अपर नद शक (प रय जन ),प स क ल, क व र भवन, बगल र Additional Director (Proj.), PCKL, KaveriBhavan, Bengaluru.

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

Renewable Regulatory Fund (RRF) Mechanism : -

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

/ Telefax : No: 1(2)2015-E/ Battery& Charger TVH/ Dated:

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE MEETING HELD ON 21 st March Grid Disturbances in the Southern Region

MINUTES OF THE 47 th SLCF MEETING HELD ON

पत स च / Address List

Guidelines for Solar Grid Power Projects

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

STATE LOAD DISPATCH CENTRES (SLDC)

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Case No. 163 of In the matter of

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

CASE No. 35 of In the matter of

Before the. Case No. 106 of 2009

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

SAILASHREE VIHAR, BHUBANESWAR TEL , , FAX

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Agenda of 11 th System Studies Meeting in NER


FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

Merger of the generator interconnection processes of Valley Electric and the ISO;

CASE No. 114 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India


दव ण त र य व द य त सवमवत

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

(URL: F /KV Damoh/ / Date:

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

ववषय ववद य त पक व ट र व ह ज म पक प वव (AIS 040:2015 प अमभन अमभग रहण )

MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006.

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Ph. No: Fax No: Website:

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

Supply of Batteries

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE

प र ख स ख य ववषय TED 27 (13009) W - II ववद य त पक व ट र व ह प पक व तथ 30 मम ट प अ पतम पक व म पक (AIS 041:2015 प अमभन अमभग रहण)

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015

Ph. No: Fax No: Website:

JEA Distributed Generation Policy Effective April 1, 2018

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

No. TE/F-814/16/WO- 145/ Dt

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

Remote Village Electrification

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

I N V O I C E S U M M A R Y

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

Intra-State Availability Based Tariff (ABT)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

Ph. No: Fax No: Website:

KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. Present : Sri. T. M. Manoharan, Chairman Sri. K. Vikraman Nair, Member OP 11/2016

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

AIRPORTS AUTHORITY OF INDIA OFFICE OF THE AIRPORT DIRECTOR ल. ग. ब. हव ई L G B I AIRPORT, GUWAHATI TECHNICAL DIRECTORATE क ट शन

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

/ I S S : / S T S I

Ph. No: Fax No: Website:

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Net Metering & Compensation Seminar

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

In-House Paper on the implementation of Single Part Tariff in Power Distribution

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

Ph. No: Fax No: Website:

February 13, Docket No. ER ; ER Response to Request for Additional Information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

UTTARAKHAND POWER CORPORATION LIMITED

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

Transcription:

पत स च/ Address List 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. म य अ भय त (व ण य), एप प स स, ह दर ब द Chief Engineer (Comml.), APPCC, Hyderabad. अपर नद शक (प रय जन ),प स क ल, क व र भवन, ब गल र Additional Director (Proj.), PCKL, KaveriBhavan, Bengaluru. ल ख नय क, एसएलड स -ट ब स -क प ट स एल, ब गल Controller of Accounts, SLDC- TBC, KPTCL, Bangalore. आर व दल प क म र, अध क अ भय त, एसएलड स, क प ट स एल, ब गल ShriR.V.Dilip Kumar, Superintending Engineer, SLDC, KPTCL, Bengaluru. एस र घव उप मह ब धक ( व त), क प स एल, ब गल ShriS.Raghavendra, Dy. GM (Finance), KPCL, Bengaluru. क य क र अ भय त (एलड ) एसएलड स, क एसईब, कलमस र Executive Engineer (LD), SLDC, KSEB, Kalamassery. अध क अ भय त (एलड व ज ओ) ट न क, च न Superintending Engineer (LD & GO), TANTRANSCO, Chennai. क य क र अ भय त ( ड), ट न क, च न Executive Engineer (Grid), TANTRANSCO, Chennai. म य अ भय त (व ण य), ट एसप स स, ह दर ब द Chief Engineer (Comml.), TSPCC, Hyderabad क य क र अ भय त / एसस स, व त वभ ग, प द च र Executive Engineer / S.C.C., Electricity Department, Puducherry. म ह ब धक (व ण य) स स, एनट प स, क प क ल स, नई द ल General Manager (Comml.), CC, NTPC, SCOPE Complex, New Delhi. म ह ब धक (व ण य), नगम म य लय, एनएलस, न व ल General Manager (Comml.), Corporate Office, NLC, Neyveli. क नद शक, एमएप एस, क पक कम Station Director, MAPS, Kalpakkam. क नद शक, क ज एस, क ग Station Director, KGS, Kaiga. क नद शक, क क एनप प, क ड क लम Station Director, KKNPP, Kudanakulam सह.मह ब धक (व ण य), एनट ईस एल, व ल र एसट प एस AGM (Comml.), NTECL, Vallur STPS. ए र गर जन, उप मह ब धक, एनट प एल, त त क ड - 628004 ShriA.Rengarajan, Dy.GM,NTPL,Tuticorin-628004.

18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. आर प थ स रथ, ब गल क य लय य क म य, य प स एल, ब गल ShriR.Parthasarathy, Head Bengaluru Office, UPCL, Bengaluru ध रज अ ज, सह मह ब धक, ज एसड य एल, नई द ल ShriDheerajAhuja, Assistant General Manager, JSWEL, New Delhi. रव प, उप मह ब धक, ज एसड य एल, ब गल ShriRavindraPai, Deputy General Manager, JSWEL, Bengaluru. ब ज र च लन म ख, एसआरएलड स, प स क, ब गल Head of Market Operations, SRLDC, POSOCO, Bengaluru व त म ख, एसआरएलड स, प स क, ब गल Head of Finance, SRLDC, POSOCO, Bengaluru मह ब धक (व ण य), द -, प वर ड, सक दर ब द GM (Comml.), SRTS-I, PGCIL, Secunderabad सह. मह ब धक (व ण य), द -, प वर ड, ब गल AGM (Comml.), SRTS-II, PGCIL, Bengaluru आसन म ह मद, Coastal Energen इव ट ल मट ड, च MrAsan Mohammed,Coastal EnergenPvtLtd,Chennai व र क य प लक (व ण य), ट प स ल, ह दर ब द -500082, भ रत, फ़ स: (91) 040 23370360 Sr.Executive (Commercial), TPCIL, Hyderabad 500 082, India, Fax: (91) 040 2337 0360 ज एम- प वर स ल, ए ल & फ स त मल न ड प वर क पन ल मट ड, च नई-600006 GM- Power Sale, IL&FS Tamil Nadu Power Company Limited, 4 th floor, KPR Power, Old No.21, New No.2, 1 st Street, SubbaRaoAveneue College Road, Chennai- 600006 व र उप य (ओ & एम), हनद ज न शनल प वर क प र शन ल मट ड, म बई -400018 Sr.Vice President (O&M), Hinduja National Power Corporation Limited (HNPCL), Hinduja House, 171, Dr. Annie Besant Road, Worli, Mumbai - 400018. म य क य क र अ धक र, ल क (एलक प एल), ह दर ब द-500081 Chief Operating Officer, LANCO (LKPL),LANCO House, Plot No.4, Software Unit Layout, Hytec City, Madhapur, Hyderabad -500081 Associate उप य,अद न एनत रप स स ल मट ड, अहमद ब द -380006 Associate Vice President, Adani Enterprises Ltd, Ahmedabad -380006 नद शक, ज एम भ ग, क व, नई द ल Director, GM Division, CEA, New Delhi. नद शक, एनप स वभ ग, उ वस भवन, कटव डय सर य, नई द ल - 16 Director, NPC Division,3 rd floor,nrpc Building,KatwariaSarai,New Delhi-16.

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the 33 rd Meeting of Commercial Sub Committee of SRPC held at Bengaluru on 31 st January 2017 1. Introduction 1.1. The 33 rd Meeting of Commercial Sub-Committee of SRPC was held on 31 st January 2017 at SRPC, Bengaluru. The list of participants is enclosed at ANNEXURE 1. 1.2. Shri S.R Bhat, Member Secretary (MS), SRPC welcomed all Members and participants to the Meeting. 1.3. MS, SRPC informed the forum that a number of Agenda Items to be discussed in the Commercial Meeting would be put forth the TCC/SRPC Meetings scheduled to be held in the month of February 2017. 2. Confirmation of the Minutes of the 32 nd Meeting of Commercial Committee meeting 2.1. Minutes of the 32 nd Meeting of the Commercial Sub-Committee of SRPC held at Hyderabad on 17 th October 2016 were issued vide letter dated 3 rd November 2016. 2.2. Since no comments / request for correction were received, the Minutes of the 32nd CC Meeting were confirmed. 3. Audit of SR Deviation & Reactive Energy Charge Pool Accounts 3.1. In line with Para 15 of Annexure-I to the CERC (IEGC) Regulations, 2010 (Complementary Commercial Mechanism), RLDC shall table the complete statement of the Regional UI account and the Regional Reactive Energy pool account in the RPC s Commercial Committee Meeting on a quarterly basis, for audit by the latter. 3.2. SRLDC vide letter SRLDC/MO/CCM dated 05.01.2017 (ANNEXURE 2) have furnished the details of payment and disbursement of weekly Deviation and Reactive Energy charges for the period from 8th August 2016 to 4th December 2016. The accounts were audited and approved. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 1 /39

4. Assessment of Metering Requirement In the 30 th and 31 st Meetings of Commercial Sub-Committee, CTU, STU and Generators had been requested to furnish SEM requirement projections for next one year, which would be installed by them in line with provisions of CEA Regulations. It was informed that Meters need to be provided as per CEA Metering Regulations and as per Specification laid down in SEM Manual of SRLDC. A thumb rule for assessment of SEM for each Substation was proposed as: For Generators which are Regional Entities Two Meters for Each Feeders + One Meter for Each Generating Transformer and Station Transformers. To be installed by CTU For Substation Owned by STU One Meter, on each feeder which is connected to Substation owned by ISTS Licensee/Generators as Regional Entity. To be installed by STU For Substation Owned by ISTS Licensee One Meter on all the feeders + HV and LV side of each Transformer. To be Installed by ISTS Licensee During 32 nd Meeting of CCM the forum had requested PGCIL, STUs, Generators and IPPs to submit the SEM requirements and procurement plan for the power system elements (as per CEA Metering regulations) for the upcoming projects to the SRLDC and SRPC Secretariat. Deliberations in the CCM: 4.1. Member Secretary, SRPC stated that assessment needs to be carried out by all constituents, which would help in timely action for procurement and installation. Any suggestion etc regarding facilitation by PGCIL in procurement for other constituents would solely be based on bilateral arrangements. 4.2. KPTCL informed that they had requested PGCIL to supply 11 no of meters on loan basis. 4.3. SRTS II, PGCIL informed the forum that the meters procured by them are for replacement of PGCIL s internal requirements. If any entity requires the meters they could approach PGCIL and separate orders will be placed for procuring them and the procurement process will take a few months time. 4.4. APTRANSCO and TSTRANSCO informed that they have assessed their meter requirements and arranging the SEMs on their own. 4.5. KSEB, TANTRANSCO informed that they are also procuring the meters on their own. 4.6. KPTCL expressed that for small quantity of meters no SEM manufacturer is willing to supply. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 2 /39

4.7. SRLDC opined that assessment may be carried out at along with planning to avoid last minute contingency arrangements. SRLDC also requested that the action plan in this regard may be furnished by all constituents. 4.8. SRLDC expressed concern that on account of of non-installation of meters, constituents are losing money heavily to the tune of Rs 1 crore to 3 crores per month. 4.9. SRLDC informed that SEM data from Kanarpatty is not being received in NPC format and required conversion software has not been provided to SRLDC. 4.10. DGM, SRLDC informed the forum that during many instances SRLDC is getting requests for clearances of new elements without proper sample SEM data etc and time drift statements. He informed the forum that clearance for charging of new element will not be given unless sample SEM data and time drift statement is received. 4.11. SEM on 230kV Chittoor line at Thiruvalam with time drift of 293 days has not been replaced from Oct 2015 and since then data of standby SEM at Chittoor is being used for Energy accounting. AGM, SRLDC stated that any issue with the SEM has to be resolved within 3months, further the alternate data for the element shall not be considered for energy accounting. 4.12. SRLDC informed the forum that the faulty SEMs need to be replaced within a period of 3 months. 4.13. SRLDC also expressed that in case one end SEM data is not available the other end data would be used only for the period of 3 months. Beyond that,the other end data will not be used. The utilities may have to bear the losses, if any. 4.14. SRLDC informed the forum that any request for revision of accounts due to faulty SEM data may not be entertained. 4.15. PGCIL informed that utilities could send advance requirement of SEMs to PGCIL and PGCIL can aggregate the requirement to procure and hand over to the utilities on cost plus basis. 4.16. It was brought to the notice of the forum a list of Solar park under implementation, which are above 500 MW capacities and would be regional entity.hence all STUs were requested to consider the SEM requirement for these parks also. 4.17. PGCIL requested the constituents to furnish the assessment of the requirement pertaining to the new/proposed lines terminating in PGCIL bays. 4.18. SRLDC stated that the clearance to charge new lines would be issued only if the energy data in proper formats are made available. Energy accounting cannot be revised or corrected later on if the data furnished are not in proper formats. 4.19. SRPC Secretariat requested the utilities to furnish the SEM assessment and arrange to procure and install the SEM as per CEA Metering regulations. 4.20. Assessments of Meter submitted during the Meeting are listed below: S.NO Constituent SEM Requirement Procurement Plan 1 Andhra Pradesh 2 Own arrangement Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 3 /39

2 Telangana 7 Own arrangement 3 Tamil Nadu Assessment is undergoing Own arrangement 4 KSEB Till now, no requirement Own arrangement 5 KPTCL 11 Own arrangement All Regional entities agreed to furnish SEM requirement and procurement plan within a month. CC forum requested the utilities to firm up the action plan for purchase / procurement of SEMs. 5. Comprehensive and thorough review of all touch points for drawal computation SRPC vide dated 30-10-2015 had circulated a revised methodology to identify the node points and touch points in a node for Southern Region. Accordingly the matter had been deliberated in the 31 st and 32 nd CCM. As per the deliberations of the 32 nd CCM the accounting based on Nodal points identified for drawl were used for accounting of Energy in the Southern Region from 7 th November 2016 onwards. Deliberations in the CCM 5.1. SRPC Secretariat informed the forum that so far no comment had been received from constituents, the accounting based on Nodal points identified for drawl were used for accounting of Energy in the Southern Region from 7 th November 2016 onwards. The CC forum noted the same. 6. Nodal Officers for SEM Data Coordination The 3 rd Meeting of Nodal Officers for SEM data coordination was held on 5 th August 2016 and the Record notes of the meeting was issued vide SRPC/SE-I/2016/5711-40 dt 19.08.2016. As per the decision of the 31 st CCM the Nodal officers for SEM data coordination are invited to attend the CC Meeting as special invitees. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 4 /39

Deliberations in the CCM& Update 6.1. Recommendations of the Previous meetings of Nodal officers meeting (1 st NOM- 3 rd NOM) for SEM data Coordination (were reviewed and the deliberations and recommendations as follows. 6.2. Deliberation with respect to Non Availability of SEMs as per CEA metering regulations S.NO Element Status 33 rd CCM deliberations and recommendations a b c MAPS: GTs (HV side) Stand By Vallur : 400kV NCTPS lines 1 & 2 400kV UPCL- Hassan line 1&2 MAPS informed them that core is not available in the HV side of the GTs and they may provide on the LT side of GTs. CC forum agreed for the provision of SEMs in the LT side as a fall back arrangement. The forum requested MAPS to coordinate with CTU/TN and install the meters. Vallur, NCTPS to coordinate with SRTS II, PGCIL for local support, accuracy check etc. UPCL end KPTCL to install the SEM. PGCIL informed that SEMs were provided at Sriperumbudur SS and MAPS can collect and install the SEMs. MAPS was requested to confirm whether CT/PT arrangement is available for installing SEMs on LV Side of GTs. Forum requested MAPS to install the SEMs at an early date. PGCIL informed that SEMs were provided at Sriperumbudur SS and NCTPS can collect and install the SEMs. KPTCL agreed to install the SEM. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 5 /39

d 400kV Nelamangala- Hassan line Nelamangala end KPTCL to install the SEM. KPTCL agreed to install the SEM. e f g h 400kV Talaguppa- Hassan Line 400kV Guttur- Hiriyur lines 1&2 Bonakaalu- Chillakallu lines 1&2 400kV Hiriyur- BTPS lines 1&2. Talaguppa end KPTCL to install the SEM. At Hiriyur: Both Line-1 and 2 (CTU). At Guttur: Line-2 (KPTCL) Bonakaalu end of 132kV Line TS informed that 132 KV Bay extension works were carried out by Railways. Hiriyur end CTU installed the SEMs. BTPS end KPTCL yet to install. KPTCL agreed to install the SEM. CTU informed that SEM installed. KPTCL agreed to install. TS informed that SEMs would be provided shortly. KPTCL agreed to install the SEM. 6.3. Deliberation with respect to Non-compliance / Pending Issues as per 2 nd Meeting of Nodal Officers for SEM Data Coordination S.NO Description Status 33 rd CCM deliberations and recommendations a Replacement of SEMs at Thiruvalam and Theni. TANTRANSCO informed that SEMs arrived at the site and they were waiting for LC to install the SEM. The forum requested TANTRANSCO to take up with SRLDC to avail the LC to replace the SEMs at the earliest and inform SRPC. TANTRANSCO informed that Theni SEM was replaced on 31.01.2017(ANNEXUR E-3) while Thiruvalam SEM would be replaced with in a week. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 6 /39

b Non receipt of SEM data from Kadra, Kodasalli, Guttur and Nelamangala. KPTCL yet to install the SEM. KPTCL agreed to install 7. SRLDC Data and Accounting issues Account statements are revised in the event of revision of the data, schedule and SEM, by SRLDC. It was observed, of late, that the data got again revised after issuance of the revised account statements, owing to discrepancies in the revised data. It may be ensured that the data revisions are carried out assiduously so as to avoid re-revision of accounts. Deliberations in the CCM 7.1. KSEB stated that repeated revisions of accounts are a matter of concern and requested for relieving the constituents from interest liability on late payment on re-revised accounts. 7.2. SRLDC informed the forum that there were inordinate delays in submission of data by constituents and due to that there were delays in submission of data to SRPC. 7.3. SRLDC also informed that they were judiciously scrutinizing the data and submitting the processed data to SRPC Secretariat. 7.4. Further, SRLDC informed that on many occasions request for the correction in the implemented schedules were received after the prescribed period of 5 days. SRLDC requested the utilities to report the discrepancies in the schedule data as prescribed in the IEGC (within 5 days) to send the correct data for accounting. 7.5. SRLDC stated that interest is payable as per the decision in 28 th CCM as it was observed that there are inordinate delay in payments of revised accounts. 7.6. SRPC secretariat stated that the numbers of revisions were very limited earlier, based on which the forum had agreed that delay in payment on revised account need to be brought in the ambit of interest payment. However, of late, almost accounts of all weeks get revised due to one reason or another. This is a matter of concern, that a single account statement undergoes multiple revisions. Also the revision of data files may be brought down to the minimum possible by SRLDC. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 7 /39

7.7. SRPC Secretariat also informed that there were many instances of mixing of old data with new data while sending the revised data. 7.8. TANTRANSCO stated that this year except 4 accounts, all accounts had been revised at least once. TANTRASCO clarified that exemption was not being sought for the regular account but only for revised account. 7.9. SRPC Secretariat stated that 10 Days for payment is based on time given for analysis of the data and computation and for disbursal of the amount. In case of revision, Beneficiaries are required to analyze not only the current week account but also the revised account. In some weeks there would be more than 3 accounts to be verified by beneficiaries including the current week. 7.10. SRLDC explained that many a time revised schedules from other RLDCs were received at a later date, compelling re-revisions in the Schedules. Similarly, there were some bugs in the Meter data processing software on account of which data (which was earlier correct) got disturbed. 7.11. SRLDC informed that they will look in to this issue and address it at the earliest. Forum recommended that interest need not computed on revised accounts. 8. Inclusion of Mahe region of UT of Puducherry power drawal in REA (i). (ii). In the 32 nd Meeting of CCM it had been decided that from 7 th Nov. 2016 onwards the Mahe Region of UT of Puducherry power drawl would be included in the REA of Southern Region. KSEB vide letter dated 24.10.2016 (ANNEXURE 4) addressed to PED stated that KSEBL will charge transmission charges for the intervening transmission facility at the rate as determined by the KESERC, i.e. at the rate of 26 paise/kwh and also the losses in the transmission system has to be taken into account. Further, it was also stated that a TSA also need to be executed between KSEBL and PED. Matter was taken up by SRPC (ANNEXURE 5) with KSEBL. Consequently, the drawal by PED could not be included in REA from 7.11.2016. KSEBL vide letter 24-12-2016 ( ANNEXURE 6) communicated the following: Their willingness to allow UT of Puducherry to draw Central share to Mahe through REA at transmission charges paid by KSEBL to other states but subject to approval of YTC by CERC. They had authorized Chief Engineer, Transmission (North) to initiate necessary action to terminate the EHT Agreement with UT of Puducherry after settlement of all dues/ Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 8 /39

arrears payable by UT of Puducherry, on switch over of drawal of power to Mahe under REA. (iii). Informed that they will approach SRPC for certification of the intra state lines of KSEBL carrying power to Mahe as ISTS lines in terms of para 2.1.3 of Annexure-1 of Third amendment of CERC Regulation. UT of Puducherry vide their letter dated 03-01-2017 ( ANNEXURE 7) requested SRPC to examine the above decisions made by KSEBL and advise accordingly. The date of inclusion of the drawal in REA may be decided on confirmation of all necessary facilities, including SEM and RTU for sending real time data on both the sides of the 110 KV D/C (Pannur end and Mahe end). Deliberations in the CCM 8.1. KSEB informed the forum that Puducherry has not paid the Maintenance charges for the line for the period 2013-14 and 2014-15. 8.2. Puducherry informed that they were regularly paying the maintenance charges. 8.3. KSEBL stated that the present connectivity need to be terminated and new agreement need to be entered. KSEBL requested Puducherry to clear all dues for the period of 2013-14 and 2014-15 before changing over to REA accounting. 8.4. SRPC Secretariat requested Puducherry to reconcile the accounts with KSEB and to pay the dues at an early date. 8.5. MS,SRPC stated that the inclusion of Mahe in REA was decided by SRPC forum and issue raised by KSEBL regarding certification of line would be discussed in the agenda item No15. CC Forum requested Puducherry to reconcile the accounts with KSEB and to pay the dues at an early date before moving to REA accounting. Mahe Region of UT of Puducherry power drawl would be included in the REA of Southern Region after deliberations in the SRPC forum. 9. Instances of Total of beneficiary schedules exceeding the DC of station There were several instances of total of beneficiary schedules of generating stations exceeding the DC of stations. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 9 /39

Deliberations in the CCM The issue was discussed in the Meeting and the SRLDC informed that the issue would be addressed at an early date. SRLDC informed that the issue would be sorted out. 10. Modification in DSM calculation and REA for ISGS It was brought to the notice of the forum that ISGS are selling their power through Power Exchanges also. It was noticed that on many occasions during scheduling to PX, total schedule of station is not zero even when DC of the station is zero. Since there are no revisions for the power sold in Exchanges, it would be accounted in station schedule. Hence flowing adjustments in the calculation are to be incorporated, i.e. in DSM and REA account statements: Whenever DC=0 and schedule 0, Deviation = -Schedule (block wise) and In REA, Schedule = Schedule + Actual and DC = Actual. This will be accounted to the beneficiaries. Deliberations in the CCM 10.1. SRPC Secretariat explained the forum regarding adjustments in the calculation of schedule and actual in DSM and REA accounts when the schedule of station is not zero even when DC of the station is zero. 10.2. CC forum agreed for the same. The CC forum formally agreed for the proposed modification in the accounting of Schedules in DSM and REA. 11. Bills for the period prior to bifurcation of AP and Telangana. Issue of payment of energy bills for the period prior to bifurcation of Andhra Pradesh and Telangana was discussed in the 32 nd meeting of CCM. CCM forum had decided to convene a special meeting to sort out the issue. Subsequently a Special meeting was convened on 25.10.2016 at Hyderabad to discuss the above issue. The Minutes of the Meeting is enclosed at ANNEXURE 8. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 10 /39

In the Meeting APTRANSCO had assured that in view of the discussion /suggestions that had emerged in the meeting, it will seek legal opinion on the issue,with broader perspective and revert back about in about one month time. Deliberations in the CCM 11.1. NTPC requested SRPC Secretariat to take up with AP & TS to sort out the pending payment issue. 11.2. SRPC Secretariat requested a formal request from NTPC to take up the issue with AP & TS. 12. Outstanding dues between Southern & Western Regional constituents Puducherry vide letter dated 09.12.2016 informed that they had received ` 54,366/- from GUVNL (ANNEXURE 9) and balance amount of ` 48,355/- only to be paid by GUVNL. Pending payments between WR& SR Constituents as on 10.01.2017 are as follows: ANDHRAPRADESH/TELENGANA RECEIVABLE FROM (`) PAYABLE TO (`) MPPMCL 1,21,76,270* NIL KARNATAKA RECEIVABLE FROM (`) PAYABLE TO (`) MPPMCL 13,27,208 CSPDCL 73,72,176 GUVNL 9,40,320 KERALA RECEIVABLE FROM (`) PAYABLE TO (`) MPPMCL 1,21,47,260 CSPDCL 7,05,279 GUVNL 4,98,019 TAMIL NADU Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 11 /39

RECEIVABLE FROM (`) PAYABLE TO (`) MPPMCL 1,17,17,268 CSPDCL 92,77,878 PUDUCHERRY RECEIVABLE FROM (`) GUVNL 48, 355 PAYABLE TO (`) * In the recent Meeting of SR-WR held on 09.11.2016 at WRPC, Mumbai, MPPMCL informed that MPPMCL has to receive money from APTRANSCO and the details of the payments would be shared with APTRANSCO / WRPC & SRPC Secretariats. Payable amount by PGCIL (WRTS / SRTS) to SR Constituents (as on 10.01.2017 ) State/UT Amount (`) Received(`) Paid by SRTS Balance to II on receiv 01.04.2 e (`) 016 (`) Andhra Pradesh & Telangana 47,05,447 3,69,848 10,16,847 33,18,752 Karnataka 49,79,733 3,91,407 10,76120 35,12,206 Kerala 27,58,402 2,16,811 5,96,091 19,45,500 Tamil Nadu 47,21,994 3,71.149 10,20,423 33,30,422 Puducherry 9,24,035 72,629 1,99,684 6,51,722 Total 1,80,89,611 14,21,844 39,09,165 1,27,58,602 Deliberations in the CCM 12.1. SRPC Secretariat informed the forum that as per TN s request a special meeting was held at WRPC, Mumbai on 09.12.2016 to discuss the outstanding SR-WR pending payment issues. Participants from TN,AP and SRPC secretariat attended (from SR) the meeting. The Minutes of the meeting is attached herewith as ANNEXURE 10. 12.2. TANTRANSCO representative informed that during the special meeting held on 09.11.2016 at WRPC, Mumbai, WR constituents noted that the there was no participation from Karnataka in the meeting, in spite of repeated reminders. They were of the opinion Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 12 /39

that since the Karnataka owes outstanding dues to WR constituents their representation in the discussion would have hastened the reconciliation and requested SRPC Secretariat to take up the matter with KPTCL / PCKL. 12.3. SRPC Secretariat requested KPTCL/PCKL to reconcile the accounts with WR constituents and settle the amount at an early date. 12.4. SRPC Secretariat requested SR constituents to take up the pending payment issues directly with the WR constituents with the copy to SRPC and WRPC Secretariats. 12.5. SRPC Secretariat also requested SR constituents to reconcile the figures with the WR counterparts at their respective Headquarters to hasten the resolution of pending payments issue. 12.6. In the meeting SRTS II, PGCIL informed that CSPDCL(CSEB) were in discussion with WRTS/SRTS regarding payment to SR constituents. PGCIL informed that the payment would be made during Mid February 2017. CC forum requested SR constituents to take up the pending payment issues directly with the WR constituents with the copy to SRPC and WRPC Secretariats and to reconcile the figures to sort out the long pending payment issue between SR-WR. CC forum requested KPTCL and PCKL to sort out the pending payment issue to WR constituents at the earliest. 12.a. Outstanding dues between SR constituents Deliberations in the CCM 12.a.i In the meeting, TANTRANSCO requested KPTCL and KPCL to pay the pending payments to TANTRANSCO. 12.a.ii KPTCL informed that the issue is pending with PCKL and PCKL informed that PCKL board had approved the payments issue and the same is pending for KPTCL board approval. 12.a.iii KSEB requested KPTCL and PCKL to pay the dues payable to them at the earliest. 12.a.iv PCKL informed that regarding payment to KSEB they were processing it and the same would be paid to KSEB shortly. 12.a.v SRPC Secretariat requested KPTCL and PCKL to sort out the pending payment issues to KSEB and Tamil Nadu at the earliest. CC forum requested KPTCL and PCKL to sort out the pending payment issue to SR constituents at the earliest. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 13 /39

13. Items proposed by SRLDC, POSOCO. SRLDC vide letter dated 05.01.2017 (refer ANNEXURE 2) had proposed the following items for discussion: (i). Audit of SR DSM & Reactive energy Accounts (ii). Reconciliation of DSM & Reactive Charges (iii). Status of outstanding charges to the pool account (iv). Non-compliance of opening of L/C for DSM payment (v). Reconciliation of Open Access disbursements (vi). Delay in SEM data transfer (vii). Lack of timely response to reports on discrepancies observed in SEM data (viii). Time drift statement non receipt status (ix). Non-compliance of replacement of SEMs at Thiruvelam and Theni& update (x). Discontinuation of intimation regarding pool related correspondence from SRLDC through hard copies. (xi). Class of CT-PT installed corresponding to all the SEMs in the region. (xii). SEMs on LV side of GTs at MAPS. (xiii). Unauthorized LiLoing of some lines by STUS (xiv). Injection schedule exceeding the Sent out Capacity. (xv). Timely submission of POC data (xvi). Status of start-up power granted and COD declared. (xvii). PSDF Fund Transfer (xviii). Furnishing installed capacity and LVRT/HVRT characteristics at RE pooling stations Deliberations in the CCM 13.1 Audit of SR DSM & Reactive energy Accounts Weekly Regional Deviation, Reactive Energy Charges Pool Accounts for the period from 8 th August 2016 to 4 th December 2016, furnished by SRLDC vide letter dated 05.01.2017, were audited. 13.2 Reconciliation of DSM and Reactive charges 13.2.1 DGM,SRLDC informed that Regional Entity-wise details of Deviation and Reactive pool payment/receipt have been sent to the pool members on a monthly basis for the period from Aug 16 to Dec 16 for reconciliation. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 14 /39

13.2.2 SRLDC informed that many of the constituents had not reconciled the accounts. 13.2.3 Status of Receipt of signed reconciliation statement is enclosed in Annexure III. SRLDC requested all other pool members who were yet to reconcile to verify the statements compulsorily and submit a signed copy to SRLDC for records and to comply with audit observations. 13.3 Status of outstanding charges to the pool accounts. 13.3.1 SRLDC expressed concern regarding rising trend of outstanding dues to pool accounts and informed that the regulation envisage only for inadvertent defaults but not intentional delays to pool payments. 13.3.2 SRLDC requested to clear all outstanding amounts and adhere to the due dates and presented the Outstanding payments to DSM pool account, interest payable to DSM Pool, RRAS pool accounts at the earliest. 13.3.3 SRLDC informed the status of outstanding payments to DSM pool account and interest payable due to delayed payments. 13.3.4 CC forum requested the utilities to pay the pool account charges with the due date. Outstanding payments to DSM pool account as on 26.12.16 S.No. 1 Beneficiary COASTAL ENERGEN 2 TPCIL 3 SEL 4 5 ER COASTAL ENERGEN Period SRPC account issue date Amount (Rs.) week 18-20, 22 R1 20-10-16 791 23-26 (05.09.2016-02.10.2016 ) R1 23-26 (05.09.2016-02.10.2016) R1 35 (28.11.2016-04.12.2016) 35 (28.11.2016-04.12.2016) 11-11-16 149023 11-11-16 56300 13-12-16 3248857 13-12-16 11990221 13.3.5 SRLDC informed that the following is the outstanding to Deviation pool account as interest payable due to delayed weekly charges. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 15 /39

S. No. Constituent Interest payable (Rs.) Interest statement issue date. 1 AP 3689 15-11-2016 2 AP 50906 15-11-2016 3 AP 53961 07-12-2016 4 CE 11937 15-11-2016 5 CE 7579 07-12-2016 6 COASTAL ENERGEN 437 07-10-2016 7 COASTAL ENERGEN 589 07-10-2016 8 GOA 1 15-11-2016 9 IL&FS 1845 07-10-2016 10 IL&FS 9992 07-10-2016 11 IL&FS 2880 15-11-2016 12 IL&FS 114 15-11-2016 13 IL&FS 249 07-12-2016 14 IL&FS 176 07-12-2016 15 KKNPP 1725 08-07-2016 16 KSEB 24911 15-11-2016 17 MEPL 157 15-11-2016 18 TN 105358 15-11-2016 13.3. 6 Following is the outstanding to RRAS pool account as interest payable due to delayed weekly charges. S. Beneficiary 1 NLC TPS II EXP Period 35 (28.11.2016-04.12.2016) SRPC account issue date Amount (Rs.) 13-12-16 16403 13.3.7 Following is the outstanding to RRAS pool as on 26.12.16 as interest payable due to delayed weekly charges. S. No. Constituent Interest Interest statement issue date payable (Rs.) 1 NLC TPS-I EXP 359 10-08-2016 Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 16 /39

2 RSTPS STG-I&II 25 10-08-2016 3 RSTPS STG-III 79 10-08-2016 4 TALCHER-II 12 10-08-2016 5 NLC TPS-I EXP 46 10-08-2016 The outstanding interest shall be recovered from the weekly payments being received and treat the short fall as default in payment. 13.4 Non-compliance of Opening of L/C for DSM payment 13.4.1 SRLDC stated that during 31 st and 32 nd CCM forums, all the Regional entities had agreed to open LC within a fortnight; however, many of the utilities were yet to open LC. 13.4.2 It was informed that non-compliance of LC opening would act as a de-motivating factor to other entities that had already opened the LC in the past. 13.4.3 SRLDC requested mentioned utilities to open LC within 15 days failing which the matter would be reported to Hon ble CERC as non-compliance of DSM Regulations. 13.4.4 The forum requested the constituents to open LC for delayed payment of DSM latest by 15.02.2017. 13.4.5 All entities concerned agreed to open LC within 15-02-17. 13.4.6 SRLDC informed that the following constituents yet to open the LC for delayed DSM payment. Sl. Constituent Week No. Period Delayed amount (Rs.) 1 LANCO ST-III 7 11.05.2015-17.05.2015 801428 2 AP 23 31.08.2015-06.09.2015 108775033 3 TN 40 28.12.2015-03.01.2016 95989506 4 PONDY 47 15.02.2016-21.02.2016 2793831 5 IL&FS 7 16.05.2016-22.05.2016 6701883 6 LANCO ST-II 11 13.06.2016-19.06.2016 151580 7 NTECL 14 04.07.2016-10.07.2016 1219770 8 CE 26 26.09.2016-02.10.2016 4973943 Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 17 /39

Forum agreed that SRPC Secretariat may report the non-compliance to CERC based on the status on March 2017 end. 13.5 Reconciliation of Open Access disbursements 13.5.1 SRLDC informed the details of disbursements of CTU,STU& SLDC charges of STOA for the period from Aug 16 to Dec 16 (enclosed at Annexure-IV). SRLDC also informed that the same had already been sent to all the concerned SLDCs/STUs/CTU and others on a monthly basis for verification and reconciliation. 13.5.2 DGM,SRLDC informed that Reconciled statements are received only from KPTCL regularly. The disbursements made for which no discrepancy was pointed out were treated as reconciled. 13.5.3 DGM,SRLDC urged the utilities to send the signed copies of the statements as record for statutory audits. 13.6 Delay in SEM data transfer 13.6.1 SRLDC informed the forum that some of the entities are not sending SEM data within time in line with IEGC Clause 6.4.21. Statement of delay in SEM data transmission from various locations is enclosed at Annexure-V. 13.6.2 DGM,SRLDC requested the constituents to submit the data as stipulated in the IEGC. 13.6.3 SRLDC informed that the status of SEM data receipt as on 17:00 hrs of Monday and 12:00hrs of Tuesday is available in the SRLDC website under the menu Commercial>SEM data receipt status. 13.6.4 SRLDC requested all stations and concerned Nodal officers to monitor this information and ensure the timely transmission of SEM data to SRLDC. 13.6.5 Instances of delayed / non-receipt of SEM data from 05-09-16 to 18-12-16 is given below: AP No of Instances Telangana No of Instances Kurnool 3 Gajwel 5 Kamavarapukota 3 Tandur 4 Uravakonda 3 Dindi 3 Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 18 /39

Nellore 3 Chalakurthy 3 Kodada 3 N Sagar 3 Karnataka No of Tamil Nadu No of Instances Instances Guttur 5 Alamathy 5 Sedam 4 Kuzhithurai 4 Nelamangala 3 NCTPS 4 Kadalangudy 3 KSEB No of Instances Kozhikode 3 PGCIL SR-I No of Instances PGCIL II SR- No of Instances ISGS No of Instances N Sagar 4 Talcher HVDC 7 NLC remote end Arasur 4 Karaikudi 4 Nagapattinam 4 Tumkur 4 14 13.7 Lack of timely response to reports on discrepancies observed in SEM data 13.7.1 In the Meeting SRLDC informed that SRLDC has been intimating the discrepancies observed in SEM data on weekly basis to all nodal officers. The same for the week from 8 th August 2016 to 4 th December 2016 are given in Annexure VIII. 13.7.2 However no response is being received in this regard. In the absence of confirmation or other-wise on the discrepancies observed, the energy accounting could become erroneous. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 19 /39

13.7.3 Forum requested Members / nodal officers to verify the discrepancies and intimate the reasons for such under/over recording 13.8 Time drift statement non-receipt status 13.8.1 In the meeting SRLDC informed that the following stations are NOT SENDING the monthly time drift statements: Stations NOT SENDING the monthly time drift statements: Karnataka None of the stations AP-Kurnool, KV Kota, VTPS, Ragulapadu, Tallapalli TN - Arni, Gummidpoondi, Achrapakkam and SP Koil Telangana- Wadapally, Wanaparthy SRTS-I Kadapa SRTS-II : - Talcher HVDC Auxillary, Detailed status of receipt of time drift / correction report is enclosed at Annexure-VI. Forum requested all the stations to submit monthly time drift statements along with the SEM data to SRLDC. 13.9 Non-compliance of Replacement of SEMs at Thiruvalam and Theni & Update 13.9.1 TANTRANSCO informed that SEM at Theni was replaced on 31.01.2017 (ANNEXURE 3) and Thiruvalam SEM would be replaced within a week. 13.10 Discontinuation of Intimation regarding pool related correspondence from SRLDC through hard copies. 13.10.1 DGM,SRLDC informed the forum that all pool (Accounting) related intimations related to DSM, Reactive, RRAS and Congestion charges will henceforth be sent via Email from SRLDC instead of hard copy. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 20 /39

13.10.2 SRLDC requested all the regional entities to provide the details of Email IDs of the concerned officers with Contact number for the same. SRLDC also requested the utilities to provide more email ids (working) of the concerned accounting officers/officials. 13.10.3 SRLDC requested all the regional entities to provide the details of officers concerned in the following format to sreasem@gmail.com latest by 28-02-17. Name of the Entity Name of contact person Designation Mobile No. Email ID All entities agreed to furnish the e-mail IDs within 15 days, for sending the Pool accounts information. SRLDC would switch to intimation only through E-Mail from 01-03-17. 13.11 Class of CT-PT installed corresponding to all the SEMs in the region 13.11.1 All the regional entities are requested to furnish the class of CTs and PTs connected to all the SEMs in the Southern Region in the enclosed format as given in Annexure IX. Further, all the regional entities are requested to check the CT-PT ratio, SEM serial number etc and to inform SRLDC in case of if any discrepancy noticed. 13.11.2 All the regional entities agreed to furnish the class of CT/PTs connected to the SEMs by 15-02-17 in the format circulated and also to verify and confirm other details like SEM Sl.No, CT/PT ratio, location etc. CC forum requested all the utilities to check the details and the send discrepancy if any noticed by 15-02-2017. 13.12 SEMs on LV Side of GTs at MAPS 13.12.1 SRLDC informed that as per 7.2 of MoM of 32 nd CCM, the forum agreed for the provision of SEMs on LV side of GTs at MAPS as a fall back arrangement. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 21 /39

13.12.2 The issue was discussed in the item No 6. CC forum requested MAPS to install SEMs on LV side of GTs at MAPS as a fall back arrangement and to furnish the installation status of the same. 13.13 Unauthorized LiLo-ing of some lines by STUs 13.13.1 SRLDC informed that it is mandatory that prior approval of Standing Committee and Transmission Planners i.e., CTU/ CEA is to be obtained before making any structural changes to the network. 13.13.2 SRLDC also informed that further such re-configuration may have to be examined form the point of view of Metering arrangement. 13.13.3 DGM,SRLDC informed that as per 13.14.7 of the MoM of 32 nd CCM, all Regional Entities had agreed to adhere to the above requirement. 13.13.4 CCM forum requested the all utilities to give prior intimation to the System Operator for smooth system operation and to have correct accounting of Energy in SR. 13.13.5 Forum requested all the entities to adhere to the above requirement before undertaking any changes in the transmission system. 13.13.6 All regional entities agreed not to make any un-authorised inter-connections of the elements used for Inter-state energy computations and take necessary clearances from all the concerned authorities including SLDCs/RLDC before making any configuration change in the existing network. 13.14 Injection Schedule exceeding the Sent Out Capability 13.14.1 SRLDC informed that there have been instances of some of the Generators exceeding their Injection Schedules exceeding the Sent Out Capability. This was due to reasons such as over-selling in Px beyond their Net Sent Out Capability or recalling of URS power by the original beneficiary etc. 13.14.2 SRLDC requested all the Regional Entities to be extra vigilant in this regard and take necessary precautions with due diligence. 13.14.3 SRLDC informed that In case the incidents occur again, the matter would be reported as non-compliance under cl.1.5 of IEGC. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 22 /39

13.15 Timely submission of PoC Data 13.15.1 As per prevailing CERC orders, PoC computations are being carried out by NLDC on quarterly basis. As STOA approvals are issued three months in advance, it is essential that the computations are completed well in advance. (1) The technical details of new transmission elements, generating units which are expected to commence commercial operation (2) Yearly Transmission charges (3) Node wise forecast MW-MVAR Injection and Drawl (4) Details of long term and medium term contracts (5) Maximum injection and withdrawal data for corresponding quarter of last 3 years. 13.15.2 SRLDC requested all DICs to furnish the above data for Q4 of 2016-17 (from Jan 17 to Mar 17) at the earliest. 13.15.3 SRLDC also requested DICs may please confirm the advance action initiated for Q1 of 2017-18 (from Apr 17 to Jun 17) 13.15.4 SRLDC informed that furnishing all required data for PoC computations would preclude disputes regarding PoC computations and urged DICs to furnish data as per time lines given in the Sharing Regulations. CCM forum requested all DICs to furnish the above data for Q1 data an early date. 13.16 Status of Start up power &Infirm power granted and COD declared 13.16.1 Start Up Power S. No Generator Start up power granted From To 1 SGPL U-2: 01-10-16 08-01-17 2 Kudgi U-2: 28-10-16 31-03-17 13.16.2 Infirm Power S. No Generator Infirm Power month period started from would end by 1 KNPP U-2: 29-08-16 28-02-17 2 Kudgi U-1 28-11-16 27-05-17 (Advance action may be taken in the likelihood of delay in declaring CoD beyond 6 months) 13.16.3 CoD Declared: Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 23 /39

13.16.1 SGPL U-1: 17-11-16. 13.17 PSDF Transfer 13.17.1 SRLDC presented the status of fund transfer from SR Pool Account to PSDF as on 26.12.2016. The status of fund transfer from SR to PSDF as on 26.12.2016 is as below: (In Rs..Crores) UI-DSM A-c. (Including capping A- c.) Reactive A-c. e-bidding charges Congestion Amount Grand Total Total (Upto Jul 16) 1135.685957 3.7940429 556.3108 2.411977 1901.623 13.17.2 SRLDC informed that no amount was transferred to PSDF since Aug 16 in order to keep sufficient surplus funds to meet RRAS deficit in pool accounts of all RLDCs. 13.17.3 SRLDC informed that an amount of Rs 38.08 Cr was transferred to NRDLC deviation pool account. CCM forum noted the same. 13.18 Furnishing company wise installed capacity and LVRT/HVRT characteristic at RE pooling stations. 13.18.1 DGM,SRLDC informed that they had sent letter to TN,KPTCL and AP to furnish the company wise installed capacity and LVRT/HVRT characteristic at Renewable Energy pooling stations(annexure 11). 13.18.2 SRLDC requested the above constituents to submit the data requested at an early date. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 24 /39

14. Admitting DC during cyclonic storm (Vardha) hit on 12-12-2016 NTECL-Vallur vide letter dated 28-12-2016 (ANNEXURE 12) requested that, DC during the period of shutdown of the plant owing to the Cyclone-Vardha during December 2016. NTECL vallur requested for allowing 1380 MW as declared capacity which was prevailing, prior to the cyclone. It was stated that the generation was affected due to Force Majeure. Deliberations in the CCM& Update 14.1. SRPC Secretariat informed the forum that this incident was similar to the effect of NTPC, Shimadri s STPS Generation due to HudHud cyclone during October 2014. 14.2. NTECL-Vallur was claiming that the DC may be allowed at considering the declared capacity of 1380 MW for the period mentioned in the annexure. 14.3. SRPC Secretariat clarified that due to Vardha cyclonic storm, NTECL units, evacuation lines, TN Generating units and TN Evacuation lines were also affected. 14.4. Similar to the NTPC Simadri s Case during Hud-Hud cyclone NTECL s the case may be considered and relief may be extended under force majure clause. 14.5. After detailed deliberation it was decided that the average of the DC prior to occurrence of Vardha (i.e.ranging from 1250-1280 MW) may be allowed for NTECL. The exact value would be taken from the DC data. 14.6. The event of tripping is as follows: Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 25 /39

14.7. The DC would be allowed considering the average DC for the past 7 days (with due consideration of normal operation days). 14.8. The DC would be allowed from the time block when first unit tripped, i.e. Unit #3, from 09:36 hrs on 12.12.2016. 14.9. The DC would be allowed till 8 hours from time of restoration of last 400kV transmission line (400kV Vallur-Kalivandapattu Line-2), which was at 14:45 hr. on 14.12.2016, i.e., up to 22:45 hrs on 14.12.2016. 14.10. NTECL-Vallur stated that they could not come back on 14.12.2016, since port clearance was not received to operate coal conveyer system till 15.12.2016. 14.11. NTECL requested to consider the average DC, excluding the time blocks when unit was tripped due to turbine pipe steam leakage. As per the SRLDC daily generation outage report the time of the unit outage due to turbine pipe steam leakage was from 18:38 on 5 th Dec 2016 to 08:07. On 6 th Dec 2016. 14.12. Average DC works out to be 1280 for the week starting from 5 th Dec 2016 to 11 th Dec 2016 excluding blocks from 18:45 on 5 th Dec 2016 to 08:15 on 6 th Dec 2016. Deemed DC for the affected period would be based on the average of the DC of stage II units for the period 7 days prior to the occurrence of the event excluding any planned outage. CC forum has recommended for Deemed DC of 1280 MW from 09:30 of 12 th December 2016 to 22:45 of 14 th December 2016 for NTECL Vallur. After deliberation it was decided to put up for the approval of SRPC forum. 15. Methodology for Certification of Intra-State Transmission line APTRANSCO vide letter dated 09-12-2016 (ANNEXURE 13) requested SRPC to certify certain intra state lines so that the same lines can be considered for inclusion in POC charges. As per Clause 2.1.3 of Annexure I CERC Third Amendment of Sharing of inter-state Transmission Charges and Losses Regulations 2015: Certification of non-ists lines carrying inter-state power, which were not approved by the RPCs on the date of notification of the Central Electricity Regulatory Commission (Sharing of Transmission Charges and Losses) Regulations, 2009, shall be done on the basis of load flow studies. For this purpose, STU shall put up proposal to the respective RPC Secretariat for approval. RPC Secretariat, in consultation with RLDC, using WebNet Software would examine the proposal. The Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 26 /39

results of the load flow studies and participation factor indicating flow of Inter State power on these lines shall be used to compute the percentage of usage of these lines as inter State transmission. The software in the considered scenario will give percentage of usage of these lines by home State and other than home State. For testing the usage, tariff of similar ISTS line may be used. The tariff of the line will also be allocated by software to the home State and other than home State. Based on percentage usage of ISTS in base case, RPC will approve whether the particular State line is being used as ISTS or not. Concerned STU will submit asset-wise tariff. If asset wise tariff is not available, STU will file petition before the Commission for approval of tariff of such lines. The tariff in respect of these lines shall be computed based on Approved ARR and it shall be allocated to lines of different voltage levels and configurations on the basis of methodology which is being donefor ISTS lines. The following methodology for SRPC certification of intra state lines, carrying power to other states, which shall be applicable to all the utilities, was proposed by SRPC secretariat in the meeting: The certification would be valid for a financial Year. The base case of each quarter submitted by DIC to validation committee for PoC Computation of the previous financial year would be examined for certification in the current Year. If in each base case the usage of state owned line is more by other state than home state then those lines would be certified as Non-ISTS lines carrying Inter State Power. The usage of lines would be obtained through WebNet Software. Deliberations in the CCM 15.1. It was brought to the notice of the forum that APTRANSCO was requesting for inclusion of lines which were utilized more than 10% by other states (ANNEXURE 14). 15.2. APTRANSCO stated that PoC regulations ensure that even a fractional utilization of ISTS lines are to be taken into account and the beneficiary should be paid for the same. 15.3. SRPC stated that most of the STU lines are built for State DISCOMS and thus non availability may not affect the import capability of other states. Hence it would be prudent to certify those intra state lines whose usages is more by other state than host states. 15.4. It was informed to the forum that study would be conducted by using Webnet software and the same would be certified by RPC for inclusion in the POC. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 27 /39

