Installation and Operating Instructions. Scraper conveyor version K

Similar documents
Installation and Operating Instructions. Magnetic band conveyer

Installation and Operating Instructions. Gravity Band Filter Typ PF

Medium and high pressure pumps

Operating Instructions

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS

Toothed belt axis ELGC-TB-KF. Operating instruction [ ]

* * * * 8 Maintenance Plan 10.1,10.2, ,4 7.1/7.2/7.3

Operating Instruction for Liquid-Ring Vacuum Pumps

OPERATING INSTRUCTIONS

Operating Guide SBFV (PN16/25) ENGLISH Steel butterfly valve SBFV Page 2. Danfoss VI.IX.A1.02 1

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 13 Engine-Crankshaft, Cylinder block (Page GR-13)

Maintenance & Inspection Manual

Butterfly Valve Type 57P

Type 8635 Remote-Positioner. Zusatzanleitung. English Deutsch Français

GL Ludemann Y-Strainers

HINGE BELT CONVEYOR FUNCTIONS AREA OF APPLICATION

TECHNICAL MANUAL GTB16N

Danfoss Butterfly Valve

Pressure relief valve

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

3-Way Ball Valve Type 23H

Operating Instructions ROCO Butterfly Valve with SKG Slider-crank Mechanism, with Electric Multi-turn Actuator

Spindle axis ELGC-BS-KF. Operating instructions [ ]

Installation and Operating Manual

Drive Unit e-drive1. Installation instructions 04/2014. English translation of the original German installation instructions

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

VBK 2596/12E/RSF. Thickness and Width Gauge for Strip and Profile. Operating- & Service Instructions. (with lateral guide rollers)

USE AND MAINTENANCE MANUAL

SECTION AIR INTAKE SYSTEM

TWO-STAGE HYDRAULIC PUMP. RWP55-IBT-Air

Eurovacuum Installations and Operating manual EV Series Vacuum pumps Models

OPERATING INSTRUCTIONS

Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Installation, Operating & Maintenance Instructions. All-metal gate valve with compact or extended pneumatic actuator

BRAKE SYSTEM Return To Main Table of Contents

Dry installed pump type LANDY BTP.

SELF PRIMING CHEMICAL SERVICE PUMPS

Operating Instruction

INSTALLATION INSTRUCTION & TECHNICAL MANUAL FLOWMETER

Installation and Operational Instructions for EAS -Compact overload clutch, Type 49_. 4._ Sizes 4 and 5

Installation and Operating Instructions for EAS -NC clutch Type 45_. _. _ Sizes 02 and 03

Sediment strainer (Type Y)

Maintenance & Inspection Manual

Operating instructions Accu Jet

Installation, Operating & Maintenance Instructions. UHV gate valve with pneumatic actuator. Series 108 DN mm (I. D. 2½ 8 )

Online version - not for reprint

3 Axles and brakes. 3.1 Function and construction of the axles Construction Function

Operating & Maintenance Manual For Steam Conditioning Valve

Installation and Start-up Instruction. This instruction is valid for all standard low pressure pumps: LPD, ACD, ACE, ACG/UCG, ACF/UCF, LPQ and ABQ

Operating & Installation Manual

BRAKE SYSTEM Article Text 1996 Toyota RAV4 For Copyright 1998 Mitchell Repair Information Company, LLC Wednesday, September 13, :30PM

Installation, Operation, and Maintenance Manual

Installation, Operating & Maintenance Instructions. HV gate valve with pneumatic actuator. Series 110 DN mm (I. D.

Single Stage Rotary Vane Vacuum Pump Installation and Operation Manual RX-10 RX-21 RX-25

Butterfly Valve Type 58 (PDCPD)

1 of 27 7/21/2015 3:33 PM

Volkswagen New Beetle 1.8 Liter 4-Cyl. 5V Turbo OBD II Engine Mechanical 17 Engine-Lubrication system (Page GR-17)

GENESIS COUPE(BK) > 2010 > G 3.8 DOHC > Steering System

1999 Toyota RAV BRAKES Disc & Drum - Trucks & Vans

OPERATING INSTRUCTIONS

Oil Pump. Features: AISIN aluminum die-casting technology allows for size and weight reduction.

