURRENT SYSTEM MODULAR ENCREASE B.1 - Waste water treatment - NEW TREATMENT LINE FOR 1000 P.E. CORODEX EFLOSAF B.1.1 New biological WWTP modular section for 1000 p.e. (mod. EFLOSAF CORODEX) New lifting station in tank#2 included - SCADA System and calibration included - No dewatering section - Pending to Corodex offer request in September 2016 #210 ea. 1 B.1.2 Hydraulic connections valves, joints and special bits included Total B.1 - B.2 - WATER LINE IMPROVEMENT B.2.1 Free Chlorine Analyzer, near to sampling manhole Electric connections and data connection with SCADA System included Total B.2 - B.3 - SLUDGE LINE CHANGE FOR IMPROVEMENT B.3.1 New lift station from current dewatering system to new sludge line N 2 unit for line pumps type mohno (progressive cavity pump) Flow: 7 m3/h Pressure: 2 bar Engine power: 1 kw n. 2 pumps (1+1 redundancy)for each lift station - Electric connection included #210 each 2 B.3.2 Hydraulic connections for new sludge line valves, joints and special bits included B.3.3 B.3.4 New steel tanks 20" for sludge stabilization N 2 unit Width: 2200 mm Height: 2.800 mm Length: 6.000 mm; Total volume: 60 m3 New sludge thickening system, over the steel tanks N 2 unit Width: 750 mm Height: 1.345 mm Totale length: 3.160 mm; Flow: 7-10 m3/h - 0,8-1 % DS Engine power: 0.37 kw basement included #210 each 2 #1 for each tank, electrical connection included #210 each 2 B.3.5 Air diffuser system for sludge tank For Oxygenation and stabilization of the sludge - hydraulic connection included HB-KBL-1780-035-025-GEN-BOQ-A4-Bill_of_Quantities-R01 3/5

B.3.6 B.3.7 B.3.8 B.3.9 B.3.10 Blowers for air diffuser system N 2 unit (1+1 redundancy) Flow (air): 230 m3/h ΔP: 400 hpa Engine power: 7.50 Kw Deodorization system New lift station for sludge dewatering and treatment system N 2 unit (1+1 redundancy) pumps type mohno (progressive cavity pump) Flow: 1-3 m3/h Pressure: 2 bar Engine power: 0.37 kw Polyelectrolite preparation system N 2 mixing unit single engine power 0,37 kw; N 2 flocculant hopper lt.60 capacity N 4 (2+2 redundancy) dispensing pumping Centrifugal sludge dewatering system N 1 unit Width: 780 mm Height: 930 mm Totale length: 2.936 mm; Flow: 1-3 m3/h - 3-4 % DS Engine power: 7.5 kw For Oxygenation and stabilisation of the sludge - electric connection included for sludge dewatering system - Electrical connection included n. 2 pumps (1+1 redundancy) - Electric connection included Electric connection included Electric connection included B.3.11 Hydraulic connections new dewatering system valves, joints and special bits included Total B.3 - HB-KBL-1780-035-025-GEN-BOQ-A4-Bill_of_Quantities-R01 4/5

B.4 - Waste water treatment - ELECTRICAL WORKS B.4.1 Backup Diesel generator - 125 kva sheltered, fuel tank on board, automatic switch gear, connections included B.4.2 B.4.3 New main panelboard with all switches for new and existing devices New electrical connection to main power line IP 65 - Switches and electric connections included l.s. 1 Cables, trenches and ill included l.s. 1 Total B.2 - B.5 - CIVIL WORKS B.5.1 New steel reinforcement for modular biologic WWTP installation over existing tanks Electric connection included B.5.2 Box for free chlorine analyzer #211 l.s. 1 B.5.3 New protection roof for sludge thickening system B.5.4 New technical room for new air blowers and polyelectrolite installation B.5.5 New technical room for new dewatering system installation Total B.3 - B. TOTAL - GRAND TOTAL A+B - HB-KBL-1780-035-025-GEN-BOQ-A4-Bill_of_Quantities-R01 5/5