Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Similar documents
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Q0044 interconnection at

Craig Quist Craig Quist

Appendix D Black Hills Project Summary

Transmission Planning Attachment K Public Input Meeting

Date: March 15, Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, Utah

Gateway South Transmission Project

North Oregon Coast Area Study. Adam Lint

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

2-MWh Flow Battery Application by PacifiCorp in Utah Mark T. Kuntz VP Marketing & Business Development

Wyoming Energy Projects

Black Hills Project Summary

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Falcon-Midway 115 kv Line Uprate Project Report

2013 ANNUAL PROGRESS REPORT

Transmission Planning Report

Customer Charge or Minimum Bill. Total Average Annual Bill (9 Dth) Total Volumetric Rate*

100 MW Wind Generation Project

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Consulting Agreement Study. Completed for Transmission Customer

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

Status of PNM s Completed Transmission Construction Projects 11/30/2017

CUSTOMER/ TWIN ARROWS PROJECT

West Station-West Cañon 115 kv Transmission Project

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

BC Hydro System 2011 Annual Progress Report

Wyoming Cost of Living Index for the Second Quarter of 2012

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Chapter 7 - Appendix A

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

747 ACRES LAND FOR SALE

TransWest Express Project

March 7, Subject: Southern California Edison 2011 Annual Progress Report

WYOMING COST OF LIVING FOR THE SECOND QUARTER 2010

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Sub Regional RTEP Committee Mid-Atlantic

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

Sub Regional RTEP Committee Mid-Atlantic

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

2013 ANNUAL PROGRESS REPORT

Business Park North Muskegon County, MI

Proposed New Construction for

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Illinois State Report

Targeted Application of STATCOM Technology in the Distribution Zone

Food and Transportation Drive Inflation for the Second Quarter of 2011

Muskegon Waste Water Treatment Site Muskegon County, MI

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration

City of Ironton WWTP. General Information County: Lawrence Counties Served: Lawrence. Type of System: Public: X Private: Year Established: 1953

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

New 115 kv Disconnect Switches at Bloomsburg MTS

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

PG&E s 2012 Request Window Proposals

South Dakota 890 Study

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006

Sub Regional RTEP Committee Mid-Atlantic

Wyoming electricity use is growing

Appendix B. Summary of Changes to the Year Assessment

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Feasibility Study Report

Gillette Lost the Most Residents in 2017

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

APPENDIX E: Project Need and Description

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Energy from Waste Grid Connections

APPENDIX E: Project Need and Description

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Four Corners Queue Transmission Interconnection Study

Unrestricted. Air Core Reactor Applications Current Limiting Reactors

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

15 Nelson-Marlborough Regional Plan

Sub-Regional RTEP Committee PJM South

Southeastern Region Transmission Planning. 10 Year Transmission Expansion Plan

Feasibility Study Report

Local Transmission Plan

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis

Ten-year Plan. Figure 1 and Table 1. Each of the facilities shown in the plan is described in greater depth in the last appendix of this report.

Dynamic Reactive Power Control for Wind Power Plants

Food Prices Propel Inflation for the Fourth Quarter of 2011

Feasibility Study Report

Transcription:

2000 PACIFICORP PAGE 1 Attachment K Rocky Mountain Power Five Year Study Findings & Kick Off Meeting Thursday, December 8 2016

2000 PACIFICORP PAGE 2 Study Areas for 2016 Findings Reports Southeast, Utah Nicole DeGiulio Vernal, Utah Sachith Abayakoon Kickoff Studies Salt Lake Valley, Utah Nicole DeGiulio Wyoming West, Wyoming Carlton Jones

2000 PACIFICORP PAGE 3 Southeast Study Findings AREA PLANNER: NATHAN WILSON Prepared by: Nicole DeGiulio

2000 PACIFICORP PAGE 4 System Overview Covers 6,500 square miles Main source is Pinto (via 345 kv Huntington to Four Corners), Abajo & Moab 31 substations, 14 being customer owned Area has 345, 138, and 69 kv lines The study will concentrate on 138 kv and 69 kv lines and associated substations

2000 PACIFICORP PAGE 5 Load Growth Base System Loads o o Summer 2016: 90 MW Winter 2015-16: 82 MW Growth: o Average Summer Percentage 1.8% o Average Winter Percentage 1.6% Projected System Loads o o Summer 2021: 103 MW Winter 2020-21: 92 MW Distribution capacity: 77 MVA Area Utilization Factor: 35%

2000 PACIFICORP PAGE 6 N-0 Conditions Increase Capacity Seven Mile Upgrade, 2017 Seven Mile transformer loads to 106% (0.35 MVA) Solution: Replace existing transformer with a 0.5 MVA Regulators replacement is not required Estimated cost: $120k

2000 PACIFICORP PAGE 7 N-0 Conditions Increase Capacity Spanish Valley Upgrade, 2018 Spanish Valley transformer loads to 147% (9.2 MVA) after load is switched to it in 2018 Solution: Replace existing transformer with a 14 MVA. Regulators and fuse will have to be upgraded as well Estimated cost: $1.4m