EasySelect-Cup Manual Powder Gun

Assembly and Maintenance Manual Type ASNU

To ensure proper installation, digital pictures with contact information to before startup.

Condensate Drain Valve AK 45. Original Installation Instructions English

6 Litre Oil-Less Air Compressor

Parker Hannifin Filtration Group Racor Division DUAL FBO OPERATION AND MAINTENANCE INSTRUCTIONS SPARE PARTS

Operating Manual. Hydra S (W)VAC

TILLOTSON LTD., CLASH INDUSTRIAL ESTATE, TRALEE, CO. KERRY, IRELAND PHONE: FAX:

SAND FILTERS. Models: ECSF500, ECSF650, ECSF700, & ECSF800

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Crispin Valves Operating Guide. Crispin

GATE VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

BTD-20 TURF TOPPER TOP DRESSER

Single Stage Rotary Vane Vacuum Pump Installation and Operation Manual RX-40 RX-63 RX-100

Diaphragm Valves Type 15

series BUTTERFLY VALVE DOUBLE ECCENTRIC FLANGED FAF 3800 PRODUCTION STANDARDS DN100 DN2000 PN Design EN 593 EN ISO Flanged

Operating instructions Form no safety definitions

Inhalt. Granule jet blasting device PG 5 8. Owner s Manual. Translation of the original instructions

Swing Check Valve ASAHI AV VALVES. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1

OPERATION MANUAL. Diaphragm Pump. TD/TD2 Series TD-08, 15, 20/TD2-25. Introduction

Assembly and Maintenance Manual Type AS

ACTIVAL Two-way Ball Valve with Threaded-end Connection

D58 Series Brake Instructions

Flexfence Tension Unit. with Hand Pump. Product Manual. Release 02/16.

Fisher 657 Diaphragm Actuator Sizes and 87

Installation and Operation Manual

POMPE AUTOADESCANTI SELF-PRIMING ELECTRO PUMP ACM DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR MULTISTAGE SELF-PRIMING PUMPS

Contents H-V034-E-12. Serial No. (page) (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Installation and Operating Instructions

tyre changer - automatic

Operating and maintenance instructions VAG RETO-STOP Non-Return Valve

SUSPENSION 2-1 SUSPENSION TABLE OF CONTENTS

Globe Valve Type Fig. 1 Type 3241 Globe Valve. Mounting and Operating Instructions EB EN

Installation and Operational Instructions for EAS - HTL housed overload clutch Sizes 01 3 Type 490._24.0

Belt Conveyor Pull Rope Switch Types HEN, HEK and SEM OPERATING INSTRUCTIONS

CRS-D Powder Coating Booth with Reverse Jet Cleaning System

OPERATING MANUAL. Black Bruin Hydraulic Rotators

Transcription:

Installation and Operating Instructions Scraper conveyor version K GB

Table of contents Page 1 Description of machine and functions... 7 2 Danger and safety instructions... 8 2.1 General instructions... 8 2.2 Instructions for repair and maintenance work and for malfunctions... 9 3 Unpacking and transport... 10 3.1 Unpacking...10 3.2 Transport... 10 4 Assembly and installation... 11 4.1 Screwing together several container parts... 11 4.2 Electrical connection... 11 4.3 Drawing in the scraper belt manually... 12 4.4 Drawing in the scraper belt with drive motor or manual crank... 14 4.5 Drawing in the scraper belt in units with full intermediate bottom... 16 4.6 Assembling the scraper belt... 16 4.7 Tightening the scraper belt... 17 5 Switching on and operating... 18 5.1 Before initial operation...... 18 5.2 Switching on...18 5.3 Switching off...18 6 Maintenance... 19 6.1 Adjusting the drive shaft... 19 6.2 Changing the broach bars... 19 6.3 Attaching the manual crank... 20 7 Information on coolants / tanks... 20 8 Maintenance table... 21 9 Eliminating malfunctions... 22 3