15.5. MS, SRPC stated that considering the data for four quarters would facilitate to capture all scenarios of load-generation balances, seasonal load flow pattern etc. He further informed that consolidated certification for intrastate lines eligible from all state would be issued for one year period. It was decided to put up the item for approval in the next SRPC meeting. 16. Certification of Inter State Transmission Lines between AP and Telangana. Lines listed below, owned by Andhra Pradesh STU connecting Andhra Pradesh with other states, viz, Telangana, Tamil Nadu, Karnataka and Union Territory of Puducherry, are certified by SRPC as interstate lines owned by APTRANSCO connecting another state. S.NO Substation Name of the Line Connected to 1 Sattennapalli 400kV Srisailam LB Line-2 Telangana 2 Sattennapalli 400kV Srisailam LB Line-1 Telangana 3 Kurnool 400kV Srisailam LB Telangana 4 VTPS 400kV Suryapet Telangana 5 VTPS 400kV Malkaram Line-1 Telangana 6 Talapalli 220kV Chalakurthy Line Telangana 7 Brahmanakotkar 220kV Wanaparthy Line Telangana 8 Talapalli 220kV N'Sagar Line-3 Telangana 9 Talapalli 220kV N'Sagar Line-2 Telangana 10 Talapalli 220kV N'Sagar Line-1 Telangana 11 Srisailam RBReceiving stn 220kV N'Sagar Line Telangana 12 Chillakallu 220kV Narketpalli Line-2 Telangana 13 Chillakallu 220kV Narketpalli Line-1 Telangana 14 L. Sileru 220kV KTPS line II Telangana 15 L. Sileru 220kV KTPS line I Telangana 16 Nunna 220kV KTPS Line Telangana 17 Sulurpet 220kV Gummidipondi line Tamil Nadu 18 Srisailam RB 220kV Dindi line II Telangana 19 Srisailam RB 220kV Dindi line I Telangana 20 Chitthoor(220 kv) 220 kv Tiruvalam line Tamil Nadu 21 Ragulapadu 220 kv Alipura line Karnataka 22 Piduguralla# 132kV Wadapalli Line Telangana 23 Tangeda 132kV Wadapalli Line Telangana 24 Chillakallu 132kV Seethapuram Line Telangana Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 28 /39

25 KCP Cements 132kV Seethapuram Line Telangana 26 Chillakallu 132kV Rampuram Line Telangana 27 N'Sagar RC 132kV N'Sagar Line Telangana 28 Chillakallu 132kV Madhira Line Telangana 29 Chillakallu 132kV Kodada Line Telangana 30 Chillakallu 132kV Khammam Line Telangana 31 Chillakallu 132kV Kasumanchi Line Telangana 32 Chillakallu 132kV Bonakal Line-2 Telangana 33 Chillakallu 132kV Bonakal Line-1 Telangana 34 Kamavarapukota 132kV Aswraopet Line-2 Telangana 35 Kamavarapukota 132kV Aswraopet Line-1 Telangana 36 AP Carbides 132kV Gadwal Line Telangana 37 AP Carbides 132kV Alampur X Road Line I Telangana 38 Kakinada 132 kv Yanam line Puducherry 39 VSP (Kalpaka) 400 kv Khammam-VSP (Kalpaka)-I Telangana 40 VSP (Kalpaka) 400 kv Khammam-VSP (Kalpaka)-II Telangana 41 Uravakonda 400 kv Veltur Line I Telangana 42 Uravakonda 400 kv Veltur Line II Telangana The CC forum noted the same 17. Scheduling and Dispatching of Adani Solar Power Project at Kamuthi, Tamil Nadu SRPC had conducted two Meetings on 03-11-2016 and 23-12-2016 to discuss the scheduling of Adani Solar Power Project, in view of the Regulations. The Minutes if the Meeting were enclosed at ANNEXURE 15&ANNEXURE 16. During the first meeting M/s. Adani Green Energy (Tamil Nadu) Ltd. (AGEL) was requested to furnish the details of share holding pattern of M/s. AGEL solar projects at Kamuthi, Tamil Nadu to TANGEDCO, TANTRANSCO, SRLDC and SRPC. Subsequently they had submitted the documents. After deliberation during the second meeting, it was decided that M/s. AGEL would obtain legal advice and submit the same to SRPC & SRLDC. Subsequently SRPC would refer the matter to CEA for legal advice. Tamil Nadu was also requested to consider furnishing their inputs to SRPC/CEA at the earliest. Additionally, the details of upcoming renewable projects with installed capacity of more than 500 MW, if any, may be intimated to SRPC. It was informed by SRPC that the legal advice had been submitted by M/s. Adani SPP. The same would be forwarded to CEA for appropriate advice. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 29 /39

18. SEM issues update with reference to Special Meeting with M/s KPTCL held on 24 th October, 2016 In order to sort the KPTCL stations SEM issues, SRPC had coordinated a meeting with KPTCL and SRLDC on 24-10-2016 at SRPC, Benagaluru. Deliberations in the CCM SRPC Secretariat enquired about the status of action taken by KPTCL to sort out the SEM issues and requested KPTCL to send the updated status within a month s time to SRPC and SRLDC. Forum requested KPTCL to furnish the update. 19. Congestion Accounting Issues Congestion Accounts were issued in the SR for the first time for the week 01.6.2015 to 07.06.2015. Second time the congestion accounts were issued for the week 15.06.2015 to 21.06.2015. In the 28 th Meeting of SRPC held at Goa on 10.10.2015,it had been agreed to waive of congestion charges for first week (01.6.2015 to 07.06.2015) of June 2015 as a special case. SRPC forum had agreed that if charges are refunded by the receivable entity, it could be given back to the entities, which made payments, else it would be adjusted in the future congestion accounts. After long time congestion Accounts were issued during the week 12.9.2016 to 18.09.2016. NTPC and other constituents requested that as per the decision of the 28 th meeting of SRPC the congestion account charges to be adjusted/refunded. Again Congestion charges accounts were issued for the week 12/12/2016 to 18/12/2016 by SRPC. KSEB requested to waive of the congestion charges since the SLDCs and Control room were not given any warning message before issuing congestion(item No II of KSEB agenda).kseb also informed that they had received the congestion after the lapse of the congestion period. NTPC and other constituents had paid the congestion charges with protest (ANNEXURE 17). Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 30 /39

Deliberations in the CCM 19.1. KSEBL submitted that congestion charge was levied on SR entities on 14-12-2016 from time blocks 77 to 80. Notice regarding congestion warning was not received by them. It was also pointed out that the matter was already discussed in the OCC meeting and considering the merit of the issue, the charges levied is to be withdrawn. 19.2. KSEBL further submitted that in the case for 14.12.2016, congestion notice/charges were issued/levied only to SR constituents which were declared downstream of the congested corridor. While analyzing the under-drawal of WR constituents it was observed that GUVNL, MPPTCL and MSEDCL were under drawing during the congestion. During the same period number of generators like DB Power JP Jindal, KSTPS, LANCO, NSPCL, JPL Stage-II, Sipat, Sasan, VSTPS were over injecting. There was large infirm injection from Mouda stage-ii also. Hence the grounds for declaring only one region as upstream/downstream was not clear. Also it is learnt that RRAS Up of 1,000 MW was triggered for generator in NR and WR between 1815 hr. to 20 00 hr. on 14.12.2016. During the same time, congestion was kicked in for SR import though all the generators were upstream of SR and would have further aggravated the ATC violations. There was no RRAS Up for SR generators which would have helped in relieving the congestion. During the above congestion incident, Tamil Nadu was recovering from the disaster of Vardha Cyclone. Number of lines and sub stations were yet to be restored. The sudden TTC violation was due to the outage of Singareni Unit I. 19.3. KSEB and KKNPP representatives stated that without receiving a congestion warning notice congestion charges should not be imposed on the utilities. As per Congestion regulation warning notice need to be issued by SRLDC to utilities. It was brought to the notice of the forum that without congestion notice it may not be correct to impose congestion. Hence, many of the constituents requested to waive off the congestion charges levied on SR Constituents. 19.4. Commercial Committee noted that the congestion charges were imposed only to SR as downstream region without imposing any charges to upstream region. 19.5. KSEB stated that the issue of congestion was discussed in the OCC meeting and considering the merit of the issue the charges may be withdrawn. 19.6. SRPC Secretariat also raised doubts about implementation of congestion without adhering to the congestion procedures in toto. 19.7. CC forum formally agreed for the waiver request of congestion charges by various constituents. 19.8. Proposal to waive off congestion charges would be put up to TCC/SRPC for approval. 19.9. DGM,SRLDC appraised the forum regarding pending payment of congestion charges to pool by the constituents. SRLDC categorically stated that there was no provision to waive off congestion charges, once imposed. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 31 /39

19.10. For the week 01.6.2015 to 07.06.2015,to the congestion pool account to enable refunding/adjustment to the constituents, who paid congestion charges for that week. S.NO Constituent Amount to be Paid to Pool (`) 1 TELANGANA 35,14,602 2 KARNATAKA 84,29,984 3 GOA 2,48,607 4 KERALA 67,72,148 5 NLC TPS-II (Expn.)-I (INFIRM) 143,979 6 NLC TPS-II (Expn.) 52,716 7 ILFS (INFIRM) 69,126 Regarding the withdrawal of Congestion charges for the week 12/12/2016 to 18/12/2016, CC forum formally agreed for the waiver request of congestion charges by various constituents and the matter was referred to SRPC meeting. 20. NLC Metering Scheme NLC vide their letter dated 10-01-2017 (ANNEXURE 18) requested for the approval of Metering Scheme for Neyveli New Thermal Power Plant (2*500 MW, Lignite fired). Deliberations in the CCM: 20.1. Issue of NLC metering was discussed in detail and the following were noted. 20.2. In order to take the startup power, existing 230 kv D/C TPS-I- to TPS-II line was LILOed at NNTPP as per 35 th SCPSSR. 20.3. It was opined that Connectivity approval for the drawal of power at 230 kv need not be granted by CTU separately as the scheme in total is approved by 35 th SCPSSR. Hence, NLC can proceed with availing start up power without any separate connectivity agreement from CTU at 230 kv as CTU has already granted connectivity at 400kV. 20.4. SRPC and SRLDC formally agreed for the Metering scheme. 20.5. The new metering scheme for the start-up drawal is as shown below: Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 32 /39

TPS-I TPS-II NLC drawal points Modified to Tamil Nadu drawal points TPS-I TPS-II NNTPP drawal points NNTPP CC forum approved the metering scheme. NNTPP to avail startup power at 230 kv. 21. Construction Power requirement for Telangana Phase-I Power Plant(2*800 MW) NTPC requested for inclusion of construction power arrangement as an agenda item for discussion in the meeting (ANNEXURE 19). NTPC informed that that they have approached TSNPDCL for construction power requirement for the project-telangana Phase-I (2 X 800 MW). Since the project is under the geographical jurisdiction of TSNPDCL. The SG/TG agencies have been mobilized and started construction activities at site. Hence, power needs to be extended to the agencies at the earliest. Deliberations in the CCM : 21.1. It was proposed to avail the power from the existing 33kV Tie transformers of RSTPS. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 33 /39

The single line diagram of construction power system is shown below: 21.2. The drawl point would be treated as another drawl point of TSTRANSCO who is connected to ISTS at RSTPS. 21.3. It was brought to the notice of the forum that there would not be any change in the allocated power to the beneficiaries. This arrangement could save capital investment. 21.4. SRPC Secretariat stated that the proposal of NTPC could be viewed as additional connectivity point of TSTRANSCO with ISTS at RSTPS. The arrangement could have validity only if TSTRANSCO approaches the forum with the proposal. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 34 /39

CC forum formally approved for the metering scheme proposed by NTPC. The approved metering scheme would be additional connectivity of Telangana from NTPC Ramagundam Station. 22. KSEBL Agenda Points KSEBL vide their letter dated 21-01-2017 (ANNEXURE 20) had requested to discuss the following agenda points during the commercial committee meeting. 22.1 Mismatch in the scheduled energy for MTOA transaction between MPL and KSEBL for the month of August 2016 in the REAs of SRPC and ERPC. KSEBL stated that the energy scheduled at ex-bus for the MTOA transaction between Maithon Power Limited and KSEBL (M-16-05), for the month of August, 2016 as per the SRPC REA is 76952650 units while as per ERPC REA is 78281640 units. The difference of 1328990 units is due to the difference in scheduling on 01.08.2016 by ERLDC and SRLDC. The schedule for the time blocks 40 to 82 was revised by SRLDC to 0 MW, since the 765 kv Raichur-Sholapur Line tripped. However, no such revision was done by ERLDC. KSEBL further informed that M/s. Maithon power Limited has confirmed that ERLDC had not issued any revision for the blocks 40 to 82 on 01.08. 2016. Deliberations in the CCM & Update: 22.1.1 KSEBL stated that the commercial impact to Kerala on account of this mismatch is around Rs 26 lakhs and the matter was already addressed to ERPC, ERLDC and NLDC. 22.1.2 KSEBL informed that they had not received any response from SRLDC or ERLDC. KSEB presented their concern that SRLDC did not intimate the mismatch or taken any action to resolve the issue. 22.1.3 SRLDC stated that the revision was appropriately carried out by them, and ERLDC may be approached to correct the mismatch. 22.1.4 SRLDC informed that the matter has been taken up with ERLDC and would follow up. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 35 /39

22.1.5 It was noted that power scheduled to KSEBL was as per SRPC REA hence the difference of figure shown in ERPC and SRPC REA is the power not scheduled to KSEBL. 22.1.6 KSEBL stated that they cannot make the payment for the power not scheduled to them. It was decided in the meeting the concerned to take up the matter with ERLDC to correct the REA as per SRPC REA. Accordingly, SRPC had taken up the issue with ERLDC to correct the schedule. (ANNEXURE 21). 22.2 KSEB request to Waiving of Congestion charges for the week 12/12/2016 to 18/12/2016 (congestion imposed on 14-12-2016). The issue was discussed in item No 19. It was decided to submit the matter to SRPC in the forthcoming meeting. 22.3 Delay in the completion of maintenance work by PGCIL on 28 & 29.12.2016 KSEBL had stated that the maintenance work on the bus 1 of Raichur substation was postponed from 28/29 th to 29/30 th December 2016. On 27 th December KSEBL inquired about the proposed shut down on 28 th as around 600 MW of MTOA was to be curtailed and source for alternate power within SR need to be finalised to avoid load shedding. SRLDC control room informed that bus shut down planned on 28 th is differed and they did not had new date for bus shut down. KSEBL did not went ahead for purchase as bus shutdown was not to be availed. On 28 th evening KSEBL was informed by SRLDC that bus shutdown would be availed on 29/30 th December. As the communication received from SRLDC regarding deferment was on short notice KSEBL could not engage itself for purchases from other source. KSEBL had to undertake load shedding. KSEBL also could not carry out planned maintenance work in its 220 kv system on 30 th December due to deferment in availing bus shutdown. KSEBL informed that there was delay in completion of maintenance work on the bus 1 of Raichur substation and the consequent delay in normalization of the system badly effected KSEBL. The MTOA got curtailed. To manage the situation the demand was restricted by imposing load shedding as their hydro reserves are under conservation to curb the severe drought expected this year due to monsoon failure. The restriction amounts to 4mu of energy, and this resulted in to a revenue loss of approximately Rs.160 lakhs to KSEBL. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 36 /39

Deliberations in the CCM : 22.3.1 PGCIL informed that the work as approved by the OCC was postponed since the clearance for the work was not received from SRLDC. However, after getting the clearance on 28.12.2016 the work had been taken up and completed within the time specified. 22.3.2 SRLDC informed that the deferment was sought, as requested by PGCIL (WR) for emergency shutdown of D/C 765 kv Aurangabad Sholapur on 29th /30thDecember 2016. This deferment helped SR with additional ATC on 28th; else ATC curtailments would have been carried out on 28th, 29thand, 30thDecember 2016. 22.3.3 KSEBL stated that as PGCIL had completed work at 5 PM but MToA was restored only at 11 PM. 22.3.4 Commercial Committee noted that clubbing the maintenance to minimize the outage of the links was proper; however, there was a lapse that KSEBL was not informed that the Outage of lines for maintenance work had been deferred. 22.3.5 Had KSEBL been informed, they would have planned their transactions accordingly to avoid commercial loss. It was also noted that there was a delay in reinstating the MTOA after removal of curtailment, though PGCIL had returned the lines within the stipulated time, which stretched the commercial and operational problems of the constituent further. 22.3.6 CC forum requested SRLDC to inform the constituents accordingly to avoid any commercial implications to the constituents. 22.4 Computation of ATC-TTC KSEBL stated that the conservative approach for the determination of ATC-TTC of the region and downward revision of TTC imposes restriction on import by KSEBL. On account of the failure of both South-West and North-East monsoon, the power availability in the state is severely affected. The impact will be more pronounced during the summer period during day time, when the hydro generation is limited and demand goes to 3,000 MW range. To tide over the situation, KSEBL has been meticulously planning to conserve hydro generation during this period. Downward revision of TTC for the months of January to March is a matter of serious concern in this context. Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 37 /39

Deliberations in the CCM: 22.4.1 KSEBL stated that the commercial impact of downward revision of TTC is to be be appreciated. The additional power purchase cost on account of such curtailment comes to Rs.7.50 per unit which means 100MW curtailment will result in additional expenditure of Rs.7.5 crores /hour of curtailment. 22.4.2 KSEBL also requested that: (i). (ii) The curtailment of corridor is to be judiciously done by POSOCO Any work has to be completed in the minimum possible time by PGCIL and should be declared realistically so as to facilitate minimization of curtailment. Committee noted that, ATC-TTC for the period of January-March, 2017 got revised based on split bus operation request from KSEBL. 23. TN Agenda :Computation of drawal mechanism for BHAVINI TANTRANSCO vide their letter dated 19-01-2017 (ANNEXURE 22) had requested to account BHAVINI commissioning power drawal for the period of the split bus arrangement at BHAVINI from 12.1.2017, used to draw power temporarily for ten days owing to planned maintenance of MAPS switchyard, by computing the injection of MAPS as summation of all outgoing feeders at MAPS and Arni-1 Feeder connecting at BHAVINI as they draw power through this line only. Tamil Nadu drawal will be only from MAPS alone and not from BHAVINI as the Arn-2 feeder is connected to Siruseri SS through separate Bus. Deliberations in the CCM: 23.1 The summary record of discussions in the meeting held on 23-01-2013(ANNEXURE 23) covers 3 cases. Case-II covers the scenario when BHAVINI draws power through 230 kv feeders emanating from BHAVINI. This scenario also covers the split bus operation at BHAVINI as the touch point with ISTS remains the same. 23.2 Even in case meter reading from one particular end is not available for any reason, there is approved methodology for considering other end meter without applying any notional Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 38 /39

loss. Hence, if Siruseri end meter reading is not available, TN drawal can be computed using available meters at BHAVINI as per above mentioned methodology. 23.3 PGCIL informed that the Siruseri bay is owned by TN. Hence, it is the case of transmission line ending at two different licensees and meter should be installed by the respective ends by respective licensee as per CEA Metering Regulations. So TANTRANSCO has to install/ replace the meter at Siruseri End. 23.4 It was concluded that no special circumstances arose which was not covered in the existing practice of accounting / as spelt in the Special Meeting held on 23-01-2013. Accounting is to be carried out as per the prevailing methodology without giving this event any special status. 24. Commercial Operation Declaration of ISTS Elements & ISGS (CGS) During the Financial Year 2016-17 ISTS & ISGS (CGS) of SR declared under commercial operation / expected during 2017-18 is enclosed at ANNEXURE 24. 25. Date and Venue of 34 th Meeting of CC 34 th Meeting of Commercial Committee is scheduled to be held in the month of March / April 2017. The date and Venue of the meeting would be communicated in due course. ***** Minutes of 33 rd CCM held on 31 st January 2017 at SRPC, Bangalore 39 /39

ANNEXURE 1 (1/5)

ANNEXURE 1 (2/5)

ANNEXURE 1 (3/5)

ANNEXURE 1 (4/5)

ANNEXURE 1 (5/5)

ANNEXURE 2 (1 of 57) CIN No. U40105DL2009GOI188682 प वर स स टम ऑपर शन क रप र शन स समट ड (प वर स ड क रप र शन ऑफ इ सडय स समट ड क एक प र ण स व समत व व ह यक क पन ) POWER SYSTEM OPERATION CORPORATION LIMITED (A wholly owned subsidiary of Power Grid Corporation of India Limited) दस र त र य ड सडस प च क न द र, 29, र क ण क र र ड, ब ग र 560 009 SOUTHERN REGIONAL LOAD DESPATCH CENTRE, 29, RACE COURSE CROSS ROAD, BANGALORE 560 009. Ref: SRLDC/MO/CCM/ 05-01-2017 The Superintending Engineer (Comml), SRPC, Bangalore Sir, Sub: Agenda for 33 rd meeting of Commercial Sub-Committee of SRPC Ref: SRPC letter No.SRPC/SE-1/33 CC/2016/ dt. 16-12-16 Please find enclosed the agenda points for discussion in the forthcoming 33 rd meeting of Commercial Sub-Committee of SRPC. Thanking you, Yours faithfully, Encl: As above: (V.BALAJI) Dy. GENERAL MANAGER Page 1 of 9

ANNEXURE 2 (2 of 57) SRLDC Agenda for 33 rd meeting of Commercial Sub-Committee of SRPC 1. Audit of SR DSM & Reactive Energy accounts The details of payments and disbursements of DSM, Reactive and RRAS accounts from 08.08.16 to 04.12.16 are enclosed in Annexure-I, II & III in line with clause No.15 of Annexure-I (Section 6.1 (d) of CERC (IEGC) regulations, 2010. 2. Reconciliation of DSM and Reactive charges Regional Entity-wise details of Deviation and Reactive pool payment/receipt have been sent to the pool members on a monthly basis for the period from Aug 16 to Oct 16 for reconciliation. Status of Receipt of signed reconciliation statement is enclosed in Annexure- IV. All other pool members who are yet to reconcile are once again requested to verify the statements compulsorily and send a signed copy to SRLDC for our records to enable us to comply with audit observations. 3. Status of outstanding charges to the pool accounts. Outstanding payments to DSM pool account as on 26.12.16 Sl. No. 1 Beneficiary COASTAL ENERGEN 2 TPCIL 3 SEL 4 5 ER COASTAL ENERGEN Period SRPC account issue date Amount (Rs.) week 18-20, 22 R1 20-10-16 791 23-26 (05.09.2016-02.10.2016) R1 23-26 (05.09.2016-02.10.2016) R1 35 (28.11.2016-04.12.2016) 35 (28.11.2016-04.12.2016) 11-11-16 149023 11-11-16 56300 13-12-16 3248857 13-12-16 11990221 The following is the outstanding to Deviation pool account as on 26.12.16 as interest payable due to delayed weekly charges. Sl. No. Constituent Interest payable (Rs.) Interest statement issue date. 1 AP 3689 15-11-2016 2 AP 50906 15-11-2016 Page 2 of 9

ANNEXURE 2 (3 of 57) 3 AP 53961 07-12-2016 4 CE 11937 15-11-2016 5 CE 7579 07-12-2016 6 COASTAL ENERGEN 437 07-10-2016 7 COASTAL ENERGEN 589 07-10-2016 8 GOA 1 15-11-2016 9 IL&FS 1845 07-10-2016 10 IL&FS 9992 07-10-2016 11 IL&FS 2880 15-11-2016 12 IL&FS 114 15-11-2016 13 IL&FS 249 07-12-2016 14 IL&FS 176 07-12-2016 15 KKNPP 1725 08-07-2016 16 KSEB 24911 15-11-2016 17 MEPL 157 15-11-2016 18 TN 105358 15-11-2016 The outstanding interest shall be recovered from the weekly payments being received and treat the short fall as default in payment. This may necessitate opening of LC and other complications. Therefore, the outstanding amounts may please be paid immediately. The following is the outstanding to RRAS pool. Sl. No. Beneficiary Period SRPC account issue date Amount (Rs.) 1 NLC TPS II EXP 35 (28.11.2016-04.12.2016) 13-12-16 16403 The following is the outstanding to RRAS pool as on 26.12.16 as interest payable due to delayed weekly charges. Sl. No. Constituent Interest payable (Rs.) Interest statement issue date. 1 NTPL 149 15-11-2016 The following is the outstanding to reactive pool account. Page 3 of 9

ANNEXURE 2 (4 of 57) Sl. No. Beneficiary Period SRPC account issue date Amount (Rs.) 1 KSEB 2 PUDUCHERRY 18(01-08-2016-07- 08-2016) R1 18(01-08-2016-07- 08-2016) R1 29/08/2016 625 29/08/2016 63 As per item 12.1.3 of minutes of 32 nd CSCM, forum had suggested to repay the congestion account received by Constituents on account of withdrawal of congestion account for the week (01.06.2015 to 07.06.2015). The following payments yet to be received into the pool account accordingly Sl. No. Beneficiary Amount (Rs.) 1 KPTCL 84,29,984 2 GOA 2,48,607 3 KSEB 67,72,148 4 IL&FS 69,126 The forum may agree for recovering the outstanding interest from the weekly payments being received into the pool accounts from the above entities and treat the short fall as default in payment. 4. Non-compliance of Opening of L-C for DSM payment Sl. No. Constituent Week No. Period Delayed amount (Rs.) 1 LANCO ST-III 7 11.05.2015-17.05.2015 801428 2 AP 23 31.08.2015-06.09.2015 108775033 3 TN 40 28.12.2015-03.01.2016 95989506 4 PONDY 47 15.02.2016-21.02.2016 2793831 5 IL&FS 7 16.05.2016-22.05.2016 6701883 6 LANCO ST-II 11 13.06.2016-19.06.2016 151580 7 NTECL 14 04.07.2016-10.07.2016 1219770 8 CE 26 26.09.2016-02.10.2016 4973943 Reconciliation of Open Access disbursements The details of disbursements of CTU, STU & SLDC charges of STOA for the period from Aug 16 to Oct 16 are enclosed in Annexure-V. The same has already been sent to all Page 4 of 9

ANNEXURE 2 (5 of 57) KSEB No of Goa No of Instances Instances Nellore 3 Talcher HVDC 4 Kozhikode 3 the concerned on a monthly basis for verification and reconciliation. The disbursements made for which no discrepancy was pointed out are treated as reconciled. However, members may note that it is compulsory to return the signed copies of the statements as record for statutory audits 5. Delay in SEM data transfer: Some of the entities are not sending SEM data within time in line with IEGC Clause 6.4.21. Statement of delay in SEM data transmission from various locations is enclosed in Annexure-VI. Constituents are once again requested for compliance. The status of SEM data receipt as on 17:00 hrs of Monday and 12:00hrs of Tuesday is available in the SRLDC website under the menu Commercial>SEM data receipt status. All stations and concerned Nodal officers to monitor this information and ensure the timely transmission of SEM data to SRLDC. The instances of notable delay or non-receipt of SEM data from 05-09-16 to 18-12-16 is as below: AP No of Instances Telangana No of Instances Kurnool 3 Gajwel 5 Kamavarapukota 3 Tandur 4 Uravakonda 3 Dindi 3 Chalakurthy 3 Kodada 3 N Sagar 3 Page 5 of 9

ANNEXURE 2 (6 of 57) *Data of Kadra, Yarendahalli, Siruseri is not being received at all Karnataka No of Instances Tamil Nadu No of Instances Guttur 5 Alamathy 5 Sedam 4 Kuzhithurai 4 Nelamangala 3 NCTPS 4 Kadalangudy 3 PGCIL SR-I No of PGCIL SR-II No of ISGS No of Instances Instances Instances Nellore 3 Talcher HVDC 4 NLC remote end 4 Kozhikode 3 6. No feedback to reports on discrepancies observed in SEM data SRLDC has been intimating the discrepancies observed in SEM data on weekly basis to all nodal officers. The same for the week from 05-09-16 to 18-12-16 are given in Annexure VIII. However most of the Nodal Officers are still not giving feedback in this regard. In the absence of confirmation or other-wise on the discrepancies observed, the energy accounting could become erroneous. All nodal officers are once again requested to verify the same and confirm with the reasons for such discrepancies noticed in the SEM data. 7. Time drift statement Non-receipt status The following stations are NOT SENDING the monthly time drift statements: Karnataka All of the stations except Konaje AP-Kurnool, KV Kota, VTPS, Ragulapadu, Tallapalli TN - Arni, Gummidpoondi, Achrapakkam and SP Koil Telangana- Wadapally, Wanaparthy SRTS-I Kadapa SRTS-II : - Talcher HVDC Auxillary, The detailed status of receipt of time drift - correction report is enclosed at Annexure- VII. Page 6 of 9

ANNEXURE 2 (7 of 57) 8. Non-compliance of Replacement of SEMs at Tiruvalem and Theni. In-spite of assurances in 29 th, 30 th, 31 st and 32 nd Commercial sub-committee meetings by TN, the SEMs at Tiruvalem and Theni having enormous time drift are yet to be replaced. TN to expedite the same on urgent basis and status to be updated. 9. Discontinuation of intimation regarding pool related correspondence from SRLDC through hard copies. In the 32 nd CSCM all the entities agreed to communicate their email-ids to SRLDC within a fortnight for getting intimation related to pool accounts. As on date, SRLDC has received response only from Puducherry and SGPL. All other entities are requested to furnish the same immediately via mail to sreasem@gmail.com in the following format. Name of the Entity Name of contact person Designation Mobile No. Email ID 10. Class of CT-PT installed corresponding to all the SEMs in the region All the regional entities are requested to furnish the class of CTs and PTs connected to all the SEMs in the Southern Region in the attached format as given in Annexure IX. Further, all the regional entities are requested to check the CT-PT ratio, SEM serial number etc pertaining to their locations and inform SRLDC any discrepancy. Further, at some locatios it is u nderstood that CTs/PTs were available only 2 phases. Entities may intimate the details of such locations and initiate action for installation in the remaining phase also. 11. Nodal Officer for SEM data coordination from NTECL Vallur It is understood that the Nodal officer for SEM data coordination has got transferred. NTECL is requested to nominate the new Nodal officer. 12. SEMs on LV Side of GTs at MAPS Vide 7.2 of MoM of 32 nd CSCM, the forum agreed for the provision of SEMs on LV side of GTs at MAPS as a fall back arrangement. MAPS-CTU may furnish the status of the same. Page 7 of 9

ANNEXURE 2 (8 of 57) 13. Unauthorised LiLoing of some lines by STUs Oflate it is seen that some of the STUs have LiLoed the lines without prior intimation to SRLDC and obtaining real time code. Sl.No Line LiLoed at Date of LiLoing 1 220kV Wadapalli-Piduguralla New Wadapalli (TS) 19-05-16 2 220kV Wadapalli-Tangeda New Wadapalli (TS) 19-05-16 3 230kV MAPS-Acharapakkam Line Echur (TN) 08-08-16. 4 220kV Neyveli-Villupuram line Ulunderpet (TN) 01-101-6 5 220kV Narketpalli-Chillakallu Line Suryapet (TS) 21-12-16 It may be appreciated that apart from intimating SRLDC, it is mandatory that prior approval of the Standing Committee and Transmission Planners ie. CTU/CEA is to be obtained before making any structural changes to the network. Further such re-configuration may have to be examined form the point of view of Metering arrangement. Vide point 13.14.7 of the MoM of 32 nd CSCM, all Regional entities had agreed to adhere to the above requirement. The concerned Regional entities may please explain the Committee the circumstances leading to the above non-compliance. 14. Injection Schedule exceeding the Sent Out Capability Oflate, there have been instances of some of the Generators exceeding their Injection Schedules exceeding the Sent Out Capability. This is due to reasons such as over-selling in Px beyond their Net Sent Out Capability or recalling of URS power by the original beneficiary etc. All Regional Entities are requested to be extra vigilant in this regard and take necessary precautions with due diligence. In case the incidents occur again, the matter would be reported as non-compliance under cl.1.5 of IEGC. 15. Timely submission of PoC Data As per prevailing CERC orders, PoC computations are being carried out by NLDC on quarterly basis. As STOA approvals are issued three months in advance, it is essential that the computations are completed well in advance. (1) The technical details of new transmission elements, generating units which are expected to commence commercial operation (2) Yearly Transmission charges (3) Node wise forecast MW-MVAR Injection and Drawl (4) Details of long term and medium term contracts (5) Maximum injection and withdrawal data for corresponding quarter of last 3 years. All DICs are requested furnish the above data for Q4 of 2016-17 (from Jan 17 to Mar 17) immediately. Page 8 of 9

ANNEXURE 2 (9 of 57) DICs may please confirm the advance action initiated for Q1 of 2017-18 (from Apr 17 to Jun 17) 16. Status of Start up power & Infirm power granted and CoD declared Start Up Power Sl. Generator Start up power granted No From To 1 SGPL U-2: 01-10-16 08-01-17 2 Kudgi U-2: 28-10-16 31-03-17 Infirm Power Sl. Generator Infirm Power 6 month period No started from would end by 1 KNPP U-2: 29-08-16 28-02-17 2 Kudgi U-1 28-11-16 27-05-17 (Advance action may be taken in the likelihood of delay in declaring CoD beyond 6 months) CoD Declared: SGPL U-1: 17-11-16. This is for the information of the Committee. 17. PSDF Transfer The status of fund transfer from SR to PSDF as on 26.12.2016 is as below: (In Rs..Crores) UI-DSM A-c. (Including capping A-c.) Reactive A-c. e-bidding charges Congestion Amount Grand Total Total (Upto Jul 16) 1135.685957 3.7940429 556.3108 2.411977 1901.623 No amount is being transferred to PSDF since Aug 16 in order to keep sufficient surplus funds to meet RRAS deficit in pool accounts of all RLDCs. An amount of Rs 38.08 Cr was transferred to NRDLC deviation pool account. This is for the information of the Committee. x----x----x Page 9 of 9

ANNEXURE 2 (10 of 57) Wk No. & period Intrest for delayed payment as per SRPC letter - SRPC/SE-I/DSM/2016/ dt. 08/07/16 Regional Entity Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. KKNPP* 1725 08-07-2016 1725 Intrest for delayed payment as per SRPC letter - SRPC/SE-I/DSM/2016/ dt. 10/08/16 IL&FS 77742 20-08-2016 06-09-2016 77742 0 PONDY 458 20-08-2016 08-11-2016 458 0 LKPL St II 61 20-08-2016 06-09-2016 61 0 COASTAL ENERGEN 1874 20-08-2016 28-10-2016 1874 0 VALLUR 488 8/20/2016 9/12/2016 488 0 (31-12-2014 to 21-06-2015) - R2 KKNPP(Start_Up) 78562450 4/20/2016 7/26/2016 78562450 0 AP 3928122 3928122 07-09-2016 0 (31-12-2014 to 21-06-2015) - R2 KPTCL 17362301 17362301 06-09-2016 0 (31-12-2014 to 21-06-2015) - R2 KSEB 10448806 10448806 06-09-2016 0 (31-12-2014 to 21-06-2015) - R2 TN 44191379 44191379 06-09-2016 0 (31-12-2014 to 21-06-2015) - R2 PONDY 2631842 2631842 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 TELANGANA 82760 8/22/2016 8/22/2016 82760 0 AP 639342 639342 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 LKPPL St II 182846 8/22/2016 8/23/2016 182846 0 KPTCL 18801461 18801461 07-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 ER 11874 8/22/2016 9/19/2016 11874 0 KSEB 23662628 23662628 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 TN 7850035 7850035 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 PONDY 503360 503360 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 GOA 36248 36248 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 MEPL 899340 899340 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 LKPPL St III 11118540 11118540 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 COASTAL ENERGEN 3211132 3211132 06-09-2016 0 09 to 13 (30-05-2016 to 03-07-2016) - R1 WR 11874 11874 06-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 LKPL St II 2397127 8/26/2016 9/6/2016 2397127 0 AP 10291 10291 07-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 LKPL St III (Infirm) 116407 8/26/2016 8/29/2016 116407 0 KPTCL 64651 64651 07-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 KSEB 94019 94019 07-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 TN 34847 34847 07-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 PONDY 4072 4072 06-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 TELANGANA 12141 12141 07-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 COASTAL ENERGEN 7834 7834 07-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 MEPL 6425 6425 07-09-2016 0 41 (04-01-2016 to 10-01-2016) - R1 LKPPL St III 2466490 2466490 07-09-2016 0 19(08.08.2016-14.08.2016) KPTCL 47908220 02-09-2016 01-09-2016 47908220 0 AP 388256 388256 07-09-2016 0 19(08.08.2016-14.08.2016) KSEB 13551762 02-09-2016 01-09-2016 13551762 0 TN 3255402 3255402 07-09-2016 0 19(08.08.2016-14.08.2016) GOA-SR 3031396 02-09-2016 02-09-2016 3031396 0 PONDY 745231 745231 06-09-2016 0 19(08.08.2016-14.08.2016) RSTPS STG-I&II 4277185 02-09-2016 01-09-2016 4277185 0 PG-HVDC 518742 518742 07-09-2016 0 19(08.08.2016-14.08.2016) RSTPS STG-III 2782445 02-09-2016 01-09-2016 2782445 0 NLC TS-II STG-I 3710673 3710673 07-09-2016 0 19(08.08.2016-14.08.2016) SIMHADRI-II 3201689 02-09-2016 01-09-2016 3201689 0 NLC TS-II STG-II 2708369 2708369 07-09-2016 0 19(08.08.2016-14.08.2016) TALCHER-II 1630551 02-09-2016 01-09-2016 1630551 0 NLC TS-I EXP 5229010 5229010 07-09-2016 0 19(08.08.2016-14.08.2016) VALLUR 2103672 02-09-2016 02-09-2016 2103672 0 MEPL 383977 383977 07-09-2016 0 19(08.08.2016-14.08.2016) LANCO ST-II 3817867 02-09-2016 02-09-2016 3817867 0 WR 109814595 109814595 07-09-2016 0 19(08.08.2016-14.08.2016) SEL 137354 02-09-2016 30-08-2016 137354 0 TPCIL 2433286 2433286 07-09-2016 0 19(08.08.2016-14.08.2016) ER 71967301 02-09-2016 08-09-2016 71967301 0 SGPL (INFIRM) 9349719 9349719 07-09-2016 0

ANNEXURE 2 (11 of 57) Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Wk No. & period Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 19(08.08.2016-14.08.2016) COASTAL ENERGEN 2009009 02-09-2016 02-09-2016 2009009 0 19(08.08.2016-14.08.2016) TELANGANA 7073918 02-09-2016 03-09-2016 7073918 0 19(08.08.2016-14.08.2016) IL&FS 2306732 02-09-2016 06-09-2016 2306732 0 19(08.08.2016-14.08.2016) LANCO ST-III 1950949 02-09-2016 02-09-2016 1950949 0 19(08.08.2016-14.08.2016) NTPL 2936593 02-09-2016 26-08-2016 2936593 0 19(08.08.2016-14.08.2016) KKNPP 10289691 02-09-2016 02-09-2016 10289691 0 19(08.08.2016-14.08.2016) NTPC, KUDGI (INFIRM) 6249443 02-09-2016 02-09-2016 6249443 0 20(15.08.2016-21.08.2016) AP 32901672 09-09-2016 09-09-2016 32901672 0 TALCHER-II 143521 143521 12-09-2016 0 20(15.08.2016-21.08.2016) KPTCL 54336213 09-09-2016 08-09-2016 54336213 0 NLC TS-II STG-I 3288603 3288603 12-09-2016 0 20(15.08.2016-21.08.2016) KSEB 8839493 09-09-2016 09-09-2016 8839493 0 NLC TS-II STG-II 2008408 2008408 12-09-2016 0 20(15.08.2016-21.08.2016) TN 13623149 09-09-2016 09-09-2016 13623149 0 NLC TS-I EXP 4707207 4707207 12-09-2016 0 20(15.08.2016-21.08.2016) PONDY 725214 09-09-2016 09-09-2016 725214 0 WR 138023813 138023813 12-09-2016 0 20(15.08.2016-21.08.2016) PG-HVDC 6476 09-09-2016 02-09-2016 6476 0 20(15.08.2016-21.08.2016) GOA-SR 2553578 09-09-2016 09-09-2016 2553578 0 20(15.08.2016-21.08.2016) RSTPS STG-I&II 1672765 09-09-2016 08-09-2016 1672765 0 20(15.08.2016-21.08.2016) RSTPS STG-III 1151512 09-09-2016 08-09-2016 1151512 0 20(15.08.2016-21.08.2016) SIMHADRI-II 2908332 09-09-2016 08-09-2016 2908332 0 20(15.08.2016-21.08.2016) VALLUR 1356698 09-09-2016 08-09-2016 1356698 0 20(15.08.2016-21.08.2016) LANCO ST-II 535893 09-09-2016 08-09-2016 535893 0 20(15.08.2016-21.08.2016) SEL 10002 09-09-2016 06-09-2016 10002 0 20(15.08.2016-21.08.2016) MEPL 2829 09-09-2016 07-09-2016 2829 0 20(15.08.2016-21.08.2016) ER 8078764 09-09-2016 19-09-2016 8078764 0 20(15.08.2016-21.08.2016) COASTAL ENERGEN 121476 09-09-2016 20-09-2016 121476 0 20(15.08.2016-21.08.2016) TPCIL 23288 09-09-2016 07-09-2016 23288 0 20(15.08.2016-21.08.2016) TELANGANA 15408493 09-09-2016 09-09-2016 15408493 0 20(15.08.2016-21.08.2016) IL&FS 2775633 09-09-2016 20-09-2016 2775633 0 20(15.08.2016-21.08.2016) LANCO ST-III 9476770 09-09-2016 09-09-2016 9476770 0 20(15.08.2016-21.08.2016) NTPL 1139847 09-09-2016 06-09-2016 1139847 0 20(15.08.2016-21.08.2016) KKNPP 17000643 09-09-2016 09-09-2016 17000643 0 20(15.08.2016-21.08.2016) NTPC, KUDGI (INFIRM) 3672519 09-09-2016 08-09-2016 3672519 0 20(15.08.2016-21.08.2016) SGPL (INFIRM) 1353478 09-09-2016 03-09-2016 1353478 0 14, 15 (04-07-2016 to 17-07-2016) - R1 KSEB 296248 9/9/2016 9/9/2016 296248 0 AP 17910 17910 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 TN 317855 9/9/2016 9/9/2016 317855 0 KPTCL 2029061 2029061 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 TALCHER-II 60111 9/9/2016 9/12/2016 60111 0 TELANGANA 47985 47985 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 NLC TS-II STG-II 76940 9/9/2016 9/7/2016 76940 0 PONDY 3371 3371 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 PG-HVDC 160 160 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 GOA 1814 1814 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 NTECL 54215 54215 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 TPCIL 279 279 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 LKPPL St II 266 266 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 LKPPL St III 11094 11094 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 Coastal Energen 1065 1065 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 WR 443810 443810 14-09-2016 0 14, 15 (04-07-2016 to 17-07-2016) - R1 ER 9613 9613 14-09-2016 0

ANNEXURE 2 (12 of 57) Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Wk No. & period Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. WR - 49, 50 (02.02.2015 to 15.05.2015) -R1 WR 3057004 3057004 14-09-2016 0 WR - 19 (08.08.2016 to 14.08.2016) - R1 WR 8506540 8506540 14-09-2016 0 21(22.08.2016-28.08.2016) AP 35769930 16-09-2016 16-09-2016 35769930 0 TN 11988517 11988517 19-09-2016 0 21(22.08.2016-28.08.2016) KPTCL 49215493 16-09-2016 15-09-2016 49215493 0 PONDY 2015751 2015751 19-09-2016 0 21(22.08.2016-28.08.2016) KSEB 12458727 16-09-2016 17-09-2016 12458727 0 PG-HVDC 682618 682618 19-09-2016 0 21(22.08.2016-28.08.2016) RSTPS STG-I&II 1785846 16-09-2016 16-09-2016 1785846 0 GOA-SR 141797 141797 19-09-2016 0 21(22.08.2016-28.08.2016) RSTPS STG-III 2431682 16-09-2016 16-09-2016 2431682 0 TALCHER-II 498672 498672 19-09-2016 0 21(22.08.2016-28.08.2016) SIMHADRI-II 2987615 16-09-2016 16-09-2016 2987615 0 NLC TS-II STG-I 1912318 1912318 19-09-2016 0 21(22.08.2016-28.08.2016) VALLUR 1033440 16-09-2016 14-09-2016 1033440 0 NLC TS-II STG-II 1126296 1126296 19-09-2016 0 21(22.08.2016-28.08.2016) LANCO ST-II 154387 16-09-2016 16-09-2016 154387 0 NLC TS-I EXP 5660103 5660103 19-09-2016 0 21(22.08.2016-28.08.2016) ER 17464462 16-09-2016 28-09-2016 17464462 0 SEL 815053 815053 19-09-2016 0 21(22.08.2016-28.08.2016) COASTAL ENERGEN 491044 16-09-2016 21-09-2016 491044 0 MEPL 234410 234410 19-09-2016 0 21(22.08.2016-28.08.2016) TPCIL 5037465 16-09-2016 16-09-2016 5037465 0 WR 90699970 90699970 19-09-2016 0 21(22.08.2016-28.08.2016) TELANGANA 5909886 16-09-2016 16-09-2016 5909886 0 IL&FS 32139 32139 19-09-2016 0 21(22.08.2016-28.08.2016) NLC TPS-II (EXPN) 4163921 16-09-2016 14-09-2016 4163921 0 NTPL 1847004 1847004 19-09-2016 0 21(22.08.2016-28.08.2016) LANCO ST-III 6040287 16-09-2016 16-09-2016 6040287 0 21(22.08.2016-28.08.2016) KKNPP 15418759 16-09-2016 16-09-2016 15418759 0 21(22.08.2016-28.08.2016) NTPC, KUDGI (INFIRM) 2866216 16-09-2016 16-09-2016 2866216 0 21(22.08.2016-28.08.2016) SGPL (INFIRM) 995968 16-09-2016 12-09-2016 995968 0 Intrest for delayed payment as per SRPC letter - SRPC/SE-I/DSM/2016/ dt. 08/09/16 COASTAL ENERGEN 7000 9/18/2016 9/21/2016 7000 0 22(29.08.2016-04.09.2016) AP 13500596 24-09-2016 26-09-2016 13500596 0 TN 20203174 20203174 26-09-2016 0 22(29.08.2016-04.09.2016) KPTCL 13202879 24-09-2016 22-09-2016 13202879 0 PONDY 5115660 5115660 26-09-2016 0 22(29.08.2016-04.09.2016) KSEB 1043283 24-09-2016 23-09-2016 1043283 0 PG-HVDC 480315 480315 26-09-2016 0 22(29.08.2016-04.09.2016) RSTPS STG-I&II 5813404 24-09-2016 22-09-2016 5813404 0 GOA-SR 27017 27017 26-09-2016 0 22(29.08.2016-04.09.2016) RSTPS STG-III 2520295 24-09-2016 22-09-2016 2520295 0 NLC TS-II STG-I 2936516 2936516 26-09-2016 0 22(29.08.2016-04.09.2016) SIMHADRI-II 3386767 24-09-2016 22-09-2016 3386767 0 NLC TS-II STG-II 3947412 3947412 26-09-2016 0 22(29.08.2016-04.09.2016) TALCHER-II 681322 24-09-2016 22-09-2016 681322 0 NLC TS-I EXP 5314569 5314569 26-09-2016 0 22(29.08.2016-04.09.2016) VALLUR 2775847 24-09-2016 23-09-2016 2775847 0 SEL 772348 772348 26-09-2016 0 22(29.08.2016-04.09.2016) LANCO ST-II 430634 24-09-2016 26-09-2016 430634 0 MEPL 298203 298203 26-09-2016 0 22(29.08.2016-04.09.2016) ER 61235381 24-09-2016 03-10-2016 61235381 0 WR 55895029 55895029 26-09-2016 0 22(29.08.2016-04.09.2016) TELANGANA 12525371 24-09-2016 23-09-2016 12525371 0 COASTAL ENERGEN 491532 491532 26-09-2016 0 22(29.08.2016-04.09.2016) NLC TPS-II (EXPN) 3117778 24-09-2016 17-09-2016 3117778 0 TPCIL 459831 459831 26-09-2016 0 22(29.08.2016-04.09.2016) IL&FS 1986112 24-09-2016 21-09-2016 1986112 0 NTPL 1105450 1105450 26-09-2016 0 22(29.08.2016-04.09.2016) LANCO ST-III 1279419 24-09-2016 26-09-2016 1279419 0 22(29.08.2016-04.09.2016) NTPC, KUDGI (INFIRM) 2868641 24-09-2016 22-09-2016 2868641 0 22(29.08.2016-04.09.2016) SGPL (INFIRM) 502019 24-09-2016 26-09-2016 502019 0 23(05.09.2016-11.09.2016) AP 21729446 30-09-2016 30-09-2016 21729446 0 TN 20107769 20107769 03-10-2016 0 23(05.09.2016-11.09.2016) KPTCL 40605670 30-09-2016 29-09-2016 40605670 0 PONDY 3099012 3099012 03-10-2016 0 23(05.09.2016-11.09.2016) KSEB 14760669 30-09-2016 30-09-2016 14760669 0 PG-HVDC 775872 775872 03-10-2016 0 23(05.09.2016-11.09.2016) GOA-SR 699 30-09-2016 07-10-2016 699 0 NLC TS-II STG-I 3425054 3425054 03-10-2016 0 23(05.09.2016-11.09.2016) RSTPS STG-I&II 4292554 30-09-2016 29-09-2016 4292554 0 NLC TS-II STG-II 5015926 5015926 03-10-2016 0

