DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE) INSTALLATION AND OPERATING INSTRUCTIONS

Similar documents
OPERATION, INSTALLATION, & MAINTENANCE MANUAL. for. Aircon compressed air (bin vents) Top-bag removal style filters

OPERATION, INSTALLATION, & MAINTENANCE MANUAL. for. Aircon CAS Compressed Air Square. Top-Bag-Removal Baghouse

COMPACT BAGHOUSE COLLECTOR

OptiFlo. Pulse-Jet Cylindrical Cartridge Dust Collector. Better Air is Our Business. Table of Contents. 1.0 General Information

PRESSURE CABINETS PROBLEM CAUSE SOLUTION

RPC-2 REVERSE PULSE DUST COLLECTOR

RPH Reverse-Pulse Dust Collectors Models RPH-2, 3, 4, 6, and 8 O. M

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

LARRY HESS AND ASSOCIATES, INC. 185 PIPER LANE SALISBURY, NC USA FAX: WARNING

Portable Oil Free Silent Series Compressor Operating Instructions

Dalamatic Dust Collectors

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT DRIVE XBL FANS

Model PVB TB-OIM-R0 OPERATION, INSTRUCTIONS & MAINTENANCE MANUAL PULSE JET BIN VENT W/ BOTTOM ACCESS

PULSE JET CARTRIDGE DUST COLLECTOR FEATURES ADVANTAGE

Model PPR TB-OIM-R3 OPERATION, INSTRUCTIONS & MAINTENANCE MANUAL PULSE JET PLEATED ELEMENT W/ ROOF ACCESS

Fabric Pulse Jet Collector Early Designs (Circa 1963)

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference.

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL

Installation & Service Manual for Horizontal Cartridge Filtration Systems

GE Energy. Advancements in Particulate Emissions Control Technology for Industrial Sources

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT & DIRECT DRIVE XB, HV, HVA, ADD, DDS, DDP

H.S. MACHINERY RING COMPRESSORS

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

MCF DUST FILTERS. Most Energy Efficient Cleaning Mechanism on the Market.

FABER BURNER ROUTINE MAINTENANCE

Installation and Operation Manual

Air pollution control

Mobile recleanable HEPA filter units for a flow of m 3 / h

OWNER S MANUAL DOWNWARD FLOW CARTRIDGE DUST COLLECTOR MODEL: SFC PATENT NO:

PRODUCT OPERATING MANUAL

Empire Abrasive Equipment Company

General Installation Instructions for Valves and Gates

Dust Collector October 2005

READ AND SAVE THESE INSTRUCTIONS

LARRY HESS AND ASSOCIATES, INC. 185 PIPER LANE SALISBURY, NC USA FAX

CA3000C & CA6000C Cartridge Air Cleaners

SUPERIOR PERFORMANCE

PULSE JET FILTER OPERATION AND MAINTENANCE MANUAL

Variable Air Volume Dampers

Copeland Screw TM Compressors

The Anatomy of a Drum Filter

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

Unique Design & Engineering Approaches for Dust Collection and Pneumatic Conveying

Principals of Operation... 1 Rotary Vane Priming Pump VPE and VPES... 2 Rotary Vane Priming Pump VPO and VPOS Priming Valve...

MODEL MC1500 Installation and Operation Manual Important:

DOWNFLO II DUST COLLECTORS

PRODUCT OPERATING MANUAL

HS Refrigeration Screw Compressor Troubleshooting Guidelines. SG March 2014

COMPRESSED AIR LOADER MODEL: AL-1

VFC-5 to VFC-500 FLO-COATER

Spencer Jet-Clean Cartridge Separator

BioJet 2100C. 1. Introduction 2

APPENDIX A. 15 DUAL WELD STATION FUME EXTRACTION with 30 WELDING BOOTHS

CDC-1 Reverse Pulse Dust Collectors Models 300, 600, and 900 CFM O. M

6. Document tasks performed during visit and report any observations to the appropriate

FJS Continuous Cleaning Cartridge Series Installation and Operation Manual

INSTALLATION, OPERATION AND MAINTENANCE MANUAL (IOM)

