V150 VERIS Verabar Installation and Maintenance Manual

Similar documents
V500 and V510 VERIS Verabar Installation and Maintenance Manual

V200D VERIS Verabar (Double Rod) Installation and Maintenance Manual

V400D VERIS Verabar (Double Rod) Installation and Maintenance Manual

PT-516 Pumping Trap Installation and Maintenance

CV Control Valves Installation and Operation Manual

Regular Models. V150 Spring Lock Threaded Components

Digital-Flo TM Boiler Water/Water Plate & Frame Heat Exchanger

V550 Spring Lock Flanged Connection with Packing Gland

Armstrong Steam Filters (ASF)

7.3L POWERSTROKE BANJO BOLT KIT Fits L Powerstroke Diesel. Installation Guide

GRINNELL Model B302 and Model BN302 Grooved End Butterfly Valves with Gear Operators or Lever-Lock Operators General Description

Nor East. Instructions Safety Messages. Inspection. Parts. DeZURIK Service. Type 05 Pneumatic Actuator Used With Globe Valves

ActuLink ABS Module - ABS-MOD-400

HR-20P Pneumatically Controlled Pressure Regulator

SUNTURA SOLAR TRACKER

Model Specifications V400S V400D Sensor Code Sensor Diameter 7/16 (11mm) 7/8 (22mm) 1-3/8 (35mm) 7/8 (22mm) 1-3/8 (35mm) Accuracy

Dual/Triple Manifold Water Filtration Systems Instruction Manual

INSTALLATION INSTRUCTIONS

APCO CRF-100A RUBBER FLAPPER SWING CHECK VALVES

EZ-IN Series Turbine Flowmeter

TBM Series 3-Way Ball Valve

Scale Feeder Manifold Water Filtration System Instruction Manual

StormPro BA Series Sump Pump

300 Series INSTRUCTION MANUAL. Compressed Air Filters Models 302 (grade) through 317 (grade)

Orifice Flange Union Assembly and Orifice Run Installation and Operation Manual

SUNTURA HD SOLAR TRACKER

Rosemount 485 Annubar Pak-Lok Assembly

V200S. ±1% of flow rate; up to +/-0.5% if calibrated ANSI Class* 600# 150# 150# 600# 600# Drive Rods Single Double (150mm-1050mm)

EWS FLUID END PARTS LIST

TITAN 13 x 2½ BRAKES DUO-SERVO AND FREE BACKING

STAINLESS STEEL FORGED FITTINGS 3000lb 304/304L & 316/316L Forged Stainless Steel Fittings Product Specifications

INTRODUCTION INSTALLATION

Manufacturing Facility is ISO9001:2000. Welded Steel Pipe Conform to ASTM A53. Threads Conform to ASME B1.20.1

DODGE CUMMINS MK-2 Micro-Kleen System

Dual Port Manifold Water Filtration Systems Instruction Manual

INSTALLATION INSTRUCTION & OWNER S MANUAL

Harley Davidson FL Touring Current Xtreme

INSTALLATION, INSTRUCTION AND SERVICE MANUAL

INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATION MANUAL

MEX (55) QRO (442) Web Controls

RollSeal 1733 County Road 68 Bremen, Alabama Part No Rev Owner s Manual RS-Divider Curtain

Dual Flow Manifold Systems Instruction Manual

PREMIER, MARINE, & STANDARD

Rosemount 285 Annubar Pak-Lok Assembly

HPx-JDx3-xx HARNESS INSTALLATION

AutoSparge. Lauter Tun Level Control. Operation, Assembly & Maintenance Manual

DeZURIK AFR3 Filter Regulator Used on Pneumatic Cylinder Actuators

CRD610 Automatic Fitting Inserter

Operator's Manual. Models (¾") (1") (1½ ) (2 ) (3") (4") (6") (8")

Installation Service Repair Kits Maintenance RP/IS-774/774DCDA/774X/774XDCDA

A Member of the. Integrated Metering Technologies

FREQUENTLY ASKED QUESTION SERIES. BANJO BOLTS WHY THE BAD RAP? 6.0L Powerstroke Diesel. Last Updated: 7/2/2018 Page 1 of 3 S Diesel, LLC

INSTRUCTIONS SMOKE BLOWER WITH HONDA ENGINE PART NUMBER

MetroPrime 22MPC Self-Priming Centrifugal Pump

INSTALLATION INSTRUCTIONS

Installation, Operation, and Maintenance Manual

ESE Series Cast Iron Sewage Pumps

Watts Series CSM-91. Grooved/Flanged Flow Measurement/Balancing Valves. Installation and Operating Instructions. Table of Contents. 1.

