IMPLEMENTING A WASTEWATER TREATMENT FACILITY UPGRADE/ EXPANSION USING IFAS AT WEST HAVEN, CT

Similar documents
Septage Treatment at Small Wastewater Treatment Plants

Relax. Just DO It! No pressure. Resist the Surge. Josh Johnson and Emil Voges

Watermatex To be Presented by: Professor Kin Man Ho Kingsford Environmental Hong Kong

Sludge Thickening. Wastewater Treatment Review. Gravity Thickening

The City of Sturgis Wastewater Treatment Plant Septage Waste Receiving Facility Operating Plan

Tow-Bro Unitube Sludge Removers

We have a large amount of national and international references with years of experience and extensive knowledge of the tube settlers.

Secondary Digester Cleaning to Meet Ohio Sludge Rules. Timothy McCann AECOM Keith Bovard Rocky River WWTP

AECOM Water. Sludge Dewatering Improvements at Gulf Coast Waste Disposal Authority s Bayport Facility

American Water College 2010

Water Technologies. Tow-Bro Unitube Sludge Removers

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

LOW OPERATING COST LOW START-UP COST. Media TM has its own built-in. the initial savings over new mechanical

September Leopold Sludge Collection Equipment

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations

Multilayer Energy Dissipating Inlet Column in Center-Feed Clarifiers 1

Appendix B-6. Mechanical Equipment Design Calculation

Spiral Scraper Clarifier

Stone Food Machinery Ltd 14 North Main Street Wexford IRELAND Tel

High Solids Loading for a DAFT Retrofit for Co-Thickening Operation

AN UPDATE ON THE IMPLEMENTATION

Thank you for your application for product renewal dated February 28, 2017, for the Fuji Clean USA CEN Model Series Treatment Systems.

APPENDIX B FUNCTIONAL DESIGN SPECIFICATIONS (Sequence of Operation)

CENTRAL MARIN SANITATION AGENCY CAPITAL IMPROVEMENT PROGRAM ACCOUNT / PROJECT DESCRIPTIONS PROPOSED FY 12 BUDGET AND 10 YEAR PROJECTION

ACO Marine product catalogue ACO Clara Waste water treatment plant Sizes 3-240

Water Solutions. API Oil/Water Separators - A Total Approach. siemens.com/energy/water-solutions

CIRCULAR CLARIFIER SYSTEMS

RAS & WAS Pumps (FLYGT Pump)

CTB3365x Introduction to Water Treatment

Septage Receiving Made Easy: Ten Things we have Learned

SLUDGE TREATMENT. Do we have a problem?

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

Approach to Aeration System Upgrade

Co-treatment of Septage with Municipal Wastewater in Medium Sized Cities in Vietnam

TREATMENTOF PETROCHEMICAL WASTEWATERS

A Visionary Review of the Land Treatment of Septage International Pumper & Cleaner Environmental Expo Louisville, Kentucky

Sludge Management EENV Overview of Sludge Treatment & Disposal

Two Sludges One Belt Press Waste Activated Sludge and Lime Sludge Handling

CIRCULAR CLARIFIER SYSTEMS

City and Borough of Juneau Juneau Douglas Wastewater Treatment Plant Facility Maintenance Evaluation Report MAY 21, 2014

INSTALLATION INSTRUCTIONS

CUR REFURBISHING WASTEWATER TREATMENT PLANT FOR RS HQ RS HQ, KABUL, AFGHANISTAN

Sugar Creek WWTP CMAR Project Delivery for Reliability Improvements

LAMELLA SETTLERS -optimal sedimentation on a minimal footprint

WATER & WASTE WATER INDUSTRIES

WSB clean: Installation Manual

Specifications. Division 46 Water and Wastewater Equipment

Over 330 Clarifier installations in 3 continents

City of Alpena Septage Receiving Facility Operating Plan

GridBee AP Series - Air-Powered Mixers

DELPHIN cube. Reliable process Strong tanks Clever modules. Compact biological wastewater treatment plants with fixed-bed technology

Troqueer WwTW is located on the banks of the River Nith and serves the market town of Dumfries. The works

The purpose of this project is to replace the influent screens and screenings handling equipment.

