SFI SPECIFICATION 27.1 EFFECTIVE: OCTOBER 11, 2006 *

Similar documents
SFI SPECIFICATION 4.2 EFFECTIVE: OCTOBER 26, 1994*

SFI SPECIFICATION 15.2 EFFECTIVE: MAY 1, 2008 *

SFI SPECIFICATION 35.1 EFFECTIVE: AUGUST 26, 2008 *

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 *

SFI SPECIFICATION 7.2 EFFECTIVE: DECEMBER 15, 2006 *

SFI SPECIFICATION 1.2 EFFECTIVE: FEBRUARY 9, 2006* PRODUCT: Multiple Disc Clutch Assemblies for Vehicles with Naturally Aspirated Engines

SFI SPECIFICATION 1.3 EFFECTIVE: MAY 23, 2000 * PRODUCT: Nitro-Methane Drag Race Multiple Disc Clutch Assemblies

SFI SPECIFICATION 14.3 EFFECTIVE: AUGUST 25, 2017 *

SFI SPECIFICATION 34.1 EFFECTIVE: January 13, 2017*

SFI SPECIFICATION 28.1 EFFECTIVE: AUGUST 25, 2017 *

SFI SPECIFICATION 15.4 EFFECTIVE: JULY 20, 2010 * PRODUCT: Top Fuel and Funny Car Drag Race Drive Beadlock Wheels

SFI SPECIFICATION 49.2 EFFECTIVE: MARCH 22, 2011 *

SFI SPECIFICATION 6.1 EFFECTIVE: FEBRUARY 26, 2014 *

SFI SPECIFICATION 39.2 EFFECTIVE: August 25, 2017 *

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *

SFI SPECIFICATION 3.2A EFFECTIVE: APRIL 20, 2018 *

SFI SPECIFICATION 32.1 EFFECTIVE: MARCH 24, 2009 *

SFI SPECIFICATION 6.3 EFFECTIVE: FEBRUARY 26, 2014 *

SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 *

SFI SPECIFICATION 28.3 EFFECTIVE: APRIL 21, 2014 *

SFI SPECIFICATION 3.3 EFFECTIVE: AUGUST 26, 2016 *

SFI SPECIFICATION 16.5 EFFECTIVE: DECEMBER 29, 2014 *

SFI SPECIFICATION 41.1 EFFECTIVE: MARCH 27, 2013 *

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

E/ECE/324/Rev.2/Add.108/Rev.1/Amend.3 E/ECE/TRANS/505/Rev.2/Add.108/Rev.1/Amend.3

DEPARTMENT OF TRADE AND INDUSTRY NO APRIL 2016

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

SYNOPSIS OF PROPOSED GEORGIA DEPARTMENT OF PUBLIC SAFETY RULES CHAPTER TRANSPORTATION NETWORK COMPANIES AND TAXI SERVICES

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)

E/ECE/324/Add.5/Rev.6/Amend.2 E/ECE/TRANS/505/Add.5/Rev.6/Amend.2

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

ST. VINCENT AND THE GRENADINES

2017 A AND B GROUP TECH REQUIREMENTS

CITY OF HAMILTON BY-LAW NO

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Lithium cells and batteries. (Instructor s Note: Post HM215N)

IMO fuel oil consumption data collection system

Purchasing Services 4202 East Fowler Avenue, SVC 1073 Tampa, Florida (813) Addendum No. 1

ECE/RCTE/CONF/4/Add.1/Rev.2

e-cfr data is current as of January 5, 2017

Informal Document N 20 (30th GRSP, 3-6 December 2001, agenda item 1.4) Insert in the "CONTENTS" the headlines of new annexes 10 & 11 to read:

UNITED STATES COAST GUARD OCEAN ENGINEERING DIVISION WASHINGTON, D.C. JANUARY 2011 SPECIFICATION FOR THE MANUFACTURE

ANNEX MOTOR VEHICLES AND EQUIPMENT AND PARTS THEREOF. Article 1. Definitions

SANDAG Vanpool Program Guidelines as of February 2018

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels

ANNEX 8 RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS

E/ECE/324/Rev.2/Add.105/Rev.2/Amend.5 E/ECE/TRANS/505/Rev.2/Add.105/Rev.2/Amend.5

