Godkjennelsesdokumenter for art. 4509, 4511

Similar documents
Certifikat och provningsprotokoll för art. 4512, 4513, 4514 och 4515

TNO report. Centre for Fire Research Van Mourik Broekmanweg 6 P.O. Box AA Delft. T F

On-road emission measurements with PEMS on a MERCEDES-BENZ ATEGO Euro VI N2 heavy-duty truck

Report Number BTC 12024F

Report Number BTC 12261F

InnoBYG small scale demonstration tests - Part 2

TÜV NEDERLAND P.O. Box AC Best - The Netherlands De Waal 21C PH Best - The Netherlands +31 (0) (0)

Title: WF Report No: Prepared for: Simonswerk UK Ltd. Burcott Works, Spring Street, Tipton, West Midlands, DY4 8TF. Date: 20 th April 2012

Title: Fire resistance test in accordance with BS EN : 2008 on an uninsulated, face fixed rolling shutter doorset. Report No: Prepared for:

Photograph 1, Current feed to connector test loop

Our firm only processes the data that is required for the preparation, implementation and completion of the case in question.

InnoBYG small scale demonstration tests - Part 1

Testing of Baier Plasterboard to AS/NZS (Electronic copy (PDF format) original signed by author) Materials Scientist.

Tyre noise limits of EC/661/2009 and ECE R117: Evaluation based on sold tyres in the Netherlands

Test report No

New: PREMIUM fireplaces with elevating door. Welcome to Spartherm. Why Spartherm? Models. Chamotte interior, colours

Title: Fire Resistance Test In Accordance With BS EN : 1999 On A Glazed Screen Assembly. WF Report No: , Issue 2. Prepared for: Date:

Test Report No.: SDHGR FM Date: Jun.08, 2012 Page 1 of 3

CertRom. BUCHAREST, S5 Calea 13 Septembrie 231A; Ph: , Fax: ;

Germany B1 Fire Rating. kraft paper products. molo design, ltd Venables Street Vancouver, B.C. Canada V5L 2G7

Introduction. Our Ref: Chilt/IF12041 AR1. 24 th June Astra Door Controls Ltd Unit 10 Astra Business Centre Roman Way Preston PR2 5AP

Enigma. Pocket sliding door systems. Wall construction preparation guide

Controlling the Speed of Tilting Trains Through Curves

LIIKENNEVIRTA LTD GENERAL TERMS AND CONDITIONS FOR THE CHARGING SERVICE

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998

PSTI High Induction Diffuser

European B1 Fire Rating. soft collection softwall + softblock Fire Retardant (FR) Treated textile products. molo design, ltd

New EU Regulation on General Safety. Implementation of Tyre Aspects

FIRE TEST REPORT FH 5154

your and attach spreadsheet of 23 December 2003; and

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM

Status of the Informal Working Group on ACSF

PRINTING OF BMI WHEELS

Chemical indicators and test devices Benchmarking sterilisation processes.

No. Pr FIRE RESISTANCE TEST REPORT. Issued on: AUTHORIZED BODY AO 216. Project No: (Z )

Proposal for a new UNECE regulation on recyclability of motor vehicles

Demonstration with optical fibres by Smart Fibres Ltd. Task 15

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Sound-absorbing spacer Sorp10

ISO :2015/DAM 1

TEST REPORT IEC Luminaires Part 2: Particular requirements: Section Two Recessed luminaires

Electric Vehicles and the Environment (EVE IWG)

OPW Fluid Transfer Group Europe BV

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-23R Extension number: 00

Electric Vehicles and the Environment (EVE IWG)

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

Test report no

Test report No

Title: The fire resistance performance of a specimen of single-acting single-leaf doorset in accordance with BS EN : Report No: A

AIRBUS EASA AD activities AD implementation

Title: WF Report No:

COMMISSION REGULATION (EC)

Test report No

Version / Status V 2.0 Date Author. Wagon Markings

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Town of Centreville Automated Speed Enforcement Program

EDS: AN EUROPEAN STUDY FOR NEW DEVELOPMENTS IN AUTOMOTIVE TECHNOLOGY TO REDUCE POLLUTION

TECHNICAL AND OPERATIONAL DOCUMENTATION

Administrative Circular TO ALL NATIONAL COMMITTEES. Dear Sir/Madam, Co-operation and Licence Agreement between IEC and IEEE

JUDGMENT OF THE COURT (Sixth Chamber) 2 June 1994 *

ISO INTERNATIONAL STANDARD. Measurement of noise emitted by accelerating road vehicles Engineering method Part 2: L category