ClariMax Inclined Plate Clarifier. Installation, Operation & Maintenance Manual

Influent Sewage Pumping Station (5 pumps) C of A (page 2 and page 5)

scfm (6.5 psi) Max HP

OVERVIEW OPERATION. 2 Stormceptor EF Technical Manual

For maximum grit removal, the PISTA Grit Chamber should be

OWS OPERATIONS & MAINTENANCE

Installation, Operation & Maintenance Manual. TotlSep (TS) Series. FRP Oil/Water Separator

AMERICAN RECIRCULATING SAND FILTER SYSTEMS

An Overview of NSPS Subpart QQQ VOC Emissions from Petroleum Refinery Wastewater Systems

The New Generation in Decentralised Wastewater Treatment. State of the Art SBR-Treatment. Compact and efficient, simple to install

VACOMASS. Technical information VACOMASS square diaphragm control valve

December Labko BioKem Wastewater Treatment Plants. Product brochure BATCH REACTORS FOR PROCESSING WASTEWATER OF 6-90 PERSONS

Inclined plate settlers

SECTION CIRCULAR CLARIFIER SLUDGE COLLECTION EQUIPMENT

ENVIRONMENTAL PERFORMANCE IN 2011 UPM Madison

Approval of the Proposed Miscellaneous Fees & Charges Adjustments Effective January 18, 2019 (FY 2019)

14.0 SOLIDS HANDLING

Installation of High Speed Blowers

Royce Total Suspended Solids Systems. Water & Wastewater

OIL & GAS FIELD SYSTEMS

Excerpt from Chapter 3 of the City Code that address Fats, Oils and Grease (FOG) control program that was adopted by the City Council on May 9, 2016.

OPERATION & MAINTENANCE for Lamella plate separators OPERATION & MAINTENANCE QUICK GUIDE For models HB50 / HB20 / HB10

Clean Water 2020 Program

FROM A LEADER IN CLEAN AIR TECHNOLOGY

ABCD BFDC BEDA AB CDEFCC

XLR TM. Next generation air filtration

1BGrease Traps and. Frequently Asked Questions About Grease:

Brief Description SOLIDO. Fully biological SBR Small Wastewater Treatment Plant for 2 32 PE according to EN

MUNICIPAL AND INDUSTRIAL DEWATERING APPLICATIONS ROTARY PRESS OPTIMUM-CV

Municipal Water Treatment, Supply and Distribution

BNR Series Wastewater Treatment Systems Installation & Owners Manual

Utilities Services Item INDIAN RIVER COUNTY, FLORIDA DEPARTMENT OF UTILITY SERVICES

BNR Series Wastewater Treatment Systems Washington State Installation & Owners Manual

City of Greenfield WWTP

Greater Ouachita Water Company. July 2015 Monthly Operations & Maintenance Report

quickone+ aerated cabinet clearwater sampling backflush HQ membranes installation weight single chamber SBR KIT

BECKLEY. General: Page 1

Design Parameters. System Equipment

Watertreatment. Landbased Farming. Weedfilter. Catvis WATER I NTAKE R ECIRCULATION S YSTEM

Water Residuals Management Presented by Michael F. Graves, PE CP&Y Co-Authors Larry L. Hare, PE Oklahoma City J. Dustin Segraves Oklahoma City

Marsh McBirney Flo-Dar

NEXT GENERATION FORCE SOLUTIONS FOR FORMING HIGH STRENGTH STEELS

Exhaust Aftertreatment Technology for Emission Control of Diesel Engines

SERVICE INSTRUCTION SI Revision 1

Overview of Blower Technologies and Comparison of High-Speed Turbo Blowers

Sludge Blanket Level Measurement

NEWTONS MORE THAN JUST A GREAT SNACK THE KEY TO COMPARING MIXER TECHNOLOGIES

Transcription:

28 January 2015 IMPLEMENTING A WASTEWATER TREATMENT FACILITY UPGRADE/ EXPANSION USING IFAS AT WEST HAVEN, CT MARIO FRANCUCCI

AGENDA Design Basis Project Challenges ConstrucEon Sequences and RestricEons Environmental RestricEons/Reviews Screening and Influent Pumping Primary SeOling Tanks AeraEon Tanks 2

AGENDA (CONT.) AeraEon Blowers ExisEng Secondary SeOling Tanks New Secondary SeOling Tanks Return AcEvated Sludge Pumping How is plant operaeng now? 3

DESIGN BASIS 4

DESIGN BASIS Average Day Maximum Month Flow (mgd) 9.7 10.4 BOD (mg/l, ppd) 187 (15,070) 227 (19,750) TSS (mg/l, ppd) 191 (15,440) 296 (25,790) TKN (mg/l, ppd) 27 (2,184) 36 (3122) Total Nitrogen Waste Load AllocaEon August 2014 353 ppd

PROJECT CHALLENGES Design and implement a robust system Keep the plant operaeng and in compliance during construceon Small site footprint Minimize disturbance to Marine Wetlands 6

