Vacuum pumps for the ESRF EBS project Michael Hahn

Similar documents
INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

SNS Operation and Upgrade Plans

Agilent Turbo-V 750 and Turbo-V 850 TwisTorr. The new molecular-drag Technology

Advanced Alignment Photon Strategy Source Upgrade Project:

PUSH PULL DEVICES. Section 03. Introduction to Push Pull Devices 044. Magnetically-coupled devices. MPPRL - Rotary and Linear Motion 046

Carlo J. Bocchetta ESLS XIX Aarhus, Denmark November Status of Solaris

All-metal gate valve Series 48

Experiences from First Top-Off Injection At The Stanford Synchrotron Radiation Lightsource

Major Upgrade Activity of the PLS in PAL: PLS-II

TURBOVAC ix Turbomolecular Pumps 90 l/s l/s

Collaboration between CELLS in Barcelona and BINP in Novosibirsk in the construction of ALBA Synchrotron

The Status of SSRF Survey and Alignment System. ChenghaoYu, Hanwen Du Lixin Yin

TURBOMOLECULAR PUMPS ATP SERIES

introduction FE Series Automated Butterfly Valves Product Data Sheet < STANDARDS >

Photon Shutters. Figure 1. Assembled and exploded view of the photon shutter assembly with main components highlighted.

Electron Beam Alignment Strategy in the LCLS Undulators


ILC. CFS update for Europe (CERN): Cross Sections 3d Layout and BDS tunnel diameters CERN Resources. LCWS10 and ILC10 - Beijing

IFPAC 2003 Dr. Berthold Andres

Varian, Inc. Vacuum Technologies. Rotary Vane Pumps. Features and Benefits 2-3. Typical Applications 4-5. Pump Models 6-19.

AGILENT ROTARY VANE PUMPS

AGILENT ROTARY VANE PUMPS

Products. Engineering Design Services. Contract Manufacturing

TE 91 PRECISION ROTARY VACUUM TRIBOMETER

TURBOVAC i Turbomolecular Pumps 90 l/s l/s

Varian, Inc. Vacuum Technologies. TPS Turbo Pumping Systems. Features and Benefits 2-3. Mini-TASK AG TPS-compact 6-7

THE 12 GeV ENERGY UPGRADE AT JEFFERSON LABORATORY

AGILENT VACUUM VALVEs

Industries Served Thin film / Etching / Semiconductor / Laboratory Research Synchrotron Radiation / Photonic / Solar

Future opportunities for Industry

TDIS pressure profile simulations after LS2

Central Region Group Status and Positron Region

Progress of the JT-60SA Project

All-metal angle valve Series 57

Five Years of Accelerator Operation Experience at HIT Andreas Peters Heidelberg Ion Beam Therapy Centre (HIT), Head Accelerator Operations

HarmonHy (SES ) Harmonization of Standards and Regulations for a Sustainable Hydrogen and Fuel Cell Technology

The Miniball Vacuum Interlock

GateKeeper Aluminum Gate Valves

HYSYS System Components for Hybridized Fuel Cell Vehicles

Status of the ESRF RF System Repeated Ceramic Leaks on the Existing Cavities. 12 th ESLS RF meeting Diamond, 1 st -2 nd October, 2008

Jih-Perng Hu, Conrad L. Foerster, John R. Skaritka, David Waterman *

Sputter System. SPS-R2R series. ULTECH Co., Ltd.

The freedom to choose. Agilent Turbo Pumping Systems. Vacuum pumping systems that really fit your needs.

Low Beta Cryomodule Development at Fermilab. Tom Nicol March 2, 2011

A- Compact. High Pressure Metering Machines for Polyurethanes. Automotive Interiors & Exteriors. Refrigerator Insulation.