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

Amsterdam Boats. High-quality luxury boats and hospitality. Conditions of use and disclaimer. Version: August 2018

FlowBar High Capacity Slot Diffuser

TEST REPORT CONCERNING THE COMPLIANCE OF A VOTING MACHINE FOR USE AT ELECTIONS IN IRELAND, BRAND NEDAP, MODEL P.R.U

PMA Parts and Approved Repairs Issues in Europe

Declaration naming Richard J. Nixon and Dale Brand under section 106 of the Oil and Gas Conservation Act

SEM.Test Compliance Service Co., Ltd

ADDINOL Eco Gear Longlife x 4 Long-term warranty. Longlife. Guarantee

Report No.: STR S. ST/SG/AC.10/11 Rev.5/Amend.2 Section 38.3

Overhead transmission lines Spacers

Australian Standard. Pneumatic fluid power General requirements for systems (ISO 4414:1998, MOD) AS AS 2788

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

specifying the applications each has before the AER and the AER licences and approvals such licensee or approval holder holds.

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea.

ISO INTERNATIONAL STANDARD

Lithium Battery UN38.3 Test Report

Cavity Stop Socks & TCBs

ISO INTERNATIONAL STANDARD. Gas turbines Procurement Part 3: Design requirements

NATIONAL HOMOLOGATION FORM KARTING ENGINE

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

TEST REPORT IEC Low-voltage switchgear and control gear Part 7-4: Ancillary equipment PCB terminal blocks for copper conductors

10-Feb-14. VCA job number: CSP Date: 10 February Dear Sirs,

A SHORT HISTORY SINCE DIESELGATE. Richard Smokers

Lithium Battery UN38.3 Test Report

NATIONAL HOMOLOGATION FORM KARTING ENGINE

Test report No

3000ZR PRECISION VOLTAGE REFERENCE 3000 PRECISION SERIES LABORATORY REFERENCE STANDARDS

This document is a preview generated by EVS

Test report no

Current and planned policies on drink-driving & drug-driving. Desirée Schaap Projectleader alcolockprogram

11-Feb-14. VCA job number: CSP Date: 11 February Dear Sirs,

Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form ) and Declarations (Form ).

Thorsten Wege. 4th ISCC Global Sustainability Conference in Brussels on 5th February 2014

WF Report No: Prepared for: Rohden UK Ltd Unit 2, Hayleys Manor Farm Upland Road, Epping Upland, Essex, CM16 6PQ. Date: Notified Body No:

QUESTION / CLARIFICATION

Lithium Battery UN38.3 Test Report

} Rev.1/Add.52/Rev.2/Amend.2

Transcription:

Godkjennelsesdokumenter for art. 4509, 4511 Innholdsliste: Samsvarserklæring side 2 SINTEF Produktdokumentasjon 050-0204 side 3 Efectis Nederland BV branntestunderlag side 8 Efectis Nederland BV testrapport side 23 ELKO AS E-mail: elko@elko.lxg.com Internett: www.elko.no Bank: 6219.05.15880 Foretaksnr.: NO 911 382 563 MVA Hovedkontor: Eyvind Lyches vei 10, NO-1338 Sandvika Postboks 234, NO-1301 Sandvika Tel: +47 67 80 73 00 Fax: +47 67 80 73 01 Fabrikk: Sporpind Industriområde, NO-3340 Åmot Postboks 124, NO-3341 Åmot Tel: +47 32 78 91 00 Fax: +47 32 78 91 01

Efectis Nederland BV Return address: P.O. Box 1090, 2280 CB Rijswijk, The Netherlands Environmental Seals Ltd Envirograf House Attn: Mr. P. Ackerman-Mond Barfrestone DOVER Kent CT15 7JG UNITED KINGDOM Efectis Nederland BV Centre for Fire Safety Lange Kleiweg 5 P.O. Box 1090 2280 CB Rijswijk www.efectis.nl T +31 15 276 34 80 F +31 15 276 30 25 Subject Preliminary test of Norwegian Elko sockets and Envirograf, product type 30 in a partition wall Efectis Nederland 1 report Dear Mr Ackerman-Mond, On behalf of your firm we have performed a preliminary test on a unloaded partition wall provided with several sockets. The test is based on the European standard EN 1364-1:1999 and performed on January 23, 2007. The partition wall is as in practice provided with Norwegian Elko sockets and switches fitted with intumescent gaskets of Envirograf, product type 30, which expand during a fire. For this test a partition wall was prepared with Fire Line Plasterboard and only two sockets on each side. The construction is assembled at our laboratory on January 22, 2007. 1 1 This report is issued by the TNO company Efectis Nederland BV (previously TNO Centre for Fire Research). TNO decided, in response to international developments and requests by customers, to collaborate with two European Egolf partners, both highly experienced in fire safety: the Norwegian Sintef/NBL and the French CTICM. Thus, through scaling up, a more comprehensive service of high quality and a wider range of facilities can be offered. In order to achieve this, the fire safety related activities of the partners involved have been privatised in this collaboration. With respect to TNO this has lead to the privatisation on the 1 st of July of the activities of the TNO Centre for Fire Research via the establishment of the company Efectis Nederland BV. Date E-mail arjo.lock@efectis.com Direct dialling (015) 27 63289 Direct fax (015) 27 63479 Project number 2007235 Efectis Nederland BV: a TNO Company The Standard Conditions for Research Instructions given to Efectis, as filed at he Registry of the District Court and the Chamber of Commerce in The Hague shall apply to all instructions given to TNO; the Standard Conditions will be sent on request.

