Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Similar documents
Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

DCP Midstream Contractor Covered Task List Last updated 7/11/2018

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018

Williams Contractor Covered Task List Last updated 11/7/2017

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

TransCanada US Contractor Covered Task List Last updated 9/27/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017

Appendix A Kinder Morgan Operator Qualification Program List of Covered Tasks - Natural Gas - Part 192 Revised 12/13/2017

ASMECourseCatalog.

Florida City Gas Contractor Covered Task List

Operator Qualification (OQ) Report

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER

PIPELINE CORROSION CONTROL

PHMSA Office of Pipeline Safety Dave Mulligan Western Region

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION

New UST Installation Inspection Checklist

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc.

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair

This article discusses a tank

Monthly Checklist For Depot

Monitoring Cathodic Protection of Natural Gas Pipelines

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

HDPE FUSIBLE VALVES EXPECT INNOVATION

No Infrared Refrigerant Leak Detector

Broetje-Automation Company Standard Structural component specification for welded parts

The Gradient Control Mat (GCM)

GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007

Methodologies and practices for non-piggable lines Andreas Landsteiner Integrity Department - Transalpine Pipeline (TAL)

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

INSTALLATION INSTRUCTIONS

An Introduction to Constructing and Maintaining Cathodic Protection Systems

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE

SPCC Regulation Integrity and Leak Testing Methods

PIPELINE INSPECTION SURVEY QUESTIONNAIRE

Official Journal of the European Union L 298/39

Processing Plant Enters. the Pipeline World. A Case Study of a Chemically Welded Anomaly Repair. By Randy Vaughn. R&F Pipecon Resources

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool

CONTENTS. Foreword...iii. 1. Introduction...1

RELIABLE AND EFFICIENT SYSTEMS

Highway Crossings - Cased or Uncased

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

Client Success Story Sheri Baucom Senior Advisor II

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016

THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES

ANNUAL UST SYSTEM INSPECTION CHECKLIST

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018

Val-Matic Extended Bonnet Assembly Instructions

September 2012 / M&H C502 / Model 129

GF Piping Systems. SurTap System Operation with VersaTap Fittings Manual

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E.

Cathodic Protection for AST s. Why is Cathodic Protection Important?

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.:

HOT TAPPING & PLUGGING SOLUTIONS

Report of Inspection

PIPELINE. catalogue. Pipeline construc on and maintenance Products & Solu ons

LAR Training. Series 8000 Pneumatic Safety Shut Off Valves Mark Lampe May,

Baumann Sanitary Diaphragm Angle and Inline Control Valve

Algeria, November 2016

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com

Report No.: Name of Ship: Plans referred during Initial Survey:

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Report of the Pipeline Safety Department. Home Explosion January 2, Whispering Hollow Drive Oklahoma City, Oklahoma

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

LINE STOPPING. Extending and modifying your existing pressurized system while it s under full operating conditions.

First Quality Solutions

EXPECT RELIABILITY AVK RESILIENT SEATED GATE VALVES

PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE REPAIRS AND STEEL SLEEVES

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA

Daikin Steam Coils. Installation and Maintenance Manual IM 901. Types HI-F5, HI-F8, & E-F5. Group: Applied Air. Part Number: IM 901

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607)

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

7. Protection System Testing

SECTION FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS

VRX Plunger. Advanced Control Valve

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS

Inline Ultrasonic Flowmeter

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY

Cable-Tight Wire Management System

Prevention vs. Reaction The Importance of Asset Integrity

GAS DISTRIBUTION PRODUCTS METER RISERS

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES

Transcription:

007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing 195.412(b) 201 Abnormal Operating Conditions Related to Welding on Pipelines 192.225 192.227 192.715 192.717 192.713 192.245 202 Monitoring of Welding Process 192.241(a) 192.241(c) 192.231 192.235 192.245 203 Visual Inspection of Welds not Non-Destructively Tested 192.241(b) 192.241(c) 204 Non-Destructive Testing (Dye Penetrant) 192.243 205 Non-Destructive Testing (Mag Particle) 192.243 206 Non-Destructive Testing (Ultrasonic) 192.243 207 Non-Destructive Testing (X-Ray) 192.243 208 Plastic Pipe Joining: Butt Fusion 192.281 192.283 192.285 192.287 209 Plastic Pipe Joining: Mechanical Joining 192.281 192.283 192.285 192.287 210 Plastic Pipe Joining: Electrofusion Joining 192.281 192.283 192.285 192.287 195.222 195.214 195.230 195.224 195.226 195.204 195.224 195.228 195.234 Oral Oral 195.204 Oral No 1:0 1 No 1:0 1 No 1:0 1 211 Perform Plastic Fusion Inspection 192.287 Oral 213 Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections 214 Joining of Metal Pipe and Components by means other than Welding - Threaded Connections 192.271 192.271 195.126 Page 1 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 10