ANNEXURE 2 (13 of 57) Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Wk No. & period Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 23(05.09.2016-11.09.2016) RSTPS STG-III 1936516 30-09-2016 29-09-2016 1936516 0 NLC TS-I EXP 5756733 5756733 03-10-2016 0 23(05.09.2016-11.09.2016) SIMHADRI-II 2985726 30-09-2016 29-09-2016 2985726 0 SEL 676725 676725 03-10-2016 0 23(05.09.2016-11.09.2016) TALCHER-II 185000 30-09-2016 29-09-2016 185000 0 MEPL 341902 341902 03-10-2016 0 23(05.09.2016-11.09.2016) VALLUR 1770132 30-09-2016 29-09-2016 1770132 0 WR 138960275 138960275 03-10-2016 0 23(05.09.2016-11.09.2016) LANCO ST-II 2783926 30-09-2016 30-09-2016 2783926 0 COASTAL ENERGEN 438655 438655 03-10-2016 0 23(05.09.2016-11.09.2016) ER 95777803 30-09-2016 03-10-2016 95777803 0 TPCIL 2934391 2934391 03-10-2016 0 23(05.09.2016-11.09.2016) TELANGANA 25036878 30-09-2016 01-10-2016 25036878 0 23(05.09.2016-11.09.2016) NLC TPS-II (EXPN) 5942631 30-09-2016 28-09-2016 5942631 0 23(05.09.2016-11.09.2016) IL&FS 327320 30-09-2016 24-10-2016 327320 0 23(05.09.2016-11.09.2016) LANCO ST-III 1961225 30-09-2016 30-09-2016 1961225 0 23(05.09.2016-11.09.2016) NTPL 1600369 30-09-2016 27-09-2016 1600369 0 23(05.09.2016-11.09.2016) NTPC, KUDGI (INFIRM) 6643138 30-09-2016 29-09-2016 6643138 0 23(05.09.2016-11.09.2016) SGPL (INFIRM) 756168 30-09-2016 26-09-2016 756168 0 12 (20-06-2016 to 26-06-2016) - R1 AP 709480 30-09-2016 15-10-2016 709480 0 12 (20-06-2016 to 26-06-2016) - R1 KPTCL 3135901 30-09-2016 10/1/2016 3135901 0 12 (20-06-2016 to 26-06-2016) - R1 KSEB 1887216 30-09-2016 04-11-2016 1887216 0 12 (20-06-2016 to 26-06-2016) - R1 TN 7981648 30-09-2016 04-11-2016 7981648 0 12 (20-06-2016 to 26-06-2016) - R1 PONDY 475351 30-09-2016 9/29/2016 475351 0 24(12.09.2016-18.09.2016) AP 996340 07-10-2016 07-10-2016 996340 0 TN 19595940 19595940 13-10-2016 0 24(12.09.2016-18.09.2016) KPTCL 11278384 07-10-2016 05-10-2016 11278384 0 PONDY 2657858 2657858 13-10-2016 0 24(12.09.2016-18.09.2016) KSEB 12242122 07-10-2016 07-10-2016 12242122 0 PG-HVDC 655654 655654 13-10-2016 0 24(12.09.2016-18.09.2016) GOA-SR 1284165 07-10-2016 07-10-2016 1284165 0 TALCHER-II 497137 497137 13-10-2016 0 24(12.09.2016-18.09.2016) RSTPS STG-I&II 3144259 07-10-2016 07-10-2016 3144259 0 NLC TS-II STG-I 7640290 7640290 13-10-2016 0 24(12.09.2016-18.09.2016) RSTPS STG-III 1407048 07-10-2016 07-10-2016 1407048 0 NLC TS-II STG-II 9517471 9517471 13-10-2016 0 24(12.09.2016-18.09.2016) SIMHADRI-II 1395778 07-10-2016 07-10-2016 1395778 0 NLC TS-I EXP 10425697 10425697 13-10-2016 0 24(12.09.2016-18.09.2016) VALLUR 1013448 07-10-2016 06-10-2016 1013448 0 SEL 603166 603166 13-10-2016 0 24(12.09.2016-18.09.2016) LANCO ST-II 130329 07-10-2016 07-10-2016 130329 0 MEPL 206758 206758 13-10-2016 0 24(12.09.2016-18.09.2016) ER 190734710 07-10-2016 13-10-2016 190734710 0 WR 139071977 139071977 13-10-2016 0 24(12.09.2016-18.09.2016) TELANGANA 16372927 07-10-2016 07-10-2016 16372927 0 COASTAL ENERGEN 659881 659881 13-10-2016 0 24(12.09.2016-18.09.2016) NLC TPS-II (EXPN) 6875918 07-10-2016 30-09-2016 6875918 0 TPCIL 1427220 1427220 13-10-2016 0 24(12.09.2016-18.09.2016) IL&FS 2285457 07-10-2016 06-10-2016 2285457 0 NTPL 3130030 3130030 13-10-2016 0 24(12.09.2016-18.09.2016) LANCO ST-III 1570006 07-10-2016 07-10-2016 1570006 0 24(12.09.2016-18.09.2016) NTPC, KUDGI (INFIRM) 2732816 07-10-2016 07-10-2016 2732816 0 24(12.09.2016-18.09.2016) SGPL (INFIRM) 889539 07-10-2016 29-09-2016 889539 0 25(19.09.2016-25.09.2016) AP 21055205 14-10-2016 14-10-2016 21055205 0 PONDY 104926 104926 18-10-2016 0 25(19.09.2016-25.09.2016) KPTCL 13253618 14-10-2016 13-10-2016 13253618 0 PG-HVDC 247736 247736 17-10-2016 0 25(19.09.2016-25.09.2016) KSEB 17322368 14-10-2016 14-10-2016 17322368 0 NLC TS-II STG-I 6249205 6249205 17-10-2016 0 25(19.09.2016-25.09.2016) TN 12577774 14-10-2016 14-10-2016 12577774 0 NLC TS-II STG-II 9611069 9611069 17-10-2016 0 25(19.09.2016-25.09.2016) GOA-SR 1257962 14-10-2016 14-10-2016 1257962 0 NLC TS-I EXP 7837428 7837428 17-10-2016 0 25(19.09.2016-25.09.2016) RSTPS STG-I&II 2782461 14-10-2016 14-10-2016 2782461 0 SEL 228858 228858 17-10-2016 0 25(19.09.2016-25.09.2016) RSTPS STG-III 1257403 14-10-2016 14-10-2016 1257403 0 MEPL 92915 92915 17-10-2016 0 25(19.09.2016-25.09.2016) SIMHADRI-II 1968755 14-10-2016 14-10-2016 1968755 0 WR 168872716 168872716 17-10-2016 0 25(19.09.2016-25.09.2016) TALCHER-II 157202 14-10-2016 14-10-2016 157202 0 COASTAL ENERGEN 492245 492245 17-10-2016 0 25(19.09.2016-25.09.2016) VALLUR 3288415 14-10-2016 13-10-2016 3288415 0 TPCIL 768613 768613 17-10-2016 0

ANNEXURE 2 (14 of 57) Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Wk No. & period Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 25(19.09.2016-25.09.2016) LANCO ST-II 95581 14-10-2016 14-10-2016 95581 0 NTPL 1780937 1780937 17-10-2016 0 25(19.09.2016-25.09.2016) ER 152176369 14-10-2016 19-10-2016 19522160 132654209 25(19.09.2016-25.09.2016) ER 25-10-2016 132654209-132654209 25(19.09.2016-25.09.2016) TELANGANA 9520639 14-10-2016 14-10-2016 9520639 0 25(19.09.2016-25.09.2016) NLC TPS-II (EXPN) 4550874 14-10-2016 10-10-2016 4550874 0 25(19.09.2016-25.09.2016) IL&FS 2194030 14-10-2016 13-10-2016 2194030 0 25(19.09.2016-25.09.2016) LANCO ST-III 690744 14-10-2016 14-10-2016 690744 0 25(19.09.2016-25.09.2016) NTPC, KUDGI (INFIRM) 1207704 14-10-2016 14-10-2016 1207704 0 25(19.09.2016-25.09.2016) SGPL (INFIRM) 912689 14-10-2016 06-10-2016 912689 0 Intrest for delayed payment as per SRPC letter - SRPC/SE-I/DSM/2016/ dt. 07/10/16 IL&FS* 1845 17-10-2016 1845 COASTAL ENERGEN* 437 17-10-2016 437 IL&FS* 9992 17-10-2016 9992 COASTAL ENERGEN* 589 17-10-2016 589 26(26.09.2016-02.10.2016) AP 21211003 20-10-2016 28-10-2016 21211003 0 PG-HVDC 203883 203883 24-10-2016 0 26(26.09.2016-02.10.2016) KPTCL 65437023 20-10-2016 19-10-2016 65437023 0 TALCHER-II 1276391 1276391 24-10-2016 0 26(26.09.2016-02.10.2016) KSEB 21859511 20-10-2016 20-10-2016 21859511 0 NLC TS-II STG-I 3589401 3589401 24-10-2016 0 26(26.09.2016-02.10.2016) TN 40553836 20-10-2016 20-10-2016 40553836 0 NLC TS-II STG-II 8846469 8846469 24-10-2016 0 26(26.09.2016-02.10.2016) PONDY 794995 20-10-2016 21-10-2016 794995 0 NLC TS-I EXP 6252195 6252195 24-10-2016 0 26(26.09.2016-02.10.2016) GOA-SR 3513015 20-10-2016 21-10-2016 3513015 0 SEL 171349 171349 24-10-2016 0 26(26.09.2016-02.10.2016) RSTPS STG-I&II 2922725 20-10-2016 20-10-2016 2922725 0 MEPL 76581 76581 24-10-2016 0 26(26.09.2016-02.10.2016) RSTPS STG-III 177855 20-10-2016 20-10-2016 177855 0 WR 207886668 207886668 24-10-2016 0 26(26.09.2016-02.10.2016) SIMHADRI-II 1594392 20-10-2016 20-10-2016 1594392 0 TPCIL 365349 365349 24-10-2016 0 26(26.09.2016-02.10.2016) VALLUR 4350610 20-10-2016 20-10-2016 4350610 0 NTPL 230064 230064 24-10-2016 0 26(26.09.2016-02.10.2016) LANCO ST-II 190618 20-10-2016 20-10-2016 190618 0 26(26.09.2016-02.10.2016) ER 132395120 20-10-2016 31-10-2016 132395120 0 26(26.09.2016-02.10.2016) COASTAL ENERGEN 4973943 20-10-2016 28-10-2016 4973943 0 26(26.09.2016-02.10.2016) TELANGANA 3551364 20-10-2016 20-10-2016 3551364 0 26(26.09.2016-02.10.2016) NLC TPS-II (EXPN) 3314863 20-10-2016 14-10-2016 3314863 0 26(26.09.2016-02.10.2016) IL&FS 142636 20-10-2016 24-10-2016 142636 0 26(26.09.2016-02.10.2016) LANCO ST-III 559862 20-10-2016 20-10-2016 559862 0 26(26.09.2016-02.10.2016) NTPC, KUDGI (INFIRM) 2388452 20-10-2016 20-10-2016 2388452 0 26(26.09.2016-02.10.2016) SGPL (INFIRM) 991976 20-10-2016 13-10-2016 991976 0 27(03.10.2016-09.10.2016) AP 21667112 28-10-2016 28-10-2016 21667112 0 PONDY 888457 888457 02-11-2016 0 27(03.10.2016-09.10.2016) KPTCL 52135376 28-10-2016 27-10-2016 52135376 0 PG-HVDC 667661 667661 03-11-2016 0 27(03.10.2016-09.10.2016) KSEB 28843933 28-10-2016 28-10-2016 28843933 0 NLC TS-II STG-I 307327 307327 03-11-2016 0 27(03.10.2016-09.10.2016) TN 3479769 28-10-2016 28-10-2016 3479769 0 NLC TS-II STG-II 2100732 2100732 03-11-2016 0 27(03.10.2016-09.10.2016) GOA-SR 1798627 28-10-2016 28-10-2016 1798627 0 NLC TS-I EXP 4321119 4321119 03-11-2016 0 27(03.10.2016-09.10.2016) RSTPS STG-I&II 7201502 28-10-2016 27-10-2016 7201502 0 WR 312909312 230736499 03-11-2016 82172813 27(03.10.2016-09.10.2016) RSTPS STG-III 3705651 28-10-2016 27-10-2016 3705651 0 WR 82172813 04-11-2016-82172813 27(03.10.2016-09.10.2016) SIMHADRI-II 3664347 28-10-2016 27-10-2016 3664347 0 TPCIL 3982090 3982090 03-11-2016 0 27(03.10.2016-09.10.2016) TALCHER-II 534985 28-10-2016 27-10-2016 534985 0 TELANGANA 6143291 6143291 03-11-2016 0 27(03.10.2016-09.10.2016) VALLUR 5002367 28-10-2016 27-10-2016 5002367 0 IL&FS 313229 313229 03-11-2016 0 27(03.10.2016-09.10.2016) LANCO ST-II 173420 28-10-2016 28-10-2016 173420 0

ANNEXURE 2 (15 of 57) Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Wk No. & period Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 27(03.10.2016-09.10.2016) SEL 1881 28-10-2016 25-10-2016 1881 0 27(03.10.2016-09.10.2016) MEPL 130955 28-10-2016 02-11-2016 130955 0 27(03.10.2016-09.10.2016) ER 228405198 28-10-2016 04-11-2016 116170926 112234272 27(03.10.2016-09.10.2016) ER 08-11-2016 25998239-25998239 27(03.10.2016-09.10.2016) ER 15-11-2016 86236033-86236033 27(03.10.2016-09.10.2016) COASTAL ENERGEN 1086073 28-10-2016 28-10-2016 1086073 0 27(03.10.2016-09.10.2016) NLC TPS-II (EXPN) 4257621 28-10-2016 24-10-2016 4257621 0 27(03.10.2016-09.10.2016) LANCO ST-III 257393 28-10-2016 28-10-2016 257393 0 27(03.10.2016-09.10.2016) NTPL 1726368 28-10-2016 21-10-2016 1726368 0 27(03.10.2016-09.10.2016) NTPC, KUDGI (INFIRM) 2133030 28-10-2016 27-10-2016 2133030 0 27(03.10.2016-09.10.2016) SGPL (INFIRM) 1150629 28-10-2016 20-10-2016 1150629 0 27(03.10.2016-09.10.2016) SGPL UNIT-2 (INFIRM) 299271 28-10-2016 20-10-2016 299271 0 week 18-20, 22 R1 dt. 20/10/16 GOA-SR 36385 30-10-2016 28-10-2016 36385 0 AP 10271909 10271909 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 SIMHADRI-II 697291 30-10-2016 27-10-2016 697291 0 KPTCL 17760604 17760604 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 NLC TS-II STG-II 25225 30-10-2016 28-10-2016 25225 0 KSEB 3567107 3567107 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 NLC TS-I EXP 38053 30-10-2016 26-10-2016 38053 0 TAMIL NADU 1082657 1082657 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 Coastal Energen* 791 30-10-2016 791 TELANGANA 8861525 8861525 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 WR 245720 30-10-2016 08-11-2016 245720 0 PUDUCHERRY 77587 77587 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 PG HVDC 6520 6520 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 TPCIL 30270 30270 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 MEPL 4925 4925 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 LKPPL St II 338947 338947 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 LKPPL St III 1020147 1020147 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 IL&FS 1600962 1600962 04-11-2016 0 week 18-20, 22 R1 dt. 20/10/16 ER 458054 458054 04-11-2016 0 28(10.10.2016-16.10.2016) AP 21036205 04-11-2016 04-11-2016 21036205 0 TN 8716086 8716086 07-11-2016 0 28(10.10.2016-16.10.2016) KPTCL 16838573 04-11-2016 04-11-2016 16838573 0 PONDY 1483952 1483952 07-11-2016 0 28(10.10.2016-16.10.2016) KSEB 24100147 04-11-2016 04-11-2016 24100147 0 PG-HVDC 790103 790103 07-11-2016 0 28(10.10.2016-16.10.2016) RSTPS STG-I&II 4455594 04-11-2016 03-11-2016 4455594 0 NLC TS-II STG-I 788077 788077 07-11-2016 0 28(10.10.2016-16.10.2016) RSTPS STG-III 948383 04-11-2016 03-11-2016 948383 0 NLC TS-II STG-II 3511005 3511005 07-11-2016 0 28(10.10.2016-16.10.2016) SIMHADRI-II 3149597 04-11-2016 03-11-2016 3149597 0 NLC TS-I EXP 4666983 4666983 07-11-2016 0 28(10.10.2016-16.10.2016) TALCHER-II 531973 04-11-2016 03-11-2016 531973 0 SEL 523076 523076 07-11-2016 0 28(10.10.2016-16.10.2016) VALLUR 7385706 04-11-2016 04-11-2016 7385706 0 WR 172024787 172024787 07-11-2016 0 28(10.10.2016-16.10.2016) LANCO ST-II 160347 04-11-2016 04-11-2016 160347 0 COASTAL ENERGEN 451428 451428 07-11-2016 0 28(10.10.2016-16.10.2016) MEPL 492042 04-11-2016 02-11-2016 492042 0 TPCIL 2628655 2628655 07-11-2016 0 28(10.10.2016-16.10.2016) ER 117217347 04-11-2016 17-11-2016 48643754 68573593 IL&FS 1394098 1394098 07-11-2016 0 28(10.10.2016-16.10.2016) ER 22-11-2016 68573593-68573593 NTPL 145119 145119 07-11-2016 0 28(10.10.2016-16.10.2016) TELANGANA 7493350 04-11-2016 04-11-2016 7493350 0 28(10.10.2016-16.10.2016) NLC TPS-II (EXPN) 4001828 04-11-2016 27-10-2016 4001828 0 28(10.10.2016-16.10.2016) LANCO ST-III 267318 04-11-2016 04-11-2016 267318 0 28(10.10.2016-16.10.2016) NTPC, KUDGI (INFIRM) 1457060 04-11-2016 03-11-2016 1457060 0 28(10.10.2016-16.10.2016) SGPL (INFIRM) 3512479 04-11-2016 03-11-2016 3512479 0 28(10.10.2016-16.10.2016) SGPL UNIT-2 (INFIRM) 544569 04-11-2016 03-11-2016 544569 0

ANNEXURE 2 (16 of 57) Wk No. & period Regional Entity Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 29(17.10.2016-23.10.2016) AP 48155923 11-11-2016 11-11-2016 48155923 0 PG-HVDC 103880 103880 14-11-2016 0 29(17.10.2016-23.10.2016) KPTCL 108850442 11-11-2016 14-11-2016 108850442 0 TALCHER-II 2773921 2773921 14-11-2016 0 29(17.10.2016-23.10.2016) KSEB 39263274 11-11-2016 11-11-2016 39263274 0 NLC TS-I EXP 3721061 3721061 14-11-2016 0 29(17.10.2016-23.10.2016) TN 15184079 11-11-2016 11-11-2016 15184079 0 SEL 93479 93479 14-11-2016 0 29(17.10.2016-23.10.2016) PONDY 2882688 11-11-2016 08-11-2016 2882688 0 ER 4141379 4141379 14-11-2016 0 29(17.10.2016-23.10.2016) GOA-SR 1477031 11-11-2016 11-11-2016 1477031 0 WR 163958411 163958411 14-11-2016 0 29(17.10.2016-23.10.2016) RSTPS STG-I&II 768376 11-11-2016 11-11-2016 768376 0 IL&FS 188711 188711 14-11-2016 0 29(17.10.2016-23.10.2016) RSTPS STG-III 400991 11-11-2016 11-11-2016 400991 0 NTPL 1457080 1457080 14-11-2016 0 29(17.10.2016-23.10.2016) SIMHADRI-II 4706308 11-11-2016 11-11-2016 4706308 0 SGPL (INFIRM) 34004910 34004910 14-11-2016 0 29(17.10.2016-23.10.2016) NLC TS-II STG-I 2471585 11-11-2016 05-11-2016 2471585 0 29(17.10.2016-23.10.2016) NLC TS-II STG-II 4112235 11-11-2016 05-11-2016 4112235 0 29(17.10.2016-23.10.2016) VALLUR 5571796 11-11-2016 12-11-2016 5571796 0 29(17.10.2016-23.10.2016) LANCO ST-II 180653 11-11-2016 11-11-2016 180653 0 29(17.10.2016-23.10.2016) MEPL 44112 11-11-2016 10-11-2016 44112 0 29(17.10.2016-23.10.2016) COASTAL ENERGEN 2916989 11-11-2016 07-11-2016 2916989 0 29(17.10.2016-23.10.2016) TPCIL 262909 11-11-2016 08-11-2016 262909 0 29(17.10.2016-23.10.2016) TELANGANA 13703778 11-11-2016 11-11-2016 13703778 0 29(17.10.2016-23.10.2016) NLC TPS-II (EXPN) 3020084 11-11-2016 07-11-2016 3020084 0 29(17.10.2016-23.10.2016) LANCO ST-III 545632 11-11-2016 11-11-2016 545632 0 29(17.10.2016-23.10.2016) NTPC, KUDGI (INFIRM) 2045991 11-11-2016 11-11-2016 2045991 0 29(17.10.2016-23.10.2016) SGPL UNIT-2 (INFIRM) 816998 11-11-2016 10-11-2016 816998 0 30(24.10.2016-30.10.2016) AP 54634639 18-11-2016 19-11-2016 54634639 0 PG-HVDC 94818 94818 21-11-2016 0 30(24.10.2016-30.10.2016) KPTCL 90759228 18-11-2016 18-11-2016 90759228 0 TALCHER-II 1674770 1674770 21-11-2016 0 30(24.10.2016-30.10.2016) KSEB 37496205 18-11-2016 18-11-2016 37496205 0 NLC TS-II STG-I 1831902 1831902 21-11-2016 0 30(24.10.2016-30.10.2016) TN 10761562 18-11-2016 18-11-2016 10761562 0 NLC TS-I EXP 2503959 2503959 21-11-2016 0 30(24.10.2016-30.10.2016) PONDY 553567 18-11-2016 18-11-2016 553567 0 SEL 92209 92209 21-11-2016 0 30(24.10.2016-30.10.2016) GOA-SR 1260309 18-11-2016 17-11-2016 1260309 0 MEPL 59188 59188 21-11-2016 0 30(24.10.2016-30.10.2016) RSTPS STG-I&II 1022890 18-11-2016 18-11-2016 1022890 0 ER 363385 363385 21-11-2016 0 30(24.10.2016-30.10.2016) SIMHADRI-II 2187006 18-11-2016 18-11-2016 2187006 0 WR 178726786 178726786 21-11-2016 0 30(24.10.2016-30.10.2016) NLC TS-II STG-II 458161 18-11-2016 10-11-2016 458161 0 TPCIL 466195 466195 21-11-2016 0 30(24.10.2016-30.10.2016) VALLUR 6121201 18-11-2016 17-11-2016 6121201 0 30(24.10.2016-30.10.2016) LANCO ST-II 146297 18-11-2016 18-11-2016 146297 0 30(24.10.2016-30.10.2016) COASTAL ENERGEN 3789713 18-11-2016 25-11-2016 3789713 0 30(24.10.2016-30.10.2016) TELANGANA 10764456 18-11-2016 18-11-2016 10764456 0 30(24.10.2016-30.10.2016) IL&FS 207850 18-11-2016 23-11-2016 207850 0 30(24.10.2016-30.10.2016) LANCO ST-III 1009350 18-11-2016 18-11-2016 1009350 0 30(24.10.2016-30.10.2016) NTPL 4179833 18-11-2016 10-11-2016 4179833 0 30(24.10.2016-30.10.2016) NTPC, KUDGI (INFIRM) 1535787 18-11-2016 18-11-2016 1535787 0 30(24.10.2016-30.10.2016) SGPL (INFIRM) 1082653 18-11-2016 15-11-2016 1082653 0 30(24.10.2016-30.10.2016) SGPL UNIT-2 (INFIRM) 437623 18-11-2016 15-11-2016 437623 0 23-26 (05.09.2016-02.10.2016) R1 TN 4380225 21-11-2016 21-11-2016 4380225 0 AP 3860432 3860432 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 PG-HVDC 64551 21-11-2016 18-11-2016 64551 0 KPTCL 2130630 2130630 29-11-2016 0

ANNEXURE 2 (17 of 57) Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Wk No. & period Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 23-26 (05.09.2016-02.10.2016) R1 GOA 16983 21-11-2016 18-11-2016 16983 0 KSEB 65848 65848 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 RSTS ST-I&II 163449 21-11-2016 21-11-2016 163449 0 TELANGANA 1029639 1029639 05-12-2016 0 23-26 (05.09.2016-02.10.2016) R1 RSTS ST-III 29983 21-11-2016 21-11-2016 32358-2375 PONDY 27099 27099 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 Talcher St-II 28830 21-11-2016 21-11-2016 28830 0 VALLUR 47731 47731 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 Simhadri 9770 21-11-2016 21-11-2016 10214-444 NLC TS-II STG-I 4984 4984 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 NLC TPS-I (EXP) 2812 21-11-2016 21-11-2016 2812 0 NLC TS-II STG-II 6228 6228 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 TPCIL* 149023 21-11-2016 149023 NLC TPS-II (EXPN) 95 95 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 MEPL* 23861 21-11-2016 20-12-2016 23674 187 NTPL 48104 48104 29-11-2016 0 23-26 (05.09.2016-02.10.2016) R1 SEL* 56300 21-11-2016 56300 RSTS ST-III 0 2375 29-11-2016-2375 23-26 (05.09.2016-02.10.2016) R1 Coastal Energen 52882 21-11-2016 07-12-2016 52882 0 SIMHADRI-II 0 444 29-11-2016-444 29(17.10.2016-23.10.2016) - ER R1 ER 56804 21-11-2016 21-11-2016 56804 0 31(31.10.2016-06.11.2016) AP 33725341 25-11-2016 01-12-2016 33725341 0 TN 22751336 22751336 05-12-2016 0 31(31.10.2016-06.11.2016) KPTCL 68849552 25-11-2016 24-11-2016 68849552 0 PONDY 2348121 2348121 29-11-2016 0 31(31.10.2016-06.11.2016) KSEB 34017484 25-11-2016 25-11-2016 34017484 0 PG-HVDC 577604 577604 05-12-2016 0 31(31.10.2016-06.11.2016) GOA-SR 1463952 25-11-2016 25-11-2016 1463952 0 TALCHER-II 776999 776999 05-12-2016 0 31(31.10.2016-06.11.2016) RSTPS STG-I&II 271213 25-11-2016 25-11-2016 271213 0 NLC TS-II STG-I 3612457 3612457 05-12-2016 0 31(31.10.2016-06.11.2016) SIMHADRI-II 1581669 25-11-2016 25-11-2016 1581669 0 NLC TS-II STG-II 2044176 2044176 05-12-2016 0 31(31.10.2016-06.11.2016) VALLUR 9725325 25-11-2016 24-11-2016 9725325 0 NLC TS-I EXP 4038886 4038886 05-12-2016 0 31(31.10.2016-06.11.2016) LANCO ST-II 164240 25-11-2016 25-11-2016 164240 0 SEL 608608 608608 05-12-2016 0 31(31.10.2016-06.11.2016) ER 74207097 25-11-2016 30-11-2016 60190568 14016529 MEPL 373629 373629 05-12-2016 0 31(31.10.2016-06.11.2016) ER 02-12-2016 14016529-14016529 WR 164691063 164691063 29-11-2016 0 31(31.10.2016-06.11.2016) TELANGANA 14316734 25-11-2016 25-11-2016 14316734 0 COASTAL ENERGEN 1807425 1807425 05-12-2016 0 31(31.10.2016-06.11.2016) NLC TPS-II (EXPN) 554456 25-11-2016 18-11-2016 554456 0 TPCIL 4105498 4105498 05-12-2016 0 31(31.10.2016-06.11.2016) IL&FS 439058 25-11-2016 28-11-2016 439058 0 31(31.10.2016-06.11.2016) LANCO ST-III 793281 25-11-2016 25-11-2016 793281 0 31(31.10.2016-06.11.2016) NTPL 6769258 25-11-2016 21-11-2016 6769258 0 31(31.10.2016-06.11.2016) NTPC, KUDGI (INFIRM) 2466155 25-11-2016 25-11-2016 2466155 0 31(31.10.2016-06.11.2016) SGPL (INFIRM) 1312437 25-11-2016 24-11-2016 1312437 0 31(31.10.2016-06.11.2016) SGPL UNIT-2 (INFIRM) 529881 25-11-2016 24-11-2016 529881 0 Intrest for delayed payment as per SRPC letter - SRPC/SE-I/DSM/2016/ dt. 15/11/16 GOA* 1 25-11-2016 1 IL&FS* 2880 25-11-2016 2880 AP* 3689 25-11-2016 3689 KSEB* 24911 25-11-2016 24911 TN* 105358 25-11-2016 105358 AP* 50906 25-11-2016 50906 CE* 11937 25-11-2016 11937 IL&FS* 114 25-11-2016 114 MEPL* 157 25-11-2016 157 32(07.11.2016-13.11.2016) AP 21901379 02-12-2016 02-12-2016 21901379 0 PG-HVDC 21089 21089 05-12-2016 0 32(07.11.2016-13.11.2016) KPTCL 57773455 02-12-2016 02-12-2016 57773455 0 RSTPS STG-I&II 1297622 1297622 05-12-2016 0 32(07.11.2016-13.11.2016) KSEB 41259358 02-12-2016 02-12-2016 41259358 0 TALCHER-II 1836812 1836812 05-12-2016 0

ANNEXURE 2 (18 of 57) Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Wk No. & period Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 32(07.11.2016-13.11.2016) TN 17498925 02-12-2016 02-12-2016 17498925 0 NLC TS-II STG-I 2989374 2989374 05-12-2016 0 32(07.11.2016-13.11.2016) PONDY 1222606 02-12-2016 02-12-2016 1222606 0 NLC TS-II STG-II 1984988 1984988 05-12-2016 0 32(07.11.2016-13.11.2016) GOA-SR 1567768 02-12-2016 02-12-2016 1567768 0 NLC TS-I EXP 4313657 4313657 05-12-2016 0 32(07.11.2016-13.11.2016) SIMHADRI-II 1810693 02-12-2016 01-12-2016 1810693 0 SEL 23168 23168 05-12-2016 0 32(07.11.2016-13.11.2016) VALLUR 9486318 02-12-2016 02-12-2016 9486318 0 MEPL 22266 22266 05-12-2016 0 32(07.11.2016-13.11.2016) LANCO ST-II 180658 02-12-2016 01-12-2016 180658 0 ER 19010324 19010324 05-12-2016 0 32(07.11.2016-13.11.2016) COASTAL ENERGEN 148319 02-12-2016 07-12-2016 148319 0 WR 43486199 43486199 05-12-2016 0 32(07.11.2016-13.11.2016) TELANGANA 20776393 02-12-2016 02-12-2016 20776393 0 TPCIL 148673 148673 05-12-2016 0 32(07.11.2016-13.11.2016) NLC TPS-II (EXPN) 2251194 02-12-2016 24-11-2016 2251194 0 SGPL (INFIRM) 64031399 64031399 05-12-2016 0 32(07.11.2016-13.11.2016) IL&FS 101139 02-12-2016 28-11-2016 101139 0 32(07.11.2016-13.11.2016) LANCO ST-III 281882 02-12-2016 01-12-2016 281882 0 32(07.11.2016-13.11.2016) NTPL 3368454 02-12-2016 28-11-2016 3368454 0 32(07.11.2016-13.11.2016) NTPC, KUDGI (INFIRM) 4047277 02-12-2016 01-12-2016 4047277 0 32(07.11.2016-13.11.2016) SGPL UNIT-1 1014843 02-12-2016 02-12-2016 1014843 0 33(14.11.2016-20.11.2016) AP 24629448 09-12-2016 09-12-2016 24629448 0 TN 4312924 4312924 12-12-2016 0 33(14.11.2016-20.11.2016) KPTCL 34170900 09-12-2016 08-12-2016 34170900 0 PONDY 1483201 1483201 12-12-2016 0 33(14.11.2016-20.11.2016) KSEB 45082169 09-12-2016 09-12-2016 45082169 0 PG-HVDC 797086 797086 12-12-2016 0 33(14.11.2016-20.11.2016) GOA-SR 640213 09-12-2016 09-12-2016 640213 0 RSTPS STG-I&II 1502969 1502969 12-12-2016 0 33(14.11.2016-20.11.2016) SIMHADRI-II 1388831 09-12-2016 09-12-2016 1388831 0 TALCHER-II 1261508 1261508 12-12-2016 0 33(14.11.2016-20.11.2016) VALLUR 5585552 09-12-2016 08-12-2016 5585552 0 NLC TS-II STG-I 3701378 3701378 12-12-2016 0 33(14.11.2016-20.11.2016) LANCO ST-II 183706 09-12-2016 09-12-2016 183706 0 NLC TS-II STG-II 3516720 3516720 12-12-2016 0 33(14.11.2016-20.11.2016) MEPL 342937 09-12-2016 20-12-2016 342937 0 NLC TS-I EXP 3725287 3725287 12-12-2016 0 33(14.11.2016-20.11.2016) ER 20774870 09-12-2016 13-12-2016 20774870 0 SEL 570081 570081 12-12-2016 0 33(14.11.2016-20.11.2016) COASTAL ENERGEN 73436 09-12-2016 07-12-2016 73436 0 WR 60676096 60676096 12-12-2016 0 33(14.11.2016-20.11.2016) TELANGANA 14540259 09-12-2016 09-12-2016 14540259 0 TPCIL 1658229 1658229 12-12-2016 0 33(14.11.2016-20.11.2016) IL&FS 639807 09-12-2016 09-12-2016 639807 0 SGPL (INFIRM) 62732937 62732937 12-12-2016 0 33(14.11.2016-20.11.2016) LANCO ST-III 229460 09-12-2016 09-12-2016 229460 0 33(14.11.2016-20.11.2016) NTPL 3953167 09-12-2016 03-12-2016 3953167 0 33(14.11.2016-20.11.2016) NTPC, KUDGI (INFIRM) 4297041 09-12-2016 08-12-2016 4297041 0 33(14.11.2016-20.11.2016) SGPL UNIT-1 297685 09-12-2016 09-12-2016 297685 0 33(14.11.2016-20.11.2016) SGPL UNIT-2 (INFIRM) 1180939 09-12-2016 09-12-2016 1180939 0 34(21.11.2016-27.11.2016) KPTCL 38135349 16-12-2016 15-12-2016 38135349 0 AP 29429071 29429071 20-12-2016 0 34(21.11.2016-27.11.2016) KSEB 47415414 16-12-2016 16-12-2016 47415414 0 TN 11883422 11883422 20-12-2016 0 34(21.11.2016-27.11.2016) GOA-SR 610529 16-12-2016 16-12-2016 610529 0 PONDY 3498500 3498500 20-12-2016 0 34(21.11.2016-27.11.2016) RSTPS STG-III 167573 16-12-2016 15-12-2016 167573 0 PG-HVDC 1138364 1138364 20-12-2016 0 34(21.11.2016-27.11.2016) SIMHADRI-II 851163 16-12-2016 15-12-2016 851163 0 RSTPS STG-I&II 4780700 4780700 20-12-2016 0 34(21.11.2016-27.11.2016) VALLUR 8893349 16-12-2016 16-12-2016 8893349 0 TALCHER-II 1360644 1360644 20-12-2016 0 34(21.11.2016-27.11.2016) LANCO ST-II 246832 16-12-2016 16-12-2016 246832 0 NLC TS-II STG-I 2576113 2576113 20-12-2016 0 34(21.11.2016-27.11.2016) COASTAL ENERGEN 26400 16-12-2016 07-12-2016 26400 0 NLC TS-II STG-II 5318994 5318994 20-12-2016 0 34(21.11.2016-27.11.2016) TELANGANA 11514180 16-12-2016 16-12-2016 11514180 0 NLC TS-I EXP 6250713 6250713 20-12-2016 0 34(21.11.2016-27.11.2016) IL&FS 437120 16-12-2016 16-12-2016 437120 0 SEL 724700 724700 20-12-2016 0 34(21.11.2016-27.11.2016) LANCO ST-III 387371 16-12-2016 16-12-2016 387371 0 MEPL 757060 757060 20-12-2016 0 34(21.11.2016-27.11.2016) NTPL 3225322 16-12-2016 08-12-2016 3225322 0 WR 39625554 39625554 20-12-2016 0

ANNEXURE 2 (19 of 57) Wk No. & period Regional Entity Receipt and Disbursement details of Deviation Charges during Sep 2016 to Dec 2016 Annexure I Details of Payments into Deviation pool Details of disbursement from Deviation pool (+) Due to be (+) Due to be disbursed Deviation Amount Payable Due date for Date of Amount Paid paid to pool / Total amt. Date of from pool / (- Regional Entity Amount into pool (Rs.) Payment. Payment (Rs.) (-) Excess disbursed (Rs.) disbursement ) Excess disbursible(rs.) Payment disbursed. 34(21.11.2016-27.11.2016) NTPC, KUDGI (INFIRM) 6478065 16-12-2016 16-12-2016 6478065 0 TPCIL 4569995 4569995 20-12-2016 0 34(21.11.2016-27.11.2016) SGPL UNIT-1 440373 16-12-2016 15-12-2016 440373 0 ER 45386077 45386077 20-12-2016 0 34(21.11.2016-27.11.2016) SGPL UNIT-2 (INFIRM) 1322594 16-12-2016 16-12-2016 1322594 0 Intrest for delayed payment as per SRPC letter - SRPC/SE-I/DSM/2016/ dt. 07/12/16 COASTAL ENERGEN* 7579 17-12-2016 7579 IL&FS* 249 17-12-2016 249 AP* 53961 17-12-2016 53961 IL&FS* 176 17-12-2016 176 *Yet to pay 35(28.11.2016-04.12.2016) KPTCL 46746461 23-12-2016 22-12-2016 46746461 0 AP 2743119 2743119 26-12-2016 0 35(28.11.2016-04.12.2016) KSEB 45080270 23-12-2016 23-12-2016 45080270 0 TN 22094336 22094336 26-12-2016 0 35(28.11.2016-04.12.2016) GOA-SR 1709743 23-12-2016 23-12-2016 1709743 0 PONDY 3557450 3557450 26-12-2016 0 35(28.11.2016-04.12.2016) NLC TS-II STG-II 585423 23-12-2016 19-12-2016 585423 0 PG-HVDC 1182943 1182943 26-12-2016 0 35(28.11.2016-04.12.2016) VALLUR 7669851 23-12-2016 23-12-2016 7669851 0 RSTPS STG-I&II 6286402 6286402 26-12-2016 0 35(28.11.2016-04.12.2016) LANCO ST-II 272791 23-12-2016 23-12-2016 272791 0 RSTPS STG-III 970971 970971 26-12-2016 0 35(28.11.2016-04.12.2016) SEL 1905476 23-12-2016 20-12-2016 1905476 0 SIMHADRI-II 67134 67134 26-12-2016 0 35(28.11.2016-04.12.2016) MEPL 813448 23-12-2016 22-12-2016 813448 0 TALCHER-II 1464891 1464891 26-12-2016 0 35(28.11.2016-04.12.2016) COASTAL ENERGEN* 3248857 23-12-2016 3248857 NLC TS-II STG-I 1192682 1192682 26-12-2016 0 35(28.11.2016-04.12.2016) TELANGANA 25033704 23-12-2016 23-12-2016 25033704 0 NLC TS-I EXP 6014605 6014605 26-12-2016 0 35(28.11.2016-04.12.2016) NLC TPS-II (EXPN) 2572913 23-12-2016 17-12-2016 2572913 0 WR 81530545 81530545 26-12-2016 0 35(28.11.2016-04.12.2016) LANCO ST-III 328776 23-12-2016 23-12-2016 328776 0 TPCIL 6274457 6274457 26-12-2016 0 35(28.11.2016-04.12.2016) NTPL 1255982 23-12-2016 17-12-2016 1255982 0 IL&FS 190513 190513 26-12-2016 0 35(28.11.2016-04.12.2016) SGPL UNIT-1 24961514 23-12-2016 23-12-2016 24961514 0 NTPC, KUDGI (INFIRM) 3846486 3846486 26-12-2016 0 35(28.11.2016-04.12.2016) SGPL UNIT-2 (INFIRM) 2680761 23-12-2016 23-12-2016 2680761 0 35(28.11.2016-04.12.2016) NTPC, KUDGI UNIT-2 8279320 23-12-2016 23-12-2016 8279320 0 35(28.11.2016-04.12.2016) ER 12115103 23-12-2016

ANNEXURE 2 (20 of 57) WEEK NO.AND PERIOD 19(08-08-2016-14-05-2016) Payable Constituent Receipt and disbursement details of Reactive Energy charges during Sep 2016 to Dec 2016 Annexure-II Details of realisation Details of Disbursement Reactive charges dues as per weekly A/c. issued by SRPC Due date Amount due in Rs. Date of realisation Amount realised (in Rs.) Balance due, if any (in Rs.) Receivable Constituent Amount receivable as per a/c No regional entity payable. Hence no amount to be disbursed. Amount receivable as per SREB decision prorata Amount disbursed Date of Disbursement Balance due, if any (in Rs.) 20(15-08-2016-21-08-2016) KPTCL 9-Sep-16 104988 8-Sep-16 104988 0 AP 204594 1749 1749 15-Sep-16 0 20(15-08-2016-21-08-2016) KSEB 676624 5785 5785 15-Sep-16 0 20(15-08-2016-21-08-2016) TANGEDCO 10281596 87902 87902 19-Sep-16 0 20(15-08-2016-21-08-2016) PUDUCHERRY 30719 263 263 15-Sep-16 0 20(15-08-2016-21-08-2016) TELANGANA 1086566 9289 9289 15-Sep-16 0 TOTAL 104988 104988 0 TOTAL 12280099 104988 104988 0 18(01-08-2016-07-08-2016) R1 KPTCL 8-Sep-16 1137 27-Oct-16 1137 0 TANGEDCO 2013 2013 2013 15-Sep-16 0 18(01-08-2016-07-08-2016) R1 KSEB* 8-Sep-16 625 625 18(01-08-2016-07-08-2016) R1 PUDUCHERRY* 8-Sep-16 63 63 18(01-08-2016-07-08-2016) R1 TELANGANA* 8-Sep-16 188 7-Sep-16 188 0 21(22-08-2016-28-08-2016) TOTAL 2013 1325 0 TOTAL 2013 2013 2013 0 No regional entity payable. Hence no amount to be disbursed. 22(29-08-2016-04-09-2016) TELANGANA 23-Sep-16 958958 23-Sep-16 958958 0 AP 2851823 91127 91127 27-Sep-16 0 22(29-08-2016-04-09-2016) KPTCL 5268861 168361 168361 27-Sep-16 0 22(29-08-2016-04-09-2016) KSEB 2524314 80662 80662 27-Sep-16 0 22(29-08-2016-04-09-2016) TANGEDCO 18858645 602609 602609 27-Sep-16 0 22(29-08-2016-04-09-2016) PUDUCHERRY 506948 16199 16199 27-Sep-16 0 TOTAL 958958 958958 0 TOTAL 30010591 958958 958958 0 23(05-09-2016-11-09-2016) TELANGANA 30-Sep-16 878397 1-Oct-16 878397 0 AP 2901886 155702 155702 4-Oct-16 0 23(05-09-2016-11-09-2016) KPTCL 2127294 114141 114141 4-Oct-16 0 23(05-09-2016-11-09-2016) KSEB 1763229 94607 94607 4-Oct-16 0 23(05-09-2016-11-09-2016) TANGEDCO 9468134 508018 508018 4-Oct-16 0 23(05-09-2016-11-09-2016) PUDUCHERRY 110500 5929 5929 4-Oct-16 0 TOTAL 878397 878397 0 TOTAL 16371043 878397 878397 0 24(12.09.2016-18.09.2016) TELANGANA 7-Oct-16 2553070 7-Oct-16 2553070 0 AP 3237377 165250 165250 14-Oct-16 0 24(12.09.2016-18.09.2016) KPTCL 4304911 219742 219742 14-Oct-16 0 24(12.09.2016-18.09.2016) KSEB 1810549 92419 92419 14-Oct-16 0 24(12.09.2016-18.09.2016) TANGEDCO 40581918 2071482 2071482 14-Oct-16 0 24(12.09.2016-18.09.2016) PUDUCHERRY 81835 4177 4177 14-Oct-16 0 TOTAL 2553070 2553070 0 TOTAL 50016590 2553070 2553070 0 25(19.09.2016-25.09.2016) TELANGANA 14-Oct-16 2218710 14-Oct-16 2218710 0 AP 2105012 267249 267249 17-Oct-16 0 25(19.09.2016-25.09.2016) KPTCL 4536311 575922 575922 17-Oct-16 0 25(19.09.2016-25.09.2016) KSEB 690560 87672 87672 17-Oct-16 0

ANNEXURE 2 (21 of 57) WEEK NO.AND PERIOD Payable Constituent Receipt and disbursement details of Reactive Energy charges during Sep 2016 to Dec 2016 Annexure-II Details of realisation Details of Disbursement Reactive charges dues as per weekly A/c. issued by SRPC Due date Amount due in Rs. Date of realisation Amount realised (in Rs.) Balance due, if any (in Rs.) Receivable Constituent Amount receivable as per a/c Amount receivable as per SREB decision prorata Amount disbursed Date of Disbursement Balance due, if any (in Rs.) 25(19.09.2016-25.09.2016) No regional entity payable. Hence TANGEDCO no amount to be disbursed. 10127260 1285738 1285738 17-Oct-16 0 25(19.09.2016-25.09.2016) PUDUCHERRY 16770 2129 2129 17-Oct-16 0 TOTAL 2218710 2218710 0 TOTAL 17475913 2218710 2218710 0 26(26.09.2016-02.10.2016) TELANGANA 21-Oct-16 3186300 20-Oct-16 3186300 0 AP 3013153 456217 456217 22-Nov-16 0 26(26.09.2016-02.10.2016) KPTCL 5160012 781270 781270 22-Nov-16 0 26(26.09.2016-02.10.2016) KSEB 959127 145220 145220 24-Oct-16 0 26(26.09.2016-02.10.2016) TANGEDCO 11827036 1790714 1790714 22-Nov-16 0 26(26.09.2016-02.10.2016) PUDUCHERRY 85059 12879 12879 24-Oct-16 0 27(03.10.2016-09.10.2016) TOTAL 3186300 3186300 0 TOTAL 21044387 3186300 3186300 0 No regional entity payable. Hence no amount to be disbursed. 28(10.10.2016-16.10.2016) TELANGANA 4-Nov-16 634374 4-Nov-16 634374 0 AP 3908671 134042 134042 7-Nov-16 0 28(10.10.2016-16.10.2016) KPTCL 3981120 136527 136527 7-Nov-16 0 28(10.10.2016-16.10.2016) KSEB 728273 24975 24975 7-Nov-16 0 28(10.10.2016-16.10.2016) TANGEDCO 9879909 338817 338817 7-Nov-16 0 28(10.10.2016-16.10.2016) PUDUCHERRY 390 13 13 7-Nov-16 0 TOTAL 634374 634374 0 TOTAL 18498363 634374 634374 0 29(17.10.2016-23.10.2016) KARNATAKA 11-Nov-16 4745 14-Nov-16 4745 0 AP 3226782 1362 1362 22-Nov-16 0 29(17.10.2016-23.10.2016) KSEB 785694 332 332 22-Nov-16 0 29(17.10.2016-23.10.2016) TANGEDCO 7044141 2974 2974 22-Nov-16 0 29(17.10.2016-23.10.2016) TELANGANA 183040 77 77 22-Nov-16 0 TOTAL 4745 4745 0 TOTAL 11239657 4745 4745 0 30(24.10.2016-30.10.2016) KARNATAKA 18-Nov-16 112502 18-Nov-16 112502 0 AP 4243824 29736 29736 22-Nov-16 0 30(24.10.2016-30.10.2016) KSEB 840008 5886 5886 22-Nov-16 0 30(24.10.2016-30.10.2016) TANGEDCO 10003097 70090 70090 22-Nov-16 0 30(24.10.2016-30.10.2016) PUDUCHERRY 137267 962 962 22-Nov-16 0 30(24.10.2016-30.10.2016) TELANGANA 831740 5828 5828 22-Nov-16 0 31(31.10.2016-06.11.2016) TOTAL 112502 112502 0 TOTAL 16055936 112502 112502 0 No regional entity payable. Hence no amount to be disbursed. 32(07.11.2016-13.11.2016) 33(14.11.2016-20.11.2016) 34(21.11.2016-27.11.2016) No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. No regional entity payable. Hence no amount to be disbursed. 35(28.11.2016-04.12.2016) No regional entity payable. Hence no amount to be disbursed.