Date Construction details: The construction consisted of a frame with wooden studs, dimensions 100 x 50 mm with a spacing of 475 mm in the middle and 240 mm near the edges, fixed together with 100 mm screws no. 8 (see figure 1). Two layers of Fire Line Plasterboards, thickness 2 x 15 mm, on both sides, secured with galvanised clout nails, dimensions 50 x 3 mm. The construction was applied with two vertical joints at 240 mm from the edges. The dimensions of the total construction were 1450 x 1440 x 140 mm (see figure 2). 2/15 For the wall construction the following type of Norwegian Elko fitting materials were submitted: S57/100 stender hoy ring Code No 4040 S57/100 stender Code No 3012 S57/100 1.5 stender Code No 4045 S57/Dobbel 4 loop stender Code No 3011 All models were provided with gaskets of Envirograf, type 30 at the bottom of the socket see photo 4. Selection of socket models From this series, two models were chosen which should present the complete series of this type of sockets. This were model S57/100 stender hoy ring and S57/Dobbel 4 loop stender The model S57/100 stender is almost the same as the S57/100 stender hoy ring with the difference that the last one is a higher model due to an extra ring to create more volume. The gasket in both models has the same surface and thickness (45 x 45 x 2.5 mm). The model S57/Dobbel 4 loop stender and the S57/100 1.5 stender are both wider models with respectively 2 gaskets (45 x 45 x 2.5 mm) and 1 gasket (45 x 60 x 2.5 mm). The capacity/surface ratio of the tested models is more unfavourable than the not tested models (worse case models), see also additional letter report 2008-Efectis- R0???. At each side of the wall construction two sockets of each model where situated. The sockets were mounted onto the wooden studs and covered with the Fire Line Plasterboards. At the position of the socket a hole was drilled which was only covered with the armature cover (name???), see photo 7. Fire test: The construction was placed in front of our preliminary furnace which was equipped with three temperature sensors and a pressure device. The partition wall was applied with ten surface thermocouples at the positions showed in figure C1. The construction fulfilled the criteria for integrity and thermal insulation during the complete 90 minutes of the test.

The thermal insulation limits were not exceeded, all the surface temperatures stayed below 100 C. Observations during the fire test N= Non-fire side Date 3/15 Time Side Observation [min] 0 Start heating 5 N Fluctuations in furnace pressure 22 N Smoke coming from the top side of the specimen 30 N More smoke coming from the specimen 45 N Moisture visible coming out of socket B 60 N Photo of specimen after 60 minutes 63 N More moisture coming out of socket B 90 N Photo of specimen after 90 minutes 92 End of heating Assessment: A partition wall constructed of timber and covered with two layers of plasterboard and provided with Norwegian Elko sockets and switches from the tested range will have a fire resistance according to NEN 6069: 2005 of at least 90 minutes under the conditions: the timber frame has the same dimensions; Fire Line Plasterboard is used, with two layers of 15 mm at each side; the fitting materials are used mentioned in this letter report; the sockets are provided with Envirograf product 30, intumescent gaskets. At the next pages the drawings, the graphs of the test results and some photographs made during the assembly and the fire test are enclosed. Yours faithfully, A.J. Lock Dr. Ir. G. van den Berg This document has the status of a Efectis Nederland report and is known at Efectis as Efectis Nederland.-report no. 2007-CVB- R0106. No part of this publication may be reproduced and/or published by print, photoprint, microfilm or any other means without the previous written consent of Efectis. In case this report was drafted on instructions, the rights and obligations of contracting parties are subject to either the Standard Conditions for Research Instructions given to TNO, or the relevant agreement concluded between the contracting parties. Submitting the report for inspection to parties who have a direct interest is permitted.