Table of contents Page 10 Accessories... 25 10.1 Plate-type filter... 25 Description of functions plate-type filter... 25 Assembly / disassembly of the plate- type filter... 26 10.2 Instructions for fixing Brushing Band... 28 10.3 Setting instructions for scrapers... 29 10.4 Reverse flow filter... 30 Description of functions reverse flow filter... 30 Assembly and disassembly of the reverse flow filter... 31 5

1 Description of machine and functions Function - Conveying metal shavings and small particles - Prepurifying the cooling lubricant (for wet processing) Scope - Decentral use in single and interlinked machine tools - Central use for waste disposal from machine groups and entire production areas - Suitable for the transport of short shavings, needle chips, cast-iron chips and cast-iron dust, dry and wet processing The length of the chips should not exceed 100 mm because the scraper conveyor is not suitable for higher chip lengths. Large chips might form snarl chips which would not be removed. In that case, a hinge band conveyor must be used. Mode of operation - Loose material falls into the feed opening of the scraper conveyor - Continuous conveyance of the loose material on the container bottom to the discharge opening - Throwing the loose material from the discharge opening into the container or another conveyor for removal - Do not use the plant for other than the intended purposes. - Note the Regulation for the Prevention of Accidents VBG 10 when operating the plant. - The discharge station must be visible during machine controlled operation. Noise level: < 70 db(a) Optional equipment - Coolant tank - Coolant purification systems (e.g. magnetic separator, centrifugal separator, band filter, superfine strainer) - Low lift and jetting pumps for purification elements and machines - Support foot - Chip carriage - Rotating filter - Piping with aggregates, valves, etc. Since nearly every plant is constructed for the special needs of the customer, deviations from the form and position of the parts and structural components described in this documentation may occur. In this case, the operating instructions should be applied analogously. 7

2 Danger and safety instructions 2.1 General instructions - Always observe all statements and instructions in the operating instructions delivered with the plant. - It is forbidden for unqualified persons to work on the plant. - Observe correct fastening if components are installed by customer. - Never bypass safety contrivances (e.g. safety clutch). - The operation of safety contrivances must always be guaranteed. - Work on the electrical system may only be carried out by qualified personnel. - Observe the relevant VDE requirements and connection requirements of the responsible Electricity Board. - Do not stand in or reach into the feed opening. - Do not reach into the discharge opening. - Cover the scraper belt and all driving elements before starting. - Do not remove covers while plant is in operation. 8

2.2 Instructions for repair and maintenance work and for malfunctions I 0 - Set the main switch in the off position. - Secure the plant against accidental starting. - Ensure that the plant is at zero voltage. - Depressurize the plant. - Close pipe valves. - Remove all noxious materials. - Coolants must not enter the environment. - When handling chips, wear protective clothing, safety boots and protective gloves. 9

3 Unpacking and transport 3.1 Unpacking 3.2 Transport Scraper conveyors over 8 m in length are delivered in several container parts. For conveyors in several parts, scraper belts are rolled up on separate pallets. Small parts (screws, sealings etc.) are delivered loose in the scraper conveyor container or in separate packing. Assembly rails for drawing in the scraper belt are fastened to the scraper belt if required or preassembled on the scraper conveyor and painted red. It is important to keep the assembly rails, as it is impossible to draw in the scraper belt without them. - Do not stand under hanging loads! - Since each conveyor is built according to customer's wishes, the illustrations on this page are to be understood as examples. - In any case, the suspension appliances fastened to the conveyor (e.g. rings, ring bolts, pipes) must be used. - By crane: If the device is no longer in the original packing, always use the suspension devices provided (e.g. eye bolts, ring bolts). - By stacker truck: Only in the original packing and with greatest care 10

