PRICE GUIDE: This will be a black engined model finished in the green and yellow paintwork.

Similar documents
DM-NAD 1975 Z1-B. Still we do like a challenge here at Z-power!

SMF / DSF / DTF SMF / DSF / DTF 200

Parts Diagrams RR/RS Models

'66 BSA Victor Restoration Project Dana Robbins

Motorcycle parts compatibility on ebay.co.uk

TABLE OF CONTENTS: GEAR CHANGE LEVERS 108 GEAR CHANGE RUBBERS 108 GEARBOX BEARINGS 108 GEARBOX SPROCKETS GENERATOR SPARES 47-50

X4 (GREEN) (A2000ATF2AUSG) Page 1 of 80 AIR INTAKE ASSEMBLY

SSR200 Zongshen 200cc Dirt Bike (VIN PREVIX LZSJ)

ATV I l. l u. r a. Parts Manual ARCTIC CAT. 250 cc/300 cc

MGB V8 Roadster restoration project - 145

This article, written by forum member Paulages in September 2008, is from the SOHC/4 Tips and Tricks Forum.

TRIUMPH KIT INFORMATION

MicrofichesExcel. Tavola Posizione Codice Quant Ing

View Catalogs Online at

Technical data. Part Thread (mm) Nm ±10% Tolerance Sidestand

enduro / motard ZH5SMX???H /07/2017

Figure 1. - Cylinder / Cylinder Head

View Catalogs Online at

Part list for Kawasaki H2, 1972

PREFACE INSTRUCTIONS FOR QUOTING THE CATALOGUE. 1. DIMENSIONS Dimensions of the parts in this catalogue are indicated in unit millimeters.

Current Price List Jan 2013

BSA Goldstar Parts - Price List Feb Exhaust Lifter Cable Exhaust Lifter Cable Holder S/S 9.00

ZH5CR0005H /03/2017

CHASSIS CONTENTS EXTERIOR PARTS 6-1 FRAME COVER 6-2 REAR FRAME COVER 6-4 FRONT WHEEL 6-6 FRONT BRAKE 6-10 HANDLEBARS 6-17 FRONT FORK 6-19

G85CS Parts list. Frank Kyul, Netherlands

Terex 820 Backhoe Loader Service And Repair Manual

Desription Model Catalogue Price Sale Price Current stock (Jan 2019) Air Box Rubber - Large All $ $ Air Box Rubber - Small All $ 38.

D-1: CRANKSHAFT & CRANKCASE

90 Utility Model Number A2013KUB2BUSZ SHARE OUR PASSION.

ETON America PARTS CATALOG

Unit: mm (in) ITEM STANDARD LIMIT IN. 33 (1.3) EX.

ML125T-26 Frame Parts

ATV 90 UTILITY GREEN (A2006KUB2BUSG) Page 1 of 60 AIR INTAKE ASSEMBLY

MAINTENANCE SXV / RXV

D-1: FAN COVER. DESCRIPTION 1 Asm., Shroud, Upper

ATV 90 UTILITY CALIFORNIA GREEN (A2008KUB2BCAG) Page 1 of 58 AIR INTAKE ASSEMBLY

DVX 90 MODEL NUMBER A2008KSB2BUSD (BLACK-RED) MODEL NUMBER A2008KSB2BUSE (BLACK-CAT GREEN) MORE TO GO ON. TM

Triumph Tiger 800. Torque settings. Torque (Nm) Camshaft cover to cylinder head 10 Camshaft drive chain tensioner to head 9

WARNING: the engine does not come with oil in it. Please fill the oil before starting. The 200cc hardknock requires 9/10 of a quart of oil.

B B B

ETON America PARTS CATALOG. Beamer PN-2

Converting a Series Land Rover to front wheel disc brakes using the kit made by Torrel Industries Ltd,

CYLINDER 11/14/2008. Item No.