Operating Instructions

HATCHGRIP Installation Instructions/Operation and Maintenance Manual

Price List. Catalog Eleven. Rigging. Effective February 16, Specialties Inc. manufacturer of stage equipment

Tiller Lock Assembly

DUAL WIDEBAND AIR/FUEL RATIO GAUGE Product Numbers: GS-W702W_Dual, GS-C702W_Dual, GS-T702W_Dual

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

DeZURIK KUL KNIFE GATE VALVES

Mustang Billet Aluminum Pedal Cover Kit P/N R (Manual) and R (Automatic) Installation Instructions

DeZURIK 24 and Larger BHP High Performance Butterfly Valves WITH (FB) FYRE-BLOCK SEAT

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

Firstmate Installation Manual and User's Guide May, 2003

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Read and follow all instructions. Safety can only be ensured if the walker is assembled and operated according to these instructions.

Installation Instructions

Installation Instructions

Installation Instructions

DeZURIK 2 20" BOS BUTTERFLY VALVES

CORN HEADER MANUAL: CNH PRE-2012

User Guide IM/TORBAR-EN Rev. D. Averaging pitot tubes

AGCO. Corn Header Manual d HEADSIGHT.COM

DeZURIK 2-24 (50-600mm) KGN-RSB BI-DIRECTIONAL CAST STAINLESS STEEL KNIFE GATE VALVES

Grinnell Grooved Fire Protection Products Grooved Fittings

LEXION SINGLE FUNCTION HYDRAULIC VALVE KIT

Fifth Wheel Power Hitch Operations Manual

Slimline Duals Installation Instructions Harley-Davidson Touring Models 2009-Current

Installation Instructions

Users Guide for Ac-sync

Watts Series CSM-61. Flow Measurement/Balancing Valves Sizes: 1 1 4", 1 1 2", 2", 2 1 2", and 3" (32, 40, 50, 65 and 80mm) Installation Instructions

AVK SERIES 41 SWING CHECK VALVE FIELD MAINTENANCE AND INSTRUCTION MANUAL FOR SWING CHECK VALVES 3" - 12"

PVI 1800/PVI Residential/Commercial Grid-Tied Photovoltaic Inverter WARRANTY MANUAL. Subject to Change REV , Solectria Renewables

Liquid Turbine Flowmeter

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

CRD600 Automatic Fitting Inserter

APCO ASR-400/450 SEWAGE AIR RELEASE VALVES

Intended Use: Explanation of Signal Word Consequences

Installation Instructions

Flange Spreader Parts and Operating Manual

SERIES L1B & L1D LADDERS

Reference Manual FM-200 Series

OPERATION MANUAL Variable Speed Pump Controller Dated: 06/04/2013 Pump Down Application. Document No.: LMSII_V100_OM Page 1 of 8 Model-V100 LMS II

READ THIS MANUAL CAREFULLY BEFORE USING THE PUMP

Transcription:

V150 VERIS Verabar Installation and Maintenance Manual 164-EN Please read and save these instructions

Contents General Safety Information...3 Product Information...3 Section 1: Scope...3 Purpose of this Manual... 3 Section 2: Receiving and Inspecting Receiving and Inspecting the Verabar... 3 Section 3: Safety Precautions...3 Safety Messages and Application Requirements... 3 Section 4: Installation Preparations... 3-5 Location... 3 Orientation... 4 Horizontal Piping... 4 Vertical Piping... 5 DP Transmitter/Local Indicator Location... 5 Installation Drawings and Bill of Materials... 5 Section 5: Installation Procedure... 6-9 Preparing the Pipe... 6 Fitting Welding...6-7 Packing Body... 7 Sensor Insertion...7-8 Insert Instrument Vales or Manifold... 9 Valves... 9 Manifold... 9 Pipe Pressurization... 9 Section 6: Proper Installation... 10 Section 7: Periodic Maintenance... 10 Limited Warranty and Remedy... 11 2 Designs, materials, weights and performance ratings are approximate and subject to change without notice.