4 Assembly and installation - Place the plant on a level surface. - Ensure a firm and secure stand. - Secure the plant against accidental starting. 4.1 Screwing together several container parts - Join container parts at the joint locations and align in parallel. Note identification markings (2) of the container flanges. The identification marking (numbers or symbols) must agree with that of the opposite flange (3). (1) 1 2 4 2 2 3 - Insert the sealings supplied (1) and join container parts completely. - Align the container in such a way that all bore holes of opposite container flanges are in alignment. - Insert but do not tighten hexagon head screws and hexagon nuts. - Drive in preassembled rollpin springs (4). - Tighten hexagon head screws. 4.2 Electrical connection - Connect power supply to motor(s) and pump(s). - Observe the correct direction of rotation (see arrow). 11

4.3 Drawing in the scraper belt manually 1 2 Recommended only for small or short scraper belts. Two or more persons are required to draw in the scraper belt depending on its size. 7 3 - Remove covers (3) on top of the container. - Loosen the fastening screws (6) on both sides of the gearing end frame, but do not remove completely. 6 type 1 5 4 - Loosen the clamping bolts (5) on both sides of the gearing end frame and turn back completely in the direction of the arrow. 1 2 - *Loosen the fastening screw (4) on both sides of the chain wheel cover (7). 3 - If installed: loosen drive shaft cover. - Push the gearing end frame (1) in the conveying direction to the stop (2). - Disassemble drive motor, install manual crank (see Chapter 6.3). - Insert the scraper belt between the guide bars (8) approx. 1 m into the scraper conveyor. 6 type 2 5 The fastening screws (9) of the broach bars must be at the top The reinforcing angles (10) of the broach bars are assembled in the direction of the guide sprocket wheel (opposite to the conveying direction) Feed direction with full intermediate bottom: see Chapter 4.5 8 Danger of injury during the feeding process: - Never touch movable parts of the scraper conveyor by hand. - Do not pull or push the scraper belt without suitable devices. 10 9 * = required only for type 1 12

- Draw in scraper belt with hook (1) or suitable device up to the guide sprocket wheel. - Pull scraper belt around the guide sprocket wheel. - Draw in scraper belt (2) between the upper guide bars (3) to approx. 1 m before the drive shaft. - Push the gearing end frame in the direction of the guide bars to the stop (5). - Insert conveyor chains in toothing of the driving chain wheel (4) and slide the end of the scraper belt between the upper guide bars (6) into the container. 6 4 5 13

4.4 Drawing in the scraper belt with drive motor or manual crank 1 2 Necessary for large or long scraper belts Two or more persons are required for drawing in the scraper belt depending on its size. See Chapter 6.3 for attaching the manual crank. - Remove covers (3) on top of the container. 7 6 type 1 5 4 3 - Loosen the fastening screws (6) on both sides of the gearing end frame. - Loosen the clamping bolts (5) on both sides of the gearing end frame and turn them back completely. 1 2 - *Loosen the fastening screws (4) on both sides of the chain wheel cover (7). 3 - If installed: loosen drive shaft cover. - Push the gearing end frame (1) against the conveying direction to the stop (2) and tighten the fastening screws (6) on the gearing end frame. Danger of injury during the feeding process: - Never touch movable parts of the scraper conveyor by hand. - Do not pull or push the scraper belt without suitable devices. 6 type 2 5 - Assemble the feed bars (10). - Turn the chain wheels in such a way that the conveying chain (8) can be inserted into the toothing on both sides. 9 8 The fastening screws (9) of the broach bars must be at the top. The reinforcing angles (11) of the broach bars are assembled in the direction of the guide sprocket wheel. Feed direction with continuous intermediate bottom: see Chapter 4.5. 11 10 * = required only for type 1 14