Complete HVAC Capability

Downflo Evolution DFE 2-8, 2-12, 3-12, 3-18, 3-24, 3-36, 3-48, 3-60, 3-72, 4-16, 4-24, 4-32, 4-48, 4-64, 4-80, 5-20, 5-30, 5-40, 5-60 and 5-80

LNG Screw Down Non-Return Valve Installation, Operation and Maintenance Manual

X4 Installation and Operation Manual - POWER FLAME INCORPORATED

Maintenance and Repair

Single Stage Rotary Vane Vacuum Pump Installation and Operation Manual RX-40 RX-63 RX-100

VT Oil-Free Range Operators Handbook

The reference in sandblasting. DCM\DCM 3000 a DCM to series.

Routine Compressor Maintenance

Modulating Furnace Information. Warning on Meter Setting - Read First!

Suggested Installation & Operating Instructions for Sidewinder Pumps

SECTION AIR INTAKE SYSTEM

Suggested Installation & Operating Instructions for Sidewinder Pumps

Series 2200/2220 Control Valve. Operation and Maintenance SCOPE OF MANUAL MAINTENANCE DESCRIPTION VALVE INSTALLATION

Modular Baghouse Top Access MBT and MBTH

Single Stage Rotary Vane Vacuum Pump Installation and Operation Manual RX-10 RX-21 RX-25

Air Boss CA3000C & CA6000C. Installation Operation Maintenance Manual. Cartridge Air Cleaners

VARIO. VARIO Separation of fine dust particles. The VARIO series is particularly suitable for separation of fine dust.

PULSE JET FILTER INSTALLATION, OPERATION, & MAINTENANCE MANUAL

RolsplicerTM. Maintenance Manual And Illustrated Parts List

MARLEY ENGINEERED PRODUCTS OPERATING INSTRUCTIONS AND PARTS LIST

Dalamatic Dust Collectors

Horizontal downflow pleated cartridge dust collector

MODULAR BAGHOUSE DUST COLLECTORS POWERED BY

Model LA 4400 Time Delay OFF Controller

Packaged Downflo Evolution

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

PAGE 1. TES Operation & Testing Guidelines: Tes Trouble shooting

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL CNW DHK PVK

MAINTENANCE MANUAL FOR THERMOSTATIC TEMPERATURE REGULATING VALVE TRAC STYLE P

Operation and Maintenance Manual. Series BI Centrifugal Blowers

NECO Pumping Systems

INSTALLATION, OPERATION & MAINTENANCE MANUAL AXIAL UPBLAST FANS RTA, RWTA, RHTA, RB, RD, RTA SH

Torit PowerCore VH 1-4, 1-6, 2-8, 2-12, 2-16, 2-20, 3-18, 3-24, 3-30 VL 1-4, 1-6, 2-8, 2-12, 2-16, 2-20, 3-18, 3-24, 3-30

Torit PowerCore CPV-1, -2, -3, -4, -6, -8, and -12 After November 2008

MAINTENANCE - LPX PORTABLE TREATER

Torit PowerCore CPC-3, -4, -6, -8, -12, -16, -24, -32, -40 and -48 Hopper Inlet After November 2008

Prodigy HDLV Pump Manifold and Circuit Board

Torit Easy-Trunk. Installation and Operation Manual Installation, Operation, and Service Information. English Master Language

RF Dust Collectors. Torit Data Sheet. Models 48RF8-484RF12

Installation, Operation, & Maintenance Manual

Wiring diagrams on page 29 are for reference only. For detailed vehicle wiring refer to Navistar documents.