E/ECE/324/Rev.1/Add.53/Rev.3/Amend.3 E/ECE/TRANS/505/Rev.1/Add.53/Rev.3/Amend.3

THE CORPORATON OF THE TOWN OF MIDLAND VEHICLE TOWING AND POUND SERVICES 2018/2019 TENDER L

Principle Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act ZEK

E/ECE/324/Rev.1/Add.57/Rev.2/Amend.4 E/ECE/TRANS/505/Rev.1/Add.57/Rev.2/Amend.4

CHAPTER 20.1 WASTEWATER HAULING. Section Definitions. For the purposes of this article, the following definitions shall apply:

06 November /13675-R. Mr. Julian Reusing President & CEO GoliathTech Inc. 175B, rue Peladeau Magog, QC J1X 5G9. Dear Mr.

E/ECE/324/Add.3/Rev.3 E/ECE/TRANS/505/Add.3/Rev.3

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

E/ECE/324/Rev.2/Add.126/Rev.1/Amend.1 E/ECE/TRANS/505/Rev.2/Add.126/Rev.1/Amend.1

E/ECE/324/Rev.1/Add.91/Rev.1/Amend.2 E/ECE/TRANS/505/Rev.1/Add.91/Rev.1/Amend.2

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 2 HOUSE BILL 469* Committee Substitute Favorable 4/24/17

Guideline for the Queensland Rally Vehicle Registration Scheme

E/ECE/324/Rev.1/Add.90/Rev.3 E/ECE/TRANS/505/Rev.1/Add.90/Rev.3

24. SOLAR INCENTIVE PROGRAM II

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.3 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.3

WPERC Irrigation Engine Rebate Program Rules

E/ECE/324/Rev.2/Add.116/Rev.4 E/ECE/TRANS/505/Rev.2/Add.116/Rev.4

E/ECE/324/Rev.1/Add.74/Rev.2/Amend.4 E/ECE/TRANS/505/Rev.1/Add.74/Rev.2/Amend.4

TCDS NUMBER E00078NE U.S. DEPARTMENT OF TRANSPORTATION REVISION: 3 DATE: April 12, 2011

AGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 102: Regulation No. 103

VOLUNTARY CODE OF PRACTICE FOR ELECTROMAGNETIC COMPATIBILITY (EMC) OF MOTOR VEHICLES (13 October 2014)

IGNITION INTERLOCK SERVICE CENTER RENEWAL LICENSE

City of Storm Lake Fire Department Heavy Rescue Specifications

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

ORDINANCE NO BE ORDAINED BY THE CITY COUNCIL OF THE CITY OF TALLADEGA, ALABAMA, AS FOLLOWS:

Business and Noninstructional Operations

Access Management Standards

E/ECE/324/Rev.1/Add.43/Rev.3/Amend.7 E/ECE/TRANS/505/Rev.1/Add.43/Rev.3/Amend.7

Section 12: Record Keeping Requirements. Minnesota Trucking Regulations

Evaluation Report CCMC R Ram Jack Helical Foundation Systems and Devices

ORDINANCE TOWN OF ALBANY. Revised 8/19/03 GREEN COUNTY WISCONSIN

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

COVINGTON POLICE DEPARTMENT STANDARD OPERATING PROCEDURE

ST. VINCENT AND THE GRENADINES

MISSOURI SERVICE AREA

BMW of North America, LLC, Grant of Petition for Decision of. AGENCY: National Highway Traffic Safety Administration (NHTSA),

CITY OF SAN GABRIEL ALL-NIGHT PARKING APPLICATION

COMMISSION REGULATION (EU) / of XXX

ENERGY STAR Program Requirements for Single Voltage External Ac-Dc and Ac-Ac Power Supplies. Eligibility Criteria.