- Switch the driving motor into the inching mode and carefully draw in scraper belt up to the guide sprocket wheel. - Turn the chain wheels in such a way that the first roll of the bush conveyor chains (2) can be inserted into a tooth space. - Pull scraper belt with hook (1) or suitable device around the guide sprocket wheel. - Insert the first member of each bush conveyor chain (2) between the respective upper guide bars (3). If the scraper belt jams and builds up, switch the driving motor briefly in the opposite direction. - Draw in scraper belt up to the chain wheel. - Remove feed bars. - Insert bush conveyor chains into the toothing of the driving chain wheel (4). - Slide the end of the scraper belt into the container between the upper guide bars (6). - Assembly of scraper belt: see Chapter 4.6. 6 4 5 15

4.5 Drawing in the scraper belt in with full intermediate bottom Only for scraper conveyors with a full intermediate bottom (6): The loose material is conveyed on the intermediate bottom, not on the container bottom. 6 - Install scraper belt at 180 angle to the normal fitting position. - The fastening screws (7) of the broach bars (9) must be at the bottom. - The reinforcing angles (8) of the broach bars point in the direction of the drive. - Further procedures: see Chapters 4.3 and 4.4. 8 9 7 4.6 Assembling the scraper belt - Connect the ends of the bush conveyor chains by means of shackle type connectors (2). 1 The pins of the shackle type connectors (2) point to the inside. If necessary, remove the first broach bar (3) to assemble the shackle type connectors (note Chapter 6.2). 3 2 - Mount the cover plates (4) on the inserted shackle type connectors. - Insert the split-pins. 4 3 16

4.7 Tightening the scraper belt - Loosen the fastening screws (9) on both sides of the gearing end frame (5), but do not remove completely. 5 - *Loosen the fastening screws (8) on both sides of the chain wheel cover (10). - On both sides, loosen the lock nuts (6) of the clamping bolts. 10 6 7 - Screw in the clamping bolts (7) evenly in the direction of the arrow on both sides. 9 8 Do not tilt the gearing end frame. Tighten evenly on both sides! type 1 Scraper belt tightening: 5 Type K-1 - Tighten clamping bolts (7) with 20 Nm, then unscrew clamping bolts by approx. one turn. 6 7 Type K-2 / K-3 - Tighten clamping bolts (7) with 25 Nm, then unscrew clamping bolts by approx. one and a half turns. 9 type 2 - Tighten the lock nuts (6) of the clamping bolts. - Tighten the fastening screws (9) on the gearing end frame. - Adjust the covers previously loosened in the same proportion as the gearing end frame and tighten. * = required only for type 1 17

5 Switching on and operating 5.1 Before initial operation - Electrical components must be connected by qualified personnel (note voltage, frequency, intensity of current and direction of rotation). - Do a leak test on pipings for liquids (possible transport damage). - Set all switches at "0" or "OFF", respectively - Fill up with required liquids (coolants, lubricants, oils, etc.). - The entire plant must be free from coarse parts (tools etc.) and all accessible danger areas must be secured or covered. 5.2 Switching on - Ensure that nobody is in the danger area of the scraper conveyor! - Note the Regulation for the Prevention of Accidents VBG 10 when operating the plant! - The discharge station must be visible during machine controlled operation! If a plate-type filter is used, the plant may not be running in the interval mode. Sequence for switching on: - Lifting pump(s)* - Low lift pump(s)* - Scraper conveyor - Auxiliary aggregates (swarf mill, sieve drum, magnetic drum etc.)* - Jetting pump(s)* 5.3 Switching off Switch off scraper conveyors with coolant system with a time delay of approx. 5 min. to the processing machine (purification of the coolant). Sequence for switching off: - Jetting pump(s)* - Low lift pump(s)* - Lifting pump(s)* - Auxiliary aggregates (swarf mill, sieve drum, magnetic drum etc.)* - Scraper conveyor 18 *= if supplied with this version