Supra-Blast Cartridge Dust Collector Installation and Operation Manual

Transcription:

4080 SE International Way. Suite B110, Milwaukie, OR 97222 (503) 654-0867 Fax: (503) 654-4671 email: ftech@filtertechnologyltd.com www.filtertechnologyltd.com DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE) INSTALLATION AND OPERATING INSTRUCTIONS GENERAL DESCRIPTION: Frequent cleaning is the key to high air to cloth filter ratios, constant differential pressure and the ability to handle heavy particulate loads. A reduced collector housing interstitial velocity is another advantage. For these reasons the dust Collector is particularly well suited to process services such as dryer exhausts, kiln stacks, pneumatic conveyor receivers, grinding systems and other sensitive systems where constant air volume is critical. Filter Technology Ltd collectors are custom designed for each application. Customer must refer to cover sheet and general arrangement drawings for proper orientation of equipment and accessories. OPERATING PRINCIPLE: (Figure 1, 2, 6 & 7) A. Solids laden air or gasses enter unit at hopper of housing inlet. B. Air passes through filter media. C. Solids are retained on filter surface. D. Filtered air is exhausted through clean air plenum. E. Cleaning cycle consists of a momentary blast of 100 psig compressed air. 1 Momentarily taking row of bags off stream through pressure reversal; 2 Flexing filter media; 3 Solids are released to fall to hopper and through unload system. F. Cycle timer is adjusted to maintain approximately 4 P across filter bags. Equipment should be installed at site location by qualified contractor. Accessories, fans, unload systems and controls are appropriate to customer s requirement. 1

INSTALLATION OF BOTTOM REMOVAL BAG & CAGE FILTERS ( Figure 4A 4F) 1. Slip filter bag over cage. The bag seam should not fall on cage split collar (Figure 4A) 2. Bottom of filter must be tight against the bottom of the cage and the longitudinal seam should be straight (Figure 4B) 3. Slip on filter clamp loosely. Tightening mechanical should not fall on filter bag seam (Figure 4C) 4. Install filter bag and cage assembly on venture and collar assembly. Filter bag and cage assembly must fit tightly against tubesheet for proper cage and venture collar groove alignment (Figure 4D) 5. Tighten clamp assembly with 5/16 socket (Figure 4E) 6. Make certain that filter bags are securely clamped and that they are hanging straight. It is that filter bags do not touch one another (Figure 4F). DIFFERENTIAL GAUGE OPERATION AND INSTALLATION: The differential pressure gauge or manometer provides the information which governs the setting of cleaning mechanism off time. Generally, the Dust Collector will operate at less than 4 W.G. differential pressure at a timer off time of 10-12 seconds. The differential gauge is supplied complete with fittings and tubing for hook up between the clean and dirty side of the dust collector. A special air filter is supplied on the dirty side of the collector to prevent fouling and false readings on the differential gauge. Installation is illustrated in figure 5. Upper Baghouse fitting should be connected to the lower part in the differential pressure gauge. Lower Baghouse fitting will connect to the upper part in the gauge. 4

CLEANING MECHANISM CONTROL AND WIRING: See separated timer and/ or control panel for wiring information. Upon completion of the preceding and other system hook ups, etc. you are ready for start-up. START-UP CHECK LIST: 1. Compressed Air Depending on unit size, a one to two inch supply line carrying 85 psig minimum plant air should be connected. It is good practice to blow down piping and air header to remove pipe cuttings, welding rod tips and other debris. An automatic purge valve is supplied on every header for purging moisture from the header. 2. Filter bags or Cartridges Are theses installed as instructed on previous page. 3. Differential pressure gauge or manometer Is this properly installed as instructed on previous page. 4. Timer Mechanism Check to see if wired as shown in Diagram and that the fuse is ok. 5. Auxiliary Equipment Check to see that there are no foreign objects in rotation equipment. Check rotation of fan, screw conveyor, and airlock. Generally airlocks (rotary valves) are operable running in either direction. 6. Duct work Check to see that all connections are tight and all clean-outs are closed. Piping must be free of all debris. START-UP DUST CONTROL SYSTEMS: 1. It is good practice to introduce the dust stream on a new bag set at a reduced rate. This is particularly true where either very fine solids (less than 2 microns) or heavy concentrations are present. Set the fan damper at about 60 to 70% of design flow. If uncertain, amperage on the fan motor can be checked to determine air flow. Pre coat the bags with a powder such as lime or use the fines being collected. Use 100 lbs. per 100 bags or 1,000 square feet of filter area. Inject the pre coat into the hopper section; with the pulse system off, run the fan for three minutes to obtain an even pre-coat. 2. Start the discharge system (rotary valve, screw conveyor, air slide, dump valve, etc.) 3. Start timer and be certain that the compressed air supply valve is open. Initial adjustment of time should be 6 seconds between pulses (off time). On time of pulse should be set at 100-110 milliseconds. 4. Start main fan. 8

