AIRVAC MARK III PORTABLE VACUUM RECOVERY SYSTEM IMPORTANT WARNING FOR SAFER WORKING

Similar documents
SINGLE CHAMBER BLAST MACHINE ABSC-1028

SPINNERBLAST INTERNAL PIPE CLEANER IMPORTANT WARNING FOR SAFER BLAST CLEANING

RCV-125 REMOTE CONTROL SYSTEM IMPORTANT WARNING FOR SAFER BLAST CLEANING

OWNER S MANUAL PIPECOATER-III /125 /300 /900 INTERNAL PIPE PAINTING TOOL

OWNER S MANUAL PIPECOATER-I AND PIPECOATER-II INTERNAL PIPE PAINTING TOOL

Dust Collectors AIRBLAST.

ABSC-1028 Blast Machine - 18 ltr.

ABSC-2452 Blast Machine ltr.

MINI BLAST INTERNAL PIPE CLEANER

SPINNERBLAST INTERNAL PIPE CLEANER

PIPECOATER-III /125 /300 /900 INTERNAL PIPE PAINTING TOOL

Railroad Ball Valves Series 5REB3

IMO-200EN 09/2010. Trunnion mounted forged ball valves Model FF and GG. Installation, Maintenance and Operating Instructions IMO-200EN 09/2010

THE MAGNUM SUCTION SYSTEM

REACTOR DISCHARGE VALVES S & DIGESTER BLOW VALVES SB & 5300SB B FLANGED BALL VALVES

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

Internal Pipe Cleaning Tool

SPIN BLAST TOOL O.M

3, 4 & 6 (DN 80, 100 & 150) CLASS 150 & 300 STANDARD BORE SERIES 7150, 730S & 7300 FLANGED BALL VALVES EQUIPPED WITH KEROTEST HANDLE ASSEMBLIES

TILLOTSON LTD., CLASH INDUSTRIAL ESTATE, TRALEE, CO. KERRY, IRELAND PHONE: FAX:

36-1 DP PLEASE READ BEFORE USING THIS EQUIPMENT

SERIES CLASS 300 FULL-BORE REACTOR DISCHARGE VALVES. Installation, Maintenance and Operating Instructions

WITH 300 CFM RECLAIM MANUAL NUMBER: 563 TABLE OF CONTENTS

SECTION AIR INTAKE SYSTEM

SJS10 & SJS10-TK OPERATING INSTRUCTIONS. Prepared by:- Matthew Hughes Approved by:- Mark Dalley Date:03/04/13 REV NO: ECO:

PRESSURE CABINETS PROBLEM CAUSE SOLUTION

Maintenance Information

1/4 Die Grinder. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference

INSTALLATION, OPERATION AND MAINTENANCE MANUAL (IOM)

BOLT TENSIONERS. carefully before use and retain it for reference.

Pressure Relief Valve Maintenance Manual

Service Manual Air Tech Second Stage

Surface Finish Solutions AIRBLAST

Maintenance Information

80 Litre Suction Oil Drainer With Inspection Chamber

3 AND 4 CLASS 300 STANDARD BORE SERIES 730S AND 7300 REACTOR DISCHARGE VALVES. Installation, Maintenance and Operating Instructions

INSTALLATION/OPERATION/MAINTENANCE INSTRUCTIONS FOR ARCHON MODELS WD2010L, WD2010, WD2010H WASHDOWN STATIONS. ARCHON Industries, Inc.

DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE) INSTALLATION AND OPERATING INSTRUCTIONS

12. CARBURETOR/FUEL PUMP

POWER STEERING PUMP REBUILDING SPK101 Read instructions completely before removal & disassembly

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTRUMENT ISOLATION VALVE

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2

EQUALIZER International Limited 10T(I) Integral Hydraulic Spreading Wedge Repair Instruction Manual

OPERATING INSTRUCTIONS FOR TPA SERIES AIR DRIVEN TORQUE PUMPS (ANALOGUE GAUGE)