6 Maintenance 6.1 Adjusting the drive shaft Only necessary if distance "A" is not the same on both sides - Loosen the axial shaft locks on both sides of the drive shaft bearings. - Move the chain wheels with the shaft axially until distance "A" is the same on both sides. - Fasten the axial shaft locks on both sides. 6.2 Changing the broach bars A A - Loosen and remove the lock nuts (1) on both sides. - Remove the hexagon head screws (2) on both sides. - Remove the broach bar (4). 5 (~5 mm) - Insert the new broach bar. Observe the direction of installation. - Screw in the hexagon head screw. - Loosen the hexagon head screw by 1/2 turn and fasten it in this position. - Install and tighten lock nut (1). 2 3 4 1 Do not tighten the broach bar at the holding angle. The broach bar must be movable by approx. 5 mm in the oblong holes (5). 19

6.3 Attaching the manual crank Examples of application for the manual crank: - Moving the scraper belt to disassemble individual parts such as broach bars etc. - Loosening coarse parts which block the scraper belt. - Drawing in the scraper belt. - Reversing operation when not possible with drive motor. 12 mm B A 300 mm - Loosen connection between drive motor and safety clutch. If necessary, remove drive motor. 25 Ø A M8 B 26 - Expel the rollpin spring of the safety clutch. - Remove the safety clutch from the drive shaft. 35 M10 36 - Attach the manual crank to the drive shaft and install hexagon head screw. If necessary, fabricate manual crank as illustrated. 7 Information on coolants / tanks - Circulate coolants continuously (weekend circulation recommended). - Do not feed any organic matter. - Avoid foreign oil charge. - Temperature should be below 25 C for emulsion, if possible. - ph-value should be within neutral range - Hardness of the initial water should not exceed 15 dh - Hardness due to upgrading must not exceed 20 dh. Cleaning the coolant tanks - Cleaning intervals greatly depend upon the kind of processing, material, coolant and working hours; no general interval can therefore be specified. A cleaning interval between four and eight weeks is recommended as standard value. 20

8 Maintenance table Assembly/ Interval Maintenance work Safety instructions/ component note Drive - Driving chain (only for version flange bearing with chain drive) 3 months Check tension and adjust if necessary; oil driving chain Sequence of operation: - Remove protective cover (1) - Loosen hexagon head screw (2) - Press take-up pulley (4) in direction of the arrow (5) against the driving chain (3) (force of pressure approx. 20 N) - Tighten hexagon head screw (2) - Replace protective cover - Driving chain (only for version pedestal bearing with chain drive) 3 months Check tension and adjust if necessary; oil driving chain - Remove protective cover - Loosen hexagon head screws (7) - Unscrew the hexagon head screws (8) evenly in the direction of the arrow (6) until the tension in the driving chain is approx. 20 N - Tighten hexagon head screws (7) - Replace protective cover 21

Assembly/ Interval Maintenance work Safety instructions/ component note - Bearing of drive shaft and guide axis, chain wheels --- Check for wear and smooth running Check when changing scraper belt; replace if necessary Scraper belt 3 months Check tension and adjust, if necessary Adjustment see Chapter 4.7 3 months Check for damage Replace damaged parts Electrical equipment - Motor(s) --- See manufacturer s operating instructions - Wiring 3 months Check for rupture and damage Replace defective wires - Level switch - Protective devices 3 months 3 months Check functioning, clean Check functioning, clean Exceed both switch points by manual operation Strainer basket --- Empty and clean At intervals depending on amount of chips produced Pumps --- See manufacturer s operating instructions Container 6 months Check for tightness, damage and corrosion Substances hazardous to the environment must not escape under any circumstances 6 months Check security of position Container must be securely and firmly anchored --- Check guide rails for wear 22