ANNEXURE 2 (22 of 57) WEEK NO.AND PERIOD * Yet to pay Payable Constituent Receipt and disbursement details of Reactive Energy charges during Sep 2016 to Dec 2016 Annexure-II Details of realisation Details of Disbursement Reactive charges dues as per weekly A/c. issued by SRPC Due date Amount due in Rs. Date of realisation Amount realised (in Rs.) Balance due, if any (in Rs.) Receivable Constituent Amount receivable as per a/c No regional entity payable. Hence no amount to be disbursed. Amount receivable as per SREB decision prorata Amount disbursed Date of Disbursement Balance due, if any (in Rs.)

ANNEXURE 2 (23 of 57) Wk No. & period Intrest for delayed payment as per SRPC letter - SRPC/SE- I/DSM/2016/ dt. 10/08/16 Receipt and Disbursement details of RRAS Charges during Sep 2016 to Dec 2016 Annexure III Details of Payments into RRAS pool Details of disbursement from RRAS pool (+) Due to be (+) Due to disbursed Regional Entity Amount Payable Due date for Date of Amount Paid be paid to RRAS Amount Total amt. Date of from pool / (- Regional Entity into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursible(rs.) disbursed (Rs.) disbursement ) Excess Excess disbursed. NLC TPS-I EXP 359 8/20/2016 9/12/2016 359 0 NLC TPS-I EXP 46 8/20/2016 9/12/2016 46 0 19(08.08.2016-14.08.2016) RSTPS STG-I&II 571876 9/2/2016 9/1/2016 571876 0 RSTPS STG-I&II 505467 505467 9/6/2016 0 19(08.08.2016-14.08.2016) RSTPS STG-III 125981 9/2/2016 9/1/2016 125981 0 RSTPS STG-III 428365 428365 9/6/2016 0 19(08.08.2016-14.08.2016) SIMHADRI-II 115536 9/2/2016 9/1/2016 115536 0 SIMHADRI-II 2707360 2707360 9/6/2016 0 19(08.08.2016-14.08.2016) TALCHER-II 507229 9/2/2016 9/1/2016 507229 0 TALCHER-II 0 0 0 19(08.08.2016-14.08.2016) NTECL VALLUR 694691 9/2/2016 9/2/2016 694691 0 NTECL VALLUR 550463 550463 9/6/2016 0 19(08.08.2016-14.08.2016) NLC TS-II STG-I 540002 9/2/2016 8/26/2016 540002 0 NLC TS-II STG-I 192636 192636 9/7/2016 0 19(08.08.2016-14.08.2016) NLC TS-II STG-II 363073 9/2/2016 8/26/2016 363073 0 NLC TS-II STG-II 137023 137023 9/7/2016 0 19(08.08.2016-14.08.2016) NLC TPS-I EXP 188620 9/2/2016 8/26/2016 188620 0 NLC TPS-I EXP 226662 226662 9/6/2016 0 19(08.08.2016-14.08.2016) NLC TPS-II EXP 0 9/2/2016 0 NLC TPS-II EXP 0 0 0 19(08.08.2016-14.08.2016) NTPL 65261 9/2/2016 8/26/2016 65261 0 NTPL 806437 806437 9/6/2016 0 20(15.08.2016-21.08.2016) RSTPS STG-I&II 1018085 9/9/2016 9/8/2016 1018085 0 RSTPS STG-I&II 652459 652459 9/12/2016 0 20(15.08.2016-21.08.2016) RSTPS STG-III 325340 9/9/2016 9/8/2016 325340 0 RSTPS STG-III 932611 932611 9/12/2016 0 20(15.08.2016-21.08.2016) SIMHADRI-II 1379440 9/9/2016 9/8/2016 1379440 0 SIMHADRI-II 495982 495982 9/12/2016 0 20(15.08.2016-21.08.2016) TALCHER-II 1086903 9/9/2016 9/8/2016 1086903 0 TALCHER-II 54488 54488 9/12/2016 0 20(15.08.2016-21.08.2016) NTECL VALLUR 851164 9/9/2016 9/7/2016 851164 0 NTECL VALLUR 703561 703561 9/12/2016 0 20(15.08.2016-21.08.2016) NLC TS-II STG-I 583769 9/9/2016 9/7/2016 583769 0 NLC TS-II STG-I 440078 440078 9/12/2016 0 20(15.08.2016-21.08.2016) NLC TS-II STG-II 442997 9/9/2016 9/7/2016 442997 0 NLC TS-II STG-II 300345 300345 9/12/2016 0 20(15.08.2016-21.08.2016) NLC TPS-I EXP 292463 9/9/2016 9/2/2016 292463 0 NLC TPS-I EXP 541511 541511 9/12/2016 0 20(15.08.2016-21.08.2016) NLC TPS-II EXP 0 9/9/2016 0 0 NLC TPS-II EXP 0 0 0 20(15.08.2016-21.08.2016) NTPL 131181 9/9/2016 9/6/2016 131181 0 NTPL 32648 32648 9/12/2016 0 0 21(22.08.2016-28.08.2016) RSTPS STG-I&II 0 9/16/2016 0 RSTPS STG-I&II 282980 282980 9/19/2016 0 21(22.08.2016-28.08.2016) RSTPS STG-III 0 9/16/2016 0 RSTPS STG-III 152760 152760 9/19/2016 0 21(22.08.2016-28.08.2016) SIMHADRI-II 0 9/16/2016 0 SIMHADRI-II 3818466 3818466 9/19/2016 0 21(22.08.2016-28.08.2016) TALCHER-II 0 9/16/2016 0 TALCHER-II 0 0 0 21(22.08.2016-28.08.2016) NTECL VALLUR 87792 9/16/2016 9/14/2016 87792 0 NTECL VALLUR 808688 808688 9/19/2016 0 21(22.08.2016-28.08.2016) NLC TS-II STG-I 175415 9/16/2016 9/12/2016 175415 0 NLC TS-II STG-I 832663 832663 9/19/2016 0 21(22.08.2016-28.08.2016) NLC TS-II STG-II 294617 9/16/2016 9/12/2016 294617 0 NLC TS-II STG-II 2133389 2133389 9/19/2016 0 21(22.08.2016-28.08.2016) NLC TPS-I EXP 10255 9/16/2016 9/12/2016 10255 0 NLC TPS-I EXP 1170251 1170251 9/19/2016 0 21(22.08.2016-28.08.2016) NLC TPS-II EXP 0 9/16/2016 0 NLC TPS-II EXP 825628 825628 9/19/2016 0 21(22.08.2016-28.08.2016) NTPL 171991 9/16/2016 9/9/2016 171991 0 NTPL 2094218 2094218 9/19/2016 0 0 22(29.08.2016-04.09.2016) RSTPS STG-I&II 1313317 9/23/2016 9/22/2016 1313317 0 RSTPS STG-I&II 58146 58146 9/26/2016 0 22(29.08.2016-04.09.2016) RSTPS STG-III 275609 9/23/2016 9/22/2016 275609 0 RSTPS STG-III 88256 88256 9/26/2016 0 22(29.08.2016-04.09.2016) SIMHADRI-II 42896 9/23/2016 9/22/2016 42896 0 SIMHADRI-II 2063312 2063312 9/26/2016 0 22(29.08.2016-04.09.2016) TALCHER-II 456770 9/23/2016 9/22/2016 456770 0 TALCHER-II 217950 217950 9/26/2016 0 22(29.08.2016-04.09.2016) NTECL VALLUR 376426 9/23/2016 9/23/2016 376426 0 NTECL VALLUR 1698244 1698244 9/26/2016 0 22(29.08.2016-04.09.2016) NLC TS-II STG-I 774654 9/23/2016 9/17/2016 774654 0 NLC TS-II STG-I 85468 85468 9/26/2016 0 22(29.08.2016-04.09.2016) NLC TS-II STG-II 437289 9/23/2016 9/17/2016 437289 0 NLC TS-II STG-II 214381 214381 9/26/2016 0

ANNEXURE 2 (24 of 57) Receipt and Disbursement details of RRAS Charges during Sep 2016 to Dec 2016 Annexure III Details of Payments into RRAS pool Details of disbursement from RRAS pool (+) Due to be (+) Due to disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to RRAS Amount Total amt. Date of from pool / (- Regional Entity Regional Entity into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursible(rs.) disbursed (Rs.) disbursement ) Excess Excess disbursed. Intrest 22(29.08.2016-04.09.2016) for delayed payment as per NLC TPS-I EXP 137843 9/23/2016 9/15/2016 137843 0 NLC TPS-I EXP 463192 463192 9/26/2016 0 22(29.08.2016-04.09.2016) NLC TPS-II EXP 0 9/23/2016 0 0 NLC TPS-II EXP 0 0 0 22(29.08.2016-04.09.2016) NTPL 37068 9/23/2016 9/19/2016 37068 0 NTPL 1881585 1881585 9/26/2016 0 23(05.09.2016-11.09.2016) RSTPS STG-I&II 0 0 RSTPS STG-I&II 0 0 0 23(05.09.2016-11.09.2016) RSTPS STG-III 0 0 RSTPS STG-III 652399 652399 10/3/2016 0 23(05.09.2016-11.09.2016) SIMHADRI-II 0 0 SIMHADRI-II 919754 919754 10/3/2016 0 23(05.09.2016-11.09.2016) TALCHER-II 0 0 TALCHER-II 0 0 0 23(05.09.2016-11.09.2016) NTECL VALLUR 0 0 NTECL VALLUR 1270179 1270179 10/3/2016 0 23(05.09.2016-11.09.2016) NLC TS-II STG-I 0 0 NLC TS-II STG-I 251750 251750 10/3/2016 0 23(05.09.2016-11.09.2016) NLC TS-II STG-II 0 0 NLC TS-II STG-II 1165434 1165434 10/3/2016 0 23(05.09.2016-11.09.2016) NLC TPS-I EXP 0 0 NLC TPS-I EXP 544681 544681 10/3/2016 0 23(05.09.2016-11.09.2016) NLC TPS-II EXP 0 0 NLC TPS-II EXP 0 0 0 23(05.09.2016-11.09.2016) NTPL 0 0 NTPL 3790473 3790473 10/3/2016 0 24(12.09.2016-18.09.2016) RSTPS STG-I&II 98489 10/7/2016 10/7/2016 98489 0 RSTPS STG-I&II 1699024 1699024 10/13/2016 0 24(12.09.2016-18.09.2016) RSTPS STG-III 52478 10/7/2016 10/7/2016 52478 0 RSTPS STG-III 229782 229782 10/13/2016 0 24(12.09.2016-18.09.2016) SIMHADRI-II 261 10/7/2016 10/7/2016 261 0 SIMHADRI-II 5602329 5602329 10/13/2016 0 24(12.09.2016-18.09.2016) TALCHER-II 31414 10/7/2016 10/7/2016 31414 0 TALCHER-II 0 0 0 24(12.09.2016-18.09.2016) NTECL VALLUR 38453 10/7/2016 10/6/2016 38453 0 NTECL VALLUR 2376982 2376982 10/13/2016 0 24(12.09.2016-18.09.2016) NLC TS-II STG-I 208409 10/7/2016 10/4/2016 208409 0 NLC TS-II STG-I 1229305 1229305 10/13/2016 0 24(12.09.2016-18.09.2016) NLC TS-II STG-II 305860 10/7/2016 10/4/2016 305860 0 NLC TS-II STG-II 2792628 2792628 10/13/2016 0 24(12.09.2016-18.09.2016) NLC TPS-I EXP 156105 10/7/2016 10/1/2016 156105 0 NLC TPS-I EXP 1437887 1437887 10/13/2016 0 24(12.09.2016-18.09.2016) NLC TPS-II EXP 0 10/7/2016 0 0 NLC TPS-II EXP 192856 192856 10/13/2016 0 24(12.09.2016-18.09.2016) NTPL 9652 10/7/2016 10/3/2016 9652 0 NTPL 4411109 4411109 10/13/2016 0 25(19.09.2016-25.09.2016) RSTPS STG-I&II 1663988 10/14/2016 10/14/2016 1663988 0 RSTPS STG-I&II 2246490 2246490 10/18/2016 0 25(19.09.2016-25.09.2016) RSTPS STG-III 226247 10/14/2016 10/14/2016 226247 0 RSTPS STG-III 634696 634696 10/18/2016 0 25(19.09.2016-25.09.2016) SIMHADRI-II 1479327 10/14/2016 10/14/2016 1479327 0 SIMHADRI-II 5836449 5836449 10/18/2016 0 25(19.09.2016-25.09.2016) TALCHER-II 133031 10/14/2016 10/14/2016 133031 0 TALCHER-II 61786 61786 10/18/2016 0 25(19.09.2016-25.09.2016) NTECL VALLUR 725987 10/14/2016 10/13/2016 725987 0 NTECL VALLUR 2253812 2253812 10/18/2016 0 25(19.09.2016-25.09.2016) NLC TS-II STG-I 807257 10/14/2016 10/6/2016 807257 0 NLC TS-II STG-I 1675126 1675126 10/18/2016 0 25(19.09.2016-25.09.2016) NLC TS-II STG-II 598415 10/14/2016 10/6/2016 598415 0 NLC TS-II STG-II 3862471 3862471 10/18/2016 0 25(19.09.2016-25.09.2016) NLC TPS-I EXP 531806 10/14/2016 10/7/2016 531806 0 NLC TPS-I EXP 803554 803554 10/18/2016 0 25(19.09.2016-25.09.2016) NLC TPS-II EXP 0 10/14/2016 0 0 NLC TPS-II EXP 0 0 0 25(19.09.2016-25.09.2016) NTPL 868275 10/14/2016 10/13/2016 868275 0 NTPL 1415171 1415171 10/18/2016 0 0 26(26.09.2016-02.10.2016) RSTPS STG-I&II 340118 10/20/2016 10/20/2016 340118 0 RSTPS STG-I&II 562889 562889 10/24/2016 0 26(26.09.2016-02.10.2016) RSTPS STG-III 80750 10/20/2016 10/20/2016 80750 0 RSTPS STG-III 50060 50060 10/24/2016 0 26(26.09.2016-02.10.2016) SIMHADRI-II 991737 10/20/2016 10/20/2016 991737 0 SIMHADRI-II 1163255 1163255 10/24/2016 0 26(26.09.2016-02.10.2016) TALCHER-II 114750 10/20/2016 10/20/2016 114750 0 TALCHER-II 0 0 0 26(26.09.2016-02.10.2016) NTECL VALLUR 475546 10/20/2016 10/19/2016 475546 0 NTECL VALLUR 871220 871220 10/24/2016 0 26(26.09.2016-02.10.2016) NLC TS-II STG-I 1249274 10/20/2016 10/14/2016 1249274 0 NLC TS-II STG-I 482699 482699 10/24/2016 0 26(26.09.2016-02.10.2016) NLC TS-II STG-II 1377072 10/20/2016 10/14/2016 1377072 0 NLC TS-II STG-II 1187381 1187381 10/24/2016 0

ANNEXURE 2 (25 of 57) Receipt and Disbursement details of RRAS Charges during Sep 2016 to Dec 2016 Annexure III Details of Payments into RRAS pool Details of disbursement from RRAS pool (+) Due to be (+) Due to disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to RRAS Amount Total amt. Date of from pool / (- Regional Entity Regional Entity into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursible(rs.) disbursed (Rs.) disbursement ) Excess Excess disbursed. Intrest 26(26.09.2016-02.10.2016) for delayed payment as per NLC TPS-I EXP 691439 10/20/2016 10/14/2016 691439 0 NLC TPS-I EXP 571022 571022 10/24/2016 0 26(26.09.2016-02.10.2016) NLC TPS-II EXP 0 10/20/2016 0 NLC TPS-II EXP 68230 68230 10/24/2016 0 26(26.09.2016-02.10.2016) NTPL 372348 10/20/2016 10/24/2016 372371-23 NTPL 820811 820811 10/24/2016 0 0 27(03.10.2016-09.10.2016) RSTPS STG-I&II 225298 10/28/2016 10/27/2016 225298 0 RSTPS STG-I&II 0 0 0 27(03.10.2016-09.10.2016) RSTPS STG-III 28229 10/28/2016 10/27/2016 28229 0 RSTPS STG-III 0 0 0 27(03.10.2016-09.10.2016) SIMHADRI-II 66838 10/28/2016 10/27/2016 66838 0 SIMHADRI-II 0 0 0 27(03.10.2016-09.10.2016) TALCHER-II 0 10/28/2016 0 0 TALCHER-II 0 0 0 27(03.10.2016-09.10.2016) NTECL VALLUR 22829 10/28/2016 10/27/2016 22829 0 NTECL VALLUR 0 0 0 27(03.10.2016-09.10.2016) NLC TS-II STG-I 433007 10/28/2016 10/21/2016 433007 0 NLC TS-II STG-I 40117 40117 11/3/2016 0 27(03.10.2016-09.10.2016) NLC TS-II STG-II 911396 10/28/2016 10/21/2016 911396 0 NLC TS-II STG-II 451451 451451 11/3/2016 0 27(03.10.2016-09.10.2016) NLC TPS-I EXP 782860 10/28/2016 10/24/2016 782860 0 NLC TPS-I EXP 48027 48027 11/3/2016 0 27(03.10.2016-09.10.2016) NLC TPS-II EXP 0 10/28/2016 0 0 NLC TPS-II EXP 0 0 0 27(03.10.2016-09.10.2016) NTPL 91107 10/28/2016 10/21/2016 91107 0 NTPL 0 0 0 28(10.10.2016-16.10.2016) RSTPS STG-I&II 0 11/4/2016 0 0 RSTPS STG-I&II 159478 159478 11/7/2016 0 28(10.10.2016-16.10.2016) RSTPS STG-III 0 11/4/2016 0 0 RSTPS STG-III 475801 475801 11/7/2016 0 28(10.10.2016-16.10.2016) SIMHADRI-II 0 11/4/2016 0 0 SIMHADRI-II 0 0 0 28(10.10.2016-16.10.2016) TALCHER-II 0 11/4/2016 0 0 TALCHER-II 0 0 0 28(10.10.2016-16.10.2016) NTECL VALLUR 0 11/4/2016 0 0 NTECL VALLUR 1365000 1365000 11/7/2016 0 28(10.10.2016-16.10.2016) NLC TS-II STG-I 0 11/4/2016 0 0 NLC TS-II STG-I 0 0 0 28(10.10.2016-16.10.2016) NLC TS-II STG-II 0 11/4/2016 0 0 NLC TS-II STG-II 0 0 0 28(10.10.2016-16.10.2016) NLC TPS-I EXP 0 11/4/2016 0 0 NLC TPS-I EXP 211316 211316 11/7/2016 0 28(10.10.2016-16.10.2016) NLC TPS-II EXP 0 11/4/2016 0 0 NLC TPS-II EXP 0 0 0 28(10.10.2016-16.10.2016) NTPL 0 11/4/2016 0 0 NTPL 531038 531038 11/7/2016 0 29(17.10.2016-23.10.2016) RSTPS STG-I&II 0 11/11/2016 0 0 RSTPS STG-I&II 368000 368000 11/14/2016 0 29(17.10.2016-23.10.2016) RSTPS STG-III 0 11/11/2016 0 0 RSTPS STG-III 0 0 0 29(17.10.2016-23.10.2016) SIMHADRI-II 0 11/11/2016 0 0 SIMHADRI-II 17989 17989 11/14/2016 0 29(17.10.2016-23.10.2016) TALCHER-II 0 11/11/2016 0 0 TALCHER-II 0 0 0 29(17.10.2016-23.10.2016) NTECL VALLUR 0 11/11/2016 0 0 NTECL VALLUR 481708 481708 11/14/2016 0 29(17.10.2016-23.10.2016) NLC TS-II STG-I 0 11/11/2016 0 0 NLC TS-II STG-I 13735 13735 11/14/2016 0 29(17.10.2016-23.10.2016) NLC TS-II STG-II 0 11/11/2016 0 0 NLC TS-II STG-II 94443 94443 11/14/2016 0 29(17.10.2016-23.10.2016) NLC TPS-I EXP 0 11/11/2016 0 0 NLC TPS-I EXP 45698 45698 11/14/2016 0 29(17.10.2016-23.10.2016) NLC TPS-II EXP 0 11/11/2016 0 0 NLC TPS-II EXP 0 0 0 29(17.10.2016-23.10.2016) NTPL 0 11/11/2016 0 0 NTPL 375638 375638 11/14/2016 0 0 30(24.10.2016-30.10.2016) RSTPS STG-I&II 162826 11/18/2016 11/18/2016 162826 0 RSTPS STG-I&II 0 0 0 30(24.10.2016-30.10.2016) RSTPS STG-III 0 11/18/2016 0 0 RSTPS STG-III 0 0 0 30(24.10.2016-30.10.2016) SIMHADRI-II 1329582 11/18/2016 11/18/2016 1329582 0 SIMHADRI-II 581061 581061 11/21/2016 0 30(24.10.2016-30.10.2016) TALCHER-II 21572 11/18/2016 11/18/2016 21572 0 TALCHER-II 0 0 0 30(24.10.2016-30.10.2016) NTECL VALLUR 164880 11/18/2016 11/17/2016 164880 0 NTECL VALLUR 0 0 0 30(24.10.2016-30.10.2016) NLC TS-II STG-I 650312 11/18/2016 11/10/2016 650312 0 NLC TS-II STG-I 0 0 0 30(24.10.2016-30.10.2016) NLC TS-II STG-II 710389 11/18/2016 11/10/2016 710389 0 NLC TS-II STG-II 0 0 0 30(24.10.2016-30.10.2016) NLC TPS-I EXP 233417 11/18/2016 11/11/2016 233417 0 NLC TPS-I EXP 0 0 0 30(24.10.2016-30.10.2016) NLC TPS-II EXP 0 11/18/2016 0 0 NLC TPS-II EXP 0 0 0

ANNEXURE 2 (26 of 57) Receipt and Disbursement details of RRAS Charges during Sep 2016 to Dec 2016 Annexure III Details of Payments into RRAS pool Details of disbursement from RRAS pool (+) Due to be (+) Due to disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to RRAS Amount Total amt. Date of from pool / (- Regional Entity Regional Entity into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursible(rs.) disbursed (Rs.) disbursement ) Excess Excess disbursed. Intrest 30(24.10.2016-30.10.2016) for delayed payment as per NTPL 90080 11/18/2016 11/10/2016 90057 23 NTPL 0 0 0 0 31(31.10.2016-06.11.2016) RSTPS STG-I&II 106530 11/25/2016 11/25/2016 106530 0 RSTPS STG-I&II 0 0 0 31(31.10.2016-06.11.2016) RSTPS STG-III 0 11/25/2016 0 0 RSTPS STG-III 0 0 0 31(31.10.2016-06.11.2016) SIMHADRI-II 73348 11/25/2016 11/25/2016 73348 0 SIMHADRI-II 0 0 0 31(31.10.2016-06.11.2016) TALCHER-II 97028 11/25/2016 11/25/2016 97028 0 TALCHER-II 0 0 0 31(31.10.2016-06.11.2016) NTECL VALLUR 0 11/25/2016 0 NTECL VALLUR 504113 504113 12/5/2016 0 31(31.10.2016-06.11.2016) NLC TS-II STG-I 54558 11/25/2016 11/17/2016 54558 0 NLC TS-II STG-I 0 0 0 31(31.10.2016-06.11.2016) NLC TS-II STG-II 53097 11/25/2016 11/17/2016 53097 0 NLC TS-II STG-II 0 0 0 31(31.10.2016-06.11.2016) NLC TPS-I EXP 319857 11/25/2016 11/28/2016 319857 0 NLC TPS-I EXP 127954 127954 11/29/2016 0 31(31.10.2016-06.11.2016) NLC TPS-II EXP 0 11/25/2016 0 NLC TPS-II EXP 0 0 0 31(31.10.2016-06.11.2016) NTPL 0 11/25/2016 0 NTPL 521278 521278 12/5/2016 0 32(07.11.2016-13.11.2016) RSTPS STG-I&II 226687 12/2/2016 12/1/2016 226687 0 RSTPS STG-I&II 0 0 0 32(07.11.2016-13.11.2016) RSTPS STG-III 0 12/2/2016 0 0 RSTPS STG-III 0 0 0 32(07.11.2016-13.11.2016) SIMHADRI-II 608867 12/2/2016 12/1/2016 608867 0 SIMHADRI-II 343333 343333 12/5/2016 0 32(07.11.2016-13.11.2016) TALCHER-II 0 12/2/2016 0 0 TALCHER-II 0 0 0 32(07.11.2016-13.11.2016) NTECL VALLUR 385595 12/2/2016 12/2/2016 385595 0 NTECL VALLUR 318140 318140 12/5/2016 0 32(07.11.2016-13.11.2016) NLC TS-II STG-I 717769 12/2/2016 11/28/2016 717769 0 NLC TS-II STG-I 26019 26019 12/5/2016 0 32(07.11.2016-13.11.2016) NLC TS-II STG-II 698123 12/2/2016 11/28/2016 698123 0 NLC TS-II STG-II 57824 57824 12/5/2016 0 32(07.11.2016-13.11.2016) NLC TPS-I EXP 746689 12/2/2016 11/28/2016 746689 0 NLC TPS-I EXP 30466 30466 12/5/2016 0 32(07.11.2016-13.11.2016) NLC TPS-II EXP 7945 12/2/2016 12/2/2016 7945 0 NLC TPS-II EXP 41193 41193 12/5/2016 0 32(07.11.2016-13.11.2016) NTPL 472019 12/2/2016 11/28/2016 472019 0 NTPL 575563 575563 12/5/2016 0 33(14.11.2016-20.11.2016) RSTPS STG-I&II 87019 12/9/2016 12/9/2016 87019 0 RSTPS STG-I&II 15830 15830 12-12-2016 0 33(14.11.2016-20.11.2016) RSTPS STG-III 0 12/9/2016 0 0 RSTPS STG-III 0 0 0 33(14.11.2016-20.11.2016) SIMHADRI-II 1157260 12/9/2016 12/9/2016 1157260 0 SIMHADRI-II 1020558 1020558 12-12-2016 0 33(14.11.2016-20.11.2016) TALCHER-II 0 12/9/2016 0 0 TALCHER-II 0 0 0 33(14.11.2016-20.11.2016) NTECL VALLUR 375485 12/9/2016 12/8/2016 375485 0 NTECL VALLUR 58775 58775 12-12-2016 0 33(14.11.2016-20.11.2016) NLC TS-II STG-I 1264660 12/9/2016 12/2/2016 1264660 0 NLC TS-II STG-I 33462 33462 12-12-2016 0 33(14.11.2016-20.11.2016) NLC TS-II STG-II 926802 12/9/2016 12/2/2016 926802 0 NLC TS-II STG-II 106704 106704 12-12-2016 0 33(14.11.2016-20.11.2016) NLC TPS-I EXP 836118 12/9/2016 12/5/2016 836118 0 NLC TPS-I EXP 23263 23263 12-12-2016 0 33(14.11.2016-20.11.2016) NLC TPS-II EXP 0 12/9/2016 0 0 NLC TPS-II EXP 0 0 0 33(14.11.2016-20.11.2016) NTPL 125227 12/9/2016 12/3/2016 125227 0 NTPL 638177 638177 12-12-2016 0 34(21.11.2016-27.11.2016) RSTPS STG-I&II 1269499 12/16/2016 12/15/2016 1269499 0 RSTPS STG-I&II 0 0 0 34(21.11.2016-27.11.2016) RSTPS STG-III 0 12/16/2016 0 0 RSTPS STG-III 36638 36638 20-12-2016 0 34(21.11.2016-27.11.2016) SIMHADRI-II 278232 12/16/2016 12/15/2016 278232 0 SIMHADRI-II 2765443 2765443 20-12-2016 0 34(21.11.2016-27.11.2016) TALCHER-II 0 12/16/2016 0 0 TALCHER-II 231925 231925 20-12-2016 0 34(21.11.2016-27.11.2016) NTECL VALLUR 497281 12/16/2016 12/16/2016 497281 0 NTECL VALLUR 223616 223616 20-12-2016 0 34(21.11.2016-27.11.2016) NLC TS-II STG-I 169029 12/16/2016 12/12/2016 169029 0 NLC TS-II STG-I 12390 12390 20-12-2016 0 34(21.11.2016-27.11.2016) NLC TS-II STG-II 338594 12/16/2016 12/12/2016 338594 0 NLC TS-II STG-II 259724 259724 20-12-2016 0 34(21.11.2016-27.11.2016) NLC TPS-I EXP 73913 12/16/2016 12/12/2016 73913 0 NLC TPS-I EXP 198851 198851 20-12-2016 0 34(21.11.2016-27.11.2016) NLC TPS-II EXP 0 12/16/2016 0 0 NLC TPS-II EXP 0 0 0 34(21.11.2016-27.11.2016) NTPL 12383 12/16/2016 12/13/2016 12383 0 NTPL 1146389 1146389 20-12-2016 0

ANNEXURE 2 (27 of 57) Receipt and Disbursement details of RRAS Charges during Sep 2016 to Dec 2016 Annexure III Details of Payments into RRAS pool Details of disbursement from RRAS pool (+) Due to be (+) Due to disbursed Wk No. & period Amount Payable Due date for Date of Amount Paid be paid to RRAS Amount Total amt. Date of from pool / (- Regional Entity Regional Entity into pool (Rs.) Payment. Payment (Rs.) pool / (-) disbursible(rs.) disbursed (Rs.) disbursement ) Excess Excess disbursed. Intrest 35(28.11.2016-04.12.2016) for delayed payment as per RSTPS STG-I&II 336707 12/23/2016 12/23/2016 336707 0 RSTPS STG-I&II 0 0 0 35(28.11.2016-04.12.2016) RSTPS STG-III 135509 12/23/2016 12/23/2016 135509 0 RSTPS STG-III 0 0 0 35(28.11.2016-04.12.2016) SIMHADRI-II 270341 12/23/2016 12/23/2016 270341 0 SIMHADRI-II 4589308 4589308 26-12-2016 0 35(28.11.2016-04.12.2016) TALCHER-II 397545 12/23/2016 12/23/2016 397545 0 TALCHER-II 70925 70925 26-12-2016 0 35(28.11.2016-04.12.2016) NTECL VALLUR 150516 12/23/2016 12/23/2016 150516 0 NTECL VALLUR 939072 939072 26-12-2016 0 35(28.11.2016-04.12.2016) NLC TS-II STG-I 167689 12/23/2016 12/19/2016 167689 0 NLC TS-II STG-I 130298 130298 26-12-2016 0 35(28.11.2016-04.12.2016) NLC TS-II STG-II 328249 12/23/2016 12/19/2016 328249 0 NLC TS-II STG-II 820895 820895 26-12-2016 0 35(28.11.2016-04.12.2016) NLC TPS-I EXP 436400 12/23/2016 12/21/2016 436400 0 NLC TPS-I EXP 237372 237372 26-12-2016 0 35(28.11.2016-04.12.2016) NLC TPS-II EXP* 16403 12/23/2016 16403 NLC TPS-II EXP 303086 303086 26-12-2016 0 35(28.11.2016-04.12.2016) NTPL 0 12/23/2016 0 NTPL 1194339 1194339 26-12-2016 0 *Yet to pay

ANNEXURE 2 (28 of 57) Status of Receipt of Signed Reconciliation Statement at SRLDC - DSM Charges Annexure IV Sl No: Pool Member Aug-16 Sep-16 Oct-16 1 APTRANSCO Yes 2 KPTCL Yes Yes Yes 3 KSEB Yes Yes Yes 4 TANTRANSCO Yes Yes Yes 5 PONDY Yes Yes Yes 6 GOA Yes (m) Yes (m) 7 TSTRANSCO Yes Yes Yes 8 PG-HVDC Yes (m) Yes (m) 9 RSTPS Stg 1 & 2 10 RSTPS Stg 3 11 Talcher Stg 2 12 Simhadri 2 13 Kudgi 14 NLC TS2 Stg 1 15 NLC TS2 Stg 2 16 NLC Ts 1 Expn Yes Yes Yes 17 NLC TS 2 Expn Yes Yes 18 NTECL, Vallur Yes (m) Yes (m) 19 LANCO ST II Yes (m) Yes (m) 20 LANCO ST III Yes (m) Yes (m) 21 Kudankulam 22 SEL Yes Yes 23 MEPL Yes Yes 24 Coastal Energen 25 TPCIL Yes (m) Yes (m) 26 NTPL Yes Yes Yes 27 IL&FS 28 NCC Yes (m) Yes (m) 29 ERLDC Yes Yes Yes 30 WRLDC (m) indicates receipt of scanned copy through mail.

ANNEXURE 2 (29 of 57) Status of Receipt of Signed Reconciliation Statement at SRLDC - RRAS Charges Annexure IV Month Pool Member Aug-16 Sep-16 Oct-16 1 RSTPS STG-I&II 2 RSTPS STG-III 3 SIMHADRI-II 4 TALCHER-II 5 NTECL VALLUR Yes (m) Yes (m) 6 NLC TS-II STG-I 7 NLC TS-II STG-II 8 NLC TPS-I EXP Yes Yes 9 NLC TPS-II EXP Yes Yes 10 NTPL Yes Yes Yes Sl. No. (m) indicates receipt of scanned copy through mail.

ANNEXURE 2 (30 of 57) Status of Receipt of Signed Reconciliation Statement at SRLDC - Reactive Charges Sl No: Pool Member Annexure IV Aug-16 Sep-16 Oct-16 1 APTRANSCO Yes 2 KPTCL Yes Yes Yes 3 KSEB Yes Yes Yes 4 TANTRANSCO Yes Yes 5 TSTRANSCO Yes Yes Yes 6 PONDY Yes Yes Yes (m) indicates receipt of scanned copy through mail. Month

ANNEXURE 2 (31 of 57) I Disbursement of PoC Charges Aug'16 to Nov'16 Annexure V Sl.no. Month Injection Withdrawal MWH PoC Charges MWH PoC Charges Total PoC Charges for CTU 1 Aug-16 1117786.16 84503176.80 1,117,786 161,607,769 246,110,946 2 Sep-16 1112312.12 120,059,520 1112312.12 158,010,632 278,070,151 3 Oct-16 901088.11 131,737,050 901088.11 153,547,109 285,284,160 4 Nov-16 859084.86 124766192.21 859,085 168,499,552 293,265,744 II Month Disbursement of STU/SLDC Charges from Aug'16 to Nov'16 STATE STU Charges SLDC Charges TOTAL A/C No. Bank of India, A/c. No. 250120910000003, RTGS Code: BKID0002501 Aug-16 GUJARAT 0 7,000 7,000 MSETCL 0 40,500 40,500 (1) STU Charge: S/B A/c.No. 380801010035093- UBIN 0538086 (2) SLDC Charge :S/B A/c.No.588901110050000 -UBIN 0558893 ORISSA 18,750 2,000 20,750 APTRANSCO 32,305,258 503,000 32,808,258 KPTCL 804,706 28,000 832,706 TNEB 7,738,502 148,000 7,886,502 TELANGANA 82,432,294 724,000 83,156,294 TOTAL 123,299,510 1,452,500 124,752,010 Sep-16 GUJARAT 0 9,000 9,000 MSETCL 0 45,000 45,000 APTRANSCO Hyderabad, ICICI, A/c.No. 000805002607, IFSC Code ICIC0000008 APTRANSCO 25,634,829 517,000 26,151,829 SBM A/c. No.54037881199, Madhavanagar Branch. RTGS Code: SBMY KPTCL 1,069,086 28,000 1,097,086 0040196 TNEB 9,436,433 172,000 9,608,433 TELANGANA 64,029,075 694,000 64,723,075 (1) STU Charge: Bank of Maharashtra, A/c.No.20130401710, RTGS Code: MAHB0001283 (2) SLDC Charge: Bank of Maharashtra, Airoli, A/C No. 60210251925 IFSC Code:MAHB0001283 APTRANSCO Hyderabad, ICICI, A/c.No. 000805002607, IFSC Code ICIC0000008 SBM A/c. No.54037881199, Madhavanagar Branch. RTGS Code: SBMY 0040196 TANTRANSCO, Canara Bank A/c.No.0911201022266, Anna Salai Branch, Chennai-2, IFSC Code:CNRB0000911 TSTRANSCO,STATE BANK OF HYDERABAD,A/c.No.62344544325,IFSC Code::SBHY0020066 Bank of India, A/c. No. 250120910000003, RTGS Code: BKID0002501 (1) STU Charge: Bank of Maharashtra, A/c.No.20130401710, RTGS Code: MAHB0001283 (2) SLDC Charge: Bank of Maharashtra, Airoli, A/C No. 60210251925 IFSC Code:MAHB0001283 TANTRANSCO, Canara Bank A/c.No.0911201022266, Anna Salai Branch, Chennai-2, IFSC Code:CNRB0000911 TSTRANSCO,STATE BANK OF HYDERABAD,A/c.No.62344544325,IFSC Code::SBHY0020066

ANNEXURE 2 (32 of 57) TOTAL 100,169,423 1,465,000 101,634,423 Oct-16 GUJARAT 0 34,000 34,000 HPSEB 1,000 2,000 3,000 (1) STU Charge : Union Bank A/c.No.552901110050000, IFSC- UBIN0555291 (2) SLDC Charge : Union Bank MPPTCL 0 3,000 A/c.No.571701010050118, IFSC- UBIN0557170 3,000 ORISSA 34,209 18,000 52,209 (1) STU Charge: S/B A/c.No. 380801010035093- APTRANSCO 18,154,050 330,000 18,484,050 SBM A/c. No.54037881199, Madhavanagar Branch. RTGS Code: SBMY 0040196 KPTCL 1,150,027 31,000 1,181,027 TNEB 7,220,221 156,000 7,376,221 TSTRANSCO,STATE BANK OF HYDERABAD,A/c.No.62344544325,IFSC TELANGANA 50,419,536 487,000 Code::SBHY0020066 50,906,536 TOTAL 76,979,044 1,061,000 78,040,044 MPPTCL 0 21,000 21,000 MSETCL 0 20,250 20,250 (1) STU Charge: S/B A/c.No. 380801010035093- UBIN 0538086 (2) SLDC Charge :S/B A/c.No.588901110050000 -UBIN 0558893 ORISSA 51,063 2,000 53,063 APTRANSCO 16,235,871 441,000 16,676,871 SBM A/c. No.54037881199, Madhavanagar Branch. RTGS Code: SBMY KPTCL 3,061,860 90,000 3,151,860 0040196 TANTRANSCO, Canara Bank A/c.No.0911201022266, Anna Salai Branch, TNEB 7,347,784 176,000 7,523,784 Chennai-2, IFSC Code:CNRB0000911 TSTRANSCO,STATE BANK OF HYDERABAD,A/c.No.62344544325,IFSC TELANGANA 38,511,441 596,000 39,107,441 Code::SBHY0020066 TOTAL 69,298,593 1,378,250 70,676,843 Bank of India, A/c. No. 250120910000003, RTGS Code: BKID0002501 1) STU charge: State Bank of Patiala, A/c No. 65111287869 STBP0001132 2) SLDC charge: Punjab National Bank A/C No. 0892000101069932 PUNB0089200 APTRANSCO Hyderabad, ICICI, A/c.No. 000805002607, IFSC Code ICIC0000008 TANTRANSCO, Canara Bank A/c.No.0911201022266, Anna Salai Branch, Chennai-2, IFSC Code:CNRB0000911 1) STU charge: SBI, A/c. No. 10820056547- SBIN0000631 2) SLDC charge: Corporation bank A/c No.014101601000254- IFSC Code: Nov-16 DELHI 4,089,093 11,000 4,100,093 CORP0000141 Bank of India, A/c. No. 250120910000003, RTGS GUJARAT 1,482 21,000 22,482 Code: BKID0002501 (1) STU Charge : Union Bank A/c.No.552901110050000, IFSC- UBIN0555291 (2) SLDC Charge : Union Bank A/c.No.571701010050118, IFSC- UBIN0557170 (1) STU Charge: Bank of Maharashtra, A/c.No.20130401710, RTGS Code: MAHB0001283 (2) SLDC Charge: Bank of Maharashtra, Airoli, A/C No. 60210251925 IFSC Code:MAHB0001283 APTRANSCO Hyderabad, ICICI, A/c.No. 000805002607, IFSC Code ICIC0000008

ANNEXURE 2 (33 of 57) Week 121216-181216 051216-111216 281016-041216 211016-271116 141016-201116 071016-131116 311016-061116 241016-301016 171016-231016 101016-161016 031016-091016 260916-021016 190916-250916 Non receipt of SEM data by Tuesday 12:00PM APTRANSCO TELANGANA KPTCL KSEB TANTRANSCO PONDY GOA POWERGRID NLC NTPC NPC IPP VTPS KODADA GUTTUR MANJESWAR ALAMATHY XELDEM PUDUCHERRY KURNOOL MAHABOOBNAGAR KUZHITURAI PONDA HYDERABAD GAJWEL KONAJE SP KOIL DINDI GUMMIDIPOONDI URAVAKONDA GAJWEL RTPS MANJESWAR HOSUR YANAM SRIKAKULAM VALLUR KURNOOL N'SAGAR KODASALLI KANIYABETTA HVDC TALCHER KV KOTA CHALAKURTHY KOZHIKODE KALPAKA WANAPARTHY MAMIDIPALLY WANAPARTHY KODASALLI NCTPS PONDY SIMHADRI TANDUR HOODY ALAMATHY RAICHUR DINDI SRIKAKULAM GAJWEL DHARMAPURI KURNOOL WANAPARTHY RTPS KADALANGUDY PONDY URAVAKONDA DICHIPALLY ALAMATHY URAVAKONDA DICHIPALLY KODASALLI MANJESWAR KADALANGUDY XELDEM MYSORE N'SAGAR SEDAM NELLORE VTPS WANAPARTHY SEDAM MANJESWAR YANAM XELDEM NELLORE TALCHER KV KOTA N'SAGAR KONAJE KADAPA CHALAKURTHY NUNNA TANDUR HOODY MANJESWAR KUZHITHURAI YANAM NELLORE NLC 2 EXP KNPP AP CARBIDES GAJWEL KODASALLI KADALANGUDU KADAPA N'SAGAR RC N'SAGAR KAMUTHI PONDY CHALAKURTHY HVDC TALCHER KV KOTA ASWARAOPETA KODASALLI XELDEM NP KUNTA MAPS GUTTUR HYDERABAD NELAMANGALA AP CARBIDES WANAPARTHY HOODY KANYABETTA RAICHUR WADAPALLI MANJESWAR PONDY KODADA SRISAILAM SRISAILAM NELAMANGALA MANJESWAR HVDC TALCHER NUNNA SEDAM KANYABETTA DINDI BELLARY MANJESWAR KUZHITHURAI TUMKUR TALCHER KNPP ASWARAOPETA TTPS NARKETPALLI SP KOIL TANDUR N'SAGAR RC KTPS KADRA VILLUPURAM XELDEM N'SAGAR NLC REMOTE RAGULAPADU GUTTUR SIRUSERI KADAPA KAKINADA KODADA KADRA MANJESWAR VILLUPURAM NP KUNTA NLC REMOTE TALCHER KHAMMAM NELAMANGALA ARNI GAZUWAKA SIMHADRI GUTTUR KUZHITURAI NAGAPATTINAM SEDAM SIRUSERI KOZHIKODE Annexure-VI 120916-180916 KADRA MANJESWAR VILLUPURAM XELDEM TRISSUR NLC REMOTE TALCHER RAGULAPADU TANDUR ALAMATHY KOZHIKODE NARKETPALLY GUTTUR NCTPS SIRUSERI 050916-110916 VTPS GAJWEL KADRA KANYEMBETTA VILLUPURAM NLC REMOTE KODASALLI ALAMATHY NCTPS SIRUSERI HOSUR

ANNEXURE 2 (34 of 57) Annexure VII Sep-16 AP TS KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA Generators N Sagar RC Wadapalli Ambewadi TIME DRIFT STATEMENT NOT RECEIVED Achrapakkam Villianur TALCHER HVDC-AUX XELDEM BHAVINI Kurnool KSTPS (Lower Seleru Line-1) Bellary(Alipur) Theni Thiruvelam PONDA Kamavarapu Kota Wanaparthy S/S BTPS ARNI VTPS Mamidipally Guttur Gummidipundi Kadakola SP KOIL Konaje STCMS Raichur Sedam Kadra Kodasally Yarandahalli Oct-16 AP TS KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA ISGS N Sagar RC Aswraopeta Ambewadi Achrapakkam Villianur TALCHER HVDC-AUX XELDEM BHAVINI Kurnool Dindi S/S Bellary(Alipur) SP KOIL PONDA Kamavarapu Kota Wadapalli S/S BTPS ARNI VTPS Wanaparthy S/S Guttur Gummidipundi Ragulapadu Malkaram Kadakola Mamidipally Konaje Tandur Raichur Sedam Kadra Kodasally Yarandahalli Nov-16 AP TS KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA ISGS Kurnool Dindi S/S Ambewadi Achrapakkam Villianur NP kunta Hosur XELDEM BHAVINI Tallapalli Wadapalli S/S Bellary(Alipur) SP KOIL TALCHER HVDC-AUX PONDA Kamavarapu Kota Wanaparthy S/S Yarandahalli ARNI Thiruvelam VTPS Alampur Guttur Gummidipundi Ragulapadu Madhira Kadakola Tandur Kodasally Aswaraopeta Raichur Sedam Kadra Dec-16 AP TS KARNATAKA KERALA TN PONDY POWERGRID POWERGRID GOA ISGS Kurnool Dindi Hoody Achrapakkam Villianur Kadapa TALCHER HVDC-AUX Xeldem BHAVINI Tallapalli Mamidipally Kadakola STCMS NP kunta Hosur Ponda Kamavarapu Kota Tandur Ambewadi ARNI VTPS Wanaparthy Nelamangala Gummidipundi Ragulapadu Alampur X roads Raichur SP KOIL Aswaraopeta Sedam Wadapalli Kadra Kodasally Yarandahalli

