November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

Similar documents
ORIGINAL AND REVISED DEVELOPMENT CONCEPTS

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

RE: Traffic Impact Statement: Paper Mill Lake Subdivision

2.0 Development Driveways. Movin Out June 2017

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

Traffic Generation November 28, Mr. Todd Baker Baker Properties, LLC 953 Islington Street Suite 23D Portsmouth, NH 03801

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

Traffic Engineering Study

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

TECHNICAL MEMORANDUM. Part A: Introduction

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

King Soopers #116 Thornton, Colorado

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL

Re: Residential Development - Ogilvie/Cummings Transportation Overview

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Dartmouth, NS B3B 1X7 Tel: WSP. Canada Inc.

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Re: 233 Armstrong Street Residential Condominium Traffic Brief

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

370 Queen Elizabeth Drive Transportation Overview

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Traffic Study for Highway 107 Phase 1 Burnside to Sackville

Prepared for: Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Environmental Assessment Derry Road and Argentia Road Intersection

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

Construction Staging Area 4 Avenue Road

TRAFFIC PARKING ANALYSIS

Traffic Impact Statement (TIS)

Lacey Gateway Residential Phase 1

830 Main Street Halifax Regional Municipality

Construction Realty Co.

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

Section 5.0 Traffic Information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

Appendix C. Traffic Study

Existing Traffic Conditions

4.14 TRANSPORTATION AND CIRCULATION

TRANSPORTATION TECHNICAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

The Re:Queen and Sparks Traffic Brief - Addendum #2

5.9 TRANSPORTATION AND TRAFFIC

RE: INNES / TRIM RETIREMENT RESIDENCE TRANSPORTATION OVERVIEW

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Alpine Highway to North County Boulevard Connector Study

4131 Chain Bridge Road

TRANSPORTATION REVIEW

Clean Harbors Canada, Inc.

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

HUMC/Mountainside Hospital Redevelopment Plan

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

11 October 12, 2011 Public Hearing APPLICANT:

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

Lakeside Terrace Development

Port Wallace Development: Safety and Traffic Concerns. April 12, 2018

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

ANDERSON PROPERTY SITE ANALYSIS

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

V. DEVELOPMENT OF CONCEPTS

Transportation & Traffic Engineering

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

EXCEPTION TO STANDARDS REPORT

Citizens Committee for Facilities

Appendix J Traffic Impact Study

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

Transcription:

161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for the development of two sites (PID 41119496 referred to as BH-1; and PID 00360560, referred to as BH-2). Both sites are located within the Bedford South Master Plan Area (site locations shown in Figure 1) and are being developed by Tabrizi Rugs. SITE DESCRIPTION The sites are currently unoccupied and are located on the southwest (BH-1) and southeast (BH-2) corners of the Bedford Highway at Southgate Drive intersection in Bedford, NS (See Figure 1). Both sites are within the Bedford South Master Plan Area. DESCRIPTION OF PLANNED DEVELOPMENT Both sites are planned for residential development with unit counts that include: 73 apartment units; 30 townhouse units; and, 1 single family home. Figure 1 Location of Subject Sites The breakdown of permitted and proposed units by site and current plans for each site are summarized in Table 1. 1 Spectacle Lake Drive Dartmouth, NS, Canada B3B 1X7 Tel.: +1 902-835-9955 Fax: +1 902-835-1645 www.wsp.com

Site Site Plan BH-1 (73 unit apartment building) Traffic Impact Statement Table 1 Unit Counts and Site Plans for BH-1 and BH-2 BH-2 (30 townhouse units; 1 single family home) Page 2