Assembly/ Interval Maintenance work Safety instructions/ component note Plate-type filter Daily In order to align the brush segments of the brushing band and gain optimum flow rates, the conveyor should run backwards at the end of shift for approx. 10 minutes. During this time, no chips may enter the conveyor. 3 months Check for contamination; if necessary, disassemble and clean Brushing band 3 months Check for contamination and wear, clean or replace, if necessary. Piping 1 year Disassemble, clean and check (wear) flap traps/ shutting flaps and valves. Clean pipeline dirt pan with strainer basket. Switch plant off Release pressure in piping Drain cooling lubricant from piping, actuate the shut-off valve, if necessary. Replace defective parts. Coolant tanks 500 working hours Check for contamination (sludge deposits) and clean, if need be. Depending on the tooling method, the interval may be greatly shortened. 23 Coolant tanks are special accessories and are therefore not installed in every plant. Scraper conveyor version K

9 Eliminating malfunctions Disturbance Possible causes Remedy Drive motor races, scraper belt does not move Driving chain broken (on chain drive version) Rollpin spring of safety clutch on driving gear shorn off Replace driving chain Drive in new rollpin spring Scraper belt blocked by large parts, safety clutch has released Remove parts If necessary, turn scraper belt in opposite direction (see Chapter 6.3). After re-activation, the safety clutch automatically locks into place and continues to work. Safety clutch defective (loud rattling) Switch off swarf conveyor immediately Inform after-sales service fitter or replace safety clutch entirely. Do not bypass safety clutch or change adjustment under any circumstances. Scraper belt does not run in the center (grazes handguard on one side) Axial shaft lock loose Adjust drive shaft (see Chapter 6.1). 24

10 Accessories max. "A" A A 10.1 Plate-type filter Description of functions plate-type filter If a plate-type filter is used, the plant may not be running in the interval mode. As long as chips are produced the conveyor has to run steadily! Big accumulation of chips might block the scraper belt. Functions - preliminary separation of short chips - pre-cleaning of the cooling lubricant Scope of application - in machine groups with low coolant reserves - in case of large coolant amounts - suitable for short chips, needle chips, wet processing Method of Functioning - Loose material and cooling lubricant flow from the processing machine to the scraper conveyor. - The feed pump (1) aspirates coolant from the interior of the plate-type filter (2). - Due to the vacuum produced, cooling lubricant flows in from the outside through the plate-type filter. - Chips (3) are continually delivered from the delivery bottom of the scraper conveyor in the direction of the ejection opening. - The plate-type filter is continually cleaned by the scraper brushes (4). 1 2 3 4 25

Disassembly of the plate-type filter Risk of injuries! For all work carried out on the scraper conveyor: - Do not stand on or reach into the scraper conveyor while it is in operation! - Disconnect main switch! - Secure scraper conveyor against accidental start-up! - Remove cover plates (1) and extract coolant. - Remove the broaching rails (3) for making the edge filter box (2) accessible from above According to the individual versions, a removal of the box lid of the edge filter might be necessary for dismounting. 2 3 Type 1 1 - release the hose band clip (5) lösen - remove the hexagon head screw (8) from the sealing plate (7) - disassemble the connecting tube (9) from the elbow socket (6) to the plate-type filter (3) - remove the hexagon head screws (11) from the holding device (10) - draw the plate-type filter (3) out of the holding devices against the conveying direction and remove it upwards - assembly in reverse order 3 5 6 7 9 10 8 11 With types 1 and 2, the plate-type filter inserts are welded to the plate-type filter (3) and cannot be replaced separately. 26

Type 2 - release the hose band clip (12) - remove the hexagon head screws (16) of the suction box (13) - remove the hexagon head screws (14) of the plate-type filter (15) - remove the plate-type filter (15) upwards - assembly in reverse order 14 15 12 13 14 Type 3 16 - For disassembly of the entire plate-type filter, see type 2. - In addition, the plate-type filter (17) can be replaced for cleaning and maintenance work by removal of the cover plate (18) without disassembly of the plate-type filter box (19) (possible only with type 3). - Remove screws (20). - Remove the covering (18) and the plate-type filter (17) upwards (if necessary, remove the 20 18 broach bar; see Chapter 6.2). - assembly in reverse order 21 - Check the seal (21) and replace, if necessary. - Slightly tighten the screws (20) by hand with max. 5 nm (the cover plate may not be 17 deformed). 19 27