ANNEXURE 2 (35 of 57) SEM discrepancies from 29/08/16 to 18/12/16 Annexure-VIII Station Main SEM Sl.No/Location ID Feeder name Standby/Check SEM Sl.No. used for a/c Date Details of Discrepancy Any feedback received NP-0607-B NP-5485-A Thiruvelam TN-56 230kV Chittoor Line AP-53 29/08/16 to 04/09/16 NP-0601-B NP-6035-A Theni TN-51 230kV Moozhiyar Line KL-51 29/08/16 to 04/09/16 Inconsistent recording due to enormous time drift Inconsistent recording due to enormous time drift Somanhalli Jeypore Kolhapur Kolhapur Chillakallu Arni Puducherry Hyderabad Hyderabad Hyderabad SA-0129-A SA-0130-A 400/220kV ICT-3 CS-05 CS-06 NP-5961-A NP-5378-A 400kV Gazuwaka line-1 ER-84 DC-03 NP-8841-A NP-9604-A 400kV Kudgi Line-1 WR-51 KD-51 NP-8843-A NP-9614-A 400kV Kudgi Line-2 WR-52 KD-52 NP-3010-A NP-3046-A 132kV Kodada Line AC-36 GK-54 NP-6174-A NP-4022-A 230kV MAPS line TN-28 MA-03 NP-5603-A NL-0006-A 400kV NLC TS-2 line PO-08 RS-37 NP-3210-A NP-5522-A 400kV Gajwel Line SR-04 AT-01 NP-3208-A NP-3202-A 220kV Side of ICT-2 AP-20 AP-19 NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 01/09/16 (55 to 59 Block) 31/08/16(71st Block) 29/08/16 to 04/09/16 29/08/16 to 04/09/16 29/08/16 (53 to 68 time blocks) 22/08/16 to 28/08/16 30/08/16 (61st Block) 29/08/16 to 04/09/16 29/08/16 to 04/09/16 29/08/16 to 04/09/16 Under Recording Over Recording Data format Error Data format Error Under Recording Under Recording Over Recording Under Recording Under Recording Under Recording Thiruvelam Theni NP-0607-B NP-5485-A Inconsistent recording due 230kV Chittoor Line 05/09/16 to 11/09/16 TN-56 AP-53 to enormous time drift NP-0601-B NP-6035-A Inconsistent recording due 230kV Moozhiyar Line 05/09/16 to 11/09/16 TN-51 KL-51 to enormous time drift Puducherry Udumalpet Hyderabad Hyderabad Hyderabad SA-0129-A SA-0130-A 400/220kV ICT-3 CS-05 CS-06 NP-5140-A NP-5139-A 400/230kV ICT-2 TN-12 TN-11 NP-3210-A NP-5522-A 400kV Gajwel Line SR-04 AT-01 NP-3208-A NP-3202-A 220kV Side of ICT-2 AP-20 AP-19 NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 07/09/16 (37th Block) 07/09/16 to 11/09/16 05/09/16 to 09/09/16 05/09/16 to 09/09/16 05/09/16 to 11/09/16 Over Recording Under Recording Under Recording Under Recording Under Recording Thiruvelam Theni NP-0607-B NP-5485-A Inconsistent recording due 230kV Chittoor Line 12/09/16 to 18/09/16 TN-56 AP-53 to enormous time drift NP-0601-B NP-6035-A Inconsistent recording due 230kV Moozhiyar Line 12/09/16 to 18/09/16 TN-51 KL-51 to enormous time drift Sriperumbudur NP-1487-A NP-1488-A 12/08/16 (50 th Block) to 13/09/16 Inter Connector-2 TN-03 TN-04 (66th Block) Under Recording Udumalpet Hosur Hiriyur Hyderabad NP-5140-A NP-5139-A 230kV ICT-2 TN-12 TN-11 NP-8364-A NP-8363-A 220kV Side of ICT-3 TH-07 TH-06 NP-5626-A NP-4052-A 400kV Nelamangala Line CK-33 CK-35 NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 9/12/2016 16/09/16(15:15 to 15:45) 15/09/16 to 16/09/16 05/09/16 to 11/09/16 Under Recording Under Recording Under Recording Under Recording Thiruvelam Theni NP-0607-B NP-5485-A Inconsistent recording due 230kV Chittoor Line 19/09/16 to 25/09/16 TN-56 AP-53 to enormous time drift NP-0601-B NP-6035-A Inconsistent recording due 230kV Moozhiyar Line 19/09/16 to 25/09/16 TN-51 KL-51 to enormous time drift Warangal Mysore Hyderabad Hyderabad Warangal Sattenapalli NP-5487-A NP-5630-A 400kV KTPP Line AT-13 AT-15 SA-0227-A SA-0225-A 220kV Side of ICT-3 CM-28 CM-27 NP-3208-A NP-3202-A 220kV Side of ICT-2 AP-20 AP-19 NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 NP-5487-A NP-5630-A 400kV KTPP Line AT-13 AT-15 NP-3117-A NP-2487-A 400kV Vijayawada line AS-16 AP-61 19/09/16(44th Block) to 22/09/16 20/09/16 to 25/09/16 19/09/16 to 25/09/16 19/09/16 to 25/09/16 26/09/16(25th to 66th Block) 26/09/16( 25 to 92 blocks) Under Recording Under Recording Under Recording Under Recording Inconsistent recording Under Recording Mysore SA-0227-A SA-0225-A 220kV Side of ICT-3 CM-28 CM-27 26/09/16 to 02/10/16 Under Recording Coastal Energen NP-8315-A NP-8316-A 400kV Tuticorin PS line CE-01 CE-02 9/26/2016 Under Recording Hyderabad NP-3208-A NP-3202-A 220kV Side of ICT-2 AP-20 AP-19 26/09/16 to 02/10/16 Under Recording Hyderabad NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 26/09/16 to 02/10/16 Under Recording Guttur NP-5612-A NP-7813-A 400kV Kaiga Line-1 CK-74 KG-21 13/10/16 to 16/10/16 Under Recording Ambewadi NP-5600-A NP-5511-A 220kV Xeldem Line CK-58 GO-01 10/10/16 to 16/10/16 Under Recording Hyderabad NP-3117-A NP-2487-A 13/10/16(50th block) to 14/10/16 (43 400kV Gajwel line AS-16 AP-61 blocks) Under Recording Mysore SA-0227-A SA-0225-A 220kV Side of ICT-3 CM-28 CM-27 10/10/16 to 12/10/16 Under Recording Kozhikode NP-8351-A NP-8349-A KK-09 KK-08 12/10/16( 46 block) Under Recording No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

ANNEXURE 2 (36 of 57) Hyderabad NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 10/10/16 to 16/10/16 Under Recording Talcher NP-5066-A NP-5069-A Inter Connector -1 TL-14 TL-16 19/10/16 (70th Block) Over Recording Talcher NP-5076-A NP-5070-A Inter Connector -2 TL-15 TL-17 19/10/16 (41st Block) Over Recording N'Sagar NP-3058-A NP-3030-A 17/10/16 (47th block) to 220kV Tallapalli Line-2 GT-63 AT-63 18/10/16(37th block) Under Recording Chillakallu NP-3016-A NP-3083-A 220kV Narketpalli Line-2 AC-32 GK-11 20/10/16( 50 to 52 blocks) Under Recording Udumalpet NP-5138-A NP-5137-A 220kV Side of ICT-1 TN-10 TN-09 21/10/16( 65th Block) Under Recording Udumalpet NP-5140-A NP-5139-A 220kV Side of ICT-2 TN-12 TN-11 21/10/16( 65th Block) Under Recording Udumalpet NP-5655-A NP-5654-A 220kV Side of ICT-3 TN-74 TN-73 21/10/16( 65th Block) Under Recording Hyderabad NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 17/10/16 to 23/10/16 Under Recording MEPL NP-7236-A NP-7208-A 25/10/16(71 blk) to 26/10/16 (46th SEL Inter Connector AT-31 AT-30 Blk) Under Recording Guttur NP-5613-A NP-7350-A 400kV Kaiga Line 2 CK-75 KG-22 24/10/16 to 30/10/16 Under Recording Udumalpet NP-5138-A NP-5137-A 220kV Side of ICT-1 TN-10 TN-09 21/10/16( 65th Block) Under Recording Udumalpet NP-5140-A NP-5139-A 220kV Side of ICT-2 TN-12 TN-11 21/10/16( 65th Block) Under Recording Udumalpet NP-5655-A NP-5654-A 220kV Side of ICT-3 TN-74 TN-73 21/10/16( 65th Block) Under Recording Hyderabad NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 17/10/16 to 23/10/16 Under Recording Talcher NP-5066-A NP-5076-A Inter Connector -1 TL-14 TL-15 05/11/16( 44th blk) Over Recording Jeypore NP-5961-A NP-5376-A 05/11/16 (74 blk ) to 06/11/16 (full 400kV Gazuwaka Line-1 ER-84 DC-01 day ) Under recording Mysore SA-0225-A SA-0227-A 400/230kV ICT -3 CM-27 CM-28 31/10/16( 38 to 47 blocks) Under recording Guttur NP-5613-A NP-7350-A 400kV Kaiga Line 2 CK-75 KG-22 31/10/16 to 05/11/16 Under Recording Trichy NP-5607-A NP-8308-A 220kV Side of ICT-1 TN-14 TN-13 05/11/16(53 to 57 blks) Under Recording Trichy NP-8310-A NP-8309-A 220kV Side of ICT-2 TN-16 TN-15 05/11/16(46 to 57 blks) Under Recording Hyderabad NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 31/10/16 to 06/11/16 Under Recording Kochi NP-6172-A NP-5669-A 400kV side of ICT 2 KC-03 KC-04 10/11/16(60TH Blk) Over recording Jeypore NP-5961-A NP-5376-A 07/11/16 to 08/11/16 (TILL 50TH Blk 400kV Gazuwaka Line-1 ER-84 DC-01 ) Under recording Hyderabad NP-3209-A NP-3170-A 220kV Side of ICT-3 AP-22 AP-21 31/10/16 to 06/11/16 Under Recording Udumalpet NP-5655-A NP-5654-A 220kV Side of ICT-3 TU-06 TU-05 17/11/16( 57th Blk) Over Recording VTPS NP-5382-A NP-3011-A 400kV Nellore(AP) line AV-51 AN-18 14/11/16 (12 to 14 blocks) Under recording Kochi NP-6170-A NP-6171-A 400kV side of ICT 1 KC-01 KC-02 20/11/16(30th Blk) Over recording NLC 2 Exp NP-5707-A NP-5706-A 400kV Pugalur line X2-11 X2-11 16/11/16( 31 Blk) to 17/11/16(33 blk) Under recording Kochi NP-6172-A NP-5669-A 400kV side of ICT 2 KC-03 KC-04 23/11/16(10:00-13:45) Under recording NLC 2 Exp NP-5707-A NP-5706-A 400kV Pugalur line X2-11 X2-12 24/11/16(09:15-09:30) Under recording Alipura NP-5388-A NP-5399-A 220kV Ragulapadu line CA-01 AR-01 23/11/16(15:45) Under recording Kolar NP-5147-A NP-5548-A 220kV side of ICT 1 at Kolar CK-12 CK-11 24/11/16 (15:45 to 16:00) Under recording Jeypore NP-5961-A NP-5378-A 400kV Gazuwaka line EJ-01 AG-41 04/12/16 (11:00 hrs) Over recording Narendra NP-7650-A NP-7652-A 400kV side of ICT 2 CN-33 CN-34 02/12/16 (20:15 to 21:45 hrs) Under recording Gazuwaka NP-5497-A NP-7280-A 400kV Simhadri line 1 AG-49 SM-15 01/12/16 (14:00 hrs) Over recording Ambewadi NP-5600-A NP-5511-A 220kV Xeldon line CA-03 GP-02 03/12/16 (14:45 hrs) Over recording Pondy NP-5606-A NP-8359-A 400kV SV Chatram line PP-12 TS-41 30/11/16 (13:00 hrs) Over recording Jeypore NP-5961-A NP-5378-A 400kV Gazuwaka line-1 EJ-01 AG-41 05/12/16 (11:45 hrs) Over recording Somanahalli NP-5612-A NP-5121-A 400/220kV ICT -1 CS-01 CS-02 05/12/16 (12:45 hrs) Over recording Guttur NP-5612-A NP-7813-A 400kV Kaiga Line-1 CG-13 KG-51 06/12/16 (11:45 hrs) Under recording Guttur NP-5690-A NP-5661-A 400kV Narendra Line-1 CG-15 CN-41 07/12/16(10:15hrs) Under recording Arasur NP-5568-A NP-5571-A 400/230kV ICT -1 TA-21 TA-22 10/12/16 (10:15 to 17:30 hrs) Under recording Guttur NP-5690-A NP-5661-A 400kV Narendra Line-1 CG-15 CN-41 12/12/16 to 18/12/16 Under recording Bhadravathy NP-4165-A NP-2310-A Pole -1 WR-01 WR-03 12/12/16 to 18/12/16 Under Recording Bhadravathy NP-4214-A NP-4215-A Pole -2 WR-02 WR-04 12/12/16 to 18/12/16 Under Recording Talcher NP-5066-A NP-5076-A Inter Connector-1 TL-21 TL-23 14/12/16(09:30) to 18/12/16 Under Recording No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Yes No Yes No No No No No No No

ANNEXURE 2 (37 of 57) SOUTHERN REGIONAL LOAD DESPATCH CENTRE 29, RACE COURSE CROSS ROAD, BANGALORE 560 009 Annexure IX Utility Name Station Name Location Description Meter No HV Current LV Current EHV Voltage LV Voltage Class of CT used Class of PT used 3Wire CT/2 Wire CT APTRANSCO ARAKU AA-01 132KV MACHKUND LINE 1 AT ARAKU NP-0166-A 300 1 132 110 APTRANSCO ARAKU AA-02 132KV MACHKUND LINE 2 AT ARAKU NP-0263-A 300 1 132 110 APTRANSCO BHOOPALAPALLY AB-01 400KV WARANGAL LINE 1 AT BOOPALAPALLY NP-5630-A 1000 1 400 110 APTRANSCO BHOOPALAPALLY AB-02 400KV WARANGAL LINE 2 AT BOOPALAPALLY NP-5631-A 1000 1 400 110 APTRANSCO BRAHMANAKOTKUR AB-10 220kV WANAPARTHY LINE at BRAHMANAKOTKUR NP-3019-A 800 1 220 110 APTRANSCO CHITTOOR AC-12 400KV CUDAPPAH LINE AT CHITTOOR NP-5499-A 1000 1 400 110 APTRANSCO CHITTOOR AC-13 400kV SRIPERUMBUDUR LINE AT CHITHOOR NP-5515-A 1000 1 400 110 APTRANSCO CHITTOOR AC-14 220KV THIRUVALAM LINE AT CHITTOOR (AP) NP-5485-A 800 1 220 110 APTRANSCO CHITTOOR AC-15 400KV THIRUVALEM LINE 1 AT CHITTOOR NP-9645-A 2000 1 400 110 APTRANSCO CHITTOOR AC-16 400KV THIRUVALEM LINE 2 AT CHITTOOR NP-9588-A 2000 1 400 110 APTRANSCO AP CARBIDES AC-20 132KV ALAMPUR X CROSS ROAD LINE 1 AT AP CARBIDES NP-3105-A 600 1 132 110 APTRANSCO AP CARBIDES AC-21 132KV ALAMPUR X ROAD LINE 2 AT AP CARBIDES NP-3106-A 600 1 132 110 APTRANSCO CHILLAKALLU AC-31 220KV NARKETPALLI LINE 1 AT CHILLAKALLU NP-3015-A 800 1 220 110 APTRANSCO CHILLAKALLU AC-32 220KV NARKETPALLI LINE 2 AT CHILLAKALLU NP-3016-A 800 1 220 110 APTRANSCO CHILLAKALLU AC-33 132kV MADHIRA LINE at CHILLAKALLU NP-3014-A 300 1 132 110 APTRANSCO CHILLAKALLU AC-34 132kV KHAMMAM LINE at CHILLAKALLU NP-3007-A 300 1 132 110 APTRANSCO CHILLAKALLU AC-35 132KV KUSUMANCHI LINE AT CHILLAKALLU NP-3013-A 600 1 132 110 APTRANSCO CHILLAKALLU AC-36 132KV KODADA LINE AT CHILLAKALLU NP-3010-A 600 1 132 110 APTRANSCO CHILLAKALLU AC-37 132KV RAMAPURAM LINE AT CHILLAKALLU NP-3009-A 600 1 132 110 APTRANSCO CHILLAKALLU AC-38 132kV SEETHAPURAM LINE at CHILLAKALLU NP-3008-A 600 1 132 110 APTRANSCO CHILLAKALLU AC-39 132KV BONAKALU LINE 1 AT CHILLAKALLU NP-3012-A 200 1 132 110 APTRANSCO CHILLAKALLU AC-40 132KV BONAKALU LINE 2 AT CHILLAKALLU NP-3091-A 200 1 132 110 APTRANSCO DITCHIPALLI AD-01 400KV RAMAGUNDAM LINE AT DITCHIPALLI NP-5501-A 1000 1 400 110 APTRANSCO PIDUGURALLA AD-21 132kV WADAPALLI LINE at PIDUGURALLA NP-3065-A 600 1 132 110 APTRANSCO DONKARAI AD-22 220KV L SILERU LINE AT DONKARAI NP-3097-A 800 1 220 110 APTRANSCO GAJWEL AG-01 400kV HYDERABAD LINE AT GAJVEL NP-5522-A 1000 1 400 110 APTRANSCO GAJWEL AG-02 400kV RAMAGUNDAM LINE AT GAJVEL NP-5528-A 1000 1 400 110 APTRANSCO KALAPAAKA AK-21 400KV GAZUWAKA LINE 1 AT KALPAKA NP-7233-A 1000 1 400 110 APTRANSCO KALAPAAKA AK-22 400KV GAZUWAKA LINE 2 AT KALPAKA NP-7242-A 1000 1 400 110 APTRANSCO KALAPAAKA AK-23 400KV KHAMMAM LINE 1 AT KALPAKA NP-7256-A 1000 1 400 110 APTRANSCO KALAPAAKA AK-24 400KV KHAMMAM LINE 2 AT KALPAKA NP-7231-A 1000 1 400 110 APTRANSCO KURNOOL AK-31 400kV GOOTY LINE AT KURNOOL NP-4089-A 1000 1 400 110 APTRANSCO KURNOOL AK-32 400KV HYDERABAD LINE AT KURNOOL NP-4086-A 1000 1 400 110 APTRANSCO KURNOOL AK-34 400KV NEW KURNOOL LINE 1 AT KURNOOL (AP) NP-3075-A 1000 1 400 110 APTRANSCO KURNOOL AK-35 400KV NEW KURNOOL LINE-2 AT KURNOOL (AP) NP-3076-A 1000 1 400 110 APTRANSCO KTPS AK-41 400KV KHAMMAM LINE 2 AT KTPS NP-7255-A 1000 1 400 110 APTRANSCO KTPS AK-42 400KV KHAMMAM LINE 1 AT KTPS NP-7266-A 1000 1 400 110 APTRANSCO KAKINADA AK-50 132kV YANAM LINE AT PRATHAP NAGAR NP-5502-A 150 1 132 110 APTRANSCO KCP CEMENTS AK-52 132kV SEETHAPURAM LINE at KCP CEMENTS NP-3026-A 300 1 132 110 APTRANSCO KURNOOL AK-61 400KV SRISAILAM LB LINE AT KURNOOL NP-3018-A 1000 1 400 110 APTRANSCO KAMAVARAPUKOTA AK-71 132KV ASWRAOPET LINE 1 AT KAMAVARAPUKOTA NP-3022-A 600 1 132 110 APTRANSCO KAMAVARAPUKOTA AK-72 132KV ASWRAOPET LINE 1 AT KAMAVARAPUKOTA NP-3023-A 600 1 132 110 APTRANSCO LOWER SILERU AL-01 220KV KTPS LINE 1 AT L SILERU NP-3051-A 800 1 220 110 APTRANSCO LOWER SILERU AL-02 220KV KTPS LINE 2 AT L SILERU NP-3052-A 800 1 220 110

APTRANSCO LOWER SILERU AL-10 220KV BARSUR LINE 1 AT L SILERU NP-0267-A 400 1 220 110 APTRANSCO LOWER SILERU AL-11 220KV BOMMURU LINE AT L SILERU NP-3098-A 800 1 220 110 APTRANSCO LOWER SILERU AL-12 220KV DONKARAI LINE AT L SILERU NP-3099-A 800 1 220 110 APTRANSCO MEHABOOBNAGAR AM-01 400kV N'SAGAR LINE AT MEHABOOBNAGAR NP-1471-A 1000 1 400 110 APTRANSCO MEHABOOBNAGAR AM-02 400kV RAICHUR LINE AT MEHABOOBNAGAR NP-1472-A 1000 1 400 110 APTRANSCO MEHABOOBNAGAR AM-03 400KV URAVAKONDA LINE-1 AT MAHABOOBNAGAR NP-3198-A 2000 1 400 110 APTRANSCO MEHABOOBNAGAR AM-04 400KV URAVAKONDA LINE -2 AT MAHABOOBNAGAR NP-3199-A 2000 1 400 110 APTRANSCO MAMIDIPALLY AM-11 400kV HYDERABAD LINE AT MAMIDIPALLY NP-5516-A 1000 1 400 110 APTRANSCO MAMIDIPALLY AM-12 400KV KHAMMAM LINE 1 AT MAMIDIPALLY NP-5518-A 1000 1 400 110 APTRANSCO MAMIDIPALLY AM-13 400KV KHAMMAM LINE 2 AT MAMIDIPALLY NP-5524-A 1000 1 400 110 APTRANSCO MAMIDIPALLY AM-14 400KV SRISAILAM LINE 2 AT MAMIDIPALLY NP-5517-A 1000 1 400 110 APTRANSCO MALKARAM AM-21 400kV HYDERABAD LINE AT MALKARAM NP-6163-A 1000 1 400 110 APTRANSCO MALKARAM AM-22 400kV RAMAGUNDAM LINE AT MALKARAM NP-7820-A 1000 1 400 110 APTRANSCO NELLORE (MANABOLU) AN-17 400KV VIJAYAWADA LINE AT NELLORE (AP) NP-3247-A 1000 1 400 110 APTRANSCO NELLORE (MANABOLU) AN-18 400KV VTPS LINE AT NELLORE (AP) NP-3011-A 1000 1 400 110 APTRANSCO NUNNA AN-71 220KV KTPS LINE AT NUNNA NP-3017-A 800 1 220 110 APTRANSCO REGULAPADU AR-01 220KV ALIPUR LINE AT RAGULAPADU NP-5399-A 800 1 220 110 APTRANSCO N'SAGAR RC AR-11 132kV N'SAGAR LINE at N'SAGAR RIGHT CANAL NP-3062-A 600 1 132 110 APTRANSCO SULURPET AS-01 220KV GUMMIDIPUNDI LINE AT SULURPET NP-4115-A 800 1 220 110 APTRANSCO SRISAILAM RB AS-11 220kV N'SAGAR LINE at SRISAILAM RB NP-3173-A 800 1 220 110 APTRANSCO SRISAILAM RB AS-12 220KV DINDI LINE 1 AT SRISAILAM RB NP-3189-A 800 1 220 110 APTRANSCO SRISAILAM RB AS-13 220KV DINDI LINE 2 AT SRISAILAM RB NP-3190-A 800 1 220 110 APTRANSCO SATTENAPALLI AS-14 400KV SRISAILAM LB LINE 1 AT SATTENAPALLI NP-3027-A 1000 1 400 110 APTRANSCO SATTENAPALLI AS-15 400KV SRISAILAM LB LINE 2 AT SATTENAPALLI NP-3028-A 1000 1 400 110 APTRANSCO SATTENAPALLI AS-16 400KV VIJAYAWADA LINE AT SATTENAPALLI NP-3117-A 1000 1 400 110 APTRANSCO TANDUR AT-01 220KV SEDAM LINE AT TANDUR (AP) NP-5526-A 800 1 220 110 APTRANSCO TALAPALLI AT-11 220KV N'SAGAR LINE 3 AT TALLAPALLI NP-3031-A 800 1 220 110 APTRANSCO TALAPALLI AT-12 220KV N'SAGAR LINE 1 AT TALLAPALLI NP-3029-A 1600 1 220 110 APTRANSCO TALAPALLI AT-13 220KV N'SAGAR LINE 2 AT TALLAPALLI NP-3030-A 1600 1 220 110 APTRANSCO TALAPALLI AT-14 220KV CHALAKURTHY LINE AT TALLAPALLI NP-3034-A 800 1 220 110 APTRANSCO TALAPALLI AT-16 400KV HYDERABAD LINE AT TALLAPALLI(N'SAGAR) NP-3033-A 1000 1 400 110 APTRANSCO TANGEDA AT-22 132KV WADAPALLI LINE AT TANGEDA NP-3066-A 600 1 132 110 APTRANSCO UPPER SILERU AU-01 220KV BALIMELA LINE AT U SILERU NP-3102-A 800 1 220 110 APTRANSCO UPPER SILERU AU-02 220KV BALIMELA LINE AT U SILERU NP-3081-A 800 1 220 110 APTRANSCO URAVAKONDA AU-03 400KV MAHABOOBNAGAR LINE 1 AT URAVAKONDA NP-3200-A 2000 1 400 110 APTRANSCO URAVAKONDA AU-04 400KV MAHABOOBNAGAR LINE 2 AT URAVAKONDA NP-3201-A 2000 1 400 110 APTRANSCO VEMAGIRI AV-41 400KV SIMHADRI LINE 1 AT VEMAGIRI NP-5498-A 1000 1 400 110 APTRANSCO VEMAGIRI AV-42 400KV SIMHADRI LINE 2 AT VEMAGIRI NP-5494-A 1000 1 400 110 APTRANSCO VEMAGIRI AV-43 400KV SATTENAPALLY LINE AT VEMAGIRI NP-5492-A 1000 1 400 110 APTRANSCO VEMAGIRI AV-44 400KV VIJAYAWADA LINE 2 AT VEMAGIRI NP-5493-A 1000 1 400 110 APTRANSCO VEMAGIRI AV-45 400KV VIJAYAWADA LINE 3 AT VEMAGIRI NP-5490-A 1000 1 400 110 APTRANSCO VEMAGIRI AV-46 400KV VIJAYAWADA LINE 4 AT VEMAGIRI NP-5508-A 1000 1 400 110 APTRANSCO VTPS-IV AV-51 400KV NELLORE LINE AT VTPS NP-5382-A 1000 1 400 110 APTRANSCO VTPS-IV AV-52 400KV VIJAYAWADA LINE 2 AT VTPS NP-1455-A 1000 1 400 110 APTRANSCO VTPS AV-61 400KV SURYAPETA LINE AT VTPS NP-3187-A 1000 1 400 110 APTRANSCO VTPS AV-62 400KV MALKARAM LINE 2 AT VTPS NP-3188-A 1000 1 400 110 APTRANSCO DUMMY DM-01 DUMMY DM-0000-A 1 1 1 1 ERR ANGUL EA-01 765KV SRIKAKULAM LINE 1 AT ANGUL NP-8077-A 2000 1 765 110 ERR ANGUL EA-02 765KV SRIKAKULAM LINE 2 AT ANGUL NP-8076-A 2000 1 765 110 ERR JEYPORE EJ-01 400KV GAZUWAKA LINE 1 AT JEYPORE NP-5961-A 2000 1 400 110 ERR JEYPORE EJ-02 400KV GAZUWAKA LINE 2 AT JEYPORE NP-5962-A 2000 1 400 110 GOA PONDA GP-01 220KV AMBEVADI LINE AT PONDA NP-5506-A 400 1 220 110 ANNEXURE 2 (38 of 57)

GOA XELDEM GP-02 220KV AMBEVADI LINE AT XELDEM NP-5511-A 400 1 220 110 GOA PONDA GP-03 110KV SUPA LINE 1 AT PONDA NP-0194-A 300 1 110 110 GOA PONDA GP-04 110KV SUPA LINE 2 AT PONDA NP-0171-A 300 1 110 110 INTER REGION SOLAPUR WR-41 765KV RAICHUR LINE 1 AT SOLAPUR NP-8711-A 3000 1 765 110 INTER REGION SOLAPUR WR-42 765KV RAICHUR LINE 2 AT SOLAPUR NP-8710-A 3000 1 765 110 IPPR COASTAL ENERGEN CE-01 400KV TUTICORIN PS LINE-2 AT COSATAL ENERGEN NP-8315-A 3000 1 400 110 IPPR COASTAL ENERGEN CE-02 400KV TUTICORIN PS LINE-2 AT COSATAL ENERGEN NP-8316-A 3000 1 400 110 IPPR COASTAL ENERGEN CE-05 400KV TUTICORIN PS LINE-1 AT COSATAL ENERGEN NP-8313-A 3000 1 400 110 IPPR COASTAL ENERGEN CE-06 400KV TUTICORIN PS LINE-1 AT COSATAL ENERGEN NP-8314-A 3000 1 400 110 IPPR COASTAL ENERGEN CE-10 400KV SIDE OF GT 1 AT CE LT-0162-A 1250 1 400 110 IPPR COASTAL ENERGEN CE-11 400KV SIDE OF GT 2 AT CE LT-0163-A 1250 1 400 110 IPPR IL&FS IL-01 400KV NAGAPATTINAM LINE AT ILFS NP-3261-A 3200 1 400 110 IPPR IL&FS IL-02 400KV NAGAPATTINAM LINE AT ILFS NP-3263-A 3200 1 400 110 IPPR IL&FS IL-03 400KV NEYVELI TPS-I LINE AT ILFS NP-3262-A 3200 1 400 110 IPPR IL&FS IL-04 400KV NEYVELI TPS-I LINE AT ILFS NP-3264-A 3200 1 400 110 IPPR IL&FS IL-06 400KV SIDE OF GT-2 AT IL&FS IL-0002-A 3200 1 400 110 IPPR LKPPL-2 LK-05 400KV VIJAYAWADA LINE 1 AT LKPPL NP-6158-A 1000 1 400 110 IPPR LKPPL-2 LK-06 400KV VIJAYAWADA LINE 2 AT LKPPL NP-6159-A 1000 1 400 110 IPPR LKPPL-2 LK-07 400KV BUS REACTOR AT LKPPL NP-3101-A 500 1 400 110 IPPR LKPPL-2 LK-10 GAS TURBINE GENERATOR AT LANCO ST-2 LT-0267-A 500 1 420 110 IPPR LKPPL-2 LK-11 STEAM TURBINE GENERATOR AT LANCO ST-2 LT-0268-A 500 1 420 110 IPPR LKPPL-3 LK-12 GAS TURBINE GENERATOR AT LANCO ST-3A LT-0269-A 500 1 420 110 IPPR LKPPL-3 LK-13 STEAM TURBINE GENERATOR AT LANCO ST-3A LT-0271-A 500 1 420 110 IPPR LKPPL-3 LK-14 GAS TURBINE GENERATOR AT LANCO ST-3B LT-0274-A 500 1 420 110 IPPR LKPPL-3 LK-15 STEAM TURBINE GENERATOR AT LANCO ST-3B LT-0275-A 500 1 420 110 IPPR MEPL ME-03 400KV NPS LINE AT MEPL NP-7200-A 1000 1 400 110 IPPR MEPL ME-04 400KV SEL INTERCONNECTOR AT MEPL NP-7236-A 1000 1 400 110 IPPR MEPL ME-05 400KV NPS LINE AT MEPL NP-3197-A 1000 1 400 110 IPPR MEPL ME-06 400KV SEL INTER CONNECTOR AT MEPL NP-3196-A 1000 1 400 110 IPPR MEPL ME-11 GT-1 AT MEPL NP-3212-A 500 1 400 110 IPPR MEPL ME-12 GT-1 AT MEPL NP-3213-A 500 1 400 110 IPPR MEPL ME-13 GT-2 AT MEPL NP-7250-A 500 1 400 110 IPPR SEL SE-03 400KV NPS LINE AT SEL NP-7195-A 2000 1 400 110 IPPR SEL SE-04 400KV MEPL INTERCONNECTOR AT SEL NP-7208-A 2000 1 400 110 IPPR SEL SE-07 GT-3 AT SEL NP-3143-A 750 1 400 110 IPPR SEL SE-08 400KV SIDE OF GT 4 AT SEL NP-3144-A 750 1 400 110 IPPR THERMAL POWERTECH TC-01 400KV NPS LINE 1 AT TPCIL NP-7166-A 3000 1 400 110 IPPR THERMAL POWERTECH TC-02 400KV NPS LINE 1 AT TPCIL NP-7249-A 3000 1 400 110 IPPR THERMAL POWERTECH TC-03 400KV NPS LINE 2 AT TPCIL NP-7168-A 3000 1 400 110 IPPR THERMAL POWERTECH TC-04 400KV NPS LINE 2 AT TPCIL NP-7270-A 3000 1 400 110 ISGS NTPL1 NT-01 400KV TUTICORIN PS LINE AT NTPL NP-8326-A 2000 1 400 110 ISGS NTPL1 NT-02 400KV TUTICORIN PS LINE AT NTPL NP-8323-A 2000 1 400 110 ISGS NTPL1 NT-03 400KV CE LINE AT NTPL NP-8324-A 2000 1 400 110 ISGS NTPL1 NT-04 400KV CE LINE AT NTPL NP-8325-A 2000 1 400 110 ISGS NTPL1 NT-10 400KV SIDE OF GT 1 AT NTPL NP-8333-A 1000 1 400 110 ISGS NTPL1 NT-11 400KV SIDE OF GT 1 AT NTPL NP-8328-A 1000 1 400 110 ISGS NTPL1 NT-12 400KV SIDE OF GT 2 AT NTPL NP-8329-A 1000 1 400 110 ISGS NTPL1 NT-13 400KV SIDE OF GT 2 AT NTPL NP-8330-A 1000 1 400 110 KPTCL ALIPUR CA-01 220KV RAGULAPADU LINE AT ALIPURA NP-5388-A 600 1 220 110 KPTCL AMBEWADI CA-02 220kV PONDA LINE AT AMBEWADI NP-5598-A 800 1 220 110 KPTCL AMBEWADI CA-03 220kV XELDEM LINE AT AMBEWADI NP-5600-A 800 1 220 110 KPTCL BTPS CB-01 400KV JSW LINE AT BTPS NP-5500-A 1000 1 400 110 ANNEXURE 2 (39 of 57)

KPTCL BTPS CB-02 400KV YTPS LINE AT BTPS NP-6165-A 1000 1 400 110 KPTCL CHIKKODI CC-01 220KV TALENGANE LINE AT CHIKKODI NP-5551-A 600 1 220 110 KPTCL CHIKKODI CC-02 220KV MUSHTUNGI LINE AT CHIKKODI NP-5597-A 600 1 220 110 KPTCL GUTTUR CG-01 400kV side of ICT 1 AT GUTTUR NP-4057-A 500 1 400 110 KPTCL GUTTUR CG-02 220kV side of ICT 1 AT GUTTUR NP-4062-A 900 1 220 110 KPTCL GUTTUR CG-03 400KV SIDE OF ICT 2 AT GUTTUR NP-4114-A 500 1 400 110 KPTCL GUTTUR CG-04 220KV SIDE OF ICT 2 AT GUTTUR NP-5688-A 900 1 220 110 KPTCL GUTTUR CG-11 400KV HIRIYUR LINE 1 AT GUTTUR NP-5686-A 1000 1 400 110 KPTCL GUTTUR CG-12 400KV HIRIYUR LINE 2 AT GUTTUR NP-4051-A 1000 1 400 110 KPTCL GUTTUR CG-13 400KV KAIGA LINE 1 AT GUTTUR NP-5612-A 1000 1 400 110 KPTCL GUTTUR CG-14 400KV KAIGA LINE 2 AT GUTTUR NP-5613-A 1000 1 400 110 KPTCL GUTTUR CG-15 400kV MUNIRABAD LINE AT GUTTUR NP-5690-A 1000 1 400 110 KPTCL GUTTUR CG-16 400KV NARENDRA LINE 1 AT GUTTUR NP-5664-A 1000 1 400 110 KPTCL GUTTUR CG-17 400KV NARENDRA LINE 2 AT GUTTUR NP-5663-A 1000 1 400 110 KPTCL GUTTUR CG-18 400KV JSW LINE AT GUTTUR NP-4061-A 1000 1 400 110 KPTCL HOODY CH-01 400kV side of ICT 1 AT HOODY NP-2496-A 800 1 400 110 KPTCL HOODY CH-02 220kV side of ICT 1 AT HOODY NP-2499-A 1400 1 220 110 KPTCL HOODY CH-03 400kV side of ICT 2 AT HOODY NP-4029-A 800 1 400 110 KPTCL HOODY CH-04 220kV side of ICT 2 AT HOODY NP-4028-A 1400 1 220 110 KPTCL HOODY CH-05 400kV NELAMANGALA LINE AT HOODY NP-2494-A 1000 1 400 110 KPTCL HOODY CH-06 400KV KOLAR LINE-1 AT HOODY SA-0226-A 1000 1 400 110 KPTCL HOODY CH-07 400KV KOLAR LINE-2 AT HOODY SA-0221-A 1000 1 400 110 KPTCL JSW CJ-01 400kV GUTTUR LINE AT JSW NP-5689-A 2000 1 400 110 KPTCL KADAKOLA CK-01 220KV KANIYAMPETTA LINE AT KADAKOLA NP-7289-A 600 1 220 110 KPTCL KONAJE CK-02 110kV MANJESWARAM LINE AT KONAJE NP-5565-A 200 1 110 110 KPTCL KADRA CK-41 220KV KAIGA LINE AT KADRA NP-7651-A 800 1 220 110 KPTCL KODASALLI CK-42 220kV KAIGA LINE AT KODASALLY NP-7653-A 800 1 220 110 KPTCL NELAMANGALA CN-11 400KV BIDADI LINE 1 AT NELAMANGALA NP-4055-A 1000 1 400 110 KPTCL NELAMANGALA CN-13 400kV GOOTY LINE AT NELAMANGALA NP-4113-A 1000 1 400 110 KPTCL NELAMANGALA CN-14 400KV HIRIYUR LINE 1 AT NELAMANGALA NP-2492-A 1000 1 400 110 KPTCL NELAMANGALA CN-15 400KV HIRIYUR LINE 2 AT NELAMANGALA NP-4052-A 1000 1 400 110 KPTCL NELAMANGALA CN-16 400KV HOODY LINE 1 AT NELAMANGALA NP-2493-A 1000 1 400 110 KPTCL NELAMANGALA CN-17 400KV MYSORE LINE 1 AT NELAMANGALA NP-2482-A 1000 1 400 110 KPTCL NELAMANGALA CN-18 400KV MYSORE LINE 2 AT NELAMANGALA NP-2483-A 1000 1 400 110 KPTCL NELAMANGALA CN-19 400KV HOODY LINE 2 AT NELAMANGALA NP-4053-A 1000 1 400 110 KPTCL NELAMANGALA CN-20 400KV MADHUGIRI (TUMKUR) LINE AT NELAMANGALA SA-0121-A 1000 1 400 110 KPTCL RTPS CR-03 220KV JURALA LINE 1 AT RTPS NP-3048-A 1200 1 220 110 KPTCL RTPS CR-04 220KV JURALA LINE 2 AT RTPS NP-3047-A 1200 1 220 110 KPTCL RTPS CR-11 400KV RAICHUR (PG) 1 LINE AT RTPS NP-5488-A 1000 1 400 110 KPTCL RTPS CR-12 400KV RAICHUR (PG) 2 LINE AT RTPS NP-5504-A 1000 1 400 110 KPTCL RTPS CR-13 400KV YTPS LINE AT RTPS NP-5534-A 1000 1 400 110 KPTCL RTPS CR-14 400KV MUNIRABAD LINE AT RTPS NP-5532-A 1000 1 400 110 KPTCL RTPS CR-15 400KV MEHBOOBNAGAR LINE AT RTPS NP-5503-A 1000 1 400 110 KPTCL SEDAM CS-31 220kV TANDUR LINE AT SEDAM NP-5391-A 800 1 220 110 KPTCL SUPA CS-34 110KV PONDA LINE 1 AT SUPA NP-0121-A 300 1 110 110 KPTCL SUPA CS-35 110KV PONDA LINE 2 AT SUPA NP-0120-A 300 1 110 110 KPTCL YERANDAHALLY CY-01 220kV HOSUR LINE AT YERANDAHALLY NP-5702-A 600 1 220 110 KSEB EDAMON KE-01 220KV TIRUNELVELI LINE 1 AT EDAMON NP-5621-A 1600 1 220 110 KSEB EDAMON KE-02 220KV TIRUNELVELI LINE 2 AT EDAMON NP-5576-A 1600 1 220 110 KSEB IDUKKI KI-01 220kV UDUMALPET LINE AT IDUKKI NP-5590-B 600 5 220 110 KSEB KANIANPETA KK-02 220KV KADAKOLA LINE AT KANIAMPETA NP-5564-A 800 1 220 110 KSEB MANJESWARAM KK-03 110KV KONAJE LINE AT MANJESWARAM NP-5566-A 200 1 110 110 ANNEXURE 2 (40 of 57)

KSEB MOOZHIYAR KK-04 220KV THENI LINE AT MOOZHIYAR NP-6035-A 800 1 220 110 KSEB PARASALA KK-05 110KV KUZHITHURAI LINE AT PARASALA NP-5639-A 100 1 110 110 NLC NLC TS-II STG1 N1-01 230KV SIDE OF GT 1 AT NEYVELI STG1 NL-0019-A 800 1 230 115 NLC NLC TS-II STG1 N1-02 230KV SIDE OF GT 1 AT NEYVELI STG1 NL-0021-A 800 1 230 115 NLC NLC TS-II STG1 N1-03 230KV SIDE OF GT 2 AT NEYVELI STG1 NL-0045-A 800 1 230 115 NLC NLC TS-II STG1 N1-04 230KV SIDE OF GT 2 AT NEYVELI STG1 NL-0022-A 800 1 230 115 NLC NLC TS-II STG1 N1-05 230KV SIDE OF GT 3 AT NEYVELI STG1 NL-0055-A 800 1 230 115 NLC NLC TS-II STG1 N1-06 230KV SIDE OF GT 3 AT NEYVELI STG1 NL-0049-A 800 1 230 115 NLC NLC TS-II STG1 N1-07 230KV SIDE OF ICT 1 AT NEYVELI STG1 NL-0072-A 800 1 230 115 NLC NLC TS-II STG1 N1-08 230KV SIDE OF ICT 1 AT NEYVELI STG1 NL-0020-A 800 1 230 115 NLC NLC TS-II STG1 N1-09 230KV SIDE OF ICT 2 AT NEYVELI STG1 NL-0073-A 800 1 230 115 NLC NLC TS-II STG1 N1-10 230KV SIDE OF ICT 2 AT NEYVELI STG1 NL-0104-A 800 1 230 115 NLC NLC TS-II STG1 N1-11 230KV SIDE OF ST 1 AT NEYVELI STG1 NL-0079-A 150 1 230 115 NLC NLC TS-II STG1 N1-12 230KV SIDE OF ST 1 AT NEYVELI STG1 NL-0027-A 150 1 230 115 NLC NLC TS-II STG1 N1-13 230KV SIDE OF ST 2 A NEYVELI STG1 NL-0060-A 150 1 230 115 NLC NLC TS-II STG1 N1-14 230KV SIDE OF ST 2 AT NEYVELI STG1 NL-0028-A 150 1 230 115 NLC NLC TS-II STG1 N1-15 230KV SIDE OF ST 3 AT NEYVELI STG1 NL-0061-A 100 1 230 115 NLC NLC TS-II STG1 N1-16 230KV SIDE OF ST 3 AT NEYVELI STG1 NL-0029-A 100 1 230 115 NLC NLC TS-II STG1 N1-17 230KV SIDE OF ST 4 AT NEYVELI STG1 NL-0062-A 100 1 230 115 NLC NLC TS-II STG1 N1-18 230KV SIDE OF ST 4 AT NEYVELI STG1 NL-0081-A 100 1 230 115 NLC NLC TS-II STG1 N1-19 66KV SIDE OF ST 1 (A) AT MINES END NL-9201-A 3000 1 66 110 NLC NLC TS-II STG1 N1-20 66KV SIDE OF ST 1 (B) AT MINES END NL-9202-A 3000 1 66 110 NLC NLC TS-II STG1 N1-21 66KV SIDE OF ST 2 (A) AT MINES END NL-9205-A 3000 1 66 110 NLC NLC TS-II STG1 N1-22 66KV SIDE OF ST 2 (B) AT MINES END NL-9204-A 3000 1 66 110 NLC NLC TS-II STG1 N1-23 66KV SIDE OF ST 3 AT MINES END NL-9126-A 3000 1 66 110 NLC NLC TS-II STG1 N1-24 66KV SIDE OF ST 4 AT MINES END NL-9127-A 3000 1 66 110 NLC NLC TS-II STG1 N1-25 230KV MF 1 AT MINES END NL-9132-A 600 1 230 115 NLC NLC TS-II STG1 N1-26 230KV SIDE OF MF 1 AT NEYVELI STG1 NL-0012-A 300 1 230 115 NLC NLC TS-II STG1 N1-28 230KV MF 2 (EXPN) AT MINES END NL-9130-A 300 1 230 110 NLC NLC TS-II STG1 N1-29 230KV MF 2 (MAIN) AT MINES END NL-9129-A 300 1 230 110 NLC NLC TS-II STG1 N1-30 230KV MF 2 AT MINES END NL-9133-A 600 1 230 115 NLC NLC TS-II STG1 N1-31 230KV MF 2 AT NEYVELI STG1 NL-0064-A 150 1 230 115 NLC NLC TS-II STG1 N1-32 230KV MF 2 AT NEYVELI STG1 NL-0009-A 150 1 230 115 NLC NLC TS-II STG1 N1-33 230KV MF 3 AT NEYVELI STG1 NL-0065-A 600 1 230 115 NLC NLC TS-II STG1 N1-34 230KV MF 3 AT NEYVELI STG1 NL-0018-A 600 1 230 115 NLC NLC TS-II STG1 N1-35 230KV MF 4 (EXPN) AT MINES END NL-9128-A 300 1 230 110 NLC NLC TS-II STG1 N1-36 230KV MF 4 (MAIN) AT MINES END NL-9131-A 300 1 230 110 NLC NLC TS-II STG1 N1-37 230KV MF 4 AT NEYVELI STG1 NL-0051-A 600 1 230 115 NLC NLC TS-II STG1 N1-38 230KV MF 4 AT NEYVELI STG1 NL-0080-A 600 1 230 115 NLC NLC TS-II STG1 N1-39 230KV BAHUR LINE AT NEYVELI STG1 NL-0016-A 800 1 230 115 NLC NLC TS-II STG1 N1-40 230KV BAHUR LINE AT NEYVELI STG1 NL-0010-A 800 1 230 115 NLC NLC TS-II STG1 N1-41 230KV KADALANGUDI LINE AT NEYVELI STG1 NL-0066-A 800 1 230 115 NLC NLC TS-II STG1 N1-42 230KV KADALANGUDI LINE AT NEYVELI STG1 NL-0013-A 800 1 230 115 NLC NLC TS-II STG1 N1-43 230KV STCMS LINE AT NEYVELI STG1 NL-0067-A 800 1 230 115 NLC NLC TS-II STG1 N1-44 230KV STCMS LINE AT NEYVELI STG1 NL-0011-A 800 1 230 115 NLC NLC TS-II STG1 N1-45 230KV TNEB TIE LINE 1 AT NEYVELI STG1 NL-9371-A 600 1 230 115 NLC NLC TS-II STG1 N1-46 230KV TNEB TIE LINE 1 AT NEYVELI STG1 NL-0069-A 800 1 230 115 NLC NLC TS-II STG1 N1-47 230KV TNEB TIE LINE 1 AT NEYVELI STG1 NL-0101-A 800 1 230 115 NLC NLC TS-II STG1 N1-48 230KV TNEB TIE LINE 2 AT NEYVELI STG1 NL-9373-A 600 1 230 115 NLC NLC TS-II STG1 N1-49 230KV TNEB TIE LINE 2 AT NEYVELI STG1 NL-0070-A 800 1 230 115 NLC NLC TS-II STG1 N1-50 230KV TNEB TIE LINE 2 AT NEYVELI STG1 NL-0008-A 800 1 230 115 NLC NLC TS-II STG1 N1-51 230KV VILLIANUR LINE AT NEYVELI STG1 NL-0071-A 800 1 230 115 ANNEXURE 2 (41 of 57)