Date Sponsor: Environmental Seals Ltd. Project number: 2007235 4/15 Figure 1

Sponsor: Environmental Seals Ltd. Project number: 2007235 Date 5/15 Figure 2

Sponsor: Environmental Seals Ltd. Project number: 2007235 Furnace conditions Centre for Fire Safety Date: 23/01/2007 Furnace temperatures Date 6/15 Project : Wall sockets and switches Projectnbr : 2007235 1200 1000 ISOmax ISOmin TPL1 TPL2 TPL3 Temperature [ C] ===> 800 600 400 200 0 0 10 20 30 40 50 60 70 80 90 100 Time [min] ===> Graph : B1 Centre for Fire Safety Date: 23/01/2007 Deviation of the fire curve Project : Wall sockets and switches Projectnbr : 2007235 40 30 20 ISO+ ISOdev_ISO Deviation fire curve [%] ===> 10 0-10 -20-30 -40-50 0 10 20 30 40 50 60 70 80 90 100 Time [min] ===> Graph : B2

Sponsor: Environmental Seals Ltd. Project number: 2007235 Centre for Fire Safety Date: 23/01/2007 Overpressure in the furnace Date 7/15 Project : Wall sockets and switches Projectnbr : 2007235 50 40 Overpressure [Pa] ===> 30 20 10 0-10 0 10 20 30 40 50 60 70 80 90 100 Time [min] ===> Graph : B3 Figure C1: Positions of thermocouples

Date Sponsor: Environmental Seals Ltd. Project number: 2007235 Graphs of test results Centre for Fire Safety Date: 23/01/2007 Surfacetemperatures of the wall (part 1) 8/15 Project : Wall sockets and switches Projectnbr : 2007235 80 70 60 Temperature [ C] ===> 50 40 30 TC1 TC2 TC3 TC4 TC5 20 10 0 0 10 20 30 40 50 60 70 80 90 100 Time [min] ===> Graph : C2 Centre for Fire Safety Date: 23/01/2007 Surfacetemperatures of the wall (part 2) Project : Wall sockets and switches Projectnbr : 2007235 80 70 60 Temperature [ C] ===> 50 40 30 TC6 TC7 TC8 TC9 TC10 TC11 TC12 20 10 0 0 10 20 30 40 50 60 70 80 90 100 Time [min] ===> Graph : C3

Sponsor: Environmental Seals Ltd. Project number: 2007235 Centre for Fire Safety Date: 23/01/2007 Ambienttemperature Date 9/15 Project : Wall sockets and switches Projectnbr : 2007235 25 20 Temperature [ C] ===> 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 Time [min] ===> Graph : C4

Sponsor: Environmental Seals Ltd. Project number: 2007235 Photos Date 10/15 Photo 1: Assembly of sockets against wooden studs. Photo 2: Both models at fire and non-fire side.

Date 11/15 Photo 3: Model S57/100 stender hoy ring Photo 4: Model S57/Dobbel 4 loop stender.

Sponsor: Environmental Seals Ltd. Project number: 2007235 Date 12/15 Photo 5: Specimen in front of furnace. Photo 6: Specimen after 60 minutes.

Sponsor: Environmental Seals Ltd. Project number: 2007235 Date 13/15 Photo 7: Detail of socket A during test, after 60 minutes. Photo 8: Detail of socket B during test, after 60 minutes.

Sponsor: Environmental Seals Ltd. Project number: 2007235 Date 14/15 Photo 9: Specimen after 90 minutes. Photo10: Fire side of specimen after the test.

Sponsor: Environmental Seals Ltd. Project number: 2007235 Date 15/15 Photo 11: Detail of completely filled hole of socket A after the test. Photo 12: Detail of completely filled hole of socket B after the test.