10.2 Instructions for fixing brushing band Risk of injuries! For all work carried out on the scraper conveyor: - Do not stand on or reach into the scraper conveyor while it is in operation! - Disconnect the main switch! - Secure scraper conveyor against accidental start-up! - Mount brush-off bar (fig. 4) with hexagon head screw (fig. 2) and disk (fig. 3). - Loosen hexagon head screw (fig. 2) by turning approx. 180 and fix it in this position. - Mount counter nut (fig. 1) and tighten it. Do not tighten brush-off bar at the holding angle. The brush-off bar must be movable in the slotted holes (fig. 5). - Please observe fitting position under all circumstances! - Wrong position leads to damage on scraper and equipment! 2 3 5 4 1 28

10.3 Setting instructions for scrapers Risk of injuries! For all work carried out on the scraper conveyor: - Do not stand on or reach into the scraper conveyor while it is in operation! - Disconnect main switch! - Secure scraper conveyor against accidental start-up! - Switch equipment on until the conveying strip is located approx. 20 mm before the scraper. - Switch equipment off and secure against accidental start-up. - Adjust scraper with the adjusting screw; loosen lock nut beforehand. - Set scraper at a distance of 10 mm from the edge of the strip! - Incorrect settings will cause damage to the scraper and to the equipment! - The equipment can be blocked! Correct Pull strip down ward Incorrect 29

10.4 Reverse flow filter Description of operation reverse flow filter - Via the jetting pump, the cooling water is taken in through the metal fabric and then cleaned. Because the metal fabric is clogged by the aspirated dirt, it is cleaned by means of interval reverse flow. Reverse flow periods: - RSF 65/100 After a jetting pump running time of approx. 3 minutes, rinse filter through for approx. 7 seconds. - The reverse flow is carried out via the rinsing rotor situated closely above the fabric. In this manner, the metal fabric is rinsed through by means of the nozzles fitted into the rotor. The rinsing pump has a higher volume flow than the jetting pump. Both pumps can be in operation during the rinsing procedure. The operation of the system is not interrupted, while the cleaning is nevertheless guaranteed. Check coolant tank for contamination every 500 working hours and clean, if necessary. Depending on the tooling method, the interval may be significantly shortened. connection reverse flow rinsing pump connection jetting pump air bleed screw metal fabric rinsing rotor coolant flow 30

Assembly and disassembly of the reverse flow filter Danger! Risk of injury! For all operations on the coolant cleaning system - Switch off main switch - Secure coolant cleaning system against unintentional start-up - Remove cover plates and suck off cooling lubricant - Disassemble tail pipe and ascending pipe from the reverse flow filter - Lift reverse flow filter out of the coolant tank and clean it or, if necessary, replace filter insert - Clean coolant tank Cleaning/replacing filter insert - Disconnect hexagon head screws and support feet from reverse flow filter. - Remove honeycomb cover without damaging the seal. - Clean or replace filter insert. - Assembly in reversed order - Adjust support feet to equal clearance (approx. 20 mm from the container bottom). - Refill evacuated coolant. - Start the system and check piping for tightness. connection reverse flow rinsing pump air bleed screw connection jetting pump support foot 20 honeycomb cover filter fabric hexagon head screw ball 31

22175/K-bed-gb-V1.6/05.01Wü Coolant cleaning systems KNOLL Maschinenbau GmbH Phone 07581/2008-0 Swarf conveying systems Schwarzachstr. 20, Postf. 1362 Telefax 07581/2008-40 Low lift and jetting pumps D-88342 Bad Saulgau e-mail info@knoll-mb.de web www.knoll-mb.de