NLC NLC TS-II STG1 N1-52 230KV VILLIANUR LINE AT NEYVELI STG1 NL-0015-A 800 1 230 115 NLC NLC TS-II STG1 N1-53 230KV VILLUPURAM LINE AT NEYVELI STG1 NL-0052-A 800 1 230 115 NLC NLC TS-II STG1 N1-54 230KV VILLUPURAM LINE AT NEYVELI STG1 NL-0014-A 800 1 230 115 NLC NLC TS-II STG2 N2-01 400KV SIDE OF GT 4 AT NEYVELI STG2 NL-0056-A 500 1 400 115 NLC NLC TS-II STG2 N2-02 400KV SIDE OF GT 4 AT NEYVELI STG2 NL-0024-A 500 1 400 115 NLC NLC TS-II STG2 N2-03 400KV SIDE OF GT 5 AT NEYVELI STG2 NL-0057-A 500 1 400 115 NLC NLC TS-II STG2 N2-04 400KV SIDE OF GT 5 AT NEYVELI STG2 NL-0023-A 500 1 400 115 NLC NLC TS-II STG2 N2-05 400KV SIDE OF GT 6 AT NEYVELI STG2 NL-0058-A 500 1 400 115 NLC NLC TS-II STG2 N2-06 400KV SIDE OF GT 6 AT NEYVELI STG2 NL-0030-A 500 1 400 115 NLC NLC TS-II STG2 N2-07 400KV SIDE OF GT 7 AT NEYVELI STG2 NL-0059-A 500 1 400 115 NLC NLC TS-II STG2 N2-08 400KV SIDE OF GT 7 AT NEYVELI STG2 NL-0026-A 500 1 400 115 NLC NLC TS-II STG2 N2-09 400KV NLC-TS-I EXP LINE AT NEYVELI STG2 NL-0078-A 1000 1 400 115 NLC NLC TS-II STG2 N2-10 400KV NLC-TS-I EXP LINE AT NEYVELI STG2 NL-0002-A 1000 1 400 115 NLC NLC TS-II STG2 N2-11 400KV PUGALUR 1 LINE AT NEYVELI STG2 NL-0048-A 1000 1 400 115 NLC NLC TS-II STG2 N2-12 400KV SALEM 1 LINE AT NEYVELI STG2 NL-0075-A 1000 1 400 115 NLC NLC TS-II STG2 N2-13 400KV SALEM 1 LINE AT NEYVELI STG2 NL-0003-A 1000 1 400 115 NLC NLC TS-II STG2 N2-14 400KV SALEM 2 LINE AT NEYVELI STG2 NL-0076-A 1000 1 400 115 NLC NLC TS-II STG2 N2-15 400KV SALEM 2 LINE AT NEYVELI STG2 NL-0004-A 1000 1 400 115 NLC NLC TS-II STG2 N2-16 400KV PONDY LINE AT NEYVELI STG2 NL-0074-A 1000 1 400 115 NLC NLC TS-II STG2 N2-17 400KV PONDY LINE AT NEYVELI STG2 NL-0006-A 1000 1 400 115 NLC NLC TS-II STG2 N2-18 400KV NAGAPATTINAM LINE AT NEYVELI STG2 NL-0077-A 1000 1 400 115 NLC NLC TS-II STG2 N2-19 400KV NAGAPATTINAM LINE AT NEYVELI STG2 NL-0005-A 1000 1 400 115 NLC NLC TS-II STG2 N2-20 400KV NLC-TS-2 EXP LINE AT NEYVELI STG2 NL-0031-A 1000 1 400 115 NLC NLC TS-II EXP SF-02 0.01HZ FRQ METER AT NLC TS-II EXP NP-0002-A 1000 1 400 110 NLC NLC TS-I EXP X1-01 400KV SIDE OF GT 1 AT NLC-TS-I EXP NX-0007-A 500 1 400 110 NLC NLC TS-I EXP X1-02 400KV SIDE OF GT 1 AT NLC-TS-I EXP NX-0008-A 500 1 400 110 NLC NLC TS-I EXP X1-03 400KV SIDE OF GT 2 AT NLC-TS-I EXP NX-0005-A 500 1 400 110 NLC NLC TS-I EXP X1-04 400KV SIDE OF GT 2 AT NLC-TS-I EXP NX-0006-A 500 1 400 110 NLC NLC TS-I EXP X1-11 220KV SIDE OF SUT 6T AT NLC-TS-I EXP NX-0013-A 200 1 220 100 NLC NLC TS-I EXP X1-12 220KV SIDE OF SUT 6T AT NLC-TS-I EXP NX-0014-A 200 1 220 100 NLC NLC TS-I EXP X1-13 220KV SIDE OF SUT 7T AT NLC-TS-I EXP NX-0015-A 200 1 220 100 NLC NLC TS-I EXP X1-14 220KV SIDE OF SUT 7T AT NLC-TS-I EXP NX-0016-A 200 1 220 100 NLC NLC TS-I EXP X1-15 33KV SIDE OF SUT 6T AT NLC-TS-I EXP GE-0009-A 1200 1 33 110 NLC NLC TS-I EXP X1-16 33KV SIDE OF SUT 7T AT NLC-TS-I EXP GE-0011-A 1200 1 33 110 NLC NLC TS-I EXP X1-21 400KV NAGAPATTINAM LINE AT NLC-TS-I EXP NX-0001-A 1000 1 400 110 NLC NLC TS-I EXP X1-22 400KV NAGAPATTINAM LINE AT NLC-TS-I EXP NX-0002-A 1000 1 400 110 NLC NLC TS-I EXP X1-23 400KV NEYVELI TS-2 LINE AT NLC-TS-I EXP NX-0003-A 1000 1 400 110 NLC NLC TS-I EXP X1-24 400KV NEYVELI TS-2 LINE AT NLC-TS-I EXP NX-0004-A 1000 1 400 110 NLC NLC TS-II EXP X2-01 400KV SIDE OF GT 1 AT NLC-TS-2 EXP NP-5577-A 500 1 400 110 NLC NLC TS-II EXP X2-02 400KV SIDE OF GT 1 AT NLC-TS-2 EXP NP-5557-A 500 1 400 110 NLC NLC TS-II EXP X2-03 400KV SIDE OF GT 2 AT NLC-TS-2 EXP NP-5558-A 500 1 400 110 NLC NLC TS-II EXP X2-04 400KV SIDE OF GT 2 AT NLC-TS-2 EXP NP-5559-A 500 1 400 110 NLC NLC TS-II EXP X2-11 400KV PUGALUR LINE AT NLC-TS-2 EXP NP-5707-A 1000 1 400 110 NLC NLC TS-II EXP X2-12 400KV PUGALUR LINE AT NLC-TS-2 EXP NP-5706-A 1000 1 400 110 NLC NLC TS-II EXP X2-13 400KV TS-2 LINE AT NLC-TS-2 EXP NP-5560-A 1000 1 400 110 NLC NLC TS-II EXP X2-14 400KV TS-2 LINE AT NLC-TS-2 EXP NP-5561-A 1000 1 400 110 NPC BHAVINI BV-01 230kV side of GT 1 AT BHAVNI NP-7299-A 200 1 230 110 NPC BHAVINI BV-02 230KV SIDE OF ST 1 AT BHAVNI NP-7298-A 200 1 230 110 NPC BHAVINI BV-03 230kV side of GST AT BHAVNI NP-7310-A 200 1 230 110 NPC BHAVINI BV-04 230kV side of GST AT BHAVNI NP-7311-A 200 1 230 110 NPC BHAVINI BV-11 230kV MAPS TIE LINE AT BHAVNI NP-7312-A 400 1 230 110 NPC BHAVINI BV-12 230kV MAPS TIE LINE AT BHAVNI NP-7313-A 400 1 230 110 ANNEXURE 2 (42 of 57)

NPC BHAVINI BV-13 230KV ARNI LINE 1 AT BHAVNI NP-7292-A 400 1 230 110 NPC BHAVINI BV-14 230KV ARNI LINE 1 AT BHAVNI NP-7293-A 400 1 230 110 NPC BHAVINI BV-15 230KV ARNI LINE 2 AT BHAVNI NP-7290-A 400 1 230 110 NPC BHAVINI BV-16 230KV ARNI LINE 2 AT BHAVNI NP-7291-A 400 1 230 110 NPC BHAVINI BV-17 230KV SIRUSERI LINE 1 AT BHAVNI NP-7303-A 400 1 230 110 NPC BHAVINI BV-18 230KV SIRUSERI LINE 1 AT BHAVNI NP-7304-A 400 1 230 110 NPC BHAVINI BV-19 230KV SIRUSERI LINE 2 AT BHAVNI NP-7301-A 400 1 230 110 NPC BHAVINI BV-20 230KV SIRUSERI LINE 2 AT BHAVNI NP-7302-A 400 1 230 110 NPC BHAVINI BV-21 230KV KANCHEEPURAM LINE 1 AT BHAVNI NP-7296-A 400 1 230 110 NPC BHAVINI BV-22 230KV KANCHEEPURAM LINE 1 AT BHAVNI NP-7297-A 400 1 230 110 NPC BHAVINI BV-23 230KV KANCHEEPURAM LINE 2 AT BHAVNI NP-7294-A 400 1 230 110 NPC BHAVINI BV-24 230KV KANCHEEPURAM LINE 2 AT BHAVNI NP-7295-A 400 1 230 110 NPC KAIGA U12 KG-01 220kV side of GT 1 AT KAIGA NP-4018-A 600 1 220 110 NPC KAIGA U12 KG-02 220kV side of GT 1 at KAIGA NP-4011-A 600 1 220 110 NPC KAIGA U12 KG-03 220kV side of GT 2 AT KAIGA NP-4019-A 600 1 220 110 NPC KAIGA U12 KG-04 220kV side of GT 2 at KAIGA NP-4031-A 600 1 220 110 NPC KAIGA U12 KG-05 220kV side of SUT 2 at KAIGA NP-4016-A 125 1 220 110 NPC KAIGA U12 KG-06 220kV side of SUT 2 at KAIGA NP-4030-A 125 1 220 110 NPC KAIGA U12 KG-07 220kV side of SUT I at KAIGA NP-4013-A 125 1 220 110 NPC KAIGA U12 KG-08 220kV side of SUT I at KAIGA NP-4012-A 125 1 220 110 NPC KAIGA U12 KG-11 220kV KADRA LINE AT KAIGA NP-7810-A 800 1 220 110 NPC KAIGA U12 KG-12 220kV KODASALLI LINE AT KAIGA NP-4015-A 800 1 220 110 NPC KAIGA U34 KG-41 400kV side of GT 3 AT KAIGA NP-7811-A 1000 1 400 110 NPC KAIGA U34 KG-42 400kV side of GT 3 AT KAIGA NP-7814-A 1000 1 400 110 NPC KAIGA U34 KG-43 400kV side of GT 4 AT KAIGA NP-5599-A 1000 1 400 110 NPC KAIGA U34 KG-44 400kV side of GT 4 AT KAIGA NP-7353-A 1000 1 400 110 NPC KAIGA U34 KG-45 220kV side of SUT 3 at KAIGA NP-7812-A 125 1 220 110 NPC KAIGA U34 KG-46 220kV side of SUT 3 at KAIGA NP-4076-A 125 1 220 110 NPC KAIGA U34 KG-47 220kV side of SUT 4 at KAIGA NP-4059-A 125 1 220 110 NPC KAIGA U34 KG-48 220kV side of SUT 4 at KAIGA NP-4060-A 125 1 220 110 NPC KAIGA U34 KG-51 400KV GUTTUR LINE 1 AT KAIGA NP-7813-A 1000 1 400 110 NPC KAIGA U34 KG-52 400KV GUTTUR LINE 2 AT KAIGA NP-7350-A 1000 1 400 110 NPC KAIGA U34 KG-53 400KV NARENDRA LINE 1 AT KAIGA NP-4128-A 1000 1 400 110 NPC KAIGA U34 KG-54 400kV NARENDRA 2 LINE AT KAIGA NP-4129-A 1000 1 400 110 NPC KUDANKULAM NPP KN-01 400KV MADURAI LINE AT KKNPP NP-5632-A 2000 1 400 110 NPC KUDANKULAM NPP KN-02 400KV MADURAI LINE AT KKNPP NP-5693-A 2000 1 400 110 NPC KUDANKULAM NPP KN-03 400KV TIRUNELVELI LINE 2 AT KKNPP NP-5691-A 2000 1 400 110 NPC KUDANKULAM NPP KN-04 400KV TIRUNELVELI LINE 2 AT KKNPP NP-5694-A 2000 1 400 110 NPC KUDANKULAM NPP KN-05 400KV TIRUNELVELI LINE 3 AT KKNPP NP-5644-A 2000 1 400 110 NPC KUDANKULAM NPP KN-06 400KV TIRUNELVELI LINE 3 AT KKNPP NP-5633-A 2000 1 400 110 NPC KUDANKULAM NPP KN-07 400KV TIRUNELVELI LINE 4 AT KKNPP NP-5645-A 2000 1 400 110 NPC KUDANKULAM NPP KN-08 400KV TIRUNELVELI LINE 4 AT KKNPP NP-5692-A 2000 1 400 110 NPC KUDANKULAM NPP KN-09 230KV TTPS LINE AT KKNPP NP-8340-A 1000 1 230 110 NPC KUDANKULAM NPP KN-10 230KV TTPS LINE AT KKNPP NP-8341-A 1000 1 230 110 NPC KUDANKULAM NPP KN-11 230KV PUDUR LINE AT KKNPP NP-5660-A 1000 1 230 110 NPC KUDANKULAM NPP KN-12 230KV PUDUR LINE AT KKNPP NP-5697-A 1000 1 230 110 NPC KUDANKULAM NPP KN-21 400KV SIDE OF GT 1 AT KKNPP NP-5698-A 2000 1 400 100 NPC KUDANKULAM NPP KN-22 400KV SIDE OF GT 1 AT KKNPP NP-5636-A 2000 1 400 100 NPC KUDANKULAM NPP KN-23 400KV SIDE OF GT 2 AT KKNPP NP-8338-A 2000 1 400 100 NPC KUDANKULAM NPP KN-24 400KV SIDE OF GT 2 AT KKNPP NP-5634-A 2000 1 400 100 NPC KUDANKULAM NPP KN-25 220KV SIDE OF CSAT AT KKNPP NP-5156-A 1000 1 220 100 NPC KUDANKULAM NPP KN-31 220KV RAT UNIT 1 AT KKNPP NP-8342-A 1000 1 220 100 ANNEXURE 2 (43 of 57)

NPC KUDANKULAM NPP KN-32 220KV RAT UNIT 2 AT KKNPP NP-5696-A 1000 1 220 100 NPC KUDANKULAM NPP KN-41 400KV SIDE OF ICT 1 AT KKNPP NP-5155-A 600 1 400 100 NPC KUDANKULAM NPP KN-42 220KV SIDE OF ICT 1 AT KKNPP NP-5153-A 600 1 220 100 NPC KUDANKULAM NPP KN-43 400KV SIDE OF ICT 2 AT KKNPP NP-5699-A 600 1 400 100 NPC KUDANKULAM NPP KN-44 220KV SIDE OF ICT 2 AT KKNPP NP-5700-A 1000 1 220 100 NPC MAPS MA-01 220KV ACHARAPAKKAM LINE AT MAPS NP-4023-A 600 1 220 110 NPC MAPS MA-02 220KV ACHARAPAKKAM LINE AT MAPS NP-4027-A 600 1 220 110 NPC MAPS MA-03 220KV ARNI LINE AT MAPS NP-4022-A 600 1 220 110 NPC MAPS MA-04 220KV ARNI LINE AT MAPS NP-4026-A 600 1 220 110 NPC MAPS MA-05 220KV SP KOIL LINE 1 AT MAPS NP-4020-A 600 1 220 110 NPC MAPS MA-06 220KV SP KOIL LINE 1 AT MAPS NP-4024-A 600 1 220 110 NPC MAPS MA-07 220KV SP KOIL LINE 2 AT MAPS NP-4025-A 600 1 220 110 NPC MAPS MA-08 220KV SP KOIL LINE 2 AT MAPS NP-4021-A 600 1 220 110 NTPC KUDGI STPP (NTPC) KD-01 400KV KUDGI(PG) LINE 1 AT KUDGI NTPC NP-9642-A 3000 1 400 110 NTPC KUDGI STPP (NTPC) KD-02 400KV KUDGI(PG) LINE 1 AT KUDGI NTPC NP-9593-A 3000 1 400 110 NTPC KUDGI STPP (NTPC) KD-03 400KV KUDGI(PG) LINE 2 AT KUDGI NTPC NP-9613-A 3000 1 400 110 NTPC KUDGI STPP (NTPC) KD-04 400KV KUDGI(PG) LINE 2 AT KUDGI NTPC NP-9632-A 3000 1 400 110 NTPC KUDGI STPP (NTPC) KD-05 400KV BUS REACTOR 1 AT KUDGI NTPC NP-9600-A 500 1 400 110 NTPC KUDGI STPP (NTPC) KD-25 400KV SIDE OF ST 1 AT KUDGI NTPC NP-9601-A 500 1 400 110 NTPC KUDGI STPP (NTPC) KD-31 400KV SIDE OF ICT-2 AT KUDGI NTPC NP-9612-A 1000 1 400 110 NTPC KUDGI STPP (NTPC) KD-32 220 KV SIDE OF ICT-2 AT KUDGI NTPC NP-9638-A 1000 1 220 110 NTPC KUDGI STPP (NTPC) KD-41 GT-1 AT NTPC KUDGI NP-9591-A 2000 1 400 110 NTPC RSTPS STG 12 RM-01 400KV SIDE OF GT 1 AT RSTPS NP-7194-A 500 1 400 110 NTPC RSTPS STG 12 RM-02 400KV SIDE OF GT 2 AT RSTPS NP-7257-A 500 1 400 110 NTPC RSTPS STG 12 RM-03 400KV SIDE OF GT 3 AT RSTPS NP-7248-A 500 1 400 110 NTPC RSTPS STG 12 RM-04 400KV SIDE OF GT 4 AT RSTPS NP-7191-A 1000 1 400 110 NTPC RSTPS STG 12 RM-05 400KV SIDE OF GT 5 AT RSTPS NP-7173-A 1000 1 400 110 NTPC RSTPS STG 12 RM-06 400KV SIDE OF GT 6 AT RSTPS NP-7193-A 1000 1 400 110 NTPC RSTPS STG 3 RM-07 400KV SIDE OF GT 7 AT RSTPS NP-4078-A 1000 1 400 110 NTPC RSTPS STG 3 RM-08 400KV SIDE OF GT 7 AT RSTPS NP-3130-A 1000 1 400 110 NTPC RSTPS STG 12 RM-11 400KV SIDE OF TT 1 AT RSTPS NP-7174-A 500 1 400 110 NTPC RSTPS STG 12 RM-12 400KV SIDE OF TT 2 AT RSTPS NP-7175-A 500 1 132 110 NTPC RSTPS STG 12 RM-13 400KV SIDE OF TT 3 AT RSTPS NP-7192-A 500 1 400 110 NTPC RSTPS STG 3 RM-14 400KV SIDE OF TT 4 AT RSTPS NP-4079-A 500 1 400 110 NTPC RSTPS STG 12 RM-21 400kV side of ICT 1 AT RSTPS NP-5542-A 500 1 400 110 NTPC RSTPS STG 12 RM-22 132kV side of ICT 1 AT RSTPS NP-3162-A 1000 1 132 110 NTPC RSTPS STG 12 RM-23 400KV SIDE OF ICT 1 AT RSTPS NP-7221-A 500 1 400 110 NTPC RSTPS STG 12 RM-24 400kV side of ICT 2 AT RSTPS NP-5514-A 500 1 400 110 NTPC RSTPS STG 12 RM-25 132kV side of ICT 2 AT RSTPS NP-6160-A 1200 1 220 110 NTPC RSTPS STG 12 RM-26 400KV SIDE OF ICT 2 AT RSTPS NP-4120-A 500 1 400 110 NTPC RSTPS STG 12 RM-27 400kV side of ICT 3 AT RSTPS NP-5505-A 500 1 400 110 NTPC RSTPS STG 12 RM-28 220kV side of ICT 3 AT RSTPS NP-7247-A 1000 1 220 110 NTPC RSTPS STG 12 RM-29 400KV SIDE OF ICT 3 AT RSTPS NP-7258-A 500 1 400 110 NTPC RSTPS STG 12 RM-30 400kV side of ICT 4 AT RSTPS NP-5520-A 500 1 400 110 NTPC RSTPS STG 12 RM-31 220kV side of ICT 4 AT RSTPS NP-7272-A 1000 1 220 110 NTPC RSTPS STG 12 RM-32 400KV SIDE OF ICT 4 AT RSTPS NP-7199-A 500 1 400 110 NTPC RSTPS STG 12 RM-33 400kV side of ICT 5 AT RSTPS NP-4121-A 500 1 400 110 NTPC RSTPS STG 12 RM-34 220kV side of ICT 5 AT RSTPS NP-7171-A 1000 1 220 110 NTPC RSTPS STG 12 RM-35 400KV SIDE OF ICT 5 AT RSTPS NP-7206-A 500 1 400 110 NTPC RSTPS STG 12 RM-41 400KV BHADRAVATI LINE 1 AT RSTPS NP-4082-A 1000 1 400 110 NTPC RSTPS STG 12 RM-42 400KV BHADRAVATI LINE 1 AT RSTPS NP-4083-A 1000 1 400 110 NTPC RSTPS STG 12 RM-43 400KV BHADRAVATI LINE 2 AT RSTPS NP-4080-A 1000 1 400 110 ANNEXURE 2 (44 of 57)

NTPC RSTPS STG 12 RM-44 400KV BHADRAVATI LINE 2 AT RSTPS NP-4081-A 1000 1 400 110 NTPC RSTPS STG 12 RM-45 400KV DITCHIPALLY LINE AT RSTPS NP-5512-A 1000 1 400 110 NTPC RSTPS STG 12 RM-46 400KV DITCHIPALLY LINE AT RSTPS NP-7223-A 1000 1 400 110 NTPC RSTPS STG 12 RM-47 400KV GAJWEL LINE AT RSTPS NP-5537-A 1000 1 400 110 NTPC RSTPS STG 12 RM-48 400KV GAJWEL LINE AT RSTPS NP-7207-A 1000 1 400 110 NTPC RSTPS STG 12 RM-49 400KV HYDERABAD LINE 3 AT RSTPS NP-5536-A 1000 1 400 110 NTPC RSTPS STG 12 RM-50 400KV HYDERABAD LINE 3 AT RSTPS NP-7222-A 1000 1 400 110 NTPC RSTPS STG 12 RM-51 400KV HYDERABAD LINE 4 AT RSTPS NP-5544-A 1000 1 400 110 NTPC RSTPS STG 12 RM-52 400KV HYDERABAD LINE 4 AT RSTPS NP-7220-A 1000 1 400 110 NTPC RSTPS STG 12 RM-53 400KV MALKARAM LINE AT RSTPS NP-5546-A 1000 1 400 110 NTPC RSTPS STG 12 RM-54 400KV MALKARAM LINE AT RSTPS NP-7187-A 1000 1 400 110 NTPC RSTPS STG 12 RM-55 400KV N'SAGAR LINE 1 AT RSTPS NP-5541-A 1000 1 400 110 NTPC RSTPS STG 12 RM-56 400KV N'SAGAR LINE 1 AT RSTPS NP-7815-A 1000 1 400 110 NTPC RSTPS STG 12 RM-57 400KV N'SAGAR LINE 2 AT RSTPS NP-5538-A 1000 1 400 110 NTPC RSTPS STG 12 RM-58 400KV N'SAGAR LINE 2 AT RSTPS NP-7267-A 1000 1 400 110 NTPC RSTPS STG 12 RM-59 400KV WARANGAL LINE AT RSTPS NP-5545-A 1000 1 400 110 NTPC RSTPS STG 12 RM-60 400KV WARANGAL LINE AT RSTPS NP-7205-A 1000 1 400 110 NTPC RSTPS STG 12 SF-04 0.01HZ FRQ METER AT RSTPS NP-0004-A 1000 1 400 110 NTPC SIMHADRI-II SM-01 400kV side of GT 3 AT SIMHADRI NP-7212-A 1000 1 400 110 NTPC SIMHADRI-II SM-02 400kV side of GT 4 AT SIMHADRI NP-7227-A 1000 1 400 110 NTPC SIMHADRI-II SM-03 400KV SIDE OF ST 1 AT SIMHADRI NP-7184-A 500 1 400 110 NTPC SIMHADRI-II SM-04 400KV SIDE OF ST 2 AT SIMHADRI NP-7215-A 500 1 400 110 NTPC SIMHADRI-II SM-11 400kV side of INTERCONNECTOR 1 AT SIMHADRI NP-7201-A 2000 1 400 110 NTPC SIMHADRI-II SM-12 400kV side of INTERCONNECTOR 1 AT SIMHADRI NP-7229-A 2000 1 400 110 NTPC SIMHADRI-II SM-13 400kV side of INTERCONNECTOR 2 AT SIMHADRI NP-7203-A 2000 1 400 110 NTPC SIMHADRI-II SM-14 400kV side of INTERCONNECTOR 2 AT SIMHADRI NP-7210-A 2000 1 400 110 NTPC SIMHADRI-II SM-15 400KV GAZUWAKA LINE 1 AT SIMHADRI NP-7280-A 2000 1 400 110 NTPC SIMHADRI-II SM-16 400KV GAZUWAKA LINE 1 AT SIMHADRI NP-7225-A 2000 1 400 110 NTPC SIMHADRI-II SM-17 400KV GAZUWAKA LINE 2 AT SIMHADRI NP-7244-A 2000 1 400 110 NTPC SIMHADRI-II SM-18 400KV GAZUWAKA LINE 2 AT SIMHADRI NP-7213-A 2000 1 400 110 NTPC SIMHADRI-II SM-19 400KV VEMAGIRI LINE 1 AT SIMHADRI NP-7182-A 2000 1 400 110 NTPC SIMHADRI-II SM-20 400KV VEMAGIRI LINE 1 AT SIMHADRI NP-7283-A 2000 1 400 110 NTPC SIMHADRI-II SM-21 400KV VEMAGIRI LINE 2 AT SIMHADRI NP-7183-A 2000 1 400 110 NTPC SIMHADRI-II SM-22 400KV VEMAGIRI LINE 2 AT SIMHADRI NP-7284-A 2000 1 400 110 NTPC TALCHER-II TL-01 400KV SIDE OF GT 3 AT TALCHER NP-4038-A 1000 1 400 110 NTPC TALCHER-II TL-02 400KV SIDE OF GT 3 AT TALCHER NP-4009-A 1000 1 400 110 NTPC TALCHER-II TL-03 400KV SIDE OF GT 4 AT TALCHER NP-4004-A 1000 1 400 110 NTPC TALCHER-II TL-04 400KV SIDE OF GT 4 AT TALCHER NP-4003-A 1000 1 400 110 NTPC TALCHER-II TL-05 400KV SIDE OF GT 5 AT TALCHER NP-4002-A 1000 1 400 110 NTPC TALCHER-II TL-06 400KV SIDE OF GT 5 AT TALCHER NP-4001-A 1000 1 400 110 NTPC TALCHER-II TL-07 400KV SIDE OF GT 6 AT TALCHER NP-4069-A 1000 1 400 110 NTPC TALCHER-II TL-08 400KV SIDE OF GT 6 AT TALCHER NP-4068-A 1000 1 400 110 NTPC TALCHER-II TL-11 400KV SIDE OF SUT 2 AT TALCHER NP-4064-A 100 1 400 110 NTPC TALCHER-II TL-12 400KV SIDE OF SUT 2 AT TALCHER NP-4065-A 100 1 400 110 NTPC TALCHER-II TL-13 400KV SIDE OF SUT 3 AT TALCHER NP-4066-A 100 1 400 110 NTPC TALCHER-II TL-14 400KV SIDE OF SUT 3 AT TALCHER NP-4067-A 100 1 400 110 NTPC TALCHER-II TL-21 400KV SIDE OF INTERCONNECTOR 1 AT TALCHER NP-5066-A 2000 1 400 110 NTPC TALCHER-II TL-22 400KV SIDE OF INTERCONNECTOR 1 AT TALCHER NP-5069-A 2000 1 400 110 NTPC TALCHER-II TL-23 400KV SIDE OF INTERCONNECTOR 2 AT TALCHER NP-5076-A 2000 1 400 110 NTPC TALCHER-II TL-24 400KV SIDE OF INTERCONNECTOR 2 AT TALCHER NP-5070-A 2000 1 400 110 NTPC TALCHER-II TL-25 400KV HVDC FEEDER 1 AT TALCHER NP-4094-A 2000 1 400 110 NTPC TALCHER-II TL-26 400KV HVDC FEEDER 1 AT TALCHER NP-4006-A 2000 1 400 110 ANNEXURE 2 (45 of 57)

NTPC TALCHER-II TL-27 400KV HVDC FEEDER 2 AT TALCHER NP-4095-A 2000 1 400 110 NTPC TALCHER-II TL-28 400KV HVDC FEEDER 2 AT TALCHER NP-4096-A 2000 1 400 110 NTPC TALCHER-II TL-29 400KV HVDC FEEDER 3 AT TALCHER NP-4090-A 2000 1 400 110 NTPC TALCHER-II TL-30 400KV HVDC FEEDER 3 AT TALCHER NP-4005-A 2000 1 400 110 NTPC TALCHER-II TL-31 400KV HVDC FEEDER 4 AT TALCHER NP-4097-A 2000 1 400 110 NTPC TALCHER-II TL-32 400KV HVDC FEEDER 4 AT TALCHER NP-4032-A 2000 1 400 110 NTPC NTECL VALLUR VL-01 400kV side of GT 1 AT VALLUR NP-7824-A 2000 1 400 110 NTPC NTECL VALLUR VL-02 400kV side of GT 2 AT VALLUR NP-7154-A 2000 1 400 110 NTPC NTECL VALLUR VL-03 400kV side of GT 3 AT VALLUR NP-7251-A 2000 1 400 110 NTPC NTECL VALLUR VL-11 400kV side of ST 1 AT VALLUR NP-7152-A 500 1 400 110 NTPC NTECL VALLUR VL-12 400kV side of ST 2 AT VALLUR NP-7276-A 500 1 400 110 NTPC NTECL VALLUR VL-13 400kV side of ST 3 AT VALLUR NP-7197-A 500 1 400 110 NTPC NTECL VALLUR VL-21 400KV ALMATHY LINE 1 AT VALLUR NP-7180-A 2000 1 400 110 NTPC NTECL VALLUR VL-22 400KV ALMATHY LINE 1 AT VALLUR NP-5392-A 2000 1 400 110 NTPC NTECL VALLUR VL-23 400KV ALMATHY LINE 2 AT VALLUR NP-7259-A 2000 1 400 110 NTPC NTECL VALLUR VL-24 400KV ALMATHY LINE 2 AT VALLUR NP-6162-A 2000 1 400 110 NTPC NTECL VALLUR VL-25 400KV KALAVINTHAPATTU LINE 1 AT VALLUR NP-7232-A 2000 1 400 110 NTPC NTECL VALLUR VL-26 400KV KALAVINTHAPATTU LINE 1 AT VALLUR NP-5519-A 2000 1 400 110 NTPC NTECL VALLUR VL-27 400KV KALAVINTHAPATTU LINE 2 AT VALLUR NP-7235-A 2000 1 400 110 NTPC NTECL VALLUR VL-28 400KV KALAVINTHAPATTU LINE 2 AT VALLUR NP-7816-A 2000 1 400 110 NTPC NTECL VALLUR VL-29 400KV NCTPS LINE 1 AT VALLUR NP-7807-A 2000 1 400 110 NTPC NTECL VALLUR VL-30 400KV NCTPS LINE 2 AT VALLUR NP-7808-A 2000 1 400 110 NTPC BANKURA WF-01 WR FREQUENCY 1 NP-2657-A 400 NTPC BANKURA WF-02 ER FREQUENCY 1 NP-8804-A 400 PONDICHERY BAHUR PB-01 230KV NEYVELI LINE AT BAHUR NP-5623-A 600 1 230 110 PONDICHERY VILLIANUR PV-01 230kV NEYVELI LINE AT VILLIANUR NP-5622-A 600 1 230 110 PONDICHERY YANAM PY-01 132kV KAKINADA LINE AT YANAM NP-6161-A 200 1 132 110 POWERGRID CUDDAPAH AC-01 400kV side of ICT 1 AT CUDDAPAH NP-5369-A 500 1 400 110 POWERGRID CUDDAPAH AC-02 220kV side of ICT 1 AT CUDDAPAH NP-5366-A 800 1 220 110 POWERGRID CUDDAPAH AC-03 400kV side of ICT 2 AT CUDDAPAH NP-5387-A 600 1 400 110 POWERGRID CUDDAPAH AC-04 220kV side of ICT 2 AT CUDDAPAH NP-5386-A 1000 1 220 110 POWERGRID CUDDAPAH AC-10 400KV NP KUNTA LINE AT CUDDPAH NP-3217-A 1000 1 400 110 POWERGRID CUDDAPAH AC-11 400KV CHITTOOR LINE AT CUDDAPAH NP-5370-A 1000 1 400 110 POWERGRID GOOTY AG-11 400KV SIDE OF ICT 1 AT GOOTY NP-5374-A 500 1 400 110 POWERGRID GOOTY AG-12 220kV side of ICT 1 AT GOOTY NP-5375-A 1000 1 220 110 POWERGRID GOOTY AG-13 400kV side of ICT 2 AT GOOTY NP-3136-A 600 1 400 110 POWERGRID GOOTY AG-14 220kV side of ICT 2 AT GOOTY NP-6038-A 1000 1 220 110 POWERGRID GOOTY AG-15 33KV SIDE (TERTIARY) OF ICT-2 AT GOOTY NP-6039-A 50 1 33 110 POWERGRID GOOTY AG-20 400KV KURNOOL(PG) LINE AT GOOTY NP-3215-A 1000 1 400 110 POWERGRID GOOTY AG-21 220KV RAGULAPADU LINE AT GOOTY (AP) NP-6164-A 600 1 220 110 POWERGRID GOOTY AG-22 400KV SOMANAHALLI LINE GOOTY NP-5371-A 2000 1 400 110 POWERGRID GOOTY AG-23 400kV NELAMANGALA LINE AT GOOTY NP-5372-A 2000 1 400 110 POWERGRID GOOTY AG-24 400KV RAICHUR LINE 1 AT GOOTY NP-5393-A 1000 1 400 110 POWERGRID GOOTY AG-25 400KV RAICHUR LINE 2 AT GOOTY NP-5390-A 1000 1 400 110 POWERGRID GOOTY AG-26 400kV KURNOOL LINE AT GOOTY NP-5373-A 1000 1 400 110 POWERGRID GOOTY AG-27 400KV MADHUGIRI LINE 1 AT GOOTY NP-3107-A 1000 1 400 110 POWERGRID GOOTY AG-28 400KV MADHUGIRI LINE 2 AT GOOTY NP-3108-A 1000 1 400 110 POWERGRID GOOTY AG-29 400KV NELLORE PS (NPS) LINE AT GOOTY NP-3218-A 2000 1 400 110 POWERGRID GOOTY AG-30 400KV NELLORE PS (NPS) LINE-2 AT GOOTY NP-3219-A 2000 1 400 110 POWERGRID GAZUWAKA AG-31 400kV side of ICT 1 AT GAZUWAKA NP-5367-A 1000 1 400 110 POWERGRID GAZUWAKA AG-32 220kV side of ICT 1 AT GAZUWAKA NP-5368-A 1000 1 220 110 POWERGRID GAZUWAKA AG-33 400kV side of ICT 2 AT GAZUWAKA NP-5527-A 600 1 400 110 ANNEXURE 2 (46 of 57)

POWERGRID GAZUWAKA AG-34 220kV side of ICT 2 AT GAZUWAKA NP-5486-A 1000 1 220 110 POWERGRID GAZUWAKA AG-41 400kV HVDC EAST BUS 1 AT GAZUWAKA NP-5378-A 2000 1 400 110 POWERGRID GAZUWAKA AG-42 400kV HVDC EAST BUS 2 AT GAZUWAKA NP-5379-A 2000 1 400 110 POWERGRID GAZUWAKA AG-43 400kV HVDC SOUTH BUS 1 AT GAZUWAKA NP-5376-A 2000 1 400 110 POWERGRID GAZUWAKA AG-44 400kV HVDC SOUTH BUS 2 AT GAZUWAKA NP-5377-A 2000 1 400 110 POWERGRID GAZUWAKA AG-45 400kV KALPAKA 1 LINE AT GAZUWAKA NP-5364-A 1000 1 400 110 POWERGRID GAZUWAKA AG-46 400kV KALPAKA 2 LINE AT GAZUWAKA NP-5365-A 1000 1 400 110 POWERGRID GAZUWAKA AG-47 400kV POLE 2 EAST BUS AT HVDC GAZUWAKA NP-5362-A 1000 1 400 110 POWERGRID GAZUWAKA AG-48 400kV POLE 2 SOUTH BUS AT HVDC GAZUWAKA NP-5361-A 1000 1 400 110 POWERGRID GAZUWAKA AG-49 400KV SIMHADRI LINE 1 AT GAZUWAKA NP-5497-A 1000 1 400 110 POWERGRID GAZUWAKA AG-50 400KV SIMHADRI LINE 2 AT GAZUWAKA NP-5496-A 1000 1 400 110 POWERGRID GAZUWAKA AG-51 400kV VIJAYAWADA LINE AT GAZUWAKA NP-5363-A 1000 1 400 110 POWERGRID GHANAPUR AH-01 400kV side of ICT 1 AT HYDERABAD NP-3171-A 1000 1 400 110 POWERGRID GHANAPUR AH-02 220kV side of ICT 1 AT HYDERABAD NP-3169-A 1000 1 220 110 POWERGRID GHANAPUR AH-03 400kV side of ICT 2 AT HYDERABAD NP-3202-A 500 1 400 110 POWERGRID GHANAPUR AH-04 220kV side of ICT 2 AT HYDERABAD NP-3208-A 1000 1 220 110 POWERGRID GHANAPUR AH-05 400KV SIDE OF ICT 3 AT HYDERABAD NP-3170-A 500 1 400 110 POWERGRID GHANAPUR AH-06 220KV SIDE OF ICT 3 AT HYDERABAD NP-3209-A 1000 1 220 110 POWERGRID GHANAPUR AH-11 400KV GAJWEL LINE AT HYDERABAD NP-3210-A 1000 1 400 110 POWERGRID GHANAPUR AH-12 400kV KURNOOL LINE AT HYDERABAD NP-3203-A 1000 1 400 110 POWERGRID GHANAPUR AH-14 400kV MALKARAM LINE AT HYDERABAD NP-3207-A 1000 1 400 110 POWERGRID GHANAPUR AH-15 400kV MAMIDIPALLY LINE AT HYDERABAD NP-3211-A 1000 1 400 110 POWERGRID GHANAPUR AH-16 400KV N'SAGAR LINE AT HYDERABAD NP-3206-A 1000 1 400 110 POWERGRID GHANAPUR AH-17 400kV RAMAGUNDAM 3 LINE AT HYDERABAD NP-3204-A 1000 1 400 110 POWERGRID GHANAPUR AH-18 400kV RAMAGUNDAM 4 LINE AT HYDERABAD NP-3205-A 1000 1 400 110 POWERGRID KHAMMAM AK-01 400kV side of ICT 1 AT KHAMMAM NP-4109-A 500 1 400 110 POWERGRID KHAMMAM AK-02 220kV side of ICT 1 AT KHAMMAM NP-4110-A 1000 1 220 110 POWERGRID KHAMMAM AK-03 400kV side of ICT 2 AT KHAMMAM NP-4102-A 600 1 400 110 POWERGRID KHAMMAM AK-04 220kV side of ICT 2 AT KHAMMAM NP-4103-A 1000 1 220 110 POWERGRID KHAMMAM AK-09 400KV NSAGAR LINE 2 AT KHAMMAM NP-3132-A 1000 1 400 110 POWERGRID KHAMMAM AK-10 400KV NSAGAR LINE 3 AT KHAMMAM NP-3133-A 1000 1 400 110 POWERGRID KHAMMAM AK-11 400KV KALPAKA LINE 1 AT KHAMMAM NP-5521-A 1000 1 400 110 POWERGRID KHAMMAM AK-12 400KV KALPAKA LINE 2 AT KHAMMAM NP-5523-A 1000 1 400 110 POWERGRID KHAMMAM AK-13 400KV KTPS LINE 1 AT KHAMMAM NP-5525-A 1000 1 400 110 POWERGRID KHAMMAM AK-14 400KV KTPS LINE 2 AT KHAMMAM NP-5495-A 1000 1 400 110 POWERGRID KHAMMAM AK-15 400KV MAMIDIPALLY LINE 2 AT KHAMMAM NP-4111-A 1000 1 400 110 POWERGRID KHAMMAM AK-16 400KV MAMIDIPALLY LINE 1 AT KHAMMAM NP-4112-A 1000 1 400 110 POWERGRID KHAMMAM AK-17 400KV N'SAGAR LINE AT KHAMMAM NP-4033-A 1000 1 400 110 POWERGRID KHAMMAM AK-18 400kV VIJAYAWADA LINE AT KHAMMAM NP-3163-A 1000 1 400 110 POWERGRID KHAMMAM AK-19 400kV WARANGAL LINE AT KHAMMAM NP-4108-A 1000 1 400 110 POWERGRID KURNOOL 765kV AK-43 765KV SIDE OF ICT 2 AT KURNOOL NP-3073-A 2000 1 765 110 POWERGRID KURNOOL 765kV AK-44 400KV SIDE OF ICT 2 AT KURNOOL NP-3074-A 3000 1 400 110 POWERGRID KURNOOL 765kV AK-45 33KV SIDE TERTIARY TRANSFORMER AT KURNOOL NP-3250-A 50 1 33 110 POWERGRID KURNOOL 765kV AK-46 440V SIDE OF STATION TRANSFORMER AT KURNOOL NP-3167-A 800 1 0.439999998 110 POWERGRID KURNOOL 765kV AK-51 400KV KURNOOL(AP) LINE 1 AT KURNOOL NP-3067-A 2000 1 400 110 POWERGRID KURNOOL 765kV AK-53 400KV N'SAGAR LINE AT KURNOOL NP-3069-A 2000 1 400 110 POWERGRID KURNOOL 765kV AK-54 400KV GOOTY LINE AT 765KV KURNOOL NP-3070-A 2000 1 400 110 POWERGRID KURNOOL 765kV AK-55 400KV KURNOOL(AP) LINE 2 AT KURNOOL NP-3068-A 2000 1 400 110 POWERGRID KURNOOL 765kV AK-56 765KV RAICHUR LINE 2 AT KURNOOL NP-3110-A 2000 1 765 110 POWERGRID KURNOOL 765kV AK-57 765KV NPS LINE 1 AT KURNOOL NP-3151-A 2000 1 765 110 POWERGRID KURNOOL 765kV AK-58 765KV NELLORE LINE 2 AT KURNOOL NP-3147-A 2000 1 765 110 POWERGRID KURNOOL 765kV AK-59 765KV TIRUVALAM LINE 1 AT KURNOOL NP-3149-A 2000 1 765 100 ANNEXURE 2 (47 of 57)

POWERGRID KURNOOL 765kV AK-60 765KV TIRUVALAM LINE 2 AT KURNOOL NP-3148-A 2000 1 765 110 POWERGRID KURNOOL 765kV AK-62 765KV RAICHUR LINE 1 AT KURNOOL NP-3121-A 2000 1 765 110 POWERGRID NELLORE AN-01 400KV NELLORE (AP) INTERCONNECTOR 1 AT NELLORE (PG) NP-7277-A 2000 1 400 110 POWERGRID NELLORE AN-02 400KV NELLORE (PG) INTERCONNECTOR 1 AT NELLORE (AP) NP-7214-A 2000 1 400 110 POWERGRID NELLORE AN-03 400KV NELLORE (AP) INTERCONNECTOR 2 AT NELLORE (PG) NP-7275-A 2000 1 400 110 POWERGRID NELLORE AN-04 400KV NELLORE (PG) INTERCONNECTOR 2 AT NELLORE (AP) NP-7216-A 2000 1 400 110 POWERGRID NELLORE AN-09 400KV VIJAYAWADA LINE-1 AT NELLORE NP-3238-A 1000 1 400 110 POWERGRID NELLORE AN-10 400KV VIJAYAWADA LINE-2 AT NELLORE NP-3237-A 1000 1 400 110 POWERGRID NELLORE AN-11 400KV SRIPERUMBADUR LINE 1 AT NELLORE NP-7278-A 1000 1 400 110 POWERGRID NELLORE AN-12 400KV SRIPERUMBADUR LINE 2 AT NELLORE NP-7282-A 1000 1 400 110 POWERGRID NELLORE AN-13 400KV THIRUVALM LINE 1 AT NELLORE NP-3078-A 2000 1 400 110 POWERGRID NELLORE AN-14 400KV THIRUVALM LINE 2 AT NELLORE NP-3077-A 2000 1 400 110 POWERGRID NELLORE AN-15 400KV TPCIL LINE 1 AT NPS NP-7271-A 2000 1 400 110 POWERGRID NELLORE AN-16 400KV TPCIL LINE 2 AT NPS NP-7273-A 2000 1 400 110 POWERGRID NSAGAR AN-21 400kV side of ICT 1 AT N'SAGAR NP-3225-A 500 1 400 110 POWERGRID NSAGAR AN-22 220kV side of ICT 1 AT N'SAGAR NP-3226-A 800 1 220 110 POWERGRID NSAGAR AN-23 400kV side of ICT 2 AT N'SAGAR NP-3227-A 500 1 400 110 POWERGRID NSAGAR AN-24 220kV side of ICT 2 AT N'SAGAR NP-3228-A 800 1 220 110 POWERGRID NSAGAR AN-25 400kV side of ICT 3 AT N'SAGAR NP-3230-A 500 1 400 110 POWERGRID NSAGAR AN-26 220kV side of ICT 3 AT N'SAGAR NP-3231-A 800 1 220 110 POWERGRID NSAGAR AN-31 400KV CUDDAPAH LINE 1 AT N'SAGAR NP-3223-A 1000 1 400 110 POWERGRID NSAGAR AN-32 400KV CUDDAPAH LINE 2 AT N'SAGAR NP-3222-A 1000 1 400 110 POWERGRID NSAGAR AN-33 400KV KURNOOL LINE AT N'SAGAR NP-3168-A 2000 1 400 110 POWERGRID NSAGAR AN-34 400kV MEHBOOBNAGAR LINE AT N'SAGAR NP-3229-A 1000 1 400 110 POWERGRID NSAGAR AN-35 400KV RAMAGUNDAM LINE 1 N'SAGAR NP-3224-A 1000 1 400 110 POWERGRID NSAGAR AN-36 400KV RAMAGUNDAM LINE 2 N'SAGAR NP-3109-A 1000 1 400 110 POWERGRID NSAGAR AN-37 400KV KHAMMAM LINE 3 AT N'SAGAR NP-3134-A 1000 1 400 110 POWERGRID NSAGAR AN-38 400KV KHAMMAM LINE 2 AT N'SAGAR NP-3135-A 1000 1 400 110 POWERGRID Nellore PS AN-48 765KV KURNOOL LINE-1 AT NPS NP-3240-A 3000 1 765 110 POWERGRID Nellore PS AN-49 400KV NELLORE LINE-1 AT NPS NP-3239-A 2000 1 400 110 POWERGRID Nellore PS AN-50 400KV NELLORE LINE-2 AT NPS NP-3245-A 2000 1 400 110 POWERGRID NELLORE AN-51 765KV SIDE OF ICT 2 AT NPS NP-7246-A 2000 1 765 110 POWERGRID NELLORE AN-53 765KV SIDE OF ICT 3 AT NPS NP-3080-A 2000 1 765 110 POWERGRID NELLORE AN-61 400KV MEPL LINE AT NPS NP-4101-A 2000 1 400 110 POWERGRID NELLORE AN-62 400KV MEPL LINE AT NPS NP-4107-A 2000 1 400 110 POWERGRID NELLORE AN-63 400KV SEL LINE AT NPS NP-4126-A 2000 1 400 110 POWERGRID NELLORE AN-64 400KV SEL LINE AT NPS NP-4117-A 2000 1 400 110 POWERGRID NELLORE AN-65 400KV GOOTY LINE 1 AT NPS NP-7237-A 2000 1 400 110 POWERGRID NELLORE AN-66 400KV GOOTY LINE 2 AT NPS NP-7181-A 2000 1 400 110 POWERGRID Nellore PS AN-67 400KV SGPL (NCC) LINE 1 AT NELLORE PS NP-3166-A 2000 1 400 110 POWERGRID Nellore PS AN-68 400KV SGPL (NCC) LINE 2 AT NELLORE PS NP-3119-A 2000 1 400 110 POWERGRID NELLORE AN-69 33KV SIDE OF TERTIARY OF ICT 2 AT NELLORE PS NP-3246-A 50 1 33 110 POWERGRID NELLORE AN-70 400V SIDE OF TERTIARY AT ICT 2 AT NELLORE PS NP-3249-A 100 1 0.400000006 110 POWERGRID NP KUNTA (PG) AN-75 400KV SIDE OF ICT 1 AT NP KUNTA (PG) NP-3122-A 1000 1 400 110 POWERGRID NP KUNTA (PG) AN-76 220KV SIDE OF ICT 1 AT NP KUNTA (PG) NP-3124-A 1600 1 220 110 POWERGRID NP KUNTA (PG) AN-77 400KV SIDE OF ICT-2 AT NP KUNTA NP-3172-A 1000 1 400 110 POWERGRID NP KUNTA (PG) AN-78 220KV SIDE OF ICT-2 AT NP KUNTA NP-3177-A 1600 1 220 110 POWERGRID NP KUNTA (PG) AN-79 400KV SIDE OF ICT-3 AT NP KUNTA NP-3178-A 1000 1 400 110 POWERGRID NP KUNTA (PG) AN-80 220KV SIDE OF ICT-3 AT NP KUNTA NP-3179-A 1600 1 220 110 POWERGRID NP KUNTA (PG) AN-81 220KV NPKUNTA (AP) LINE 1 AT NP KUNTA (PG) NP-3129-A 1600 1 220 110 POWERGRID NP KUNTA (PG) AN-83 220KV NPKUNTA (AP) LINE 2 AT NP KUNTA (PG) NP-3128-A 1600 1 220 110 POWERGRID NP KUNTA (PG) AN-96 400KV KOLAR LINE AT NP KUNTA (PG) NP-3127-A 2000 1 400 110 ANNEXURE 2 (48 of 57)