5. After 20 minutes operation, open fan damper to desired setting. Observe differential pressure if less than 2 W.G. increase valve off time 2 or 3 seconds at a time during the first 8 hours until the differential pressure is 3.5 to 4.0. START-UP PROCESS SYSTEMS: 1. if water vapor or other condensables are present, it will be necessary to preheat the system so the skin temperatures of the piping and collector are above saturation temperature. Dryers, coolers, and certain grinding systems are common examples. 2. Temperature must be controlled to within the thermal limit of the filter media in use. 3. On pneumatic conveying systems, watch the differential pressure gauge closely for the first hour or so. If unstable, the collector discharge system may be too small for the volume it is seeing. A quick fix is to reduce the material feed until the discharge rates can be increased. ALL SYSTEMS: You have purchased equipment to provide a clean stack. If there are visible stack losses, refer to the trouble shooting check list. SHUT DOWN: 1. Dust Control Systems Reverse start up procedure, shut down fan, then after 5 or 10 minutes delay, shutdown the timer and discharge system. 2. Process Systems Dryers should have product run down and heat continued at a reduced rate to dry the metal surfaces and filter media. 3. Pneumatic Systems As in Item 1. Wiring shown for 10 output timer Wiring similar for 4, 6, and 22 position timers. Wiring Notes: 1. Operating Logic: Input power is applied to L1 and L2 at all times upon closure of the isolated control contacts the present Off time is initiated. At the end of the Off time, the control will energize a solenoid to provide the cleaning pulse and then transfer to the next solenoid. The cycle continues until the control contacts are opened. 2. Reset the control can be programmed for fewer than 10 outputs by jumping the program wire to the last output number used. 3. Input 105 to 135 VAC 50/60 Hz. 4. Output solid state switch maximum load 60 Watts per output (2 solenoids per output terminal.) 9 5. Off time adjustable, between 1.5 seconds minimum 60 seconds maximum.

6. Programming Programming is accomplished by connecting the program wire to the pin corresponding to the number of outputs required. 7. On pulse time width 50 500 milliseconds, On Time has been preset at factory do not adjust. 8. Where two or more timers are employed solenoid valves should be divided equally between the timers. 9. Recommended wire size No. 16 AWG. 10. Recommended on-off switch by customer to be installed near timer. 11. Suggested off time setting: 6 seconds, refinements may be necessary after system becomes operational to maintain proper differential pressure. 12. Timer to be conveniently located on dust collector by customer. Trouble Shooting Check List: PROBLEM & PROBABLE CAUSE: SOLUTIONS: A. VISIBLE EXHAUST DUST LOSS 1. Missing Bag dust loss will be constant, * Locate and replace missing bag. not in synchronization with valve blasts. 2. Improperly installed bags. Loose clamp * Inspect bag connections. or bag tops not clamped between cage Retighten bag clamps. and venturi collar. 3. Holes in bags. Can be from either * Inspect for worn or damaged bags. Mechanical damage during installation, abrasion, thermal or corrosive attack, or worn out bags. This loss is generally cyclic and in synchronization with valve blasts. 4. Failure to clean plenum after massive bag * Always check plenum, clean if failure. necessary before installing new bag set. This will generally clear up. *Plugging the venturi with a surgical cork from the clean air side of the collector is a quick temporary measure to stop leakage until such time that the bag or cages can be replaced. 10