WEST HAVEN WPCF BEFORE AFTER 7

SITE PLAN Page - 8

ENVIRONMENTAL RESTRICTIONS/REVIEW SecEon 404 CWA, ACOE Coastal Zone Management Act Page - 9 02/25/08

CONSTRUCTION SEQUENCING AND RESTRICTIONS WPCF conenuous operaeon One unit out of service at a Eme No work on exiseng primary clarifiers unel PC 1 work is complete No work on aeraeon unel all PC work completed and new SCs in service No work on exiseng SCs unel new SCs on line

SCREENING AND INFLUENT PUMPING Fine screens required for IFAS Unmanned facility requires simple and reliable screenings handling systems Required bypass pumping for construceon 11

MAIN PUMPING STATION UPPER LEVEL 12

MAIN PUMP STATION NEW MECHANICAL SCREENS 13

SLUICE TROUGH & GRINDER WASHER COMPACTOR 14

PRIMARY SETTLING TANKS FoundaEon required bolstering Repair cracked Tank No. 1 15

PRIMARY SETTLING TANKS BEFORE CONSTRUCTION 16

PRIMARY CLARIFIER REPAIR Tank 1 out of service since August 1994 Non- destruceve teseng Pulse echo teseng, 1995 Ground penetraeng radar, 2006 Not complete agreement between two teseng methods Sludge trough was not completely clean

PRIMARY SETTLING TANKS 1& 2 MICROPILE INSTALLATION 18

AERATION TANKS No room for new tanks, required a small footprint design Reliable and robust system required Readily implemented at this plant IFAS chosen 19

AERATION TANK BEFORE CONSTRUCTION 20

IFAS BASINS

IFAS BASIN (CONT.)

AERATION TANK MODIFICATION WORK 23

AERATION TANK INTERIOR WORK 24

AERATION TANK IFAS INSTALLATION 25

AERATION TANK IFAS 26

AERATION BLOWERS Average air requirement increased from approx. 8,000 to 11,800 SCFM Increased efficiency Limited building footprint 27

BLOWER ROOM BEFORE CONSTRUCTION 28

BLOWER ROOM POST CONSTRUCTION 29

EXISTING SECONDARY SETTLING TANKS Solids pass- through due to shallow depth Poor inlet design 30

EXISTING SECONDARY CLARIFIERS MODIFICATIONS PER FACILITIES PLAN New Inlet Baffles Aera4on Basin Effluent Aera4on Basin Effluent Floc Zone

Performed CFD Modeling to OpEmize Goals: - De- bogleneck clarifiers - Provide Good Inlet floccula4on, and - Diffusion into tank with energy dissipa4on CFD of Exis4ng West Haven Clarifier CFD of simple LA-EDI retrofit Inlet Diffuser and Relocation of Sludge Hopper Alternative 1 Alternative 2 3.7' LA-EDI 7.3' Flocculation 3' 2' 3' Baffled Diffusers 7.3' 3' 3' 3.7' No Scale Baffle to Protect Sludge Hopper Alternative 2 Plan 6' 6" 7 Sludge hopper relocated and equipped with manifold withdrawal

NEW SECONDARY SETTLING TANKS Designed to match available land area Doubled clarifier surface area 33

SECONDARY SETTLING TANK 7 & 8 EXISTING CONDITIONS 34

SECONDARY SETTLING TANK 7 & 8 TEMPORARY FILL 35

SECONDARY SETTLING TANK 7 & 8 SHEET PILING 36

SECONDARY SETTLING TANK 7 & 8 EXCAVATION 37

SECONDARY SETTLING TANK 7 & 8 INSTALLING PILES 38

SECONDARY SETTLING TANK 7 & 8 39

SECONDARY SETTLING TANK 7 & 8 40

RETURN ACTIVATED SLUDGE PUMPING Inaccurate sludge drawoff control Single pump for each pair of tanks Manual throoling of tank suceon lines Limited pump backup ExisEng sludge cross- collectors inoperable 41

EXISTING RETURN ACTIVATED SLUDGE PUMPING 42

RETURN ACTIVATED SLUDGE PUMPING

RAS PUMP STATION PRE CONSTRUCTION 44

RAS PUMP STATION POST CONSTRUCTION 45

HOW IS PLANT OPERATING NOW?

900 West Haven WPCF Effluent Total Nitrogen 800 TN Monthly Average (lbs/day) 700 600 500 400 300 200 100 0 2008 2009 2010 2011 2012 2013 2014 47