POWERGRID NP KUNTA (PG) AN-97 400KV KADAPA LINE AT NP KUNTA (PG) NP-3123-A 2000 1 400 110 POWERGRID NSAGAR AT-15 400KV KHAMMAM LINE AT N'SAGAR (TALLAPALLI) NP-3032-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-01 400kV side of ICT 1 AT VIJAYAWADA NP-2479-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-02 220kV side of ICT 1 AT VIJAYAWADA NP-4122-A 1000 1 220 110 POWERGRID VIJAYAWADA AV-03 400KV SIDE OF ICT 2 AT VIJAYAWADA NP-3100-A 600 1 400 110 POWERGRID VIJAYAWADA AV-04 220kV side of ICT 2 AT VIJAYAWADA NP-3174-A 1000 1 220 110 POWERGRID VIJAYAWADA AV-11 400kV GAZUWAKA LINE AT VIJAYAWADA NP-2490-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-12 400kV KHAMMAM LINE AT VIJAYAWADA NP-4124-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-13 400KV NELLORE LINE 1 AT VIJAYAWADA NP-4077-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-14 400KV NELLORE LINE 2 AT VIJAYAWADA NP-4123-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-15 400KV SATTENAPALLY LINE AT VIJAYAWADA NP-2487-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-16 400KV VEMAGIRI LINE 2 AT VIJAYAWADA NP-2488-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-17 400KV VEMAGIRI LINE 3 AT VIJAYAWADA NP-4104-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-18 400KV VEMAGIRI LINE 4 AT VIJAYAWADA NP-4105-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-19 400KV NELLORE LINE 3 AT VIJAYAWADA NP-4118-A 1000 1 400 110 POWERGRID VIJAYAWADA AV-20 400KV VTPS IV LINE 2 AT VIJAYAWADA NP-4116-A 1000 1 400 110 POWERGRID VEMAGIRI(PG) AV-71 400KV VIJAYAWADA LINE AT VEMAGIRI(PG) NP-9310-A 2000 1 400 110 POWERGRID VEMAGIRI(PG) AV-72 400KV GAZUWAKA LINE AT VEMAGIRI(PG) NP-9311-A 2000 1 400 110 POWERGRID WARANGAL AW-01 400kV side of ICT 1 AT WARANGAL NP-5510-A 600 1 400 110 POWERGRID WARANGAL AW-02 220kV side of ICT 1 AT WARANGAL NP-5513-A 1000 1 220 110 POWERGRID WARANGAL AW-03 400kV side of ICT 2 AT WARANGAL NP-5529-A 600 1 400 110 POWERGRID WARANGAL AW-04 220kV side of ICT 2 AT WARANGAL NP-5530-A 1000 1 220 110 POWERGRID WARANGAL AW-05 33kV side of AUT AT WARANGAL NP-6166-A 50 1 33 110 POWERGRID WARANGAL AW-11 400KV BOOPALAPALLY LINE 1 AT WARANGAL NP-5487-A 1000 1 400 110 POWERGRID WARANGAL AW-12 400KV BOOPALAPALLY LINE 2 AT WARANGAL NP-6167-A 1000 1 400 110 POWERGRID WARANGAL AW-13 400kV RAMAGUNDAM LINE AT WARANGAL NP-5394-A 1000 1 400 110 POWERGRID WARANGAL AW-14 400KV KHAMMA LINE AT WARANGAL NP-5629-A 1000 1 400 110 POWERGRID BIDADI CB-11 400KV SIDE OF ICT 1 AT BIDADI NP-7331-A 1000 1 400 110 POWERGRID BIDADI CB-12 220KV SIDE OF ICT 1 AT BIDADI NP-7329-A 1600 1 220 110 POWERGRID BIDADI CB-13 400KV SIDE OF ICT 2 AT BIDADI NP-7324-A 1000 1 400 110 POWERGRID BIDADI CB-14 220KV SIDE OF ICT 2 AT BIDADI NP-8345-A 1600 1 220 110 POWERGRID BIDADI CB-21 400KV SOMANAHALLI LINE 1 AT BIDADI NP-7327-A 1000 1 400 110 POWERGRID BIDADI CB-22 400KV SOMANAHALLI LINE 2 AT BIDADI NP-7330-A 1000 1 220 110 POWERGRID BIDADI CB-23 400KV NELEMANGALA LINE 1 AT BIDADI NP-7655-A 1000 1 400 110 POWERGRID BIDADI CB-24 400KV MADHUGIRI LINE AT BIDADI NP-8344-A 1000 1 400 110 POWERGRID HASAN CH-11 400kV side of ICT 1 AT HASSAN NP-5582-A 1000 1 400 110 POWERGRID HASAN CH-12 220kV side of ICT 1 AT HASSAN NP-5648-A 800 1 220 110 POWERGRID HASAN CH-13 400kV side of ICT 2 AT HASSAN NP-5649-A 600 1 400 110 POWERGRID HASAN CH-14 220kV side of ICT 2 AT HASSAN NP-5650-A 800 1 220 110 POWERGRID HASAN CH-21 400KV MYSORE LINE 1 AT HASSAN NP-5666-A 1000 1 400 110 POWERGRID HASAN CH-22 400KV MYSORE LINE 2 AT HASSAN NP-5667-A 1000 1 400 110 POWERGRID HASAN CH-23 400kV NELAMANGALA LINE AT HASSAN NP-5591-A 1000 1 400 110 POWERGRID HASAN CH-24 400kV TALAGUPPA LINE AT HASSAN NP-5646-A 1000 1 400 110 POWERGRID HASAN CH-25 400KV UPCL LINE 1 AT HASSAN NP-7800-A 3000 1 400 110 POWERGRID HASAN CH-26 400KV UPCL LINE 2 AT HASSAN NP-7801-A 3000 1 400 110 POWERGRID HIRIYUR CH-41 400kV side of ICT 1 AT HIRIYUR NP-8318-A 600 1 400 110 POWERGRID HIRIYUR CH-42 220kV side of ICT 1 AT HIRIYUR NP-8319-A 1000 1 220 110 POWERGRID HIRIYUR CH-43 400kV side of ICT 2 AT HIRIYUR NP-5637-A 600 1 400 110 POWERGRID HIRIYUR CH-44 220kV side of ICT 2 AT HIRIYUR NP-5638-A 1000 1 220 110 POWERGRID HIRIYUR CH-51 400KV NELAMANGALA LINE 1 AT HIRIYUR NP-4046-A 2000 1 400 110 POWERGRID HIRIYUR CH-52 400KV NELAMANGALA LINE 2 AT HIRIYUR NP-4047-A 2000 1 400 110 POWERGRID HIRIYUR CH-53 400KV GUTTUR LINE -1 AT HIRIYUR SA-0132-A 1000 1 400 110 ANNEXURE 2 (49 of 57)

POWERGRID HIRIYUR CH-54 400KV GUTTUR LINE-2 AT HIRIYUR SA-0133-A 1000 1 400 110 POWERGRID HIRIYUR CH-55 400KV BTPS LINE-1 AT HIRIYUR SA-0136-A 1000 1 400 110 POWERGRID HIRIYUR CH-56 400KV BTPS LINE-2 AT HIRIYUR SA-0137-A 1000 1 400 110 POWERGRID KOLAR CK-11 400kV side of ICT 1 AT KOLAR NP-5548-A 1000 1 400 110 POWERGRID KOLAR CK-12 220kV side of ICT 1 AT KOLAR NP-5147-A 1600 1 220 110 POWERGRID KOLAR CK-13 400kV side of ICT 2 AT KOLAR NP-5549-A 1000 1 400 110 POWERGRID KOLAR CK-14 220kV side of ICT 2 AT KOLAR NP-5146-A 1600 1 220 110 POWERGRID KOLAR CK-21 400kV side of CONVERTER TRANSFORMER 1 AT KOLAR NP-5158-A 3000 1 400 110 POWERGRID KOLAR CK-22 400kV side of CONVERTER TRANSFORMER 2 AT KOLAR NP-5159-A 3000 1 400 110 POWERGRID KOLAR CK-23 400KV NP KUNTA LINE AT KOLAR NP-5154-A 1000 1 400 110 POWERGRID KOLAR CK-24 400kV FILTER BANK 1 (MAIN) AT KOLAR NP-5620-A 3000 1 400 110 POWERGRID KOLAR CK-25 400kV FILTER BANK 1 (TIE) AT KOLAR NP-5619-A 3000 1 400 110 POWERGRID KOLAR CK-26 400kV FILTER BANK 2 AT KOLAR NP-5157-A 3000 1 400 110 POWERGRID KOLAR CK-27 400kV FILTER BANK 3 AT KOLAR NP-5550-A 3000 1 400 110 POWERGRID KOLAR CK-28 400KV HOODY LINE 1 AT KOLAR NP-5150-A 1000 1 400 110 POWERGRID KOLAR CK-29 400KV HOODY LINE 2 AT KOLAR NP-5152-A 1000 1 400 110 POWERGRID KOLAR CK-30 400KV HOSUR LINE 1 AT KOLAR NP-5151-A 1000 1 400 110 POWERGRID KOLAR CK-31 400KV HOSUR LINE 2 AT KOLAR NP-5148-A 1000 1 400 110 POWERGRID KOLAR CK-32 400kV SOMANAHALLI LINE AT KOLAR NP-5641-A 1000 1 400 110 POWERGRID KOLAR CK-33 400KV THIRUVALEM LINE AT KOLAR NP-5149-A 1000 1 400 110 POWERGRID KUDGI (PG) CK-51 765KV KOLHAPUR LINE 1 AT KUDGI(PG) (CHARGED AT 400KV) NP-9604-A 2000 1 400 110 POWERGRID KUDGI (PG) CK-52 765KV KOLHAPUR LINE 2 AT KUDGI(PG) (CHARGED AT 400KV) NP-9614-A 2000 1 400 110 POWERGRID KUDGI (PG) CK-53 400KV NTPC KUDGI LINE 1 AT KUDGI(PG) NP-9599-A 2000 1 400 110 POWERGRID KUDGI (PG) CK-54 400KV NTPC KUDGI LINE 2 AT KUDGI(PG) NP-9639-A 2000 1 400 110 POWERGRID KUDGI (PG) CK-61 400KV NARENDRA LINE 1 AT KUDGI(PG) NP-9622-A 2000 1 400 110 POWERGRID KUDGI (PG) CK-62 400KV NARENDRA LINE 2 AT KUDGI(PG) NP-9640-A 2000 1 400 110 POWERGRID KUDGI (PG) CK-63 400KV MADHUGIRI LINE -1 AT KUDGI (PG) SA-0246-A 2000 1 400 110 POWERGRID KUDGI (PG) CK-64 400KV MADHUGIRI LINE-2 AT KUDGI(PG) SA-0243-A 2000 1 400 110 POWERGRID MUNIRABAD CM-01 400kV side of ICT 1 AT MUNIRABAD NP-5397-A 500 1 400 110 POWERGRID MUNIRABAD CM-02 220kV side of ICT 1 AT MUNIRABAD NP-5398-A 1000 1 220 110 POWERGRID MUNIRABAD CM-03 400kV side of ICT 2 AT MUNIRABAD NP-5383-A 600 1 400 110 POWERGRID MUNIRABAD CM-04 220kV side of ICT 2 AT MUNIRABAD NP-5384-A 1000 1 220 110 POWERGRID MUNIRABAD CM-11 400kV GUTTUR LINE AT MUNIRABAD NP-5381-A 1000 1 400 110 POWERGRID MUNIRABAD CM-12 400kV RAICHUR LINE AT MUNIRABAD NP-5396-A 1000 1 400 110 POWERGRID MYSORE CM-21 400KV SIDE OF ICT 1 AT MYSORE NP-8365-A 600 1 400 110 POWERGRID MYSORE CM-22 220kV side of ICT 1 AT MYSORE NP-8366-A 1000 1 220 110 POWERGRID MYSORE CM-23 400kV side of ICT 2 AT MYSORE NP-8347-A 600 1 400 110 POWERGRID MYSORE CM-24 220kV side of ICT 2 AT MYSORE NP-8367-A 1000 1 220 110 POWERGRID MYSORE CM-25 400KV KOZHIKODE LINE 1 AT MYSORE NP-8331-A 1000 1 400 110 POWERGRID MYSORE CM-26 400KV KOZHIKODE LINE 2 AT MYSORE NP-8332-A 1000 1 400 110 POWERGRID MYSORE CM-27 400KV SIDE OF ICT 3 AT MYSORE SA-0225-A 1000 1 400 110 POWERGRID MYSORE CM-28 220KV SIDE OF ICT 3 AT MYSORE SA-0227-A 1600 1 220 110 POWERGRID MYSORE CM-31 400KV HASSAN LINE 1 AT MYSORE NP-8408-A 1000 1 400 110 POWERGRID MYSORE CM-32 400KV HASSAN LINE 2 AT MYSORE NP-8409-A 1000 1 400 110 POWERGRID MYSORE CM-33 400KV NELAMANGALA LINE-1 AT MYSORE SA-0223-A 1000 1 400 110 POWERGRID MYSORE CM-34 400KV NELAMANGALA LINE-2 AT MYSORE SA-0224-A 1000 1 400 110 POWERGRID MADHUGIRI CM-51 400KV SIDE OF ICT 1 AT MADHUGIRI NP-9589-A 1000 1 400 110 POWERGRID MADHUGIRI CM-52 220KV SIDE OF ICT 1 AT MADHUGIRI NP-9643-A 1600 1 220 110 POWERGRID MADHUGIRI CM-53 400KV SIDE OF ICT 2 AT MADHUGIRI NP-9590-A 1000 1 400 110 POWERGRID MADHUGIRI CM-54 220KV SIDE OF ICT 2 AT MADHUGIRI NP-9644-A 1600 1 220 110 POWERGRID MADHUGIRI CM-61 400KV GOOTY LINE 1 AT MADHUGIRI NP-9616-A 1000 1 400 110 POWERGRID MADHUGIRI CM-62 400KV GOOTY LINE 2 AT MADHUGIRI NP-9611-A 1000 1 400 110 ANNEXURE 2 (50 of 57)

POWERGRID MADHUGIRI CM-63 400KV NELAMANGALA LINE AT MADHUGIRI (TUMKUR) SA-0139-A 1000 1 400 110 POWERGRID MADHUGIRI CM-64 400KV BIDADI LINE AT MADHUGIRI (TUMKUR) SA-0134-A 1000 1 400 110 POWERGRID MADHUGIRI CM-65 400KV KUDGI(PG) LINE-1 AT MADHUGIRI SA-0140-A 2000 1 400 110 POWERGRID MADHUGIRI CM-66 400KV KUDGI(PG) LINE-2 AT MADHUGIRI SA-0138-A 2000 1 400 110 POWERGRID NARENDRA CN-31 400kV side of ICT 1 AT NARENDRA NP-7351-A 600 1 400 110 POWERGRID NARENDRA CN-32 220kV side of ICT 1 AT NARENDRA NP-7352-A 1000 1 220 110 POWERGRID NARENDRA CN-33 400kV side of ICT 2 AT NARENDRA NP-7650-A 600 1 400 110 POWERGRID NARENDRA CN-34 220kV side of ICT 2 AT NARENDRA NP-7652-A 1000 1 220 110 POWERGRID NARENDRA CN-41 400KV GUTTUR LINE 1 AT NARENDRA NP-5661-A 1000 1 400 110 POWERGRID NARENDRA CN-42 400KV GUTTUR LINE 2 AT NARENDRA NP-5662-A 1000 1 400 110 POWERGRID NARENDRA CN-43 400KV KAIGA LINE 1 AT NARENDRA NP-7354-A 1000 1 400 110 POWERGRID NARENDRA CN-44 400KV KAIGA LINE 2 AT NARENDRA NP-6185-A 1000 1 400 110 POWERGRID NARENDRA CN-45 400KV KUDGI(PG) LINE-1 AT NARENDRA SA-0039-A 2000 1 400 110 POWERGRID NARENDRA CN-46 400KV KUDGI(PG) LINE-2 AT NARENDRA SA-0040-A 2000 1 400 110 POWERGRID SOMANAHALLI CS-01 400kV side of ICT 1 AT SOMANAHALLI NP-5120-A 1000 1 400 110 POWERGRID SOMANAHALLI CS-02 220kV side of ICT 1 AT SOMANAHALLI NP-5121-A 1600 1 220 110 POWERGRID SOMANAHALLI CS-03 400kV side of ICT 2 AT SOMANAHALLI NP-5122-A 1000 1 400 110 POWERGRID SOMANAHALLI CS-04 220kV side of ICT 2 AT SOMANAHALLI NP-5123-A 1600 1 220 110 POWERGRID SOMANAHALLI CS-05 400KV SIDE OF ICT-3 AT SOMANAHALLI SA-0129-A 1000 1 400 110 POWERGRID SOMANAHALLI CS-06 220KV SIDE OF ICT-3 AT SOMANAHALLI SA-0130-A 1600 1 220 110 POWERGRID SOMANAHALLI CS-11 400KV BIDADI LINE 1 AT SOMANAHALLI NP-7656-A 1000 1 400 110 POWERGRID SOMANAHALLI CS-12 400KV BIDADI LINE 2 AT SOMANAHALLI NP-5128-A 1000 1 400 110 POWERGRID SOMANAHALLI CS-13 400KV GOOTY LINE AT SOMANAHALLI NP-5126-A 2000 1 400 110 POWERGRID SOMANAHALLI CS-14 400KV HOSUR LINE AT SOMANAHALLI NP-5608-A 1000 1 400 110 POWERGRID SOMANAHALLI CS-15 400KV KOLAR LINE AT SOMANAHALLI SA-0122-A 1000 1 400 110 POWERGRID COCHIN KC-01 400KV SIDE OF ICT 1 AT COCHIN NP-6170-A 600 1 400 110 POWERGRID COCHIN KC-02 220KV SIDE OF ICT 1 AT COCHIN NP-6171-A 1000 1 220 110 POWERGRID COCHIN KC-03 400KV SIDE OF ICT 2 AT COCHIN NP-6172-A 600 1 400 110 POWERGRID COCHIN KC-04 220KV SIDE OF ICT 2 AT COCHIN NP-5669-A 1000 1 220 110 POWERGRID COCHIN KC-11 400KV TRICHUR LINE 1 AT COCHIN NP-6168-A 2000 1 400 110 POWERGRID COCHIN KC-12 400KV TRICHUR LINE 2 AT COCHIN NP-6169-A 2000 1 400 110 POWERGRID KOZHIKODE KK-06 400KV SIDE OF ICT 1 AT KOZHIKODE NP-8348-A 1000 1 400 110 POWERGRID KOZHIKODE KK-07 220KV SIDE OF ICT 1 AT KOZHIKODE NP-8350-A 1600 1 220 110 POWERGRID KOZHIKODE KK-08 400KV SIDE OF ICT 2 AT KOZHIKODE NP-8349-A 600 1 400 110 POWERGRID KOZHIKODE KK-09 220KV SIDE OF ICT 2 AT KOZHIKODE NP-8351-A 1000 1 220 110 POWERGRID KOZHIKODE KK-21 400KV MYSORE LINE -1 AT KOZHIKODE SA-0217-A 1000 1 400 110 POWERGRID KOZHIKODE KK-22 400KV MYSORE LINE -2 AT KOZHIKODE SA-0218-A 1000 1 400 110 POWERGRID PALAKKAD KP-11 400kV side of ICT 1 AT PALAKKAD NP-7803-A 600 1 400 110 POWERGRID PALAKKAD KP-12 220kV side of ICT 1 AT PALAKKAD NP-7321-A 1000 1 220 110 POWERGRID PALAKKAD KP-13 400kV side of ICT 2 AT PALAKKAD NP-7802-A 600 1 400 110 POWERGRID PALAKKAD KP-14 220kV side of ICT 2 AT PALAKKAD NP-7804-A 1000 1 220 110 POWERGRID PALAKKAD KP-21 400KV TRICHUR LINE 2 AT PALAKKAD NP-8337-A 1000 1 400 110 POWERGRID PALAKKAD KP-22 400KV UDUMALPET LINE 2 AT PALAKKAD NP-7659-A 1000 1 400 110 POWERGRID PALAKKAD KP-23 400KV TRICHUR LINE 1 AT PALAKKAD NP-7319-A 1000 1 400 110 POWERGRID PALAKKAD KP-24 400KV UDUMALPET LINE 1 AT PALAKKAD NP-7318-A 1000 1 400 110 POWERGRID TRICHUR KT-01 400KV TRICHUR(KSEB) INTERCONNECTOR 1 AT TRICHUR(PG) NP-5143-A 1000 1 400 110 POWERGRID TRICHUR KT-02 400KV TRICHUR(PG) INTERCONNECTOR 1 AT TRICHUR(KSEB) NP-5142-A 1000 1 400 110 POWERGRID TRICHUR KT-03 400KV TRICHUR(KSEB) INTERCONNECTOR 2 AT TRICHUR(PG) NP-5145-A 1000 1 400 110 POWERGRID TRICHUR KT-04 400KV TRICHUR(PG) INTERCONNECTOR 2 AT TRICHUR(KSEB) NP-5144-A 1000 1 400 110 POWERGRID TRICHUR KT-05 400KV KOCHI LINE-1 AT TRICHUR NP-5617-A 1000 1 400 110 POWERGRID TRICHUR KT-06 400KV KOCHI LINE-2 AT TRICHUR NP-5618-A 1000 1 400 110 POWERGRID TRICHUR KT-07 400KV PALAKKAD LINE -1 AT TRICHUR SA-0024-A 1000 1 400 110 ANNEXURE 2 (51 of 57)

POWERGRID TRICHUR KT-08 400KV PALAKKAD LINE-2 AT TRICHUR SA-0025-A 1000 1 400 110 POWERGRID TRIVANDRUM KT-21 400kV side of ICT 1 AT TRIVANDRAM NP-4042-A 600 1 400 110 POWERGRID TRIVANDRUM KT-22 220kV side of ICT 1 AT TRIVANDRAM NP-4044-A 1000 1 220 110 POWERGRID TRIVANDRUM KT-23 400kV side of ICT 2 AT TRIVANDRAM NP-4043-A 600 1 400 110 POWERGRID TRIVANDRUM KT-24 220kV side of ICT 2 AT TRIVANDRAM NP-4063-A 1000 1 220 110 POWERGRID TRIVANDRUM KT-25 400kV side of ICT 3 AT TRIVANDRAM NP-5587-A 600 1 400 110 POWERGRID TRIVANDRUM KT-26 220kV side of ICT 3 AT TRIVANDRAM NP-5588-A 1000 1 220 110 POWERGRID VIJAYAWADA LK-01 400KV LANCO LINE 1 AT VIJAYAWADA NP-3244-A 1000 1 400 110 POWERGRID VIJAYAWADA LK-02 400KV LANCO LINE 1 AT VIJAYAWADA NP-3131-A 1000 1 400 110 POWERGRID VIJAYAWADA LK-03 400KV LANCO LINE 2 AT VIJAYAWADA NP-3175-A 1000 1 400 110 POWERGRID VIJAYAWADA LK-04 400KV LANCO LINE 2 AT VIJAYAWADA NP-3243-A 1000 1 400 110 POWERGRID NELLORE ME-01 400KV NPS LINE 1 AT NELLORE NP-7228-A 2000 1 400 110 POWERGRID NELLORE ME-02 400KV NPS LINE 1 AT NELLORE NP-7211-A 2000 1 400 110 POWERGRID GAZUWAKA HVDC PG-01 33KV SIDE OF AUX TRASFORMER AT GAZUWAKA HVDC POLE-1 NP-5395-A 50 1 33 110 POWERGRID GAZUWAKA HVDC PG-02 33KV SIDE OF AUX TRASFORMER AT GAZUWAKA HVDC POLE-2 NP-5380-A 40 1 33 110 POWERGRID KOLAR HVDC PG-03 33KV SIDE OF AUX TRASFORMER AT KOLAR HVDC POLE 12 NP-5547-A 200 1 33 110 POWERGRID KOLAR HVDC PG-04 33KV SIDE OF AUX TRASFORMER AT KOLAR HVDC POLE 12 NP-5687-A 200 1 33 110 POWERGRID TALCHER HVDC PG-05 400KV SIDE OF AUX TRANSFORMER 1 AT TALCHER HVDC NP-4036-A 3000 1 400 110 POWERGRID TALCHER HVDC PG-06 11KV SIDE OF AUX TRANSFORMER 1 AT TALCHER HVDC NP-4035-A 150 1 11 110 POWERGRID TALCHER HVDC PG-07 400KV SIDE OF AUX TRANSFORMER 2 AT TALCHER HVDC NP-4008-A 3000 1 400 110 POWERGRID TALCHER HVDC PG-08 11KV SIDE OF AUX TRANSFORMER 2 AT TALCHER HVDC NP-4039-A 150 1 11 110 POWERGRID TALCHER HVDC PG-09 400KV SIDE OF AUX TRANSFORMER 3 AT TALCHER HVDC NP-2363-A 3000 1 400 110 POWERGRID TALCHER HVDC PG-10 11KV SIDE OF AUX TRANSFORMER 3 AT TALCHER HVDC NP-4202-A 150 1 11 110 POWERGRID KOLAR HVDC PG-11 33KV SIDE AUXILIARY TRANSFORMER AT KOLAR ICT 1 NP-7328-A 200 1 33 110 POWERGRID KOLAR HVDC PG-12 33KV SIDE AUXILIARY TRANSFORMER AT KOLAR ICT 2 NP-7333-A 200 1 33 110 POWERGRID PONDY PP-01 400kV side of ICT 1 AT PONDY NP-5705-A 600 1 400 110 POWERGRID PONDY PP-02 220kV side of ICT 1 AT PONDY NP-5602-A 1000 1 220 110 POWERGRID PONDY PP-03 400kV side of ICT 2 AT PONDY NP-5605-A 600 1 400 110 POWERGRID PONDY PP-04 220kV side of ICT 2 AT PONDY NP-5601-A 1000 1 220 110 POWERGRID PONDY PP-11 400KV NEYVELI TS 2 LINE AT PONDY NP-5603-A 1000 1 400 110 POWERGRID PONDY PP-12 400KV SV CHATRAM LINE AT PONDY NP-5606-A 1000 1 400 110 POWERGRID RAICHUR 765kV RC-10 765KV SHOLAPUR LINE 2 AT RAICHUR NP-7170-A 2000 1 765 110 POWERGRID RAICHUR 765kV RC-11 765KV SHOLAPUR LINE 1 AT RAICHUR NP-7172-A 2000 1 765 110 POWERGRID RAICHUR 765kV RC-12 400KV RTPS LINE 1 AT RAICHUR NP-7178-A 2000 1 400 110 POWERGRID RAICHUR 765kV RC-13 400KV RTPS LINE 2 AT RAICHUR NP-7269-A 2000 1 400 110 POWERGRID RAICHUR 765kV RC-14 400KV SIDE OF ICT 1 AT RAICHUR NP-7179-A 2000 1 400 110 POWERGRID RAICHUR 765kV RC-15 400KV SIDE OF ICT 2 AT RAICHUR NP-7167-A 2000 1 400 110 POWERGRID RAICHUR 765kV RC-16 765KV SIDE OF ICT 1 AT RAICHUR NP-7176-A 2000 1 765 110 POWERGRID RAICHUR 765kV RC-17 765KV KURNOOL LINE -2 AT RAICHUR NP-3103-A 2000 1 765 110 POWERGRID RAICHUR 765kV RC-18 765KV KURNOOL LINE 1 AT RAICHUR NP-3120-A 2000 1 765 110 POWERGRID RAICHUR 765kV RC-19 33KV SIDE (TERTIARY) OF ICT-1 AT RAICHUR NP-3165-A 50 1 33 110 POWERGRID NELLORE SE-01 400KV NPS LINE 2 AT NELLORE NP-7281-A 2000 1 400 110 POWERGRID NELLORE SE-02 400KV NPS LINE 2 AT NELLORE NP-7261-A 2000 1 400 110 POWERGRID TRICHUR SF-01 0.01HZ FRQ METER AT TRICHUR NP-0001-A 1000 1 400 110 POWERGRID SOMANAHALLI SF-03 0.01HZ FRQ METER AT SOMANAHALLI NP-0003-A 1000 1 400 110 POWERGRID SRIKAKULAM SK-01 765KV ANGUL LINE 1 AT SRIKAKULAM NP-9340-A 3000 1 765 110 POWERGRID SRIKAKULAM SK-02 765KV ANGUL LINE 2 AT SRIKAKULAM NP-9341-A 3000 1 765 110 POWERGRID ARASUR TA-21 400kV side of ICT 1 AT ARASUR NP-5568-A 600 1 400 110 POWERGRID ARASUR TA-22 230kV side of ICT 1 AT ARASUR NP-5571-A 1000 1 230 110 POWERGRID ARASUR TA-23 400kV side of ICT 2 AT ARASUR NP-6182-A 600 1 400 110 POWERGRID ARASUR TA-24 230kV side of ICT 2 AT ARASUR NP-5643-A 1000 1 230 110 POWERGRID ARASUR TA-31 400KV UDUMALPET LINE 1 AT ARASUR NP-5567-A 1000 1 400 110 ANNEXURE 2 (52 of 57)

POWERGRID ARASUR TA-32 400KV UDUMALPET LINE 2 AT ARASUR NP-5569-A 1000 1 400 110 POWERGRID ARASUR TA-33 400KV METTUR LINE 1 AT ARASUR NP-7806-A 1000 1 400 110 POWERGRID ARASUR TA-34 400KV METTUR LINE 2 AT ARASUR NP-7805-A 1000 1 400 110 POWERGRID DHARMAPURI TD-21 400KV NAGAPATTINAM LINE-1 AT DHARMAPURI SA-0228-A 2000 1 400 110 POWERGRID DHARMAPURI TD-22 400KV NAGAPATTINAM LINE-2 AT DHARMAPURI SA-0060-A 2000 1 400 110 POWERGRID DHARMAPURI TD-23 400KV SALEM LINE-1 AT DHARMAPURI SA-0229-A 2000 1 400 110 POWERGRID DHARMAPURI TD-24 400KV SALEM LINE-2 AT DHARMAPURI SA-0230-A 2000 1 400 110 POWERGRID DHARMAPURI TD-25 400KV TUTICORIN PS LINE 1 AT DHARMAPURI SA-0215-A 2000 1 400 110 POWERGRID DHARMAPURI TD-26 400KV TUTICORIN PS LINE 2 AT DHARMAPURI SA-0211-A 2000 1 400 110 POWERGRID HOSUR TH-01 400KV SIDE OF ICT 1 AT HOSUR NP-5670-A 600 1 400 110 POWERGRID HOSUR TH-02 230kV side of ICT 1 AT HOSUR NP-5133-A 1000 1 230 110 POWERGRID HOSUR TH-03 400kV side of ICT 2 AT HOSUR NP-8353-A 600 1 400 110 POWERGRID HOSUR TH-04 230kV side of ICT 2 AT HOSUR NP-8355-A 1000 1 230 110 POWERGRID HOSUR TH-05 400KV SALEM LINE 1 AT HOSUR NP-5642-A 1000 1 400 110 POWERGRID HOSUR TH-06 400KV SIDE OF ICT 3 AT HOSUR NP-8363-A 600 1 400 110 POWERGRID HOSUR TH-07 230KV SIDE OF ICT 3 AT HOSUR NP-8364-A 800 1 230 110 POWERGRID HOSUR TH-08 400KV SOMANAHALLI LINE AT HOSUR NP-8357-A 1000 1 400 110 POWERGRID HOSUR TH-09 400KV SALEM LINE 2 AT HOSUR NP-8354-A 1000 1 400 110 POWERGRID HOSUR TH-10 400KV KOLAR LINE-1 AT HOSUR NP-8343-A 1000 1 400 110 POWERGRID HOSUR TH-11 400KV KOLAR LINE-2 AT HOSUR SA-0127-A 1000 1 400 110 POWERGRID KALAVINTHAPATTU TK-01 400kV side of ICT 1 AT KALIVANTHAPATTU NP-5683-A 600 1 400 110 POWERGRID KALAVINTHAPATTU TK-02 230KV SIDE OF ICT 1 AT KALIVANTHAPATTU NP-5682-A 1000 1 230 110 POWERGRID KALAVINTHAPATTU TK-03 400kV side of ICT 2 AT KALIVANTHAPATTU NP-5684-A 600 1 400 110 POWERGRID KALAVINTHAPATTU TK-04 230KV SIDE OF ICT 2 AT KALIVANTHAPATTU NP-5681-A 1000 1 230 110 POWERGRID KALAVINTHAPATTU TK-05 400KV SIDE OF ICT 3 AT KALAVINTHAPATTU NP-9615-A 1000 1 400 110 POWERGRID KALAVINTHAPATTU TK-06 230KV SIDE OF ICT 3 AT KALAVINTHAPATTU NP-9627-A 1600 1 220 110 POWERGRID KALAVINTHAPATTU TK-11 400KV VALLUR LINE 1 AT KALAVINTHAPATTU NP-5665-A 1000 1 400 110 POWERGRID KALAVINTHAPATTU TK-12 400KV VALLUR LINE 2 AT KALAVINTHAPATTU NP-6183-A 1000 1 400 110 POWERGRID KALAVINTHAPATTU TK-13 400KV PUGALUR LINE 1 AT KALAVINTHAPATTU NP-9625-A 2000 1 400 110 POWERGRID KALAVINTHAPATTU TK-14 400KV PUGALUR LINE 2 AT KALAVINTHAPATTU NP-8361-A 2000 1 400 110 POWERGRID KALAVINTHAPATTU TK-15 400KV THIRUVELAM LINE 1 AT KALAVINTHAPATTU NP-9623-A 1000 1 400 110 POWERGRID KALAVINTHAPATTU TK-16 400KV THIRUVELAM LINE 2 AT KALAVINTHAPATTU NP-8356-A 1000 1 400 110 POWERGRID KARAIKUDI TK-21 400kV side of ICT 1 AT KARAIKUDI NP-5593-A 600 1 400 110 POWERGRID KARAIKUDI TK-22 230KV SIDE OF ICT 1 AT KARAIKUDI NP-5585-A 1000 1 220 110 POWERGRID KARAIKUDI TK-23 400kV side of ICT 2 AT KARAIKUDI NP-5595-A 600 1 400 110 POWERGRID KARAIKUDI TK-24 230KV SIDE OF ICT 2 AT KARAIKUDI NP-5596-A 1000 1 220 110 POWERGRID KARAIKUDI TK-25 400kV MADURAI LINE AT KARAIKUDI NP-5594-A 1000 1 400 110 POWERGRID KARAIKUDI TK-26 400kV TRICHY LINE AT KARAIKUDI NP-5592-A 1000 1 400 110 POWERGRID KARAIKUDI TK-27 400KV KAYATHAR LINE 1 AT KARAIKUDI SA-0033-A 2000 1 400 110 POWERGRID KARAIKUDI TK-28 400KV KAYATHAR LINE 2 AT KARAIKUDI SA-0034-A 2000 1 400 110 POWERGRID KARAIKUDI TK-29 400KV PUGALUR LINE 1 AT KARAIKUDI NP-1494-A 2000 1 400 110 POWERGRID KARAIKUDI TK-30 400KV PUGALUR LINE 2 AT KARAIKUDI SA-0035-A 2000 1 400 110 POWERGRID MADURAI TM-01 400kV side of ICT 1 AT MADURAI NP-5132-A 1000 1 400 110 POWERGRID MADURAI TM-02 230kV side of ICT 1 AT MADURAI NP-5709-A 1000 1 230 110 POWERGRID MADURAI TM-03 400kV side of ICT 2 AT MADURAI NP-5134-A 1000 1 400 110 POWERGRID MADURAI TM-04 230kV side of ICT 2 AT MADURAI NP-5710-A 1000 1 230 110 POWERGRID MADURAI TM-05 400KV SIDE OF ICT 3 AT MADURAI SA-0123-A 1000 1 400 110 POWERGRID MADURAI TM-06 220KV SIDE OF ICT 3 AT MADURAI SA-0128-A 1000 1 230 110 POWERGRID MADURAI TM-11 400kV KUDAMKULAM LINE AT MADURAI NP-5136-A 1000 1 400 110 POWERGRID MADURAI TM-12 400KV TIRUNELVELI LINE AT MADURAI NP-5135-A 1000 1 400 110 POWERGRID MADURAI TM-13 400kV UDUMALPET LINE AT MADURAI NP-5708-A 1000 1 400 110 POWERGRID MADURAI TM-14 400KV TUPS LINE 2 AT MADURAI NP-8336-A 2000 1 400 110 ANNEXURE 2 (53 of 57)

POWERGRID MADURAI TM-15 400KV TRICHY LINE AT MADURAI SA-0248-A 1000 1 400 110 POWERGRID MADURAI TM-16 400KV PUGALUR LINE-1 AT MADURAI SA-0124-A 1000 1 400 110 POWERGRID MADURAI TM-17 400KV PUGALUR LINE-2 AT MADURAI SA-0250-A 1000 1 400 110 POWERGRID MADURAI TM-18 400KV KARAIKUDI LINE AT MADURAI SA-0125-A 1000 1 400 110 POWERGRID MADURAI TM-19 400KV TUPS LINE 1 AT MADURAI NP-8334-A 2000 1 400 110 POWERGRID MADURAI TM-20 400KV TUPS LINE 1 AT MADURAI NP-8335-A 2000 1 400 110 POWERGRID NAGAPATTINAM TN-01 400KV NLC EXP-1 LINE AT NAGAPATTINAM NP-9636-A 1000 1 400 110 POWERGRID NAGAPATTINAM TN-02 400KV NLC TS 2 LINE AT NAGAPATTIANAM NP-9580-A 1000 1 400 110 POWERGRID NAGAPATTINAM TN-03 400KV ILFS LINE 1 AT NAGAPATTINAM NP-9587-A 2000 1 400 110 POWERGRID NAGAPATTINAM TN-04 400KV ILFS LINE 2 AT NAGAPATTINAM NP-9598-A 2000 1 400 110 POWERGRID NAGAPATTINAM TN-05 400KV TRICHY LINE 1 AT NAGAPATTINAM NP-8321-A 1000 1 400 110 POWERGRID NAGAPATTINAM TN-06 400KV TRICHY LINE 2 AT NAGAPATTINAM NP-8322-A 1000 1 400 110 POWERGRID NAGAPATTINAM TN-21 400KV DHARMAPURI LINE-1 AT NAGAPATTINAM SA-0037-A 2000 1 400 110 POWERGRID NAGAPATTINAM TN-22 400KV DHARMAPURI LINE-2 AT NAGAPATTINAM SA-0038-A 2000 1 400 110 POWERGRID PUGALUR TP-01 400kV side of ICT 1 AT PUGULUR NP-5583-A 600 1 400 110 POWERGRID PUGALUR TP-02 230KV SIDE OF ICT 1 AT PUGULUR NP-5553-A 1000 1 220 110 POWERGRID PUGALUR TP-03 400kV side of ICT 2 AT PUGULUR NP-5552-A 600 1 400 110 POWERGRID PUGALUR TP-04 230KV SIDE OF ICT 2 AT PUGULUR NP-5554-A 1000 1 220 110 POWERGRID PUGALUR TP-07 400KV KALAVINTHAPATTU LINE 1 AT PUGALUR NP-9617-A 2000 1 400 110 POWERGRID PUGALUR TP-08 400KV KALAVINTHAPATTU LINE 2 AT PUGALUR NP-9619-A 2000 1 400 110 POWERGRID PUGALUR TP-09 400KV KARAIKUDI LINE 1 AT PUGALUR NP-9628-A 2000 1 400 110 POWERGRID PUGALUR TP-10 400KV KARAIKUDI LINE 2 AT PUGALUR NP-9630-A 2000 1 400 110 POWERGRID PUGALUR TP-11 400kV MADURAI 1 LINE AT PUGALUR NP-5586-A 1000 1 400 110 POWERGRID PUGALUR TP-12 400kV MADURAI 2 LINE AT PUGULUR NP-5584-A 1000 1 400 110 POWERGRID PUGALUR TP-13 400kV NEYVELI LINE AT PUGULUR NP-5556-A 1000 1 400 110 POWERGRID PUGALUR TP-14 400kV NLC TS 2 EXPN LINE AT PUGULUR NP-5555-A 1000 1 400 110 POWERGRID SALEM TS-01 400KV INTERCONNECTOR(TNEB) 1 AT SALEM (PG) NP-7316-A 1000 1 400 110 POWERGRID SALEM TS-02 400KV INTERCONNECTOR(PG) 1 AT SALEM (TNEB) NP-7317-A 1000 1 400 110 POWERGRID SALEM TS-03 400KV INTERCONNECTOR(TNEB) 2 AT SALEM (PG) NP-7660-A 1000 1 400 110 POWERGRID SALEM TS-04 400KV INTERCONNECTOR(PG) 2 AT SALEM (TNEB) NP-7661-A 1000 1 400 110 POWERGRID SALEM TS-11 400KV UDUMALPET LINE 1 AT SALEM NP-1500-A 1000 1 400 110 POWERGRID SALEM TS-12 400KV UDUMALPET LINE 2 AT SALEM NP-7662-A 1000 1 400 110 POWERGRID SALEM TS-13 400KV DHARAMAPURI LINE-1 AT SALEM SA-0245-A 2000 1 400 110 POWERGRID SALEM TS-14 400KV DHARAMAPURI LINE-2 AT SALEM SA-0247-A 2000 1 400 110 POWERGRID SALEM TS-15 400KV HOSUR LINE -1 AT SALEM SA-0022-A 1000 1 400 110 POWERGRID SALEM TS-16 400KV HOSUR LINE -2 AT SALEM SA-0036-A 1000 1 400 110 POWERGRID SALEM TS-17 400KV NLC TS2 LINE-1 AT SALEM SA-0023-A 1000 1 400 110 POWERGRID SALEM TS-18 400KV NLC TS2 LINE-2 AT SALEM SA-0032-A 1000 1 400 110 POWERGRID SRIPERUMBUDUR TS-21 400KV INTERCONNECTOR(TNEB) 1 AT SRIPERAMBADUR (PG) NP-1489-A 2000 1 400 110 POWERGRID SRIPERUMBUDUR TS-22 400KV INTERCONNECTOR(PG) 1 AT SRIPERAMBADUR (TNEB) NP-1486-A 1000 1 400 110 POWERGRID SRIPERUMBUDUR TS-23 400KV INTERCONNECTOR(TNEB) 2 AT SRIPERAMBADUR (PG) NP-1487-A 2000 1 400 110 POWERGRID SRIPERUMBUDUR TS-24 400KV INTERCONNECTOR(PG) 2 AT SRIPERAMBADUR (TNEB) NP-1488-A 1000 1 400 110 POWERGRID SRIPERUMBUDUR TS-31 400KV NELLORE LINE 1 AT SRIPERUMBUDUR NP-1234-A 1000 1 400 110 POWERGRID SRIPERUMBUDUR TS-32 400KV NELLORE LINE 2 AT SRIPERUMBUDUR NP-1485-A 1000 1 400 110 POWERGRID SRIPERUMBUDUR TS-33 400kV CHITTOOR LINE AT SRIPERUMBUDUR NP-1446-A 1000 1 400 110 POWERGRID SRIPERUMBUDUR TS-34 400kV SV CHATHRAM LINE AT SRIPERUMPUDUR SA-0053-A 2000 1 400 110 POWERGRID SRIPERUMBUDUR TS-35 400KV THIRUVELAM LINE SRIPERUMBUDUR SA-0054-A 1000 1 400 110 POWERGRID TRICHY TT-01 400kV side of ICT 1 AT TRICHY NP-8308-A 500 1 400 110 POWERGRID TRICHY TT-02 230kV side of ICT 1 AT TRICHY NP-5607-A 1000 1 230 110 POWERGRID TRICHY TT-03 400kV side of ICT 2 AT TRICHY NP-8309-A 500 1 400 110 POWERGRID TRICHY TT-04 230kV side of ICT 2 AT TRICHY NP-8310-A 1000 1 230 110 POWERGRID TRICHY TT-11 400KV MADURAI LINE AT TRICHY NP-8327-A 1000 1 400 110 ANNEXURE 2 (54 of 57)

POWERGRID TRICHY TT-12 400KV KARAIKUDI LINE AT TRICHY NP-8312-A 1000 1 400 110 POWERGRID TRICHY TT-13 400KV NAGAPATTINAM LINE 2 AT TRICHY NP-8311-A 1000 1 400 110 POWERGRID TRICHY TT-14 400KV NAGAPATTANAM LINE-1 AT TRICHY SA-0055-A 1000 1 400 110 POWERGRID TIRUNELVELI TT-21 400kV side of ICT 1 AT TIRUNELVELI NP-5675-A 600 1 400 110 POWERGRID TIRUNELVELI TT-22 220kV side of ICT 1 AT TIRUNELVELI NP-5676-A 1000 1 220 110 POWERGRID TIRUNELVELI TT-23 400kV side of ICT 2 AT TIRUNELVELI NP-5679-A 600 1 400 110 POWERGRID TIRUNELVELI TT-24 220kV side of ICT 2 AT TIRUNELVELI NP-5680-A 1000 1 220 110 POWERGRID TIRUNELVELI TT-30 400KV MADURAI LINE AT THIRUNELVELI SA-0126-A 1000 1 400 110 POWERGRID TIRUNELVELI TT-32 400KV KUDAMKULAM LINE 2 AT TIRUNELVELI NP-5671-A 2000 1 400 110 POWERGRID TIRUNELVELI TT-33 400KV KUDAMKULAM LINE 3 AT TIRUNELVELI NP-5658-A 2000 1 400 110 POWERGRID TIRUNELVELI TT-34 400KV KUDAMKULAM LINE 4 AT TIRUNELVELI NP-5659-A 2000 1 400 110 POWERGRID TIRUNELVELI TT-35 400KV TRIVANDRUM LINE 1 AT TIRUNELVELI NP-7654-A 1000 1 400 110 POWERGRID TIRUNELVELI TT-36 400KV TRIVANDRUM LINE 2 AT TIRUNELVELI NP-5678-A 1000 1 400 110 POWERGRID TIRUNELVELI TT-37 400KV UDUMALPET LINE 1 AT TIRUNELVELI NP-5656-A 1000 1 400 110 POWERGRID TIRUNELVELI TT-38 400KV UDUMALPET LINE 2 AT TIRUNELVELI NP-5657-A 1000 1 400 110 POWERGRID TIRUNELVELI TT-39 220KV EDAMON LINE 1 AT TIRUNELVELI NP-5574-A 1600 1 220 110 POWERGRID TIRUNELVELI TT-40 220KV EDAMON LINE 2 AT TIRUNELVELI NP-5575-A 1600 1 220 110 POWERGRID Thiruvalem 765 TT-66 765KV SIDE OF ICT 1 AT THIRUVALEM NP-9603-A 2000 1 765 110 POWERGRID Thiruvalem 765 TT-67 765KV SIDE OF ICT 2 AT THIRUVALEM NP-9608-A 2000 1 765 110 POWERGRID Thiruvalem 765 TT-68 400KV SIDE OF ICT 1 AT THIRUVALEM NP-9594-A 3000 1 400 110 POWERGRID Thiruvalem 765 TT-69 400KV SIDE OF ICT 2 AT THIRUVALEM NP-9597-A 3000 1 400 110 POWERGRID THIRUVALAM TT-70 400KV CHITTOOR LINE 1 AT THIRUVALEM NP-9583-A 2000 1 400 110 POWERGRID THIRUVALAM TT-71 400KV CHITTOOR LINE 2 AT THIRUVALEM NP-9581-A 2000 1 400 110 POWERGRID THIRUVALAM TT-72 400KV KOLAR LINE AT THIRUVALEM NP-9582-A 2000 1 400 110 POWERGRID THIRUVALAM TT-73 400KV SRIPERUMBUDUR LINE AT THIRUVALEM NP-9586-A 2000 1 400 110 POWERGRID THIRUVALAM TT-74 400KV NELLORE LINE 1 AT THIRUVALEM NP-9584-A 2000 1 400 110 POWERGRID THIRUVALAM TT-75 400KV NELLORE LINE 2 AT THIRUVALEM NP-9585-A 2000 1 400 110 POWERGRID THIRUVALAM TT-76 400KV KALAVINTHAPATTU LINE 1 AT THIRUVALEM NP-9595-A 2000 1 400 110 POWERGRID THIRUVALAM TT-77 400KV KALAVINTHAPATTU LINE 2 AT THIRUVALEM NP-9633-A 2000 1 400 110 POWERGRID THIRUVALAM TT-78 400 KV KURNOOL LINE 1 AT THIRUVALEM NP-9592-A 3000 1 765 110 POWERGRID THIRUVALAM TT-79 400 KV KURNOOL LINE 2 AT THIRUVALEM NP-9607-A 3000 1 765 110 POWERGRID THIRUVALAM TT-80 400KV BUS SECTION 2 AT THIRUVALEM NP-9621-A 2000 1 400 110 POWERGRID THIRUVALAM TT-81 400KV BUS SECTION 1 AT THIRUVALEM SA-0031-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-92 400KV DHARMAPURI LINE 1 AT TUTICORIN PS SA-0220-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-93 400KV DHARMAPURI LINE 2 AT TUTICORIN PS SA-0219-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-94 400KV COASTAL ENERGEN LINE-1 AT TUTICORIN PS SA-0058-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-95 400KV COASTAL ENERGEN LINE-2 AT TUTICORIN PS SA-0059-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-96 400KV MADURAI LINE 2 AT TUPS NP-9605-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-97 400KV MADURAI LINE 1 AT TUPS NP-9609-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-98 400KV CEPL LINE AT TUPS NP-9610-A 2000 1 400 110 POWERGRID TUTICORIN PS TT-99 400KV NTPL LINE AT TUPS NP-9641-A 2000 1 400 110 POWERGRID UDUMALPET TU-01 400kV side of ICT 1 AT UDUMALPET NP-5137-A 1000 1 400 110 POWERGRID UDUMALPET TU-02 230kV side of ICT 1 AT UDUMALPET NP-5138-A 1000 1 230 110 POWERGRID UDUMALPET TU-03 400kV side of ICT 2 AT UDUMALPET NP-5139-A 1000 1 400 110 POWERGRID UDUMALPET TU-04 230kV side of ICT 2 AT UDUMALPET NP-5140-A 1000 1 230 110 POWERGRID UDUMALPET TU-05 400kV side of ICT 3 AT UDUMALPET NP-5654-A 600 1 400 110 POWERGRID UDUMALPET TU-06 230kV side of ICT 3 AT UDUMALPET NP-5655-A 1000 1 230 110 POWERGRID UDUMALPET TU-11 400KV TIRUNELVELI LINE-1 AT UDUMALPET SA-0027-A 2000 1 400 110 POWERGRID UDUMALPET TU-12 400KV TIRUNELVELI LINE-2 AT UDUMALPET SA-0028-A 2000 1 400 110 POWERGRID UDUMALPET TU-13 400KV ARASUR LINE-1 AT UDUMALPET NP-5572-A 1000 1 400 110 POWERGRID UDUMALPET TU-14 400KV ARASUR LINE-2 AT UDUMALPET SA-0026-A 1000 1 400 110 SGPL (NCC PPL) SGPL (NCC PPL) NC-01 400KV NPS LINE 1 AT SGPL (NCC) NP-3112-A 3000 1 400 110 ANNEXURE 2 (55 of 57)