General Safety Information Instructions and procedures listed in this manual may require special precautions to ensure the safety of the individuals performing the operations. Review the entire manual, taking note of safety messages prior to performing any operations listed in the manual. Product Information The VERIS Verabar averaging pitot flow sensor provides unsurpassed accuracy and reliability. With its solid, one-piece construction and bullet shape the VERIS Verabar makes flow measurement reliable and precise. The unique sensor shape reduces drag and flow induced vibration. The location of the low-pressure ports eliminates the potential for clogging and improves signal stability. The V150 model features mounting with threaded tube fitting components and a spring-lock feature that locks and pre-loads the sensor to the opposite pipe wall regardless of changes in pipe ID due to pressure, temperature, or mechanical force. Section 1 Scope These instructions provide a description of procedures for installing the V150 Verabar model flow sensor. Procedures are given for all industrial flow measurement applications including liquid, steam and gas, for both horizontal and vertical piping configurations. Section 2 Receiving Inspection The following tasks should be performed as part of the receiving inspection procedure: Check items received against the packing list. Check sensor nameplate for proper model number, serial number and tag number. Verify the actual pipe diameter matches the ID stated on the sensor nameplate. Check the bullet shaped sensor tube for any signs of damage. Damage to the sensor tube may result in erroneous flow readings. Check the round cover tube for any damage, especially axial gouges or scratches. Damage to the cover tube may prevent the packing from sealing properly. Section 3 Safety Precautions The following process should be conducted prior to installing the Verabar flow sensor: Check the maximum operating conditions on the flow sensor nameplate. Verify that the maximum operating conditions of the application do not exceed the parameters stated on the nameplate. If any pressure, temperature, or flow limits will be exceeded, contact the factory before proceeding. Check to ensure the pipe is depressurized and drained prior to installation. Be cautious of pipe temperature prior to prepping the pipe for installation. The Spring-Lock Model V150 is designed for carbon and stainless steel pipes with a schedule 10 or heavier wall thickness. The V150 should not be used with PVC, copper, aluminum, cast iron or thin-walled pipes or ducts. If there is any question as to the proper application for a model V150, consult the factory. Section 4 Installation Preparations 4.1 Location For the most accurate flow measurement, a minimum straight run of pipe is required. Table 1 shows the minimum straight run requirements. If longer straight runs are available, position the Verabar such that the ratio of upstream straight run to downstream straight run is approximately 4 to 1. If straight run lengths are less than the values stated in Table 1, consult the factory for additional accuracy and location information. Straightening vanes should be positioned such that the end closest to the Verabar is half way between the Verabar and the closest upstream configuration. For elbow installations, mount the Verabar in the same plane as the closest upstream elbow. Designs, materials, weights and performance ratings are approximate and subject to change without notice. 3

Table 1. Straight Run Requirements 4.2 Orientation Verify the proper sensor orientation by checking for an -H (horizontal piping) or a -V (vertical piping) in the model number on the Verabar nameplate. Deviation from the following mounting location instructions may cause inaccuracy in the flow measurement. 4.2.1 Horizontal Piping For air or gas installations, mount the Verabar in the upper 160 of the pipe to allow any condensate to drain into the pipe (Figure 1). For liquid or steam installations, mount the Verabar in the lower 160 of the pipe. This allows any entrained air to bleed back into the pipe for liquid applications and allows condensate to collect in the instrument piping for steam applications. 4 Designs, materials, weights and performance ratings are approximate and subject to change without notice.