215 Joining of Metal Pipe and Components by means other than Welding- Flanged Connections 192.271 216 Joining of Metal Pipe - Compression Couplings 192.271 217 Small Diameter Metal Tubing and Fitting Installation 192.271 195.126 301 Install Tracer (electrically conductive) Wire 192.321(e) NA 302 Installation of Customer Meters and Service Regulators (Residential and Small Commercial) 192.353 192.355 192.357 401 of Buried Pipelines When Exposed 192.459 404 Protection of Coating When Backfilling and From Below Ground Supports 192.461(d) 192.614(c)(6) 192.461( c ) 192.319(b) NA 195.569 Oral 195.252 195.422 405 Protection of Coatings From Above Ground Structures 192.461(d) 406 Conduct Test to Determine Cathodic Protection Current Requirements 192.465(a) 192.620(d)(6) 407 Perform Cathodic Protection Survey 192.465(a) 192.465(e) 192.328(e) 192.620(d)(6) Oral 195.571 195.573(a) 408 Inspect Cathodic Protection Rectifier 192.465(b) 195.573( c ) 409 Inspect Interference Bonds 192.465(c) 195.573( c ) 410 Clear Shorted Casing 192.467(c) 195.401(b)(1) 195.575(a) 411 Inspect/Test to Assure Electrical Isolation is Adequate 192.467(d) 192.620(d)(6) 195.575 412 Install CP Leads on Pipeline Using Exothermic Weld 192.471 195.567 413 Anode Installation on Submerged Pipeline or Facilities 192.471 414 Inspect for Internal Corrosion Whenever Pipe is Removed 192.475(b)(1) 415 Monitoring for Internal Corrosion with Probes and Coupons 192.477 192.620(d)(5) 416 Monitoring for Internal Corrosion with Gas Samples 192.477 195.579(c) 195.579(b) Page 2 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 10

417 Atmospheric Corrosion Monitoring 192.481 195.581 418 General and Localized Corrosion Measurement (Remedial Measures) 192.485(a)(b) 419 Cathodic Protection Potential Measurement 192.465(a) 192.620(d)(8) 195.585(b) 195.587 195.573(a) 420 Soil Resistivity 421 Measurement of Depth of Pitting with Pit Gage 192.485 195.569 195.585 422 Assessment of Pipeline Segments Using Long Range Guided Wave UT 423 Perform Direct Current Voltage Gradient (DCVG) Survey 192.490 192.620(d)(7) 424 Perform AC Current Attenuation (ACCA) Survey 192.490 192.328(e) 192.620(d)(7) 425 Perform Alternating Current Voltage Gradient (ACVG) Survey 192.112(h)(3) 192.620(d)(7) 426 Inspect Pipe Coating with Holiday Detector 192.455(a) 192.457(a) 192.461 192.479 195.588 195.588 195.588 195.561 195.569 427 Inspection of Above or Below Ground Coatings Oral 428 Pin Brazing to Install CP Leads on Pipeline 192.471 195.567 429 Monitoring for corrosion - bacteria testing - serial dilution method (MIC) 435 Measure and Identify Mechanical Damage on Installed Pipe and Components 192.711 192.713 192.933 436 Perform Close Survey 192.328(e) 192.465(e) 192.620(d)(6) & (7) 195.422 195.573(a) 437 Perform Hot Spot Survey 192.465(e) 195.573(a) 480 Apply Approved Coating by Hand Application 192.461(a) 195.557 195.559 195.581 482 Apply Approved Coatings by Mechanical Spray and Hand Application Methods 192.461(a) 195.557 195.559 195.581 484 Apply Approved Coatings by Wrap Application 192.461(a) 195.557 195.559 195.581 Page 3 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 10