Efectis Nederland BV Return address: P.O. Box 1090, 2280 CB Rijswijk, The Netherlands Environmental Seals Ltd Envirograf House Attn: Mr. D.A. Ward Barfrestone DOVER Kent CT15 7JG United Kingdom Subject Additional letter report for, product type 30 of Envirograf Efectis Nederland report R0??? 1 Dear Mr Ward, On behalf of your firm we have performed a preliminary test on an unloaded partition wall provided with two socket models as described in test report R0106/LKA/TNL. The test is based on the European standard EN 1364-1:1999 and assessed according to the Dutch standard NEN 6069: 2005. To achieve information about the fire resistance aspects of the complete range of this product two models of this type of sockets were chosen and tested on January 23, 2007. The partition wall construction as described below was provided with the two models, one of each at the fire side and also at the non-fire side. 1 1 This report is issued by the TNO company Efectis Nederland BV (previously TNO Centre for Fire Research). Centre for Fire Safety Lange Kleiweg 5 P.O. Box 1090 2280 CB Rijswijk www.efectis.nl T +31 15 276 34 80 F +31 15 276 30 25 Date February 26, 2008 2008-Efectis-R0???/LKA E-mail arjo.lock@efectis.com Direct dialling (015) 27 63289 Direct fax (015) 27 63479 Project number 2007235/2008??? Efectis Nederland BV: a TNO Company The Standard Conditions for Research Instructions given to Efectis, as filed at he Registry of the District Court and the Chamber of Commerce in The Hague shall apply to all instructions given to TNO; the Standard Conditions will be sent on request. TNO decided, in response to international developments and requests by customers, to collaborate with two European Egolf partners, both highly experienced in fire safety: the Norwegian Sintef/NBL and the French CTICM. Thus, through scaling up, a more comprehensive service of high quality and a wider range of facilities can be offered. In order to achieve this, the fire safety related activities of the partners involved have been privatised in this collaboration. With respect to TNO this has lead to the privatisation on the 1 st of July 2006 of the activities of the TNO Centre for Fire Research via the establishment of the company Efectis Nederland BV.

Date Construction details of partition wall The wall construction consisted of a frame with wooden studs, dimensions 100 x 50 mm with a spacing of 475 mm in the middle and 240 mm near the edges, fixed together with 100 mm screws no. 8. Two layers of Fire Line Plasterboards, thickness 2 x 15 mm, on both sides, secured with galvanised clout nails, dimensions 50 x 3 mm. The construction was applied with two vertical joints at 240 mm from the edges. The dimensions of the total construction was 1450 x 1440 x 140 mm (see also the mentioned preliminary letter report). 2008-Efectis-R0???/LKA 2/2 Construction details of sockets and gaskets: All the sockets were provided with the same type of gasket. The models are used with one or with two gaskets with the following dimensions: 45 x 45 mm and 45 x 60 mm. The at the front side red coloured gasket were glued to the bottom of the socket and had a thickness of approx. 2.5 mm. The capacity of the socket models (without adapter) and the surface of the gaskets are determined and are shown in the table below. Table: 1 Norwegian socket models with Envirograf gaskets product 30 Model Code Socket surface Ratio capacity in [cm 3 ] [cm 2 ] S57/100 stender hoy ring No. 4040 250 20 12.5 S57/100 stender No. 3012 150 20 7.5 S57/100 1.5 stender No. 4045 250 27 9.3 S57/Dobbel 4 loop stender No. 3011 500 40 12.5 Capacity/surface relation The determined capacity of the sockets and the surface of the gaskets show that the increase of the socket capacity is less than the surface increase of the used gasket (ratio). With thes mentioned amount of material each model of this type of sockets should be filled completely in case of a fire. Aim of the test The aim of the test set-up was to check two aspects. The sockets mounted at the nonfire and at the fire side in the mentioned type of wall and the influence of the different gaskets in the sockets. The constructions fulfill the requirements during this test.

Date Additional assessment * : The models of the complete range of above described Norwegian Elko fitting materials implemented in a partition wall constructed of timber and covered with two layers of plasterboard will have a fire resistance according to NEN 6069: 2005 of at least 90 minutes under the conditions: 2008-Efectis-R0???/LKA 3/3 the timber frame has the same dimensions; Fire Line Plasterboard is used, with two layers of 15 mm at each side; the fitting materials are used from this range of products; the sockets are enclosed with Envirograf product 30, intumescent gaskets with a sufficient amount of material to fill the sockets. Remark: * The construction is assessed according to the Dutch standard because only a preliminary test is performed and not a full scale test according to EN 1364-1. The Dutch Standard is similar with the European standard. Since 2005 the Dutch Standard refers for this type of constructions to the European standard EN 1364-1. Yours faithfully, A.J. Lock Dr. Ir. G. van den Berg Centre for Fire Safety This document has the status of a Efectis Nederland report and is known at Efectis as Efectis-report no. 2008-Efectis-R0???. No part of this publication may be reproduced and/or published by print, photoprint, microfilm or any other means without the previous written consent of Efectis In case this report was drafted on instructions, the rights and obligations of contracting parties are subject to either the Standard Conditions for Research Instructions given to TNO, or the relevant agreement concluded between the contracting parties. Submitting the report for inspection to parties who have a direct interest is permitted.