160 AIR AND GAS LIQUID AND STEAM 160 Figure 1. Verabar Orientation in Horizontal Pipe 4.2.2 Vertical Piping The Verabar may be mounted in any location around the circumference of the pipe for vertical piping applications. 4.3 DP Transmitter/Local Indicator Location When choosing a Verabar location, consider the DP transmitter/local indicator location: The transmitter must be mounted below the Verabar for liquid and steam applications. The transmitter must be mounted above the Verabar for air and gas applications. 4.4 Installation Drawings and Bill of Materials Additional information is available in the Installation Drawings and Bill of Materials VB-7061 (Contact factory for access information). It contains standard and alternate transmitter locations and a complete bill of materials based on the fluid type and sensor orientation on the pipe. Designs, materials, weights and performance ratings are approximate and subject to change without notice. 5

Section 5 Installation Procedure 5.1 Preparing the Pipe Completely depressurize and drain pipe prior to installation of the Verabar. Mark the location of the hole through which the Verabar will be mounted. Use a center punch to mark the hole to prevent the drill bit from walking on the pipe. Drill the pipe with the proper sized hole per the following table (Important: Do not torch cut hole!): Sensor Size Hole Diameter V150-05 ½ (13mm) V150-10 1 (25mm) V150-15 1-1/2 (38mm) IMPORTANT: Deburr the hole on the inside of the pipe. 5.2 Fitting Welding With the follower and packing rings already in place (factory assembled), loosely insert the sensor into the Spring- Lock body (see Figure 2). Thread the Spring-Lock body into the thread-o-let (hand tight), then insert the complete assembly into the pipe. This will assure proper alignment of the thread-o-let to the hole already drilled in the pipe. Instrument Head Jam Nuts (3) Load Plate Load Spring Indicator Ring Load Nuts (3) Lock Washers (3) Packing Bolts (3) Follower Studs (3) Cover Tube Packing Rings (4) Spring-Lock Body Sensor Thread-o-let Figure 2. Verabar Model V150 Assembly 6 Designs, materials, weights and performance ratings are approximate and subject to change without notice.

Using the appropriate weld gap (1/16 [1.5mm] typical), tack weld the thread-o-let into position, then remove the sensor and Spring-Lock body. Protect threads on the thread-o-let and finish welding the thread-o-let to the pipe per applicable codes (see Figure 3). Gap (1/16 [1.55mm] Typical) Tack weld Protect threads Complete weld Figure 3. Weld Gap 5.3 Packing Body Using appropriate pipe thread sealant, thread the Spring-Lock body into the thread-o-let. 5.4 Sensor Insertion With the follower and packing rings already in place (factory assembled), insert the sensor into the Spring-Lock body until the tip of the sensor hits the opposite side of the pipe. Note the three studs must pass through the indicator ring and the load plate. Align the head of the sensor so that the arrow labeled flow on the head is in the direction of the flow in the pipe to within 3 (Figure 4). Maintain the head in this position for the remainder of the installation. Vertical Pipe Orientations Direction of Flow Direction of Flow Direction of Flow Direction of Flow Horizontal Pipe Orientations Figure 4. Orientation of Flow Arrow Place the three lock washers and the three load nuts on the studs and tighten. Tighten the load nuts until the load plate is 0.050 (1.3mm) from the indicator ring for 05 and 10 sensors. For 15 sensors, the load plate should be 0.063 (1.6mm) from the indicator ring (Figure 6). For 05 sensors, this can be done by tightening all the load nuts until the load plate just touches the indicator ring and then backing off all the load nuts one complete turn. For 10 and 15 sensors, this can be done by tightening all the load nuts until the load plate just touches the indicator ring and then backing off all the load nuts 3/4 of a turn. The load springs are now properly set. Designs, materials, weights and performance ratings are approximate and subject to change without notice. 7

Thread on the three jam nuts and tighten until they are resting hand-tight against the lock nuts. Place a backup wrench on the load nut to prevent it from rotating. While not allowing the load nut to rotate, tighten the jam nuts 1/8 turn beyond hand tight. Using a torque wrench, tighten the three packing bolts to the appropriate torque value listed in the table below. Sensor Size Packing Bolt Torque 05 4.2 ft-lbs (5.7 Nm) 10 8.3 ft-lbs (11.3 Nm) 15 14.1 ft-lbs (19.1 Nm) Note: The weld on the weld ring (Figure 6) should not contact the top surface of the follower. If the weld on the weld ring comes into contact with the follower, the sensor will not be properly bottomed in the pipe. If this occurs, consult the factory before proceeding. Jam Nut Load Nut Lock Washer Location of Pressure Stomp Stud Load Plate Load Springs Packing Bolt Indicator Ring Follower Packing Ring Spring-Lock Body Figure 5. Spring-Lock Cut Away 8 Designs, materials, weights and performance ratings are approximate and subject to change without notice.

