UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Similar documents
UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED CLASSIFICATION: EXHIBIT

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Exhibit R-2, RDT&E Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Airborne SIGINT Enterprise (JMIP) FY 2012 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Exhibit R-2, RDT&E Budget Item Justification

Statement of Jim Schoppenhorst, Director, DD(X) BAE Systems / Armament Systems Division. Before the

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED R-1 ITEM NOMENCLATURE

CLASSIFICATION: UNCLASSIFIED. DATE February 2008 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/INTEGRATED SURVEILLANCE SYSTEM

CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET (P-40) FY2013 Presidents Budget Submission February 2012

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology. FY 2011 Total Estimate. FY 2011 OCO Estimate

Mike Gibbons Paul Summers John Murnane

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-5. FY-10 FY-11 FY-12 FY-12 OCO FY-12 Total FY-13 FY-14 FY-15 FY-16

International Diesel Electric Submarine Integrated Combat System

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: RQ-4

Washington Metropolitan Area Transit Authority

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #30

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: End Item Industrial Preparedness Activities FY 2012 OCO

PM AAA NDIA Conference 25 October 2011

Centerwide System Level Procedure

Establishment of Light Tactical Vehicles Program Office

TORONTO TRANSIT COMMISSION REPORT NO.

Aviation S&T: Future Vertical Lift & JMR Tech Demonstrator

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 P-1 Line #51

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Open & Evolutive UAV Architecture

Too Good to Throw Away Implementation Strategy

PEO USC. NAVSEA Small Business Industry Day. Mr. Nidak Sumrean PEO USC Executive Director. 21 August 2018

SamTrans Business Plan Update May 2018

DDG 1000 Class Destroyer

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Qty (Each)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

A New Strategy for Submarine Payload Integration

MK 48 Mod 7 Production Restart

Transcription:

Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years R1 Program Element (Number/Name) FY 2017 FY 2018 FY 2019 FY 2020 Navy Page 1 of 8 R1 Line #123 To Program Element 0.000 57.282 120.602 167.719 167.719 100.234 68.989 514.826 4500: VIRGINIA Payload Module 0.000 57.282 120.602 167.719 167.719 100.234 68.989 514.826 Program MDAP/MAIS Code: 516 Note 1. Beginning in FY2014, an administrative change shifted efforts funded from PE 0604558N (New Design SSN) / Project 4500 to PE 0604580N (VIRGINIA Payload Module) / Project 4500. This shift is consistent with Congressional intent identified in the FY14 Appropriations Act Committee Report. 2. Detailed design funding for this project transitions to SCN (BLI: 2013) beginning in FY17 to support VPM production beginning in FY19. A. Mission Description and Budget Item Justification The U.S. Navy must maintain a submarine fleet that is of sufficient capability and numbers to defend American interests. The VIRGINIA Class Submarine, formerly the New Attack Submarine (New SSN), is designed to fulfill this need. It will counter the potential threats of the next century in a multi mission capable submarine that has the ability to provide covert, sustained combat presence in denied waters. The primary goal of the program is to develop an affordable yet capable submarine by evaluating a broad range of system and technology alternatives, and pursuing cost reduction, producibility improvement, and technical risk management. This Program Element (PE) provides the technology, prototype components, and systems engineering needed to design and construct the VIRGINIA Payload Module ). VPM mitigates and will recapitalize the conventional TOMAHAWK Land Attack Missile (TLAM) gap created by the retirement of SSGNs in the late 2020s while maintaining current platform requirements. This PE directly supports the following VIRGINIA Class Submarine missions: (1) covert strike warfare; (2) antisubmarine warfare; (3) covert intelligence collection/surveillance, indication and warning, and electronic warfare; (4) antisurface ship warfare; (5) special warfare; (6) mine warfare; and (7) battle group support. B. Program Change Summary ($ in Millions) Previous President's Budget 59.120 132.602 167.719 167.719 Current President's Budget 57.282 120.602 167.719 167.719 Adjustments 1.838 12.000 Congressional General Reductions Congressional Directed Reductions 12.000 Congressional Rescissions Congressional Adds Congressional Directed Transfers Reprogrammings SBIR/STTR Transfer 1.838 Program Adjustments

Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) Change Summary Explanation The FY 2015 congressional reduction was due to program execution. R1 Program Element (Number/Name) Navy Page 2 of 8 R1 Line #123

Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 COST ($ in Millions) Years R1 Program Element (Number/Name) FY 2017 FY 2018 FY 2019 FY 2020 To 4500: VIRGINIA Payload Module 57.282 120.602 167.719 167.719 100.234 68.989 514.826 Quantity of RDT&E Articles A. Mission Description and Budget Item Justification This project encompasses Navy RDT&E efforts required to incorporate a modular design for future VIRGINIA Class Submarines (VCS) which integrates strike payload capacity for Tomahawk Land Attack and follow on missiles. The design is targeted for VCS Block V (FY1923 ships). B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) Title: NonPropulsion Electronics System (NPES) Engineering Articles: 15.250 25.241 27.506 27.506 FY 2014 Accomplishments: Continued development of VPM system launch control and integration with existing VIRGINIA Class combat systems. Integrated and automated launch processes to enable efficient launch of payloads. Assessed launcher electronics and software design to support rapid, low cost integration and testing of payloads. Reduced overall launch electronics weight and footprint, and provided increased unit space for future payload electronics. Specified and developed interfaces including software for VPM systems and existing C3I systems. FY 2015 Plans: Continue development of VPM system launch control and integration with existing VIRGINIA Class combat systems. Integrate and automate launch processes to enable efficient launch of payloads. Assess launcher electronics and software design to support rapid, low cost integration and testing of payloads. Reduce overall launch electronics weight and footprint, and provide increased unit space for future payload electronics. Products include specifications, systems diagrams, arrangements, implementation of Advanced Message Queuing Protocol (AMQP) to VPM network (CORBA technology replacement), next generation tomahawk (replaces TLAM BLK IV), implementation of new Tomahawk Control System (PMA280 software), implementation of TTWCS 5.6 supporting tomahawk cell tasking vice tube tasking. Plans: Continue development of VPM system launch control and integration with existing VIRGINIA Class combat systems. Integrate and automate launch processes to enable efficient launch of payloads. Assess launcher electronics and software design to support rapid, low cost integration and testing of payloads. Reduce overall launch electronics weight and footprint, and provide increased unit space for future payload electronics. Products Navy Page 3 of 8 R1 Line #123

Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) include specifications, systems diagrams, arrangements, implementation of Advanced Message Queuing Protocol (AMQP) to VPM network (CORBA technology replacement), next generation tomahawk (replaces TLAM BLK IV), implementation of new Tomahawk Control System (PMA280 software), implementation of TTWCS 5.6 supporting tomahawk cell tasking vice tube tasking. Plans: N/A Title: Hull, Mechanical, and Electrical (HM&E) Systems Engineering Articles: 42.032 95.361 140.213 140.213 FY 2014 Accomplishments: Continued design efforts for the VPM including integration to existing hull structure, hydrodynamic assessments, hydraulic system design, tube control interface, and internal arrangements to accommodate hardware, electronics and personnel. Developed Integrated Master Schedule (IMS) and Manufacturing Plans. Conducted design studies to assess all ship characteristics including maneuvering, signature levels, shock survivability, operational impacts and life cycle support. Products include specifications, system diagrams, and arrangements. FY 2015 Plans: Continue design efforts for the VPM including integration to existing hull structure, hydrodynamic assessments, hydraulic system design, tube control interface, and internal arrangements to accommodate hardware, electronics and personnel. Update Integrated Master Schedule (IMS) and Manufacturing Plans. Design studies to assess all ship characteristics including maneuvering, signature levels, shock survivability, operational impacts and life cycle support. Products include specifications, system diagrams, arrangements, technical trade studies, system description documents, develop long lead time components and update requirements matrix. Plans: Continue design efforts for the VPM including integration to existing hull structure, hydrodynamic assessments, hydraulic system design, tube control interface, and internal arrangements to accommodate hardware, electronics and personnel. Executing Integrated Master Schedule (IMS) and Manufacturing Plans. Start payload tube prototype construction. ship specifications and diagrams. Begin development of plug design arrangements and base ship arrangements. Products include specifications, system diagrams, arrangements, system description documents, long lead time components and payload tube prototype. Plans: Navy Page 4 of 8 R1 Line #123

Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) N/A R1 Program Element (Number/Name) Accomplishments/Planned Programs Subtotals 57.282 120.602 167.719 167.719 C. Other Program Funding Summary ($ in Millions) Line Item FY 2017 FY 2018 FY 2019 FY 2020 To SCN//2013: VIRGINIA Class Submarine 6,462.316 5,832.079 5,340.110 5,340.110 5,184.120 5,023.887 6,691.774 6,768.232 90,040.091 OPN/0942: VA CL 69.341 70.689 35.747 35.747 56.262 49.263 49.672 50.743 Continuing Continuing Support Equipment O&MN/0204283N: 38.776 33.938 31.355 31.355 28.028 29.238 30.175 30.770 Continuing Continuing Sub Ops & Safety RDT&E/0604558N: 58.070 85.125 115.006 115.006 112.727 173.190 87.948 84.689 Continuing Continuing New Design SSN* Remarks *Note: RDT&E PE 0604558N contains project 3062: Submarine MultiMission Team Trainer which is not funding directly related to the VIRGINIA Class Program. D. Acquisition Strategy The VIRGINIA Class Submarine Program has implemented Integrated Product and Process Development (IPPD). The traditional distinct phasing of the design process has been replaced with the continuous concurrent engineering IPPD process. The IPPD approach has facilitated a smoother transition from design to manufacturing and has reduced the number of changes typically encountered during construction of the lead and early followon ships. In September 1997, Congress passed a law allowing Electric Boat (EB) and Northrop Grumman Newport News (NGNN), now Huntington Ingalls Industries (HII), to team for production of the first four VIRGINIA Class Submarines. Under the teaming agreement, EB remained the design yard for the VIRGINIA Class Submarine and HII became a part of the IPPD process. The Program Office is managing three MultiYear Procurement (MYP) contracts. The first and second contracts are for the Block II (FY0408) and Block III (FY0913) ships. The third contract is for Block IV (FY1418) ships awarded April 2014. All Block I & II ships (SSNs 774783) have been delivered. The lead Block III ship, SSN 784, delivered in August 2014 with the remaining 7 ships awarded and under construction. Developmental efforts began in FY13 and will be executed via current Lead Design Yard Agent contract with Electric Boat. E. Performance Metrics Preliminary Design Review Critical Design Review Navy Page 5 of 8 R1 Line #123

Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Product Development ($ in Millions) Category Item Component Development Method & Type WR Performing Activity & Location NSWC : Carderock, MD Years R1 Program Element (Number/Name) To Target Value of 0.000 12.500 Mar 2014 12.000 Jan 2015 15.674 Nov 2015 15.674 15.815 55.989 Component Development WR NUWC : Newport, RI 0.000 11.250 Mar 2014 16.290 Jan 2015 7.647 Nov 2015 7.647 20.538 55.725 Component Development C/CPFF Component Development C/CPFF Support ($ in Millions) Category Item or Engineering Support Remarks Method & Type Electric Boat : Groton, CT GDAIS : Pittsfield, MA Performing Activity & Location 0.000 33.282 Mar 2014 85.062 Nov 2014 137.148 Nov 2015 137.148 132.370 387.862 0.000 7.000 Feb 2015 7.000 Nov 2015 7.000 14.000 Subtotal 0.000 57.032 120.352 167.469 167.469 168.723 513.576 Years To C/CPAF URS : Rockville, MD 0.000 0.250 Mar 2014 0.250 Feb 2015 0.250 Nov 2015 0.250 0.500 1.250 Target Value of Subtotal 0.000 0.250 0.250 0.250 0.250 0.500 1.250 Years To Project s 0.000 57.282 120.602 167.719 167.719 169.223 514.826 Target Value of Navy Page 6 of 8 R1 Line #123

Exhibit R4, RDT&E Schedule Profile: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) Proj 4500 Top Level Requirements Set/Updated VPM line Ship Specifications Rev A Diagrams Major Arrangements Design Development FY 2017 FY 2018 FY 2019 FY 2020 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Navy Page 7 of 8 R1 Line #123

Exhibit R4A, RDT&E Schedule Details: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) Schedule Details Start End Events by Sub Project Quarter Year Quarter Year Proj 4500 Top Level Requirements Set/Updated VPM line 1 2014 2 2015 Ship Specifications 4 2014 2 2016 Rev A Diagrams 4 2014 2 2016 Major Arrangements 4 2014 2 2016 Design Development 1 2015 4 2019 Navy Page 8 of 8 R1 Line #123