ATV 50 DVX BLACK-RED (A2008KSA2BUSD) Page 1 of 60 AIR INTAKE ASSEMBLY

X150 National Extreme 150cc Atv (VIN PREFIX RKKG)

Shay - Painting The Trucks & Frames

BikeSelection ML100-A ML125-7 LF150-7 LF250GY-4 ML200-16D ML250-4 ML200ZH-3

Parts Lists - WD90 Fym Wilderness 90cc ATV (VIN PREFIX LE8S)

CHASSIS CONTENTS FRONT WHEEL 6-1 FRONT BRAKE 6-6 FRONT FORK 6-14 STEERING STEM 6-20 REAR WHEEL AND REAR BRAKE 6-25 SUSPENSION 6-31 REAR SWING ARM 6-36

3 - OIL SEALS & 'O' RINGS

PREFACE INSTRUCTIONS FOR QUOTING THE CATALOGUE. 1. DIMENSIONS Dimensions of the parts in this catalogue are indicated in unit millimeters.

400 4x4 Euro MODEL NUMBER A2008IDG4BEUR (RED) MODEL NUMBER A2008IDG4BEUG (GREEN) MODEL NUMBER A2008IDG4BEUZ (CAT GREEN) MORE TO GO ON.

Description. Copyright 2006 Suzuki Worldwide Motorcycle-ATV. All Rights Reserved.

Torque settings Torque settings. Frame torque settings. Note

Please note that any machine outside the specifications may be put into a consolation class. This class will not receive any school points nor prizes.

This is a hobby website dedicated to the Kawasaki KLR650 motorcycle. I make no claim concerning the

Mike and Barb s 1953 MG TD


MGB V8 Roadster restoration project Report 67

ETON America PARTS CATALOG

REVIVAL SPARE PARTS MANUALS Tomos d.o.o., motoindustrija

ETON America PARTS CATALOG. Matrix R4-150

HAMMERHEAD GT200. Page 1 of 9

Two sets pole position chickenhawk tire warmers, with stands for thermostats

Berkeley 328, 4 wheeler, Micro Sports Car

Hexhead Torque Values

CYLINDER. Ref. Part No. Number Description Qty Remarks

400 2x4/4x4 EFT SHARE OUR PASSION ṬM

2016 MODEL INFORMATION

TRX450ER MOTORCYCLES.HONDA.COM.AU

PARTS CATALOGUE. Rockford Motors inc.

No. Description No. Descreption

Description. Copyright 2005 Suzuki Worldwide Motorcycle-ATV. All Rights Reserved.

PYRTE. Building The Front Axle, Fork and Steering

ETON America PARTS CATALOG

FRONT RACK, BODY PANEL, AND HEADLIGHT ASSEMBLIES

20 C (68 F) Ω C (68 86 F)

11/14/ U. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PARTS AND PRICES ARE SUBJECT TO CHANGE 1 of 53

ETON America PARTS CATALOG

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks

NC30 Listing. Please contact us if you cannot find what you require. To order please telephone or write to :

QUADRO SPARE PARTS MANUAL Tomos d.o.o., motoindustrija

MKX 50 PRO MKX 50 BIGFOOT MKX 50 MONGOOSE

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks

Honda Super Cub Etc. Frame & Forks

ESS INSTALL. The donor car /6 Cosmos Black/Sand UUC Short Shifter Brembo cross drilled rotors Phillips Nav System 16:9

lbs sq. Camshaft bush ID 0.5 ± Clearance bush to camshaft ±

Part No. AJS & MATCHLESS WHEELS & BRAKES - NEW PARTS Price (20% VAT)

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks

JBrake.com Made in the U.S.A. Forums.SuperTrapp.com P:

CYLINDER. Ref. Part No. Number Description Qty Remarks

SF90 Pmi Shifter 90cc Go Kart (VIN PREFIX LBFM)

Illustrated Parts Manual

Part No. AJS & MATCHLESS WHEELS & BRAKES - NEW PARTS Price (20% VAT)

MAXI-BORE TM CARBURETTORS

Valve + Valve Guide Unit: mm (in) Item Standard Limit Valve diam. IN (1.20) EX (1.06) Valve clearance (when cold)

Part No. AJS & MATCHLESS WHEELS & BRAKES - NEW PARTS Price (incl 17.5% VAT)