MODELS 9917, , 9946P and 9989 High Pressure Lubrigun Series A

PRODUCT OPERATING MANUAL

SW14.5TI INTEGRAL HYDRAULIC FLANGE SPREADING WEDGE. Repair Manual INNOVATION IN ITS MOST FUNCTIONAL FORM

PRODUCT OPERATING MANUAL

PRODUCT OPERATING MANUAL

PRODUCT OPERATING MANUAL

NSGV EVE-ER I, O, & M MANUAL

OWNER S MANUAL. Power-Injection-Gun PIG

Engine Dismantle and Assemble ( )

PRODUCT OPERATING MANUAL

BLAST MACHINES - SYSTEMS -

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

Installation and Operating Manual

Getz Equipment Innovators 450 lb Portable / Wheeled Unit Dry Chemical Fill System Part No: 3G0061/3G0063

HIGH PRESSURE SANDBLASTING CABINET

1394 Operating Instructions. Prepared by:- M.Davies Approved by:- Date: 12/03/14 REV NO:- 1 ECO: HPX1500 Hand Pump. Hand Pump 1500 Bar

INSTALLATION TROUBLESHOOTING SUPPLEMENT

Instructions for Installation, Operation, Care and Maintenance

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

COYOTE ENTERPRISES, INC. 9/10 BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL

NOTE: Visit our website at for video repair procedures, under the Tools section.

Thompson Valve 1 IMPORTANT WARNING FOR SAFER BLAST CLEANING

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

Service Guide. High-Pressure Grease Pump. 100 psi (6.8 bar) High-Pressure Pump Model 7785 Series Specifications

Service Manual Air Plus Second Stage

DT34 and DT54 Series Rotary Sprinklers

TYPE E Main Valve Sizes 3 /8 through 12

Easy Riser swing check valve Models E-1 & F-1

Removal and Installation of Fuel Injection Pumps

OWNER S MANUAL. Power Injection Gun (PIG)

AVK SAUDI VALVES MANUFACTURING COMPANY

Service Manual. Balanced Piston First Stage

Model 210HP Beadbreaker

MACHINES / RECLAIMS WITH DUST BAG

PRODUCT OPERATING MANUAL

Gas Actuated Valve Supplement

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

Part # SuperFlow 450 Regulator Parts Upgrade Kit

500R MIXER SYPHON TYPE WATER TANK WORKSHOP MANUAL

KEYSTONE SERIES GRF RESILIENT SEATED BUTTERFLY VALVES INSTALLATION AND OPERATION MANUAL

13. FUEL SYSTEM/CARBURETOR/

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Section 10 Chapter 17

PRODUCT OPERATING MANUAL

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SUPERHONE Installation * Operation * Maintenance * Replacement Parts

K81 Guardian Fire Hydrants. Operation & Maintenance Guide

Installation must be in Accordance with AS/NZS

Service Information System

Oreck Magnesium Series Service Manual. The Oreck Manufacturing Company

FUEL SYSTEM. Table of Contents. Specifications. Section 3A Fuel Delivery System. Models 6/8/9.9/10/15 CARBURETOR SPECIFICATIONS

Maintenance Information

INSTRUCTION MANUAL. Portable Greasing System S1180, REV C GS

EURO BEAD BREAKER MODEL # Instruction Manual Parts Breakdown

DYNAFLUID 2000 STEAM & WATER MIXING VALVE INSTALLATION & OPERATING MANUAL

WEBER CARBURETOR TROUBLESHOOTING GUIDE

Transcription:

OWNER S MANUAL AIRVAC MARK III PORTABLE VACUUM RECOVERY SYSTEM IMPORTANT WARNING FOR SAFER WORKING 1. Check for possible silicosis hazards. Avoid dust. 2. Use only proper dry and well-screened abrasives specifically intended for blasting. 3. Before use: Check fittings and hose for wear. Safety-wire couplings together. 4. Do not weld on blast machine, this voids Airblast and safety organization approval. 5. Do not substitute Airblast parts or modified equipment in any way. AIRBLAST B.V. P.O. Box 1075 1700 BB Heerhugowaard The Netherlands Tel. : + 31-72-5718002 Fax : + 31-72-5714340 E-mail : info@airblast.com Web : www.airblast.com