B. LOSS OF COMPRESSED AIR 1. Piping leaks. * Retighten fittings. 2. Debris in diaphragm valve. * Remove cover and clean. 3. Dirt in solenoid plunger. * Remove cover and clean. 4. Electrical short * Refer to wiring diagram and check for proper connections. C. HIGH DIFFERENTIAL PRESSURE 1. Over Volume * Cut back on fan damper at individual inlet pick- ups. 2. Compressed air pressure below 75 psig * Check for system leaks, new usage or as above. Check compressed air valve assembly. 3. Timer skipping one or more valves. * See Timer Diagram 4. Reverse leakage through rotary valve. * Check for wear or damage. 5. Other air short circuits piping leaks, * Repair as required. door gaskets, etc. 6. Dust on clean side of bags from plenum * Clean plenum chamber and inside of bags after previous bag failure. 7. Binding due to condensable. * Change operations up stream so that liquids remain vaporized through unit. Usually operating cleaning mechanism with fan off or with fan on but no solids flowing will permit recovery. D. SYSTEM VOLUME TOO LOW 1. Fan running backwards. * Correct fan rotation 2. High differential pressure. * Review Section C above. 3. Fan belt slippage. * Tighten or replace belts. 4. Air short circuiting. * Check piping, rotary valve and collector flanges for leaks. 11

5. System blockage. * Check piping for build up or foreign blockage. Check bags for binding. Bags should be soft to the hand. E. TIMER PROBLEMS 1. Timer does not operate. * Check for faulty wiring - refer to wiring diagram 2. Power ON indicator not lighted. * Check wiring diagram with input/output terminals for short circuit. Check for blown fuse. 3. Timer operates, solenoids do not operate. * Check wiring diagram for valve common open. 4. Timer operates one or more. * Check valve continuity for faulty solenoid circuit. Check output light and voltage at terminal for faulty output terminal. Check solenoid valve, clean/repair/replace parts if required. 5. Improper Timer Sequence. * Check valve on and off times. ROUTINE MAINTENANCE: A. INSPECTION: Frequency will vary as widely as there are operating conditions. In general proceed as follows: B. REPAIRS: 1. Daily Check unit differential pressure. 2. Weekly Check timer and solenoid valves for function. This usually is only listening to check uniform time interval between blasts. 3. Monthly Lube fan, rotary valve and screw conveyor. Check seals on latter two for dust loss. 4. Quarterly Inspect bags for soft to hand condition and uniform tightness of clamps. 1. Filter bags Generally replacement. 2. Solenoid Valves 3. Diaphragm Valves 4. Rotary Valves Usually a matter of periodic seal and blade replacement. More detailed information supplied with the unit. 5. Screw Conveyors Periodic replacement of V belts and shaft seals. Inspect hangar bearings during filter bag change. Failure will be deducted by the squeal. 6. Fans V belt tension and replacement of bearings if running rough. 12

C. SAFETY: Before entering any dust collector: 1. Run cleaning mechanism 20 minutes with the fan off to clean down filter bags. 2. Run solids out of hopper. 3. Lock out electrical power 4. On toxic operation purge collector housing and install blank in inlet duct. 5. Install catwalks and safety cables. 6. Secure access doors in open position or remove doors by lifting off of hinge pins. 7. Use buddy system. 8. Wear respirator. 9. Use common sense. The preceding information has been complied to assist the purchaser in successful installation and operation of the Dust Collection System. If, however, a problem exists that cannot be rectified with this manual, Filter Technology, Ltd. and its representatives stand ready to assist in any way possible. 13