Status of the Nuclotron-M project

Gemini MxG50x BENEFITS. Long lifetime in harsh environments

PRICE BID - PART: I I

introduction VKD Series Automated Ball Valves Product Data Sheet < STANDARDS >

KAON Factory Alignment

Linac Girder R&D. C. Boffo E. Borissov H. Carter. Fermilab, Technical Division RF Technology and Development Group

THE NEW EXPERIENCE IN TURBOPUMPS

Groove Mitigation and Plans

Task Cryomodule. Paolo Pierini INFN Sezione di Milano - LASA

11.2 SPECIAL SERIES FLANGES 316LN STAINLESS STEEL -> Page 11.5

Costing of Test Articles Ancillary Equipment and Costing Methodology

PETRA III Damping Sections

Accumulator. High-pressure diaphragm accumulator conforming to regulations. ELM Range

VACUUM FOR PARTICLE ACCELERATORS LUND, SWEDEN, JUNE 8 9, 2017 MECHANICAL VACUUM PUMPS

Electropneumatic pressure regulator EPP4 Series. Connection G ½. Catalogue 8684/UK G ½"

ACTIVELINE GAUGES. The new ActiveLine PKR and IKR gauges. Compact, durable and maintenance-friendly, minimized stray magnetic field.

AGILENT VACUUM VALVES

Measuring equipment for the development of efficient drive trains using sensor telemetry in the 200 C range

Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier

ALCOHOL LOX STEAM GENERATOR TEST EXPERIENCE

INFN LNF DAΦNE. DAΦNE Storage Ring. Laminated Yoke Quadrupole Low carbon steel Magnetil B-C

Inductive Power Supply (IPS ) for the Transrapid

Activities of Hitachi Regarding Construction of the J-PARC Accelerator

EU Procurement of In Vessel Components for ITER

Direct-acting 3/2 way plunger valve

LINEAR MOTION AND ALIGNMENT

From MYRRHA to XT-ADS: lessons learned and towards implementation

AccuSputter AW 4450-Series Sputtering Deposition Systems

Automotive Particle Emissions: an update of regulatory Euro 6/VI and UNECE developments

HEX KORVUS TECHNOLOGY VERSATILE COATING SYSTEM FOR THIN FILM DEVELOPMENT SPUTTERING ORGANICS DEPOSITION

UHV gate valve Series 10

Turbomolecular Pump Systems TURBOLAB 80, 350, 450

Engineering Data Manual. New : available with EC motor. High Static Pressure Ductable Fan Coil Unit. Models 07 to to 4650 m 3 /h

FK Series Automated Butterfly Valves Product Data Sheet

Dual Stage Rotary Vane Pumps

COMPACT DRY PUMPING SYSTEMS DRYTEL SERIES

NEW TECHNOLOGIES IN COLD CHAMBER DIE CASTING PROCESS ACCORDING TO INDUSTRY 4.0

MMATERIALS. Vacuum M 01. Magnetrons... M 02. MATERIALS / Inorganics & thin films guide

STP-iX455 Turbomolecular vacuum pump

Development test stands for E-motors

Delomatic 400 (DM 400) based Gas Engine and Combined Heat and Power (CHP) Control and Management System

UPGRADE PROGRAM. V141 Series Pumps vs Turbo-301 Series Pumps. Technical Memo

Directional servo-valve of 4-way design

HIGHLY-COMPACT SMA ACTUATORS A Feasibility Study of Fuel-Powered and Thermoelectric SMA Actuators

Technical data Demag DC-Com 1 to DC-Com 10 chain hoist

UPDATE ON THE LHC MAIN MAGNETS. Lucio Rossi CERN - LHC MAC 15

TG5 Review: Infrastructure on top of the tank

BULLETIN January Goulds Model 3700 API th Edition/ISO Process Pumps

TURBOVAC i Multi Inlet Line Turbomolecular pumps

Online data sheet DFS60B-S4EL00800 DFS60 INCREMENTAL ENCODERS

CBM Engineering. Mechanical Concept, design and prototyping of the STS for the CBM Experiment at FAIR

Innovative Technology for Multi-PUR Sound Deadening Components for Large Engines: Combining Innovative Processes to Develop a Turnkey Solution

Scientific vapor pumps

Standard Linear Shift Mechanism LSM/HLSM Series

XFEL Bunch Compressor BC1 and BC2 Vacuum Issues

Transcription:

3 rd Rencontres Nationales DU RESEAU TECHNOLOGIES DU VIDE SEVRIER, 10 13 October 2016 Vacuum pumps for the ESRF EBS project Michael Hahn On behalf of the EBS Accelerator Project Team

OUTLINE Project definition - Machine issues and parameters - Time schedule - Logistics Vacuum pumping - UHV pump selection and constraints - Vacuum assembly, chamber issues - Installation and vacuum preparation (pre-pumping) - Vacuum pump interface and control - Bake out Conclusion Page 2