Grant Guidelines To States For Implementing The Secondary Containment Provision Of The Energy Policy Act Of 2005

City of Sealy Emergency Wrecker Service License Application

Special Condition. Approval of Turbofan Engine Take-off Thrust at High Ambient Temperature (TOTHAT) rating.

Safe-Stop TMA (Truck Mounted Attenuator) GENERAL SPECIFICATIONS

VILLAGE OF NEW BADEN, ILLINOIS ORDINANCE NO A

Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

Frazeysburg Police Department

Forensic Sciences Chapter ALABAMA DEPARTMENT OF FORENSIC SCIENCES ADMINISTRATIVE CODE CHAPTER IGNITION INTERLOCK RULES

Transcription:

SFI SPECIFICATION 27.1 EFFECTIVE: OCTOBER 11, 2006 * PRODUCT: Window Nets 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for evaluating and determining performance capabilities for Window Nets used by individuals engaged in competitive motorsports. 1.2 The procedures, test evaluations and standards contained herein, are intended only as minimum guidelines for construction and evaluation of products. Certification that products meet such minimum standards is made by the product manufacturer and products are not certified, endorsed or approved by SFI under this program. 1.3 Use of the "This Manufacturer Certifies That This Product Meets SFI Specification 27.1" logo/designation, the authorized artwork style, or conventional lettering by a manufacturer, on a subject product, is intended only to indicate that the manufacturer of the product has represented that they have submitted the product to the recommended tests, with positive results, in compliance with the standards established herein. 1.4 This SFI Specification requires a demonstration that the product of a manufacturer meets or exceeds the requirements when the manufacturer enters the program; and on a periodic basis thereafter. Any manufacturer may participate in the program by providing Window Nets that meet or exceed the SFI Specification 27.1 test standards, by complying with the requirements of the SFI Specification 27.1 program, and by signing a licensing agreement with the SFI Foundation, Inc. 1.5 Compliance with this specification is entirely voluntary. However, when a manufacturer provides Window Nets in compliance with all requirements of the SFI Specification 27.1 and enters into the licensing agreement with the SFI Specification 27.1 Page 1 Effective: October 11, 2006

SFI Foundation, Inc., they may certify that compliance with such standards is in accordance with the guidelines established herein. 1.6 Manufacturers wishing to participate in the program, in addition to the other requirements of this specification, must label each of their products with the manufacturer's name, trademark or symbol as well as the date of manufacture of the product. 1.7 No manufacturer may display the SFI logo/designation on their product unless the manufacturer has signed a licensing agreement with SFI and has successfully complied with all the requirements of this specification and the self-certification program. 2.0 DEFINITIONS 2.1 Window Nets are used to contain the occupants within a vehicle during unusual attitude conditions. They are normally required in motor sport applications when the drivers side window or window area is open. 2.2 The webbing is the inner portion of the Window Net that is connected to the outer borders. 2.3 The useful life of the Window Net shall not exceed two years and must be replaced at or before that time. 2.4 Any Window Net pertaining to this specification shall remain as constructed by the original manufacturer and not modified. 3.0 CONSTRUCTION The Window Net can be made of various materials. The requirements, besides passing the tests herein, are those of functionality. Adequate driver visibility through the net, ease of mounting and removal, and fire retardant material properties are all desirable features. This specification pertains to window nets only and not the installation thereof. 4.0 MODEL CLASSIFICATION Window net models are primarily based on materials, method of manufacture and webbing pattern dimensions. Any change of these factors constitutes a model change. The minimum width, as measured along the length of the car, shall be ten (10) inches (254mm). SFI Specification 27.1 Page 2 Effective: October 11, 2006