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks

View Catalogs Online at

Transcription:

Z1-D 900 PROJECT NAME: Z1-D 1972 Z1-900 PRICE GUIDE: 9000 This will be another one of our "standard" special bikes. Based on an original Z1 but with all the updates seen on the Z1-C project, upgraded brakes, electrics, frame and suspension. This will be a black engined model finished in the green and yellow paintwork. From a distance it will look standard with it`s 4-4 exhaust and standard paintwork but we will be doing the small mods to make it handle and brake much better. *BILLET YOKES *UPGRADED FORKS *AP RACING 4 POT CALIPERS AND DISCS *HYDRAULIC CLUTCH RELEASE *HAGON SHOCKS *BRACED FRAME AND SWING ARM *BILLET ENGINE MOUNTS *UPGRADED ELECTRICS * MODERN TYRES *KEIHIN 29mm SMOOTHBORE CARBS

We dont have much to start with (alright just a frame and crankcase!!!), but we do like a challenge here at Zpower!!! The frame and other metal bits will be going off to VANDEN our powder coaters while the engine parts will be going off to our good friend Steve Smethurst for cleaning before we paint them black. Friday 16th March: Got the frame and the other Black bits back today from Vanden. There was a small discrepancy on the log book with the frame number which DVLA are sorting out so i was keen to look at the frame number to make sure it was correct. However the powder coating has covered it all up anyway!!!. Will have to wait for the log book to come back. Looks like i will have to use one of our Headstock decals with the Vin number on it like on the American import bikes. Such is life!!!!

Thursday 22nd March: I fitted a few bits to the frame today, the battery box, the tool box and the rear brake pedal using new fasterners and rubbers and the rear inner plastic fender. I also ran a tap through the various threads in readiness for some of the other parts that will be fitted later.

Thursday 29th March: We have started to try out a new company specialising in motorcycle powder coating. These are in Aintree near Liverpool, ELITE engineering (0151-524-2838). They have powder coated a set of crankcases for us for this early black engined Z1 for us. This should be more durable than the old process of spray painting them although the cost is considerably more!. They justify the cost with the blasting and masking that they have to do. They have done an excellent job in re-producing the original satin black finish. I intend to give them the head, barrel and cam cover as well now that i have seen thier work.

Wednesday 4th April: We are really busy here at Z-power so i have been struggling to get anything done on any of the bikes so i came in early today to assemble the bottom end of the motor. A new cam chain was fitted along with one of our gearbox bearing sets. A few new tab washers,o`rings and a set of re-zinced crankcase bolts and the job was done within an hour. I got a letter from the DVLA today to say that they wanted to inspect the bike regarding the reg number!

I think they may have to wait a while for that?

Sunday 22nd April: Did a bit of work on the bike this weekend. I fitted the billet yokes using a new set of taper roller head bearings. I then fitted the oil pump and then the sump plate using new gaskets and seals. Then i fitted the bottom end of the motor into the frame using the alloy billet engine mounts. Once this was in i fitted a few of the polished outer engine covers and the inner transmission cover.

Tuesday 24th April: Got the rear wheel hub back from Steve Smethurst today all niceley polished and cleaned so i added this to the powder coated front hub and sent it to Steve at B+C motorcycles (0161-205-3243) along with a new set of chrome DID rims and a new set of spokes to get rebuilt. I had already replaced the bearings and seals in the hubs with new ones, so as soon as they come back i can get a set of tyres fitted to them. I will be trying to fit the biggest size tyres i can but until i get the swing arm from JMC i dont really know how big? The arm is due from them in the next two weeks!. I also sent the cylinder barrels off to ELITE powder coatings to get them to do the same finish on them like they did on the crankcases. Once these come back i can get them bored to 998cc. The customer for this bike decided that we would take it out to 998cc using one of our Japanese High compression big bore kits. I also need to get the cylinder head over to Tony at Pitsop motorcycles (01942 684684) for him to check the threads, studs and valve guides for us. Once this is given the OK then i can also send this to Elite as well. I am away on My bike for 3 weeks in May so not much will get done on this project but everything should be ready to go for when i return? *************************************************************** Thusday 24th May: Well i am back!!! 3 weeks and 9500 miles riding my bike around the coast of America!! Feels good to be standing still for a change! In my absence the cylinder was powder coated at Elite and the wheels have been rebuilt at B+C motorcycles but the swingarm from JMC have not come in yet, 11 weeks now!!!!!