SCOPE OF THE PROJECT ESRF TODAY Energy 6.04 GeV Storage ring circumference 844 m 200 MeV Electron Linac 10 Hz Booster Synchrotron Multibunch current 200 ma Horizontal emittance 4000 pm.rad Vertical emittance 4 pm.rad 42 Beamlines (including 14 Bending Magnet BL) Page 3 3 rd rencontres vide cnrs 10 13 October 2016

SCOPE OF THE PROJECT EBS.. Now EBS Energy (GeV) 6.04 6 Multibunch current (ma) 200 200 Circumference (m) 844.39 843.98 Horizontal emittance (pm.rad) 4000 140 Vertical emittance (pm.rad) 4 5 - Is going to be the new photon source (6 GeV electron storage ring) of the ESRF. The brilliance of the generated X-Rays will improve by factors due to the reduced horizontal e-beam emittance. - Will contain 7 dipoles per cell (today 2), 7 x 32 = 224 dipole magnets - Will replace the existing machine in the same tunnel - Will be pre-assembled prior to installation which starts in Jan 2019 - Will contain 128 + 1 girders for magnets, vacuum chambers, etc. - Will be an in-situ bakeable machine - Will mainly use lumped (discrete) UHV pumping rather than functional coatings - Will consist of stainless steel and aluminum vacuum chambers and use conventional flanges Page 4 3 rd rencontres vide cnrs 10 13 October 2016

SCOPE OF THE PROJECT Now EBS Energy (GeV) 6.04 6 Multibunch current (ma) 200 200 Circumference (m) 844.39 843.98 Horizontal emittance (pm.rad) 4000 140 Vertical emittance (pm.rad) 4 5 present EBS Dipoles-quadrupoles Page 5 3 rd rencontres vide cnrs 10 13 October 2016

MASTER PLAN Courtesy of Pantaleo Raimondi Page 6 3 rd rencontres vide cnrs 10 13 October 2016

VACUUM PUMPS SELECTION CRITERIA Compactness Good pumping speed for H2, N2, CO, CO2 Sufficient pumping speed for CH4, noble gases Compatibility with existing installation Reliability Failure tolerance (power cuts) Page 7 3 rd rencontres vide cnrs 10 13 October 2016

20 VACUUM CHAMBERS (HIGH PROFILE) - Production of 139 aluminum chambers started at CECOM, Italy - Bi-metal Al2219/SS316LN has been selected for flanges - Production of 159 HP Stainless steel chambers at FMB, Germany - 316LN material flow from steel suppliers to producer started 20mm vert. internal height - Production of 33 HP absorber chambers at Pink, Germany - 316LN material flow from steel suppliers to producer started CH3 CH14 ( absorber chamber ) CH5 Production of Al dipole chamber at CECOM (Photo D. Gibson) Page 8 3 rd rencontres vide cnrs 10 13 October 2016

13 PROCUREMENT VACUUM CHAMBERS (LOW PROFILE) - Production of 102 low profile stainless steel vacuum chambers at FMB, Germany - 316LN material flow from steel suppliers to producer started - Central curved sheet sections to be produced by deep drawing CH7 - Optimization of aspects like required thickness of some of the sheets in collaboration with supplier CH6 CH8 Page 9 3 rd rencontres vide cnrs 10 13 October 2016

PROCUREMENT - INSTRUMENTATION AND CONTROL 322 NEG cartridge pumps and 21 activation controllers, contract placed with SAES, Italy - Lab test of pre-series completed - Series production to be delivered end 2016 522 sputtering ion pumps and 50 IPPS 4 channel NEG activation controller - Contract placed with AGILENT - Pre-Series delivery received 76 RGA assemblies Company proposed by tender board, sorting remaining minor technical and contractual issues - AFC approval received 100 l/s NEG pump 294 inverted magnetron (Penning) gauges and 160 Pirani gauges - Contract under preparation 200 l/s NEG pump Page 10 3 rd rencontres vide cnrs 10 13 October 2016

VACUUM ASSEMBLY 200 l/s NEG pump Page 11 3 rd rencontres vide cnrs 10 13 October 2016