WARNING THE MAXIMUM RECOMMENDED AIR PRESSURE FOR THIS UNIT IS 150 PSI (10 BAR). UNDER NO CIRCUMSTANCES MUST IT BE CONNECTED TO AN AIR SUPPLY OF GREATER PRESSURE. 1.0 INTRODUCTION. This manual covers the set-up, operating instructions and maintenance of the Airvac Mark III Portable Vacuum Recovery System. 2.0 OPERATION SET-UP. The set-up procedure for the Airvac Mark III Portable Vacuum Recovery System is as follows: a. Start the compressor (min. capacity: 250 cfm / 7 cbm³) and run for a period of 5 to 10 minutes to allow it to reach operating temperature. b. Connect a suitable length of 1½ (38 mm) I.D. air hose to the main compressor outlet. c. Carefully turn ON the air to blow out any dirt or moisture from the air hose. d. Turn OFF the air supply. e. Insert the adjustable gulper (pos. 15) into an appropriate length of 2½ (62 mm) I.D. vacuum hose and secure with a hose clip. N.B. Although a maximum length of 100 ft. (30 m) of 2½ (62 mm) hose is recommended, the unit will still operate, with reducing efficiency, up to 200 ft. (60 m). Performance varies according to site conditions such as horizontal or vertical recovery, etc. f. Connect the open end of the 2½ (62 mm) hose to the suction hose coupling insert (pos. 3) and secure with a hose clip. g. Connect an appropriate length of 4 (100 mm) I.D. discharge hose on the discharge hose coupling (pos. 2) and secure with a hose clip. N.B. The maximum recommended length of discharge hose is 40 ft. (12 m). h. Locate the discharge end of the 4 (100 mm) hose into a suitable hopper or waste skip etc. i. Turn off the air valve (pos. 11) i.e. with the handle at 90 degrees to the valve. j. Connect the air hose to the air valve (pos. 11) using a 1½ (38 mm) male / male nipple. 3.0 OPERATION 3.1 Turn ON the air at the compressor. 3.2 Turn ON the air valve (pos. 11). 3.3 With the adjustable gulper (pos.15) drawing free air only ensure that the pressure gauge (pos. 7) is reading a min. of 80 psi (5.4 bar) and the vacuum gauge (pos. 8) is reading between 1.8 and 2.2 Hg. If either gauge does not read as above, see paragraph 5. 3.4 If the intermittent flow of abrasive is observed, slowly open the adjusting ring on the gulper after releasing the Allen screw with the key provided. When a smooth flow is obtained lock the ring in position with the Allen screw. 3.5 If the rate of recovery is too slow the adjusting ring can be closed slightly as above, to increase the flow. 3.6 When the work has been completed or the Airvac is left unattended always turn OFF the compressor, then air valve (pos. 11) before disconnecting the hoses etc. 4.0 MAINTENANCE. N.B. Ensure that the air supply at the compressor is turned OFF and that the air line is purged of pressure before maintenance work is carried out. In order to keep the Airvac operating at maximum efficiency and keep wear to a minimum it is imperative that the following maintenance procedures are carried out. 4.1 After 8 working hours. Remove the venturi sheath (pos. 6) from the main body by turning anti clockwise. Turn the venturi tube (pos. 1) one eight of a full turn within the sheath and refit the assembly to the body. 4.2 Where the unit is not fitted with a primary air filter immediately adjacent to the air valve (pos.11) the nozzle (pos. 10) should be removed frequently and checked. This is carried out by: Page 1 Nov 2012 Airblast B.V.