They have promised it for next week? I got Tony from MCM engineering to bore the cylinders to take the big bore kit while i waited! I need to ring Tony at Pitstop motorcycles to see if the cylinder head is ready.

I also Put the paintwork on the bike to see how it would look? Excellent of course! While i was at it i fitted the fork legs and headlamp bracket to the yokes. Then i fitted the headlamp shell and a chrome rear grabrail and the chrome Hagon shock absorbers. These are all fitted loose because no doubt i will need to remove them at some stage to fit some other major parts.

Monday 28th May: I spent the whole day today working on the bike. I fitted the new 6-fuse system wiring loom along with a new combined regulater/rectifier, a new starter solenoid and a set of heavy duty ignition coils, also fitted were the rest of the smaller electrical components (relays, horn, brake switches). All the electrics are going to be new, that way nothing should go wrong with them! I assembled a set of clocks using a new electronic Tacho and a re-con speedo expertley done by Chris Rivett. All the other clock parts were new from our vast stocks! I then fitted these to the top yoke.

Then i assembled a set of standard type high handlebars using new standard switchgear, new rubbers and the master cylinders from the relevant clutch and brake kits. Then i bolted these to the top yoke and fitted a set of new standard type mirrors.

I then started on the Fenders. A new standard front chrome one was used and a new short USA type chrome one on the back. Then i fitted the tail light assembly.

I fitted the brake hose guides to the front fender and the fork brace as well. Then i fitted the tank badges, the tank chrome filler cap and the side panel badges.

Then the rear footrest and then a new standard seat. I will need to fit a UK strap to this later on.

Wednesday 13th June: Well it seems ages since i looked at this bike!! We have been so busy here that most of my time has been spent doing my real job, selling kawasaki parts!!! JMC still have not done the swing arm, god knows what they are playing at? I could not wait any longer and got SMD in Leigh to fit a set of Metzlers to the wheels. I went for a 100/90 front and a 130/80 rear. These are oversize to the original but will be ok.

Sunday 17th June: I did a bit more work on the wheels today. I fitted a new bearing and seal to the sprocket carrier and then using 6 new bolts and nuts, fitted a 35 teeth rear sprocket. Then i fitted a new set of brake shoes to the rear brake panel and then fitted the camshaft and lever to it.

Wednesday 20th June: I fitted the two front Disc rotors today, then the front axel and speedo gearbox and fitted the front wheel into the forks. I have used a stainless steel front axel and spacer. The speedo gearbox is the original, powder coated satin black. (still no sign of the JMC swing arm by the way!!!)

Thursday 21st June: I fitted the centre stand today along with new bolts and springs. Then i fitted the 4 pot AP lockheed calipers to the fork legs. I rode that last project we did with these calipers on and the braking was superb, it was hard to adjust after so many years of no brakes!!!!! I also fitted a pair of our alloy fork covers instead of the reflectors.

Friday 22nd June: I did a bit more on the electrics today, fitted a new Sealed GEL battery and put the main earth and live wires onto the loom. Because the starter motor will be seen through the outer clutch release cover i decided to paint the motor silver.

Tuesday 26th June: It`s a miracle!!!!! The JMC swing arm has arrived!!!!! I can get it powder coated now.

Wednesday 18th July. Got the swing arm back from ELITE today. I quickly fitted the bearings and sleeves and fastened it to the frame. Looks really well in Satin black.

I also got the cylinder head back from the head shop, having fitted new guides for me and repairing a few "loose" threads, so i dropped that off at Elite to get powder coated as well. I then fitted the wheel adjusters which i kept a polished alloy finish and then the chrome torque arm and a alloy chain gaurd.