LOGISTICS (STORAGE AND ASSEMBLY BUILDINGS) B1 - Architect view Preliminary design in progress B2 Temporary storage building Page 12 3 rd rencontres vide cnrs 10 13 October 2016

INSTRUMENTATION AND CONTROL Baking controllers compatible with fixing them on cable trays 16 control loops per unit Prototype tested Mechanics for 4 additional devices (preseries) arrived Series production of 20 more to cope with installation schedule Page 13 3 rd rencontres vide cnrs 10 13 October 2016

GATE VALVES Dimensional and vacuum test for RF sector valves prototype OK RF test with beam postponed RFQ Custom shaped RF All Metal gate valves for SR sector separation (pneumatic actuation) 69 units RFQ Modified catalogue all metal valves for FE separation (pneumatic actuation) 31 units DN63CF and 34 units DN100CF Proposal of tender commission approved by DM, contract with valve supplier pending AFC approval Page 14 3 rd rencontres vide cnrs 10 13 October 2016

BAKING SYSTEM Sheathed heaters selected as primary source Tests of shaping insulation coats (aluminum coated PI) ongoing by means of foam chamber and magnet mockups CFT Thermocouples under preparation Purchase of heating collars being prepared Foam vacuum chamber in foam magnet with thermal insulation (1) 316L sheathed heater in dedicated groove of aluminum chamber prototype Foam vacuum chamber in foam magnet with thermal insulation (2) Page 15 3 rd rencontres vide cnrs 10 13 October 2016

PREPUMPING FOR ASSEMBLY AND INSTALLATION Traditional pumping groups with Hybrid turbomolecular pump, membrane pump, gauge controller, PLC, etc. too space demanding for EBS machine because of space constraints. This is also to comply with safety standards and European legislation (CE conformity). A more compact pumping concept had to be found.. Page 16 3 rd rencontres vide cnrs 10 13 October 2016

PREPUMPING FOR ASSEMBLY AND INSTALLATION 6 turbomolecular pumps attached to pre-pumping valves of each vacuum sector. Backed by a dry pump. Isolation valve in the exhaust which closes when rotation speed of turbo gets low, operated by Turbo controller. A trolley will transport controllers, turbos, ACP etc., materials to be installed on cable trays to keep the walkway free. Page 17 3 rd rencontres vide cnrs 10 13 October 2016

PRESSURE PROFILE Expected conditioning after 1, 10, 100, 1000, 3000 Ah of beam 200 l/s NEG pump Page 18 3 rd rencontres vide cnrs 10 13 October 2016

ID14 TEST OF KEY COMPONENTS EBS Prototypes installed in a 6m ID straight section of ESRF: - Straight aluminum chamber following EBS dipole chamber production principle(1) - Bellow chamber containing two low profile RF liner assemblies(2) - All metal pneumatic RF gate valve prototype(3) - 1800mm NEG coated ESRF extruded Al ID chamber to fill up full length of SS (4) 3 1 2 4 Page 19 3 rd rencontres vide cnrs 10 13 October 2016

PROBLEMS AND LESSONS LEARNED FROM ID14 TEST IN AUGUST 2016 - Full aluminum flanges can create problems outside lab environment - Co-incidence of vacuum and RF gaskets on the flanges complicates flange assembly - With the same fixation hole pattern, RF gaskets for low and high profile chambers could be confused - Crossing welding seams on aluminum chambers produced from two plates can create problems - Given the amount of issues identified on this small test assembly, it becomes obvious that the mockup construction is very important Aluminum prototype chamber on ID14 View from below, with leaking CF100 aluminum flange (IP) Page 20 3 rd rencontres vide cnrs 10 13 October 2016

CONCLUSION Contracts for the custom-shaped series production items (standard cell chambers, valves,.. ) have been placed; Design and procurement for one-of-a-kind items (injection and diagnostic chambers, straight section adaptation,..) is ongoing; Procurement of vacuum instrumentation (UHV pumps, gauges, controllers,..) close to completion; Still a lot of work for consumables ( screws, gaskets, heating collars and connectors, thermal insulation,..) ahead; Page 21 3 rd rencontres vide cnrs 10 13 October 2016

MANY THANKS FOR YOUR ATTENTION Page 22 3 rd rencontres vide cnrs 10 13 October 2016