a. Removing the venturi sheath and mixing chamber (pos. 5) together thus giving access to the nozzle. b. Using the nozzle key (pos. 25) in the radial by-pass slots, unscrew the nozzle by turning anti clockwise. c. The nozzle radial slots should be cleaned and examined for uneven wear. Inspect the 7 nozzle ports and clear any obstructions taking care not to damage the surfaces, which are machined to fine tolerances to ensure optimum efficiency. Should any of the nozzle ports be worn or damaged the nozzle should be discarded and a new one fitted. d. Before replacing the nozzle clean out any foreign matter remaining in the manifold ports and clean the threads of both aerofoil (pos. 17) and nozzle. Replace the nozzle using the key provided taking care to start the finely pitched thread correctly then tighten until the machined shoulders of the aerofoil and nozzle are firmly mated. WARNING A BLOCKED OR DAMAGED NOZZLE WILL CAUSE NOT ONLY A DROP IN PERFORMANCE BUT ALSO TURBULANCE WHICH WILL CAUSE RAPID WEAR OF BOTH THE PUMP BODY AND THE VENTURI TUBE. e. Inspect the mixing chamber (pos. 5) for excessive wear and replace if necessary. Refit the mixing chamber and venturi assembly ensuring that the identification groove is towards the pump end. 4.3 Removing the suction hose coupling (pos. 4). Release the camlocks and remove any debris, which may be trapped in the rear of the pump. Examine aerofoil (pos. 17) for excessive wear and blockages, suction hose coupling insert (pos. 3) for excessive wear and where necessary replace worn parts. 4.4 Replacement of venturi tube (pos. 1). Remove the venturi sheath (pos. 6) from the mixing chamber (pos. 5) by un-screwing it in an anti-clockwise direction. Place the protruding outlet of the venturi tube on the floor and push down the sheath. Pull up the venturi tube by pulling against the cam levers. Fit the new venturi tube after cleaning the location recess. Fitting is the reverse operation. 4.5 Replacement of the suction hose coupling insert (pos. 3). Remove the suction hose-coupling insert by opening the camlocks on the body coupler (pos. 20). Slacken the socket screws on the suction hose coupling (pos. 4) approximately 4 full turns and knock out the coupling insert. Clean locations shoulder and fit new insert. Tighten each screw until the insert is retained in the coupling but can still be rotated inside it. Tighten the socket screws evenly until tight, observing inward pull of insert onto sealing face of coupling, ensuring seal ring (pos. 26) is in position. 4.6 Replacement of the aerofoil. Remove the venturi tube and mixing chamber together, nozzle and suction hose coupling as previously described. Remove the four socket head screws (pos. 23) securing the manifold assembly (pos. 12) to the pump body (pos. 18). Remove the two central screws in the pump body either side of the inlet port and also the two remaining screws diametrically opposite pos. 21 and 22. Using a piece of timber suitably notched tap the aerofoil out in the direction of the venturi. Clean any remaining gasket material from the manifold, inlet flange and pump interior. Offer the new aerofoil to the body and check that only light tapping will be required to fit in place. If the aerofoil is obviously a tight fit trim down the new aerofoil on the side opposite the air inlet only by rubbing with wetted P120 wet and dry paper. When the aerofoil is correctly trimmed smear the air inlet side of both the body and the aerofoil with gasket compound and immediately tap the aerofoil into place in the body using a wooden dowel inserted in the nozzle port. Align the inlet ports of both body and aerofoil then insert and tighten the two long countersunk screws on either side of the inlet port. Leave the gasket material to harden for 1 hour then replace the two short countersunk screws on the side opposite the air inlet and tighten. With the remaining rubber compound make a fillet round the aerofoil where it touches the body on both sides and using a spreader smooth into any crevices particularly on the side opposite the air inlet. Apply gasket compound to both body and manifold flanges and fit new manifold gasket (pos. 12) taking care to align the central hole correctly. Replace the manifold assembly securing with the four socket head screws and replace the nozzle in the aerofoil. Allow 1 hour for gasket compound to cure then connect pump to air supply and check for leaks around aerofoil and manifold joint faces. Refit inlet body coupler and mixing chamber venturi tube. Nov 2012 Airblast B.V. Page 2

5.0 TROUBLESHOOTING PROBLEM CAUSE REMEDY Pressure gauge (pos. 7) reads Air valve (pos. 11) or outlet valve Open valves fully. below 80 psi (5.4 bar) on compressor not fully open. Airline couplings not tight or gaskets missing. Compressor operating below pressure. Nozzle (pos. 10) worn. Aerofoil (pos. 17) worn out. Tighten couplings, check and replace gaskets if required. Check compressor. N.B. Compressor maintenance should only be carried out by competent person. Check and replace if necessary. Check and replace if necessary. Vacuum gauge (pos. 8) reads Pressure gauge (pos. 7) reads See 4.1 1.8 Hg below 80 psi (5.4 bar). Air leaks at suction hose coupling. Air leaks around aerofoil (pos. 17). Nozzle (pos. 10) worn or not sealing correctly. Venturi tube (pos. 1) worn. Excessive length of 4 (100 mm) discharge hose fitted, max. recommended-40 ft. (12 mtr.) Check action of camlock, check And replace seal ring (pos. 26) if necessary. Check, reseal or replace as necessary. Check and replace as necessary. Remove 2½ (62 mm) suction hose, place flat blanking plate over end of suction hose coupling insert (pos. 3). If vacuum gauge reads below 13.5 Hg. replace venturi tube. Reduce length if necessary. Intermittent flow of abrasive. Insufficient air flow through recovery Slowly open adjusting ring on hose. gulper head (see 2.5) until smooth flow achieved. Very poor recovery rate. Excessive air flow through recovery Slowly adjust ring on gulper head hose. (see 2.5) to restrict air flow. Blockage in pump body (pos. 18). Blockage in suction hose. Remove suction hose coupling, check and clear blockages around aerofoil. Remove and clear blockages. Page 3 Nov 2012 Airblast B.V.