5.0 TESTING Test samples shall be fully processed new nets which are representative of nets currently produced or to be produced. If mounting hardware and/or mounting instructions are included with the net, they shall also be supplied. 5.1 PENETRATION RESISTANCE 5.1.1 SAMPLES Three samples shall be tested. If one sample fails, a fourth one shall be tested. 5.1.2 APPARATUS A. FIXTURE The fixture shall simulate the open portion of the vehicle that the window net is to cover. The mounting shall also simulate that of an actual vehicle except that the net shall be mounted in the horizontal plane. The net shall be secured at each of the four corners. If mounting hardware or mounting instructions are supplied, they shall be used to mount the net to the fixture. Otherwise, dowels made of solid steel, 0.562 ±0.020 inch (14.3 ±0.5 millimeter {mm}) in diameter, shall be used to support the net at each side and to attach the net to the fixture. The dowels shall be long enough to protrude from each end of the net to allow installation. Each end of the dowels shall have a 0.125 ±0.020 inch (3.2 ±0.5 mm) diameter hole drilled through to allow attachment of cotter pins. After placing in the fixture, flat metal washers are to be installed on the ends of the dowels, then secured with the cotter pins. B. PENETRATION OBJECT A solid ball with a diameter of 3.00 ±0.06 inches (76.2 ±1.5 mm) shall be used. The ball shall be made of steel with a smooth finish and weigh 4.00 ±0.25 pounds {lb} (17.79 ±1.11 newtons {N}). 5.1.3 PROCEDURE Align the center of the ball with the geometric center of a webbing opening near the center of the net. Drop the ball from a height of 2.00-0/+0.12 inches (50.8-0/+3.0 mm). The ball shall be allowed to fall freely without interference. Perform the test three times by dropping the ball onto three SFI Specification 27.1 Page 3 Effective: October 11, 2006

different openings. Note the penetration of the ball into the webbing on each drop. 5.2 RAPID IMPACT RESISTANCE 5.2.1 SAMPLES Three samples shall be tested. If one sample fails, a fourth one shall be tested. 5.2.2 APPARATUS A. FIXTURE The fixture shall be identical to the one used in the previous test. B. IMPACT BAG The impact bag shall be made of leather and/or any other heavy weight material. If the bag penetrates the net, the material shall not rip (heavy cotton canvas has proven unsuitable for this purpose). The bag shall be 10.00 ±0.25 inches (254 ±6 mm) in diameter at the bottom, impact side and shall be long enough to allow 175 lb (778.4 N) of "OO" or smaller lead shot pellets to be placed inside the bag. The opening shall be capable of being closed off tightly to prevent spillage of the shot during testing. 5.2.3 PROCEDURE Drop the impact bag from a height of 26.5-0/+0.5 inches (673-0/+13 mm) directly over the center of the net and onto the webbing. The bag shall be allowed to fall freely without interference. 5.2.4 INSPECTION Inspect the net for failure of the inner cross-section joints, separation of the webbing from the net border and stitching at the border. 6.0 PROOF OF COMPLIANCE Window Net manufacturers are required to provide the following information to enroll in this program: SFI Specification 27.1 Page 4 Effective: October 11, 2006

6.1 TEST RESULTS Test results shall be documented in a test report. 7.0 TEST REPORTS 6.1.1 PENETRATION RESISTANCE Three out of four nets shall be required to prevent the ball from passing through on each of the three tries in order to pass this test. 6.1.2 RAPID IMPACT RESISTANCE Three out of four nets shall be required to pass this test. Failure of a net constitutes any of the following conditions: A. The impact bag passes through the net. B. More than 50 percent of the inner cross-section webbing joints pull apart. C. 50 percent or more of the webbing ends separate from the border of the net. D. 50 percent or more of the border material is ripped at the border stitching (dowel loop). A separate test report, or set of test reports if required, shall be submitted for each product model. If more than one test facility is required to complete all necessary tests, then a separate test report shall be submitted from each one. A test report shall be submitted for each component, if tested separately. The test facility shall assign a unique number to each test report. This number along with the report date and page number shall appear on each page. Each test report shall include: 7.1 RELEVANT INFORMATION 7.1.1 Manufacturer's name, contact name, address and telephone number. 7.1.2 Name, address and telephone number of the test facility. 7.1.3 Name and signature of the responsible test supervisor. 7.1.4 Actual date of the test. SFI Specification 27.1 Page 5 Effective: October 11, 2006