Traffic Impact Statement ACCESS FOR LOT BH-1 Vehicular access to Lot BH-1 (See Table 1) is planned to be via an underground parking garage and a surface parking lot for short term drop off/pick up and visitor parking, both driveways will be two way and access Southgate Drive. Stopping sight distance (SSD) measurements were recorded for the proposed driveways and indicate the following: Driveway for Surface Lot Driveway for Underground Parking SSD measurements recorded indicate over 100 m of available SSD for both directions of travel, which is greater than the minimum SSD of 77 m for an approach speed of 60 km/h on a +6% grade and of 92 m for an approach speed of 60 km/h on a -6% grade. SSD measurements recorded indicate over 100 m of available SSD for the northbound approach (toward Bedford Highway), which is greater than the minimum SSD of 92 m for an approach speed of 60 km/h on a -6% grade (See Photo 2). Vehicles from the north are traveling at lower speed after just turning from Bedford Highway. SSD measurements recorded indicate 50 m of available SSD for the southbound approach (from Bedford Highway), which is greater than the minimum SSD of 42 m for an approach speed of 40 km/h on a +6% grade. With removal of brush on the site side (seen to the left in Photo 1) it is expected that a vehicle exiting the driveway will be able to see traffic in the right turn channel and turning left from Bedford Highway. There are small trees in the boulevard on Southgate Drive that could be pruned and growth monitored to improve visibility (See Photo 1). Photo 1 Looking Left (toward Bedford Highway) from the proposed driveway to underground parking Photo 2 Looking right from the proposed driveway to underground parking ACCESS FOR LOT BH-2 Vehicular access to Lot BH-2 (See Table 1) is planned to be via: A single driveway access to Bedford Highway for 18 townhouse units; A single driveway access to Glenmount Avenue for the remaining 12 townhouse units; and, Continued use of a driveway to Glenmount Avenue for the single family home. Stopping sight distance (SSD) measurements were recorded for the proposed driveway onto Bedford Highway and indicate over 110 m of available SSD for both directions of travel, which is greater than the minimum SSD of 101 m for an approach speed of 65 km/h on a -3% grade (See Photos 3 and 4). Photo 3 Looking Left (toward Southgate Drive) from the proposed driveway connection to Bedford Highway Photo 4 Looking right from the proposed driveway connection to the Bedford Highway Page 3

Traffic Impact Statement DESCRIPTION OF EXISTING STREETS AND INTERSECTIONS Bedford Highway is a two lane arterial road that runs northsouth between Bedford and Windsor Street in Halifax. In the subject area, the Bedford Highway has a 50 km/h posted speed limit, sidewalk on the west side ending at Southgate Drive and a 2 lane cross section and marked bicycle lanes. Machine traffic counts collected by HRM Traffic Management in November 2012 between Hammond Plains Road and Moirs Mill Road indicate a two-way volume on Bedford Highway of approximately 19,600 vehicles per day (vpd) with two-way volumes of approximately 1,300 vehicles per hour (vph) in the AM peak hour and 1,700 vph in the PM peak hour. Southgate Drive is a minor collector road that runs east-west from Larry Uteck Boulevard in the west to Bedford Highway in the east. Southgate Drive has a two-lane cross section and a 50 km/h speed limit with concrete sidewalk on the south side. Machine traffic counts collected by HRM Traffic Management in October 2017 indicate a daily volume of approximately 3500 vehicles per day. Glenmount Avenue is a local street that runs east-west from its intersection with the Bedford to its terminus with a cul-desac bulb. The street has two lane urban cross section and no concrete sidewalk. The T-intersection of Bedford Highway at Southgate Drive is signalized with lane configurations that include a northbound left turn lane, a southbound right turn channelized island, and a two lane eastbound approach (See Figure 2). TRANSIT Halifax Transit currently operates Route #80 and #82 past the site with stops on both sides of Bedford Highway immediately in front of Site BH-2 (the existing shelter at the Halifaxbound bus stop can be seen in Photo 3). Figure 2 Bedford Highway at Southgate Drive Intersection Layout Moving Forward Together Plan (Halifax Transit, 2016) indicates that transit routes #8 (corridor route) and #93 will operate on Bedford Highway past the site and that route #192 will operate on Southgate Drive. TRIP GENERATION PROPOSED SITE When using the published trip generation rates in Trip Generation, 9th Edition (Institute of Transportation Engineers, Washington, 2012) the transportation engineer s objective should be to provide a realistic estimate of the number of trips that will be generated. For smaller developments that have unit counts well below the averages seen in the ITE studies, the use of the fitted curve equations may provide estimates that are unreasonably high for the size of the development (while underestimating trip generation for very large developments). The number of proposed single family residential units (31, combined townhouse and single family) is well below the average rates for the AM (292 average units in ITE studies) and PM (321 average units in ITE studies). Additionally, the number of apartment units (73) is below the average rates for the AM and PM (120 average units in the ITE studies). Since the use of the average rate for Single Family Detached Housing (Land Use 210, Pages 297 and 298) and Mid-Rise Apartment (Lane Use 223, Pages 387 and 388) were expected to provide more realistic trip generation estimates for this development, the average rates were used. Although the use of average rates is expected to produce a more accurate estimate of the trips generated by this development, WSP has reviewed the trip generation estimates (top section, Table 2) and compared them to those obtained using the fitted curve equations for the AM and PM peak hours to estimate the trips generated by the development using the fitted curve equations (bottom section, Table 2). Page 4