Load Plate Gap Indicator Ring Weld Ring Sensor Size Gap 05.050 [1.3mm} 10.050 [1.3mm} 15.063 [1.6mm} Top Surface of Follower Follower Figure 6. Proper Spring Compression 5.5 Insert Instrument Vales or Manifold 5.5.1 Valves If the Verabar does not have a valve head, install instrument valves using proper thread sealant. Be sure instrument shut-off valves are installed and shut prior to re-pressurizing the pipe. 5.5.2 Manifold If the Verabar has a direct or integral manifold, be sure the high and low pressure block valves are shut off prior to re-pressurizing the pipe. 5.6 Pipe Pressurization Pressurize the pipe and check for leaks. If leaks are present, retighten the packing bolts until leaking is eliminated. Verify that the distance between the load plate and the indicator ring is approximately 0.050 (1.3mm) for -05, and -10 sensors and 0.063 (1.6mm) for -15 sensors; make adjustments as required. Designs, materials, weights and performance ratings are approximate and subject to change without notice. 9

Section 6 Proper Installation 6.1 The Verabar is now properly installed (Figure 7). Section 7 Periodic Maintenance Figure 7. Installed V150 The assembly should be periodically checked. Verify that no leaks are present. Tighten the packing bolts if necessary. Inspect sensor for wear or damage. Note: Different threads require different maintenance requirements. 10 Designs, materials, weights and performance ratings are approximate and subject to change without notice.

VERIS, Inc. Limited Warranty and Remedy VERIS, Inc. ( VERIS ) warrants to the original user of those products supplied by it and used in the service and in the manner for which they are intended shall be free from defects in material and workmanship for a period of five (5) years from the date of installation, but not longer than 63 months from the date of shipment from the VERIS factory, unless a Special Warranty Period applies, as noted below. This warranty does not extend to any product that has been subject to misuse, neglect or alteration after shipment from the VERIS factory. Except as may be expressly provided in a written agreement between VERIS and the user, which is signed by both parties, VERIS DOES NOT MAKE ANY OTHER REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF MERCHANTABILITY OR ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. The sole and exclusive remedy with respect to the above limited warranty or with respect to any other claim relating to the products or to defects or any condition or use of the products supplied by VERIS, however caused, and whether such claim is based upon warranty, contract, negligence, strict liability, or any other basis or theory, is limited to VERIS repair or replacement of the part or product, or, at VERIS option, to repayment of the purchase price. In addition to replacing any part of parts found to VERIS satisfaction to be defective, VERIS will pay the cost of shipment of both the defective part to the VERIS plant and the replacement part to the original user. As a condition of enforcing any rights or remedies relating to VERIS products, notice of any warranty or other claim relating to the products must be given in writing to VERIS: (i) within 30 days of last day of the applicable warranty period, or (ii) within 30 days of the date of the manifestation of the condition or occurrence giving rise to the claim, whichever is earlier. IN NO EVENT SHALL VERIS BE LIABLE FOR SPECIAL, DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING, BUT NOT LIMITED TO, LOSS OF USE OR PROFITS OR INTERRUPTION OF BUSINESS. The Limited Warranty and Remedy terms herein apply notwithstanding any contrary terms in any purchase order or form submitted or issued by any user, purchaser, or third party and all such contrary terms shall be deemed rejected by VERIS. Special Warranty Periods are as follows: Electronic components, including without limitation, differential pressure transmitters, multivariable transmitters, flow computers, rate or totalizer displays: one (1) year from the date of installation, but not longer than 15 months from the date of shipment from the VERIS factory. Designs, materials, weights and performance ratings are approximate and subject to change without notice. 11

V150 VERIS Verabar Installation and Maintenance Manual Designs, materials, weights and performance ratings are approximate and subject to change without notice. Armstrong VERIS Flow Measurement Group 6315 Monarch Park Pl, Niwot, CO 80503 - USA Phone: 303-652-8550 Fax: 303-652-8552 armstronginternational.com 164-EN Printed in U.S.A. - 1/29/16 2016 Armstrong International, Inc.