7.2 TESTS 7.1.5 Specification number and effective date. 7.1.6 Product name, description and model designation. 7.1.7 Component name and description. Each test conducted shall be listed showing the test name, apparatus used, procedure used and test results obtained along with any other appropriate information. 7.3 AUTHENTICATION Test reports shall be authenticated and stamped by a Professional Engineer who is registered in the state in which the testing is conducted. If necessary, SFI may allow an equivalent entity to provide authentication. 8.0 INITIAL DESIGN VALIDATION To receive initial recognition from SFI as a participant in the SFI Specification 27.1 Program, the manufacturer must submit to SFI all information delineated in the Proof of Compliance section. This information shall be provided for each Window Net model offered by the applicant that is to be included in the program. Any change in design, materials and/or methods of manufacturing not specifically excluded is considered a model change and, therefore, requires initial design validation. 9.0 PERIODIC REVALIDATION Test reports with successful test results must be submitted to SFI at least once every 24 month period following the date of the initial design validation test for each model of Window Net manufactured by the participant. If multiple test reports are required to obtain all test results, then the earliest test date shall be used to determine when the periodic revalidation reports are due. Also, SFI shall retain the option to conduct random audit reviews. SFI shall purchase the product on a commercial basis and test for compliance to the specification. The submitting manufacturer shall reimburse SFI for all audit costs. 10.0 CERTIFICATION OF COMPLIANCE Upon demonstration of successful compliance with all the requirements of the specification and the self-certification program and upon entering the licensing agreement with SFI, the manufacturer may advertise, present and offer the Window Nets for sale with the representation that their product meets the SFI Specification 27.1. Continuing certification is contingent upon the following additional considerations: (1) the product shall be SFI Specification 27.1 Page 6 Effective: October 11, 2006

resubmitted for testing following any change in design, materials and/or methods of manufacturing not specifically excluded, and (2) periodic revalidation test reports are submitted when due to SFI. 11.0 CONFORMANCE LABELS The conformance label is a patch which shall be sewn to the outer surface of the net (the surface facing the exterior of the vehicle). The patch issued by SFI is preprinted to indicate the month and year of certification expiration per Paragraph 2.3 of this specification. 12.0 DECERTIFICATION Participating manufacturers are subject to decertification when not in compliance with the requirements of this program or when their products are not in compliance with the requirements of this specification. Decertification will provide SFI the right to effect any and all remedies which are available to SFI in the licensing agreement. 13.0 APPEAL PROCEDURE In the event of decertification, the manufacturer is entitled to an appeal of the decision of SFI. Requests for appeal must be received by SFI no later than thirty days following receipt of the notice of decertification. Appeals of such decisions will be heard at the next meeting of the Board of Directors of SFI. 14.0 STATEMENT OF LIMITATIONS Testing procedures and/or standards contained in this specification are intended for use only as a guide in determining compliance with the minimum performance requirements as defined herein. The granting and assignment of the "This Manufacturer Certifies That This Product Meets SFI Specification 27.1" logo/designation is in no way an endorsement or certification of product performance or reliability by SFI. SFI, its officers, directors and/or members assume no responsibility, legal or otherwise, for failure or malfunctions of a product under this program. 15.0 COSTS All costs involved in this program will be absorbed by the submitting manufacturer. SFI Specification 27.1 Page 7 Effective: October 11, 2006

16.0 COMPLIANCE PERIOD As this specification is revised to reflect changes in technology and/or field conditions, to remain current, participating manufacturers in the SFI Specification 27.1, Window Net, Program, must demonstrate full compliance with the requirements of this specification within ninety (90) days of the latest effective date. * Original Issue: October 10, 1989 Reviewed: December 4, 1993 Revised: February 14, 1996 Reviewed: December 4, 1997 Edited: February 2, 1998 Reviewed: November 20, 1999 Reviewed: December 1, 2001 Reviewed: December 6, 2003 Reviewed: December 3, 2005 Revised: October 11, 2006 Edited: February 20, 2008 Reviewed: December 12, 2009 Reviewed: December 3, 2011 Reviewed: December 13, 2013 Reviewed: December 11, 2015 Edited: January 20, 2017 SFI Specification 27.1 Page 8 Effective: October 11, 2006