Tuesday 8th August. Been a bit slowed down with normal work recently so not really done much on the bike. However i did get around the finishing the rear wheel off and fitting the number plate. I also finished off the electrics and fitted the seat lock. A new 35tooth rear sprocket was fitted to the sprocket carrier and a new set of cush drive rubbers.

Then i fitted the wheel to the swing arm. I can`t adjust it or tighten it up yet until i fit the rear drive chain.

I also, after it seems ages, got around to fitting the cylinders to the crankcases. The special tool we have for holding the pistons will not work on the big bore kit because of the size of the piston skirts so i had to do it by hand, the old fashioned way!!

Tuesday 21st August: I put a new set of steel/friction plates into the clutch today and a new set of heavy duty springs. The old ones looked ok and were well within spec but i replaced them anyway!

I also got the cylinder head back from Elite powder coaters so i started to polish up the fins at each end. Then i got a new set of valves and seals out of stock and fitted these to the new guides that Engine-tecknics had fitted weeks ago! I then got a new set of cam chain tensioners/guides/rollers and rubbers out of stock to fit to the top of the cylinders.

Wednesday 22nd August: I fitted the cylinder head onto the cylinders today using a new Wiseco head gasket, new washers and chrome cylinder head nuts. This early Z1 motor uses the one piece head gasket and because of the bigbore kit it had to be a wiseco part. Then i fitted 4 new inlet rubbers to the back of the head.

Sunday 26th August: Well i decided to work this bank holiday weekend, having a "blitz" on this project. I fitted the new alternator to the new engine cover then fitted this to the engine. It was then that i noticed one of the 6mm threads in the crankcase was missing!!! I reckon to have checked all these threads before i sent the cases away for painting!, guess i missed one eh? Anyway my good old mate Tony from Pitstop motorcycles (01942 684684) came right round with his box of tricks and put an insert into the cases. Job done!!

Then i fitted the new DID 630 chain and set the chain tension. Once this was done i fitted the Rear brake rod and tightened up the rear torque arm. Then i noticed that the extra width of the JMC swingarm fouled the rod!! So a little gentle persusuian of the rod was required!

Then i fitted the blanking plug to the tacho drive because the electronic tacho does not require a drive. Then i fitted the four new Exhaust using a new fitting kit of course. The curse of the JMC swing arm struck me down again. The rear mounting bolts of the exhaust are very, very close to the arm. I may need to do some fine adjustments??

Then i fitted a new set of 29mm Keihin smoothbore carbs. I have had some adapters made for the rear of these carbs so that a standard airbox can be used, not cheap but it makes the whole set up look more like standard.

Then i fitted the refurbished kickstart. The kickstart is one of the very few parts we cant buy anymore new, so i have to get them re-chromed. They always look too good though!!

I have decided to fit the original chain case cover and normal clutch release instead of the hydralic one. This is a bit of a problem because i dont have one!! However i am bidding on a few on Ebay at present, but they seem to go for silly money!! This will also mean fitting the original clutch lever assy and clutch cable. Next job is to fit the camshafts, check the shim clearances and put the cam cover on.then i can fit the plugs, fit the dyna-s ignition, fit the tank and seat, bleed the front brakes and then get it off the bench! Then i can think about starting it up!! Saturday 1st September: I decided to "borrow" a sprocket cover from another project so that i could finish off the engine covers. After fitting the clutch release and a new cable i fitted the polished cover and then a new gear change lever. Then i fitted a new clutch lever assembly. Once the sprocket cover and alternator cover was fitted i put on the chrome starter motor cover.

Then i fitted the camshafts using a new set of 16 cam shell bearings, then i re-shimmed the head and put on the cam cover using 4 new billet cam end seals and a new gasket. Then i fitted 4 new NGK B7EV plugs and 4 new plug caps. Then i fitted the Dyna-S electronic ignition. I adjusted the cam chain tension and turned the motor over on the starter. All sounded ok, no bangs or loud clonks!!!!

After that i fitted a hi-flow fuel tap to the Tank and then a new seat and strap. The bike is basically finished now! Just need to fill it with oil and petrol and get it running!!