501 Conduct a Pressure Test 192.505 192.507 192.513 192.328(d) 502 Conduct Pressure Test on Pipe that is to be Operated at a Pressure <100 psig 601 Start-up/Shut-down of Pipeline to Assure Operation Within MAOP / MOP 192.509 192.511 192.513(b) 192.605(b)(5) 602 Monitoring Pipeline Pressure 192.605(b)(5) 192.619 603 Compressor Units: Startup, Operation, Shutdown and Purging Before Returning to Service 192.605(b)(7) 192.605(b)(6) 195.304 195.305 195.306 195.402 195.406 195.402( c )(9) 195.406 Oral 605 Locate Line/Install Temporary Marking of Buried Pipeline 192.614(c)(5) 195.442(c)(5) 606 Locate and Mark Submerged Pipelines 192.614(c)(5) 607 Damage Prevention: Observation of Excavating and Backfilling 192.614(c)(6) 192.319(b) 195.252 195.442(c)(6) 608 Damage Prevention for Blasting Near a Pipeline 192.614(c)(6) 195.442(c)(6) Oral 609 Inspect and Maintain Odorization Equipment 192.625(e) 610 Monitor Odorant Concentration 192.625(f) 611 Hot Tap (Steel Pipe) 192.627 612 Hot Tap (Plastic Pipe) 192.627 613 Purge Pipeline Facilities With Gas 192.629(a) 614 Purge Pipeline Facilities With Air or Inert Gas 192.629(b) 195.422 195.402(c)(10) Oral 616 Atmospheric Monitoring during Hot Work Operations 195.402( c )(11) 619 Damage Prevention during Vacuum Excavation and Backfilling Activities 661 Launching and/or Receiving Internal Devices (Pigs) 192.937(c) 192.476 192.620(d)(5)(iv ) 192.620(d)(9) 192.614(c)(6) 195.442(c)(6) Oral 195.426 Page 4 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 10

701 Patrolling Pipeline and Leakage Survey without Instrument 192.705 192.613 192.706 192.620(d)(4) 192.721 195.412(a) Oral 702 Leakage Survey with Leak Detection Device 192.706 703 Placing/Maintaining Line Markers 192.707 195.410(a) 195.410(c) 704 Permanent Field Repair by Grinding 192.713 195.226 195.230 705 Permanent Field Repair Using Composite Materials (Clockspring) 706 Permanent Field Repair Using Composite Materials (Armor Plate) 192.713 195.422(a) 195.585(a)(2) 192.713 195.422(a) 195.585(a)(2) 707 Permanent Field Repair Using Bolt-On Clamp/Sleeve 192.717 195.422(a) 195.585(a)(2) 708 Permanent Field Repair Using Full Encirclement Weld Sleeve 709 Inspection and Testing of Relief Devices (Compressor Stations, Meter Stations, Regulating Stations) 710 Inspect/Test Compressor Station Remote Shutdown Devices (ESD/EBD) 192.717 195.585(a)(2) 195.422(a) 192.731(a) 192.731(b) 192.739 192.743 Oral Certificate and Oral Certificate and Oral 195.428 192.731(c) 711 Inspect, Test, and Maintain Systems 192.731(c) 195.408(b)(1) 195.408(b)(1) 712 Programmable Logic lers 192.731(c) 195.408(b)(1) 195.428(a) 713 Test/Maintain Gas Detection and Alarm Systems 192.736(c) 714 Inspect and Maintain Pressure ing and Regulating Devices 715 Test and Maintain Pressure Switches and Transmitters in Pressure ing and Regulating Service 192.739 192.743(a) 192.619(b) 192.739 192.743(a) 192.619(b) 716 Inspect, Maintain, and Operate Valves 192.745 192.747 718 Monitoring for Internal Corrosion with Liquid Samples 192.477 192.620 195.428 195.428 195.420(a) 195.420(b) 195.579 725 Aerial Leakage Survey: Transmission 192.706 728 Aerial Leakage Survey: Transmission (UV/IR) 192.706 Yes 1:3 1 Page 5 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 10

762 Line Stopping Utilizing a Hot Tap Fitting Page 6 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 10