Traffic Impact Statement Land Use Single Family Residential (Land Use 210) Units 3 Table 2 Trip Generation Estimates Trip Generation Rates Trips Generated 4 AM Peak PM Peak AM Peak PM Peak In Out In Out In Out In Out Trip Generation Estimate for BH-1 Residential Development (Access to Southgate Drive) (Average Rates) 1 Mid-Rise Apartment 73 0.09 0.21 0.23 0.16 7 15 17 12 (Land Use 223) Trip Generation Estimate for BH-2 with Bedford Highway Access (Average Rates) 1 18 0.19 0.56 0.63 0.37 Trip Generation Estimate for BH-2 with Glenmount Avenue Access (Average Rates) 1 Single Family Residential (Land Use 210) 3 10 11 13 0.19 0.56 0.63 0.37 2 7 8 5 7 Total Estimated Trips (Average Rates) 12 32 36 24 Trip Generation Estimate for BH-1 Residential Development (Fitted curve equations) 2 Mid-Rise Apartment (Land Use 223) Trip Generation Estimate for BH-2 Residential Development (Fitted curve equations) 2 Single Family Residential (Land Use 210) 73 31 Fitted Curve Equations have been Used Fitted Curve Equations have been Used 5 12 14 10 8 24 23 Total Trips with Fitted Curve Equations 13 36 37 24 % Increase in estimated trips by using the fitted curve equations 8% 13% 3% 0% Notes: 1. Trip generation rates are 'vehicles per hour per unit' for the indicated land use, prepared using published rates from Trip Generation, 9th Edition (Institute of Transportation Engineers, Washington, 2012). 2. Trip generation rates use the fitted curve equation for indicated Land Use from Trip Generation, 9th Edition (Institute of Transportation Engineers, Washington, 2012). 3. Units are number of residential units. 4. Vehicles per hour for peak hours 14 A summary of the estimated trips by access and for the combined site development is included in Table 3. BH-1 BH-2 Via Bedford Highway BH-2 Via Glenmount Avenue Total Combined Sites (BH-1 and BH-2) Table 3 Summary of Estimated Trips AM Peak Hour PM Peak Hour 22 two-way trips (7 entering and 15 exiting) 13 two-way trips (3 entering and 10 exiting) 9 two-way trips (2 entering and 7 exiting) 44 two-way trips (12 entering and 32 exiting) 29 two-way trips (17 entering and 12 exiting) 18 two-way trips (11 entering and 7 exiting) 13 two-way trips (8 entering and 5 exiting) 60 two-way trips (36 entering and 24 exiting) Page 5

Original Signed Original Signed