6.0 SPARE PARTS ART.NR. MODEL DESCRIPTION 30640 AIRVAC MARK III Portable vacuum recovery system complete. Weight: 27 kgs. 01) 30650 AV - 1 Venturi tube 02) 30660 AV - 2 Discharge hose coupling 03) 30670 AV - 3 Suction hose coupling insert 04) 30680 AV - 4 Suction hose coupling 05) 30690 AV - 5 Mixing chamber 06) 30700 AV - 6 Venturi sheath 07) 30710 AV - 7 Pressure gauge 08) 30720 AV - 8 Vacuum gauge 09) 30730 AV - 9 Discharge coupler 10) 30740 AV - 10 Nozzle 11) 30750 AV - 11 Air valve 12) 30760 AV - 12 Manifold assembly 13) 30770 AV - 13 Pump assembly (body with aerofoil fitted) 14) 30780 AV - 14 Restrictor 15) 30790 AV - 15 Gulper (adjustable) 17) 30810 AV - 17 Aerofoil 18) 30820 AV - 18 Body 19) 30830 AV - 19 Leg bracket 20) 30840 AV - 20 Body coupler 21) 30850 AV - 21 Location screws short (2 per set) 22) 30860 AV - 22 Location screws long (2 per set) 23) 30870 AV - 23 Manifold screws (4 per set) 24) 30880 AV - 24 Manifold gasket 25) 30890 AV - 25 Nozzle key 26) 30900 AV - 26 Seal ring (camlock) 21830 2½ (62 mm) hose 2½ (62 mm) antistatic flexible plastic hose 21840 4 (100 mm) hose 4 (100 mm) antistatic flexible plastic hose Nov 2012 Airblast B.V. Page 4

Page 5 Nov 2012 Airblast B.V.

NOTES: Nov 2012 Airblast B.V. Page 6

Airblast Group Airblast B.V. P.O. Box 1075 1700 BB Heerhugowaard The Netherlands Tel : +31 72 5718002 Fax : +31 72 5714340 Email : info@airblast.com Web : www.airblast.com Airblast Middle East L.L.C. P.O. Box 33419 Dubai United Arab Emirates Tel : +971 4 3242776 Fax : +971 4 3242778 Email : airblast@emirates.net.ae Airblast Saudi Trading & Industrial Est. P.O. Box 30476 Al-Khobar 31952 Kingdom of Saudi Arabia Tel : +966 3 8473178 Fax : +966 3 8471430 Email : info@airblast.com.sa Airblast Qatar WLL P.O. Box 47044 Wakra Qatar Tel : +974 4 4631043 / +974 4 4631074 Fax : +974 4 4631154 Email : info@airblast.com.qa Asia Airblast Pte Ltd. 58, Tuas Basin Link Singapore 638774 Tel. : +65 6266 6010 Fax : +65 6266 6968 E-mail : airblastsg@singnet.com.sg AB Corrosion Control Equipment Sdn Bhd No. 33, Jalan Permas 3/18 Bandar Baru Permas Jaya 81750 Masai, Johor Darul Takzim Malaysia Tel : +60 7357 7989 Fax : +60 7357 7689 Email : airblastmy@airblastasia.org Airblast Equipment India Private Ltd. #6-1-73/Unit - 207 SAEED PLAZA HDFC Bank Building Lakdi Ka Pul Hyderabad 500004-AP India Tel : +91 40 6674 8855 Fax : +91 40 6674 8851 Email : info@airblastindia.com