2000 PACIFICORP PAGE 8 N-0 Conditions Improve Voltage Rattlesnake feeder issue, 2020 Rattlesnake has two 25 kv feeders. The RAT22 feeder will experience low voltage in 2020 Solution: Install new 69-25 kv substation called Disappearing Angel. This will take load off of the feeder with low voltage issues Estimated cost: $1.67m

2000 PACIFICORP PAGE 9 N-1 Conditions There were no prominent N-1 conditions

2000 PACIFICORP PAGE 10 Total Construction Costs Construction Item 2017 CONSTRUCTION Cost Seven Mile ~ Increase Capacity $120k Spanish Valley ~ Increase Capacity 2018 CONSTRUCTION 2020 CONSTRUCTION Rattlesnake ~ Install Disappearing Angel substation TOTAL COST Subtotal $120k Subtotal Subtotal $1.40m $1.40m $1.67m $1.67m $3.185m

Any questions or comments? 2000 PACIFICORP PAGE 11

2000 PACIFICORP PAGE 12 Vernal Study Findings AREA PLANNER: NATHAN WILSON Prepared by: Sachith Abayakoon

2000 PACIFICORP PAGE 13 Vernal Study Area Town of Hanna in west Town of Vernal in east Bonanza Power Plant (Deseret Gas & Transmission) Approximately 53 miles northwest of Helper, Utah

2000 PACIFICORP PAGE 14 System Overview About 1,700 sq miles of territory located in Duchesne & Uintah counties Major communities served are Vernal & Maeser 11 substations, four customer owned Transmission voltages include 345,138, & 69 kv

2000 PACIFICORP PAGE 15 Vernal Area Generation Generation from Flaming Gorge contributes to the area Bonanza (owned by Deseret Generation & Transmission) is the only generation within the study area

2000 PACIFICORP PAGE 16 Load Growth Base System Loads o o Growth Summer 2016: 123 MW Winter 2015-16: 145 MW o Average Summer Percentage 2.1% o Average Winter Percentage 2.3% Projected System Loads o o Summer 2021: 137 MW Winter 2020-21: 163 MW Distribution capacity 60 MVA Area Utilization Factor: 71%

2000 PACIFICORP PAGE 17 N-0 Conditions There were no prominent N-0 conditions

2000 PACIFICORP PAGE 18 N-1 Conditions Improve Voltage Loss of UPALCO Bonanza 138 kv line, 2017 Low voltage in Myton (0.89 pu at 69 kv) Solution: Tap change from tap #1 to tap #2 Estimated cost: N/A

2000 PACIFICORP PAGE 19 N-1 Conditions Improve Voltage Loss of WAPA Vernal Ashley 138 kv line, 2017 The 69 kv system will experience low voltage Solution: Install a new two Stage 15 Mvar capacitor bank on Ashley 138 kv and remove one stage of capacitors on Ashley 69 kv Estimated cost: $1.9 M

2000 PACIFICORP PAGE 20 Total Construction Costs Construction Item 2017 CONSTRUCTION Cost Ashley ~ Adding 2 stage 15 Mvar each capacitor bank at Ashley 138 kv $1.9 m Subtotal $1.9 m TOTAL COST $1.9 m $18.425m

Any questions or comments? 2000 PACIFICORP PAGE 21

2000 PACIFICORP PAGE 22 Study Areas for 2016 Kickoff Studies Salt Lake Valley, Utah Nicole DeGiulio Wyoming West, Wyoming Carlton Jones

2000 PACIFICORP PAGE 23 Salt Lake Valley Study Service Area Area is located in Salt Lake County Main sources are Terminal, MidValley, 90 th South and Oquirrh. Local Generation is Gadsby and West Valley Generators.

2000 PACIFICORP PAGE 24 Salt Lake Valley Study Info Covers 350 square miles in Salt Lake County Serve 1 municipal customer: Murray City 117 substations, 26 are customer owned Transmission voltages are 46, 138 & 345 kv Study will concentrate on the 138 & 46 kv portion of the system

Any questions or comments? 2000 PACIFICORP PAGE 25

2000 PACIFICORP PAGE 26 Wyoming West Study Service Area Pinedale and industrial load in the north 230 kv feeds 69 kv through Chimney Butte Naughton Plant near Kemmerer 230 kv source from Eastern Wyoming 138 kv system feeds Evanston area

2000 PACIFICORP PAGE 27 Wyoming West Study Info Covers 9,000 square miles in Lincoln, Sublette, & Uinta Counties Main source is the 230 kv lines from Monument 36 substations, 17 are customer owned Transmission voltages are 69, 138, and 230 kv Load is approximately 90% industrial Generation at Naughton, Mountain Wind, and Hinshaw (740, 140, and 125 MW)

Any questions or comments? 2000 PACIFICORP PAGE 28