SGPL (NCC PPL) SGPL (NCC PPL) NC-02 400KV NPS LINE 1 AT SGPL (NCC) NP-3113-A 3000 1 400 110 SGPL (NCC PPL) SGPL (NCC PPL) NC-03 400KV NPS LINE 2 AT SGPL (NCC) NP-3114-A 3000 1 400 110 SGPL (NCC PPL) SGPL (NCC PPL) NC-04 400KV NPS LINE 2 AT SGPL (NCC) NP-3115-A 3000 1 400 110 SGPL (NCC PPL) SGPL (NCC PPL) NC-05 400KV SIDE OF GT AT SGPL (NCC) NP-3142-A 2000 1 400 110 SGPL (NCC PPL) SGPL (NCC PPL) NC-06 GT-2 OF SGPL (NCC) NP-3126-A 500 1 400 110 TANTRANSCO ALAMATHY TA-01 400kV side of ICT 1 AT ALMATHY NP-5609-A 500 1 400 110 TANTRANSCO ALAMATHY TA-02 110kV side of ICT 1 AT ALMATHY NP-4045-A 1200 1 110 110 TANTRANSCO ALAMATHY TA-03 400kV side of ICT 2 AT ALMATHY NP-5610-A 1000 1 400 110 TANTRANSCO ALAMATHY TA-04 230kV side of ICT 2 AT ALMATHY NP-2480-A 1600 1 230 110 TANTRANSCO ALAMATHY TA-05 400kV side of ICT 3 AT ALMATHY NP-5611-A 1000 1 400 110 TANTRANSCO ALAMATHY TA-06 230kV side of ICT 3 AT ALMATHY NP-2537-A 1600 1 230 110 TANTRANSCO ALAMATHY TA-11 400KV VALLUR LINE 1 AT ALAMATHY NP-7819-A 2000 1 400 110 TANTRANSCO ALAMATHY TA-12 400KV VALLUR LINE 2 AT ALAMATHY NP-7817-A 2000 1 400 110 TANTRANSCO ALAMATHY TA-13 400KV THIRUVALEM (TN) LINE 1 AT ALAMATHY NP-7262-A 2000 1 400 110 TANTRANSCO ALAMATHY TA-14 400KV THIRUVALEM (TN) LINE 2 AT ALAMATHY NP-7818-A 2000 1 400 110 TANTRANSCO ARNI TA-51 230KV MAPS LINE AT ARNI NP-0000-A 1 1 1 1 TANTRANSCO ARNI TA-52 230KV BHAVNI LINE 1 AT ARNI NP-7307-A 800 1 230 110 TANTRANSCO ARNI TA-53 230KV BHAVNI LINE 2 AT ARNI NP-7308-A 800 1 230 110 TANTRANSCO ACHARAPAKKAM TA-54 230KV MAPS LINE AT ACHARAPAKAM NP-6175-A 600 1 230 110 TANTRANSCO ECHUR TE-01 230KV MAPS LINE AT ECHUR NP-6174-A 600 1 230 110 TANTRANSCO GUMMIDIPUNDI TG-01 230KV SULURPET LINE AT GUMMIDIPONDI NP-6173-A 600 1 230 110 TANTRANSCO HOSUR230 TH-30 230KV YERANDAHALLI LINE AT HOSUR (TN) NP-6036-A 600 1 230 110 TANTRANSCO KUZHITHURAI TK-40 110KV PARASALA LINE AT KUZHITHURAI NP-5640-A 100 1 110 110 TANTRANSCO KADLANGUDI TK-41 230KV NLC TS 2 LINE AT KADALANGUDI TN-9333-A 800 1 230 110 TANTRANSCO Kaythar TK-50 400KV KARAIKUDI LINE 2 AT KAYTHAR NP-9634-A 2000 1 400 110 TANTRANSCO Kaythar TK-51 400KV KARAIKUDI LINE 1 AT KAYATAR NP-9629-A 2000 1 400 110 TANTRANSCO KAMUTHI TK-52 400KV KARAIKUDI LINE AT KAMUTHI LT-0316-A 2000 1 400 110 TANTRANSCO METTUR TM-21 400KV ARASUR LINE 1 AT METTUR NP-8352-A 1000 1 400 110 TANTRANSCO METTUR TM-22 400KV ARASUR LINE 2 AT METTUR NP-8362-A 1000 1 400 110 TANTRANSCO NCTPS TN-11 400KV VALLUR LINE 1 AT NCTPS NP-7809-A 1000 1 400 110 TANTRANSCO NCTPS TN-12 400KV VALLUR LINE 2 AT NCTPS NP-8360-A 1000 1 400 110 TANTRANSCO PUDUR TP-15 230KV KUDANKULAM LINE AT PUDUR NP-5131-A 1200 1 230 110 TANTRANSCO SV CHATRAM TS-41 400KV PONDY LINE AT SV CHATRAM NP-8359-A 2000 1 400 110 TANTRANSCO SV CHATRAM TS-42 400kV SRIPERUMBUDUR LINE AT SV CHATRAM NP-8358-A 2000 1 400 110 TANTRANSCO SP KOIL TS-50 230KV MAPS LINE 1 AT SP KOIL NP-6176-A 1200 1 230 110 TANTRANSCO SP KOIL TS-51 230KV MAPS LINE 2 AT SP KOIL NP-6177-A 800 1 230 110 TANTRANSCO SIRUCHERI TS-53 230KV BHAVNI LINE 1 AT SIRUSERI NP-7306-A 1200 1 230 110 TANTRANSCO SIRUCHERI TS-54 230KV BHAVNI LINE 2 AT SIRUSERI NP-6181-A 1200 1 230 110 TANTRANSCO STCMS TS-55 230KV NLC ST 1 LINE AT STCMS TN-7596-A 800 1 230 110 TANTRANSCO TTPS TT-15 230KV KNPP LINE AT TTPS LT-0160-A 800 1 230 110 TANTRANSCO TTPS TT-16 230KV KNPP LINE AT TTPS LT-0173-A 800 1 230 110 TANTRANSCO THENI TT-50 230KV MOOZHIYAR LINE AT THENI NP-0601-B 600 5 230 110 TANTRANSCO TIRUVALEM TT-51 230KV CHITOOR LINE AT TIRUVALAM NP-0607-B 600 5 230 110 TANTRANSCO TIRUVALEM TT-85 400KV BUS SECTION 1 AT THIRUVALAM NP-9624-A 4000 1 400 110 TANTRANSCO TIRUVALEM TT-86 400KV BUS SECTION 2 AT THIRUVALAM NP-9626-A 4000 1 400 110 TANTRANSCO UDUMALPET230 TU-21 230kV IDUKKI LINE AT UDUMALPET (TNEB) NP-9648-B 600 5 230 110 TANTRANSCO ULUNDURPET TU-22 230KV NLC TS 2 LINE AT ULUNDURPET TN-7595-A 800 1 230 110 TELENGANA ALAMPUR X Roads GA-60 132KV AP CARBIDES LINE 1 AT ALAMPUR X ROAD NP-3084-A 600 1 132 110 TELENGANA ASWARAPET GA-61 132KV KAMAVARAPUKOTA LINE 1 AT ASWAROPET NP-3043-A 600 1 132 110 TELENGANA ASWARAPET GA-62 132KV KAMAVARAPUKOTA LINE 2 AT ASWAROPET NP-3044-A 600 1 132 110 TELENGANA ALAMPUR X Roads GA-63 132KV AP CARBIDES LINE 2 AT ALAMPUR X ROAD NP-3104-A 600 1 132 110 TELENGANA CHALAKURTHY GC-12 220KV TALLAPALLI LINE AT CHALAKURTHY NP-3056-A 800 1 220 110 ANNEXURE 2 (56 of 57)

TELENGANA DINDI GD-01 220KV SRISAILAM LINE 1 AT DINDI NP-3089-A 800 1 220 110 TELENGANA DINDI GD-02 220KV SRISAILAM LINE 2 AT DINDI NP-3090-A 800 1 220 110 TELENGANA JURALA GJ-01 220KV RAICHUR LINE 1 AT JURALA NP-3050-A 800 1 220 110 TELENGANA JURALA GJ-02 220KV RAICHUR LINE 2 AT JURALA NP-3049-A 800 1 220 110 TELENGANA KTPS GK-01 220kV NUNNA LINE at KTPS NP-3096-A 800 1 220 110 TELENGANA KTPS3 GK-02 220KV L SILERU LINE 1 AT KTPS NP-3093-A 800 1 220 110 TELENGANA KTPS3 GK-03 220KV L SILERU LINE 2 AT KTPS NP-3053-A 1000 1 220 110 TELENGANA Narketpalli GK-10 220KV CHILLAKALLU LINE 1 AT NARKETPALLI NP-3082-A 800 1 220 110 TELENGANA Narketpalli GK-11 220KV CHILLAKALLU LINE 2 AT NARKETPALLI NP-3083-A 800 1 220 110 TELENGANA ALAMPUR X Roads GK-30 400KV VTPS LINE 1 AT MALKARAM NP-3088-A 2000 1 400 110 TELENGANA ALAMPUR X Roads GK-31 400KV VTPS LINE 2 AT MALKARAM NP-3087-A 1000 1 400 110 TELENGANA ALAMPUR X Roads GK-52 132KV CHILLAKALLU LINE AT KHAMMAM NP-3040-A 300 1 132 110 TELENGANA KUSUMANCHI GK-53 132kV CHILLAKALLU LINE at KUSUMANCHI NP-3042-A 600 1 132 110 TELENGANA KODADA GK-54 132kV CHILLAKALLU LINE at KODADA NP-3046-A 500 1 132 110 TELENGANA MADHIRA GM-32 132kV CHILLAKALLU LINE at MADHIRA NP-3041-A 600 1 132 110 TELENGANA RAMPURAM GR-01 132kV CHILLAKALLU LINE at RAMPURAM NP-3045-A 600 1 132 110 TELENGANA SRISAILEM LB GS-60 400kV KURNOOL LINE at Srisailam LB NP-3037-A 2000 1 400 110 TELENGANA SRISAILEM LB GS-61 400KV SATTENAPALLI LINE 1 AT SRISAILAM LB NP-3038-A 2000 1 400 110 TELENGANA SRISAILEM LB GS-62 400KV SATTENAPALLI LINE 2 AT SRISAILAM LB NP-3039-A 2000 1 400 110 TELENGANA SEETHAPURAM GS-63 132kV CHILLAKALLU LINE at SEETHAPURAM NP-3092-A 600 1 132 110 TELENGANA SEETHAPURAM GS-64 132kV KCP CEMENTS LINE at SEETHAPURAM NP-3094-A 150 1 132 110 TELENGANA ALAMPUR X Roads GS-65 220KV SRISAILAM RB LINE AT N'SAGAR NP-3060-A 600 1 220 110 TELENGANA ALAMPUR X Roads GS-66 132KV N'SAGAR RIGHT CANAL LINE AT N'SAGAR NP-3061-A 600 1 132 110 TELENGANA SURYAPETA GS-67 220KV CHILLAKALLU LINE-1 AT SURYAPETA NP-3194-A 800 1 220 110 TELENGANA ALAMPUR X Roads GT-60 220KV TALAPALLI LINE 3 AT N'SAGAR NP-3059-A 800 1 220 110 TELENGANA ALAMPUR X Roads GT-61 220KV TALAPALLI LINE 1 AT N'SAGAR NP-3057-A 1600 1 220 110 TELENGANA ALAMPUR X Roads GT-63 220KV TALAPALLI LINE 2 AT N'SAGAR NP-3058-A 1600 1 220 110 TELENGANA WARNAPARTHY GW-01 220kV BRAHMANAKOTKUR LINE at WANAPARTHY NP-3085-A 800 1 220 110 TELENGANA WADAPALLI GW-10 132kV TANGEDA LINE at WADAPALLI NP-3064-A 600 1 132 110 TELENGANA WADAPALLI GW-11 132kV PIDUGURALLA LINE at WADAPALLI NP-3063-A 600 1 132 110 WRR BHADRAVATHI WR-01 400kV WEST BUS 1 AT BHADRAVATI NP-4165-A 2000 1 400 110 WRR BHADRAVATHI WR-02 400kV WEST BUS 2 AT BHADRAVATI NP-4214-A 2000 1 400 110 WRR BHADRAVATHI WR-03 400kV SOUTH BUS 1 AT BHADRAVATI NP-2310-A 2000 1 400 110 WRR BHADRAVATHI WR-04 400kV SOUTH BUS 2 AT BHADRAVATI NP-4215-A 2000 1 400 110 WRR KORBA WR-05 WR MASTER FREQUENCY METER NP-2465-A 2000 1 400 110 WRR KOLHAPUR WR-51 765KV KUDGI LINE 1 AT KOLHAPUR (CHARGED AT 400KV) NP-8841-A 2000 1 400 110 WRR KOLHAPUR WR-52 765KV KUDGI LINE 2 AT KOLHAPUR (CHARGED AT 400KV) NP-8843-A 2000 1 400 110 ANNEXURE 2 (57 of 57)

ANNEXURE 3 (1/1)

ANNEXURE 4 (1/1)

ANNEXURE 5 (1/2)

ANNEXURE 5 (2/2)

ANNEXURE 6 (1/2)

ANNEXURE 6 (2/2)

ANNEXURE 7 (1/2)

ANNEXURE 7 (2/2)

ANNEXURE 8 (1/9)

ANNEXURE 8 (2/9)

ANNEXURE 8 (3/9)

ANNEXURE 8 (4/9)

ANNEXURE 8 (5/9)

ANNEXURE 8 (6/9)

ANNEXURE 8 (7/9)

ANNEXURE 8 (8/9)

ANNEXURE 8 (9/9)

ANNEXURE 9 (1/1)

ANNEXURE 10 (1/6) Western Regional Power Committee Mumbai Record Notes of discussions held on 9 th December 2016 at WRPC, Mumbai between WR and SR constituents regarding outstanding payment issues A meeting between SR & WR constituents to discuss the outstanding dues between Southern & Western Regional constituents was held on 9.12.2016 at WRPC, Mumbai. The list of participants is at Annexure-1. Shri Satyanarayan.S, Superintending Engineer (C), WRPC welcomed the participants from SR & WR to the Meeting. He informed the forum that the outstanding dues were settled by MSEDCL (MSEB) to SR constituents and the issue have narrowed down since last meeting. He informed the forum that the issue of pending payment between WR-SR was pending for a long time and requested the WR-SR constituents to make efforts to sort out this issue with in the financial year 2016-17. He stated that the WR-SR dues have two parts, one pertaining to the energy transactions and the second part is the amount payable by PGCIL (WRTS / SRTS) to SR Constituents, which was earlier credited wholly to WRTS account. 1. Outstanding payment issues between SR and WR Constituents. 1.1. After the discussions the final reconciled figures of outstanding dues, except in the case of MPPMCL, were agreed as below:- S.NO Payable by WR constituents State/ Utility Receivable from Kerala 1 CSPDCL 7,05,279 2 GUVNL * 4,98,019 48,355 ( `) Puducherry ( `) * GUVNL had paid Rs. 5,59,936/- (against an outstanding of Rs. 10,57,955/-) and Rs. 54,366/- (against an outstanding of Rs. 1,02,721/-) to Kerala and Puducherry respectively.

ANNEXURE 10 (2/6) S.NO Payable by SR constituents State / Utility Receivable from GUVNL (`) CSPDCL 1 Karnataka 9,40,320 73,72,176 2 TamilNadu 92,77,878 (`) 1.2. GUVNL stated that on receipt of the dues from Karnataka they would immediately settle the dues to Kerala and Puducherry. 1.3. Tamil Nadu stated that once the receivable from MPPMCL is realized then they would settle the dues to CSPDCL. 1.4. It is noted that the there was no participation from Karnataka in the meeting, in spite of repeated reminders. The WR constituents were of the opinion that since the Karnataka owes outstanding dues to WR constituents their representation in the discussion would have hastened the reconciliation and requested SRPC Secretariat to take up the matter with KPTCL / PCKL. 1.5. MPPMCL had stated that the due amounts as indicated in the minutes / record notes of the previous meetings on the issue were not acceptable to MPPCL and they have informed the forum that they will submit the details of pending dues to MPPCL from SR constituents shortly. In a nutshell MPPCL informed the forum that as per their records they have to receive money from AP and Kerala and they are finding some difference in the amount payable to TamilNadu. 1.6. SE (C ),SRPC informed the forum that MPPPCL had not attended the previous meetings and they have not responded with in the reasonable time to the Minutes of the meeting to correct them. He also informed the forum that MPPCL did not responded to the requests of SR constituents letters wrt to reconciliation of accounts. 1.7. Representative from Tamil Nadu stated that meeting regarding the issue was held with Director (Finance), MPPMCL and the amount reconciled was Rs. 1,17,17,268/- (payable to Tamil Nadu) and now MPPCL had come up with different figure. This would not help in settling the dues early. 1.8. The forum requested MPPMCL to furnish all the documents pertaining to their claims by the end of December 2016, so that the figures can be verified by respective entities and hopefully reconcile the figures before the next meeting of WRPC. 1.9. SE (C ),WRPC informed that if it is needed a meeting at Jabalpur, Madhya Pradesh would be convened with a participation from AP, Kerala and TN to reconcile the figures.

ANNEXURE 10 (3/6) 1.10. SE (C), WRPC also stated that after reconciliation of accounts WR constituents would attend the meeting with SR constituents during the next CCM meeting of SRPC and hoped that all the outstanding dues would be cleared at an early date. 1.11. MPPMCL agreed to furnish all the documents wrt to their claim to the SR constituents by the end of December, 2016. 1.12. The forum requested respective SR constituents to respond to MMPCL facts and figures within a fortnight to reconcile the accounts. 1.13. MPPMCL also stated that the wheeling charge issue in respect of the transaction with KSEB would be taken up with GRIDCO/KSEB separately. 1.14. Superintending Engineer (C), SRPC requested the WR and SR constituents to take up the pending payment issues directly with the respective utility with a copy to WRPC and SRPC secretariats. He also requested utilities to reconcile the figures first to sort out the long pending payment issues. 2. Outstanding payment in respect of WR export to SR during August and September, 2002. 2.1. The second part of the outstanding dues, regarding the amount payable by PGCIL (WRTS / SRTS) to SR Constituents, in respect of the energy export from WR to SR during August- September, 2002, which was earlier credited wholly to WR by WRTS. 2.2. During the last meeting held on 28.10.2014, WRTS stated that they had verified the statements of SEBs and it was found that the amount received from PTC was reflected in the reconciliation statements of 2004-05 signed with individual SEBs, except GUVNL and DD and requested the WR constituents to reimburse 50% of the amount credited to them in this respect. The status of reimbursement furnished by WRTS was as under:- S.NO SEB Amount Ratio Amount to Status credited (`) Reimbursed (`) 1 MPSEB 80,33,192 0.2161 40,07,044 Under Process 2 CSEB 27,52,273 0.0740 13,72,148 Under Process 3 MSEB 1,31,21,208 0.3529 65,43,664 Under Process 4 GOA 15,61,537 0.0420 7,78,787 Payment received 5 DNH 13,61,802 0.0366 6,78,657 Payment received

ANNEXURE 10 (4/6) 2.3. Payable amount by PGCIL (WRTS / SRTS) to SR Constituents (as on 09.12.2016) S.NO State/UT Amount (`) Received(`) Paid by SRTS II on 01.04.2016 (`) Balance to receive (`) 1 Andhra Pradesh & Telangana 47,05,447 3,69,848 10,16,847 33,18,752 2 Karnataka 49,79,733 3,91,407 10,76120 35,12,206 3 Kerala 27,58,402 2,16,811 5,96,091 19,45,500 4 Tamil Nadu 47,21,994 3,71.149 10,20,423 33,30,422 5 Puducherry 9,24,035 72,629 1,99,684 6,51,722 6 Total 1,80,89,611 14,21,844 39,09,165 1,27,58,602 2.4. WRTS stated that the reconciliation would be completed before the next WRPC meeting. Superintending Engineer (C), WRPC thanked all the participants for the proactive role played by them in sorting out the long pending WR-SR outstanding dues issue. ***

ANNEXURE 10 (5/6)

ANNEXURE 10 (6/6)

ANNEXURE 11 (1/3)

ANNEXURE 11 (2/3)

ANNEXURE 11 (3/3)

ANNEXURE 12 (1/5)

ANNEXURE 12 (2/5)

ANNEXURE 12 (3/5)

ANNEXURE 12 (4/5)

ANNEXURE 12 (5/5)

ANNEXURE 13 (1/11) TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED From To Chief Engineer/SLDC APTRANSCO Vidyut Soudha Khairatabad Hyderabad 500 082. Member-Secretary Southern Regional Power Committee (SRPC) Central Electricity Authority 29, Race Course Cross Road Bangalore-560 009 Tel: 080-22259343 Fax: 080-22352616 Letter No. CE(SLDC)/SE(SLDC)/F.POC/D.No.594/2016, dated: 09.12.2016. Sir, Sub: APTRANSCO SLDC - Request for certification of intra-state lines of APTRANSCO with incidental flows for inter-state power transfers as Interstate Transmission System (ISTS) lines. Ref: (1)Letter No.CE/SLDC/SE/SLDC/F.POC/D.No.634/16, dated;26.10.2016. (2)Letter No.SRPC?SE-1/4(Dev)/2016/7296-97, dated:31.10.2016. (3) Letter No.CE/SLDC/SE/SLDC/F.POC/D.No.519/16, dated:23.11.2016. (4)Letter No.SRPC/SE-1/4(dev0/2016, dated:23.11.2016 As per the Central Electricity Regulatory Commission (CERC) (Sharing of Interstate Transmission Charges and Losses Regulations, 2010 or Sharing Regulations), it must be noted that State Transmission Utility (STU) lines used for carrying Inter-State power need to be certified by the Regional Power Committee (RPC) in order to be considered for inclusion in PoC charges. It must be also noted that Section 2(36) of the Electricity Act, 2003 defines the ISTS as under: Inter-State transmission system includes(ii) The conveyance of electricity across the territory of any intervening State as well as conveyance within the State which is incidental to such inter-state transmission of electricity; Further, the Intra-State lines used for carrying Inter-State power can be considered for inclusion in the PoC charges only if it is certified by RPC as per Clause 2.1.3 of Annexure-I CERC (Sharing of inter-state Transmission Charges and Losses Regulations, 2010) as amended in CERC (Sharing of inter-state Transmission Charges and Losses) (Third Amendment) Regulations 2015, extracted as under, Certification of non-ists lines carrying inter-state power, which were not approved by the RPCs on the date of notification of the Central Electricity Regulatory Commission (Sharing of Transmission Charges and Losses) Regulations, 2009, shall be done on the basis of load flow studies. For this purpose, STU shall put up proposal to the respective RPC Secretariat for approval. RPC Secretariat, in consultation with RLDC, using Web Net Software would examine

ANNEXURE 13 (2/11) the proposal. The results of the load flow studies and participation factor indicating flow of Inter State power on these lines shall be used to compute the percentage of usage of these lines as inter State transmission. The software in the considered scenario will give percentage of usage of these lines by home State and other than home State. For testing the usage, tariff of similar ISTS line may be used. The tariff of the line will also be allocated by software to the home State and other than home State. Based on percentage usage of ISTS in base case, RPC will approve whether the particular State line is being used as ISTS or not. Concerned STU will submit asset-wise tariff. If asset wise tariff is not available, STU will file petition before the Commission for approval of tariff of such lines. The tariff in respect of these lines shall be computed based on Approved ARR and it shall be allocated to lines of different voltage levels and configurations on the basis of methodology which is being done for ISTS lines. In line with the stated regulations, we have identified the Intra-State lines that carry interstate power and are submitting the same for approval as ISTS lines. The intra-state lines have been identified as ISTS lines based on power flow studies carried out on the WebNet Software. The assumptions taken while doing the power flow studies on WebNet software for Q3 FY16-17 are given in Annexure I. Only the transmission lines that have more than 10% utilization by other states have been requested for approval as ISTS lines. The total list of transmission lines of the STU along with the utilization by home state (Andhra Pradesh) and other states has been enclosed in the Annexure II. SRPC may consider a lower utilization as cutoff for classification of the lines as ISTS line. (The details of results of power flow studies and PSS/E file is sent through mail). The list of lines with more than 10% utilization by other states is as below: Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) Sr No Line 1 CHITOOR-SDSTPS:1 400 16% 84% 302.53 2 CHITOOR-SDSTPS:2 400 16% 84% 302.53 3 GAZUWAKA1-KALPAKKA1:1 400 5% 95% 3.16 4 GAZUWAKA1-KALPAKKA1:2 400 5% 95% 3.16 5 JAMALAMADUGU-URAVAKONDA:1 400 33% 67% 118.32 6 JAMALAMADUGU-URAVAKONDA:2 400 33% 67% 118.32 7 KALPAKKA1-HINDUJA:1 400 66% 34% 6.80 8 KALPAKKA1-HINDUJA:2 400 66% 34% 6.80 9 KALPAKKA1-SIMHADRI:1 400 69% 31% 3.47 10 KALPAKKA1-SIMHADRI:2 400 69% 31% 3.47 11 KALPAKKA1-SIMHADRI:3 400 69% 31% 3.47 12 KALPAKKA1-SIMHADRI:4 400 69% 31% 3.47 13 KALPAKKA1-VEMAGIRI1:1 400 64% 36% 155.52 14 KALPAKKA1-VEMAGIRI1:2 400 64% 36% 155.52 15 NLR-AP-SDSTPS:1 400 63% 37% 58.82 16 NLR-AP-SDSTPS:2 400 63% 37% 58.82 17 NUNNA2-STNPLLI1:1 400 35% 65% 142.12

ANNEXURE 13 (3/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 18 NUNNA2-VEMAGIRI1:1 400 37% 63% 183.89 19 NUNNA2-VTS-IV:1 400 17% 83% 17.38 20 SIMHADRI-SMHDRI-2:@1 400 75% 25% 1.29 21 VEMAGIRI1-GMR1:1 400 58% 42% 1.64 22 VEMAGIRI1-GMR1:2 400 58% 42% 1.64 23 VEMAGIRI1-STNPLLI1:1 400 43% 57% 316.48 24 VTS-IV-NLR-AP:1 400 35% 65% 17.38 25 VTS-IV-STNPLLI1:1 400 46% 54% 61.49 26 VTS-IV-STNPLLI1:2 400 46% 54% 61.49 27 KURNOOL1-JAMALAMADUGU:1 * 400 33% 67% 160.39 28 KURNOOL1-JAMALAMADUGU:2 * 400 33% 67% 160.39 29 A.PCADES-KURNOOL:1 220 63% 37% 5.64 30 A.PCADES-KURNOOL:2 220 63% 37% 5.64 31 ANATHPUR-TIMMPR:1 220 83% 17% 18.16 32 ANATHPUR-TIMMPR:2 220 83% 17% 18.16 33 BHEMAOLU-PALL:1 220 71% 29% 11.49 34 BHEMAOLU-PALL:2 220 71% 29% 11.49 35 BHEMAOLU-VIJESM-I:1 220 75% 25% 24.83 36 BOMMUR-LOWRERU:1 220 67% 33% 49.76 37 BOMMUR-PEDAPRAM:1 220 89% 11% 19.20 38 BOMMUR-VEMAGIRI:1 220 74% 26% 1.41 39 BOMMUR-VEMAGIRI:2 220 74% 26% 1.41 40 BOMMUR-VEMAGIRI:3 220 74% 26% 7.25 41 BOMMUR-VIJESM-I:1 220 75% 25% 4.99 42 BOMMUR-VIJHE-II:2 220 73% 27% 4.99 43 BOYRELLI-TADPATRI:1 220 88% 12% 12.46 44 CHITTOOR4-CHITTOOR:1 220 28% 72% 6.32 45 CHITTOOR4-CHITTOOR:2 220 28% 72% 6.32 46 CHITTOOR4-NGRI:1 220 85% 15% 41.90 47 CHITTOOR4-RENGUNTA:2 220 83% 17% 31.36 48 CHITTOOR-KALIKIRI:1 220 22% 78% 28.22 49 CHNKMPLY-KALIKIRI:1 220 61% 39% 36.84 50 CHNKMPLY-MUDDANUR:1 220 83% 17% 21.16 51 CHNKMPLY-MUDDANUR:2 220 83% 17% 21.16 52 CHNKMPLY-MUDDANUR:3 220 82% 18% 22.34 53 CHNKMPLY-MUDDANUR:4 220 82% 18% 22.34 54 CHNKMPLY-RAJAMPET:1 220 82% 18% 24.57 55 CHNKMPLY-RENGUNTA:1 220 77% 23% 56.86 56 CUDDAPAH-CHNKMPLY:1 220 89% 11% 6.21

ANNEXURE 13 (4/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 57 CUDDAPAH-MYDUKUR:1 220 75% 25% 13.74 58 DONKARAI-LOWRERU:1 220 67% 33% 20.51 59 DONKARAI-UPPRERU:1 220 67% 33% 12.36 60 GAZUWAKA-GANGAVRAM:2 220 83% 17% 3.49 61 GAZUWAKA-GAZUWAKA-PG:1 220 83% 17% 5.24 62 GAZUWAKA-PENURTHI:1 220 83% 17% 18.55 63 GAZUWAKA-PG-GANGAVRAM:2 220 84% 16% 4.36 64 GAZUWAKA-PG-KAKINADA:1 220 71% 29% 79.00 65 GAZUWAKA-PG-KALPAKKA:1 220 79% 21% 1.37 66 GAZUWAKA-PG-KALPAKKA:2 220 79% 21% 1.37 67 GAZUWAKA-PG-PARWADA:1 220 70% 30% 2.71 68 GAZUWAKA-PG-PENURTHI:1 220 83% 17% 11.93 69 GAZUWAKA-PG-PENURTHI:2 220 83% 17% 11.93 70 GOOTY-PG-ANATHPUR:1 220 66% 34% 25.93 71 GOOTY-PG-BHOGASRAM:1 220 40% 60% 18.94 72 GOOTY-PG-BOYRELLI:1 220 84% 16% 16.01 73 GOOTY-PG-DHONE:1 * 220 67% 33% 33.53 74 GOOTY-PG-DHONE:2 * 220 67% 33% 33.53 75 GOOTY-PG-GTY-RLY:2 220 54% 46% 1.55 76 GOOTY-PG-SHAPURAM:1 220 70% 30% 54.03 77 GTY-AP2-GOOTY-PG:1 220 54% 46% 1.88 78 GTY-AP2-GTY-RLY:2 220 54% 46% 1.54 79 GTY-AP2-RGLPDU:1 220 36% 64% 25.04 80 GUDIVADA-BHEMARAM:1 220 57% 43% 21.94 81 GUDIVADA-BHEMARAM:2 220 57% 43% 21.94 82 GUNADALA-NUNNA:1 220 53% 47% 2.69 83 HINDUPUR-PULVEULA:1 220 90% 10% 46.70 84 HINDUPUR-PULVEULA:2 220 90% 10% 46.70 85 HINDUPUR-SHAPURAM:1 220 83% 17% 13.29 86 HINDUPUR-SHAPURAM:2 220 83% 17% 13.29 87 JEGRUADU-NIDDAOLU:1 220 86% 14% 10.82 88 KALPAKKA-BRANDIX:1 220 84% 16% 8.72 89 KALPAKKA-BRANDIX:2 220 84% 16% 8.72 90 KALPAKKA-DAIYARM:1 220 83% 17% 19.16 91 KALPAKKA-DAIYARM:2 220 83% 17% 19.16 92 KONAPLLY-CHILALLU:1 220 7% 93% 22.05 93 KONAPLLY-CHILALLU:2 220 7% 93% 22.05 94 KONAPLLY-KONAPGS:1 220 44% 56% 0.30 95 KONAPLLY-KONAPGS:2 220 44% 56% 0.30

ANNEXURE 13 (5/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 96 KONAPLLY-VTPS:1 220 22% 78% 2.40 97 KONAPLLY-VTPS:2 220 22% 78% 2.40 98 KURNOOL-BKOTKUR:1 220 26% 74% 10.12 99 MUDDANUR-TIMMPR:1 220 80% 20% 15.56 100 MUDDANUR-TIMMPR:2 220 80% 20% 15.56 101 NARARETA-STNPLLI:1 220 61% 39% 17.32 102 NARARETA-STNPLLI:2 220 61% 39% 17.32 103 NELLORE-NLR42:1 220 80% 20% 17.21 104 NELLORE-NLR42:2 220 80% 20% 17.21 105 NELLORE-NLR42:3 220 80% 20% 13.53 106 NELLORE-ONGOLE:1 220 51% 49% 55.78 107 NELLORE-PODILI1:1 220 51% 49% 61.41 108 NELLORE-PODILI1:2 220 51% 49% 61.41 109 NIDDAOLU-PALL:1 220 74% 26% 11.49 110 NIDDAOLU-PALL:2 220 74% 26% 11.49 111 NLR42-RCHGNRI:1 220 49% 51% 32.50 112 NLR42-RCHGNRI:2 220 49% 51% 32.50 113 NLR42-SBQ:1 220 75% 25% 8.05 114 NLR42-SBQ:2 220 75% 25% 8.05 115 NUNNA-GUDIVADA:1 220 84% 16% 37.12 116 NUNNA-GUDIVADA:2 220 84% 16% 37.12 117 ONGOLE-PODILI1:1 220 81% 19% 13.62 118 ONGOLE-PODILI1:2 220 81% 19% 13.62 119 PALL-PATT:1 220 88% 12% 11.08 120 PALL-PATT:2 220 88% 12% 11.08 121 PEDAPRAM-ANRAKU:1 220 78% 22% 52.16 122 PEDAPRAM-BSES:1 220 76% 24% 0.92 123 PEDAPRAM-BSES:2 220 76% 24% 0.92 124 PEDAPRAM-GMRBORGE:1 220 76% 24% 10.45 125 PEDAPRAM-GMRBORGE:2 220 76% 24% 10.45 126 PENURTHI-DAIYARM:1 220 81% 19% 5.48 127 PENURTHI-DAIYARM:2 220 81% 19% 5.48 128 PENURTHI-UPPRERU:1 220 70% 30% 72.77 129 PODILI1-MARKAPRAM:1 220 52% 48% 31.41 130 PODILI1-NARARETA:1 220 56% 44% 39.65 131 PODILI1-PRCHUR:1 220 56% 44% 28.81 132 PODILI1-PRCHUR:2 220 56% 44% 28.81 133 PRCHUR-STNPLLI:1 220 65% 35% 46.48 134 PRCHUR-STNPLLI:2 220 65% 35% 46.48

ANNEXURE 13 (6/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 135 RAJAMPET-KODURU:1 220 78% 22% 16.71 136 RENGUNTA-KODURU:1 220 76% 24% 25.86 137 RENGUNTA-NGRI:1 220 52% 48% 22.04 138 RENGUNTA-RCHGNRI:1 220 44% 56% 6.68 139 RENGUNTA-RCHGNRI:2 220 44% 56% 6.68 140 RGLPDU-SUZLON-W21:1 220 33% 67% 0.37 141 RGLPDU-SUZLON-W21:2 220 33% 67% 0.37 142 SOMYALLI-BELKALAGDUR:2 220 58% 42% 16.57 143 SOMYALLI-DHONE:2 220 38% 62% 15.77 144 SOMYALLI-DHONE:3 220 38% 62% 15.77 145 SOMYALLI-KURNOOL:1 220 64% 36% 8.10 146 SOMYALLI-KURNOOL:2 220 64% 36% 8.10 147 SRIAILAM-BELKALAGDUR:1 220 62% 38% 33.61 148 SRIAILAM-MARKAPRAM:1 220 90% 10% 32.35 149 SRIAILAM-MYDUKUR:1 220 45% 55% 75.07 150 SRIAILAM-PODILI1:1 220 85% 15% 51.34 151 SRIAILAM-SOMYALLI:1 220 59% 41% 46.26 152 SRIAILAM-TALAPLLI:1 220 35% 65% 36.49 153 SRIAILAM-TALAPLLI:2 220 35% 65% 36.49 154 SujilonPS-VAJR:1 220 33% 67% 2.27 155 SULURETA-NLR42:1 220 13% 87% 25.16 156 SULURETA-NLR42:2 220 13% 87% 37.45 157 SULURETA-NLR42:3 220 13% 87% 25.16 158 TADKONDA-ONGOLE:1 220 69% 31% 41.55 159 TADKONDA-VTPS:1 220 79% 21% 11.17 160 TADKONDA-VTPS:2 220 79% 21% 11.17 161 TALAPLLI-RENACALA:2 220 74% 26% 7.37 162 TALAPLLI-VTPS:1 220 25% 75% 50.69 163 TALAPLLI-VTPS:2 220 25% 75% 54.62 164 TALAPLLI-VTPS:3 220 25% 75% 50.69 165 TIMMPR-KNDAPRM:1 220 86% 14% 3.55 166 TIMMPR-KNDAPRM:2 220 86% 14% 3.55 167 URVAKONDA-VAJR:1 220 33% 67% 5.91 168 URVAKONDA-VAJR:2 220 33% 67% 5.91 169 VEMAGIRI-BHEMARAM:1 220 65% 35% 23.12 170 VEMAGIRI-BHEMARAM:2 220 65% 35% 23.12 171 VIJHE-II-K.V.KOTA:1 220 73% 27% 35.18 172 VIJHE-II-VEMAGIRI:1 220 75% 25% 7.42 173 VTPS-CHILALLU:1 220 7% 93% 25.04

ANNEXURE 13 (7/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 174 VTPS-CHILALLU:2 220 7% 93% 25.04 175 VTPS-NARARETA:1 220 79% 21% 28.69 176 VTPS-PODILI1:1 220 67% 33% 64.16 177 VTPS-RENACALA:2 220 32% 68% 48.66 178 ADNI-ALUR:1 132 78% 22% 5.72 179 ADNI-YEMN:1 132 76% 24% 8.84 180 ADNI-YEMN:2 132 76% 24% 8.84 181 ALIP-TRML:1 132 87% 13% 2.59 182 APC-GDRK:1 132 88% 12% 10.44 183 APC-KNL:1 132 87% 13% 5.64 184 APC-KNL:2 132 87% 13% 5.64 185 APC-NANDIK:1 132 60% 40% 10.21 186 APC-YEMN:1 132 85% 15% 10.99 187 ATKR-NANDIK:1 132 64% 36% 14.64 188 ATKR-SUNPTA:1 132 70% 30% 15.51 189 ATMK-UDAY:1 132 87% 13% 16.46 190 ATP-NGPM-W:1 132 84% 16% 9.55 191 BDWL-ATMK:1 132 68% 32% 26.17 192 BHMDVM-KPORT:1 132 84% 16% 3.63 193 BHMDVM-NIDRLY:1 132 84% 16% 4.07 194 BKKT1-BKKT:1 132 74% 26% 3.60 195 BMD-KNML:1 132 73% 27% 14.66 196 BMD-NDV-1:1 132 79% 21% 16.74 197 BMD-PEDA:1 132 78% 22% 10.75 198 BPT-PRCH:1 132 78% 22% 10.75 199 BRANDI-PTPRM:1 132 82% 18% 26.58 200 CDP-NALIN:1 132 89% 11% 15.32 201 CDP-NALIN:2 132 89% 11% 14.28 202 CDP-RTSSK:1 132 78% 22% 3.93 203 CGRI-ALIP:1 132 87% 13% 2.59 204 CGRI-RCGNRI:1 132 76% 24% 17.16 205 CHEN-MANUBO:1 132 82% 18% 11.10 206 CHPT-NALLAP:1 132 86% 14% 10.37 207 CHPT-NRSPT:1 132 82% 18% 5.33 208 CHPT-NRSPT:2 132 82% 18% 5.33 209 CHPT-VNK:1 132 84% 16% 17.83 210 CNP-MULAVA:1 132 71% 29% 3.00 211 COMP-SMHC:1 132 73% 27% 3.30 212 CTR-IRALA:1 132 84% 16% 8.39

ANNEXURE 13 (8/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 213 DARSI-PODILI:1 132 89% 11% 9.98 214 DHON-RACHER:1 132 77% 23% 6.70 215 ELUR-PEDA:1 132 76% 24% 9.66 216 GDL-ATNGR:1 132 79% 21% 1.06 217 GDL-GANGUR:1 132 78% 22% 5.78 218 GDR-MANUBO:1 132 67% 33% 8.30 219 GDR-MANUBO:2 132 67% 33% 6.42 220 GDR-MNKR:1 132 82% 18% 9.09 221 GDR-NDPTA:1 132 57% 43% 10.43 222 GRMKD-SMBPAL:1 132 68% 32% 12.98 223 GRWN-RNG:1 132 88% 12% 2.56 224 GTY-NGPM-W:1 132 78% 22% 9.55 225 GTY-PTKD:1 132 81% 19% 13.89 226 GTY-RACHER:1 132 82% 18% 18.37 227 GVPRT-MALK:1 132 30% 70% 2.91 228 GZK-1-BRANDI:1 132 68% 32% 2.00 229 GZK-1-PRWD:1 132 69% 31% 2.00 230 GZK-GZK-1:1 132 47% 53% 0.35 231 IRALA-SOMALA:1 132 62% 38% 10.11 232 KDP-NZVD:1 132 84% 16% 16.81 233 KLH-RCGNRI:1 132 74% 26% 9.62 234 KLH-RNG:1 132 83% 17% 8.92 235 KLH-SLP:1 132 77% 23% 11.20 236 KLK-GRMKD:1 132 70% 30% 9.48 237 KLK-MDPL:1 132 84% 16% 9.19 238 KLK-MDPL:2 132 84% 16% 9.19 239 KLK-SOMALA:1 132 69% 31% 6.61 240 KNL-DHON:1 132 70% 30% 18.37 241 KNML-ELUR:1 132 88% 12% 6.73 242 KNML-GDV:1 132 82% 18% 7.72 243 KNML-GDV:2 132 82% 18% 8.17 244 KNML-NZVD:1 132 88% 12% 9.22 245 KONPRM-W-GANKOT:1 132 75% 25% 0.80 246 KRPL-TUNI:1 132 88% 12% 10.26 247 KVL-KDKR:1 132 78% 22% 18.68 248 LNGSM-PODILI:1 132 89% 11% 18.58 249 MARTUR-AMRT:1 132 78% 22% 0.18 250 MCL-KARMPU:1 132 67% 33% 12.52 251 MCL-NSRC:1 132 84% 16% 7.54

ANNEXURE 13 (9/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 252 MCL-RENTA:1 132 58% 42% 3.89 253 MCL-RENTA:2 132 58% 42% 3.89 254 MDPL-PUNGA:1 132 88% 12% 13.15 255 MULAVA-RTSSK:1 132 77% 23% 2.48 256 MURTSS-GANKOT:1 132 75% 25% 10.93 257 NAD-PNYM:1 132 73% 27% 10.31 258 NAGR-KPMT:1 132 81% 19% 12.71 259 NAGR-KPMT:2 132 81% 19% 12.71 260 NARS1-BRANDI:1 132 89% 11% 9.69 261 NARS1-KRPL:1 132 88% 12% 2.77 262 NDPTA-ESUG:1 132 80% 20% 3.63 263 NDV-1-PTDP:1 132 87% 13% 7.61 264 NLR-ADUR:1 132 84% 16% 15.69 265 NLR-ATMK:1 132 77% 23% 17.63 266 NLR-BHMDVM:1 132 84% 16% 5.15 267 NLR-BHMDVM:2 132 84% 16% 5.15 268 NLR-NTS:1 132 86% 14% 8.67 269 NLR-NVG:1 132 86% 14% 6.35 270 NTS-ALLUR:1 132 90% 10% 14.74 271 ONG-KDKR:1 132 81% 19% 13.04 272 ONGN-INKOLL:1 132 83% 17% 14.77 273 ONG-ONGN:1 132 85% 15% 0.92 274 PDG-KARMPU:1 132 62% 38% 8.57 275 PDG-RNTPLE:1 132 43% 57% 15.27 276 PDP-PTPRM:1 132 71% 29% 7.12 277 PDP-SAMRLA:1 132 83% 17% 2.34 278 PDP-SAMRLA:2 132 83% 17% 2.34 279 PKL-KPMT:1 132 67% 33% 10.08 280 PKL-ROMP:1 132 90% 10% 11.64 281 PLMN-PLMN1:1 132 89% 11% 0.35 282 PMRU-AVGADD:1 132 76% 24% 8.61 283 PMRU-GDV:1 132 77% 23% 10.11 284 PMRU-MACP:1 132 76% 24% 6.13 285 PMRU-MACP:2 132 76% 24% 6.13 286 PORT-NKVP:1 132 75% 25% 2.31 287 PRCH-CHRL:1 132 78% 22% 7.93 288 PRCH-INKOLL:1 132 81% 19% 9.59 289 PRCH-MARTUR:1 132 78% 22% 6.77 290 PTKD-ALUR:1 132 78% 22% 5.72

ANNEXURE 13 (10/11) Sr No Line Voltage kv % Utilization by Andhra Pradesh % Utilization by other States Monthly Cost (Lakhs) 291 PUNGA-PLMN1:1 132 89% 11% 11.01 292 PUTR-NAGR:1 132 70% 30% 5.03 293 PUTR-NAGR:2 132 70% 30% 5.03 294 PUTR-RNG:1 132 76% 24% 6.61 295 PUTR-RNG:2 132 76% 24% 6.61 296 RAYA-CNP:1 132 73% 27% 12.22 297 RAYA-SMBPAL:1 132 74% 26% 4.98 298 RCGNRI-LILR:1 132 81% 19% 0.42 299 RNG-AMAR:1 132 88% 12% 2.91 300 RNG-CGRI:1 132 84% 16% 7.72 301 RNG-CGRI:2 132 84% 16% 7.72 302 RNG-TPT:1 132 82% 18% 5.74 303 SHKT-SLP:1 132 82% 18% 9.52 304 SLP-CHER:1 132 81% 19% 3.90 305 SLP-NDPTA:1 132 89% 11% 9.38 306 SMHC-GZK-1:1 132 67% 33% 5.52 307 SMHC-GZK-1:2 132 67% 33% 5.52 308 SMHC-NKVP:1 132 83% 17% 3.30 309 SMHC-PEN:1 132 72% 28% 2.42 310 SMHC-PEN:2 132 72% 28% 2.42 311 SMHC-VSEZ:3 132 77% 23% 2.86 312 SS-SUNPTA:1 132 70% 30% 0.35 313 TDK-MARRIP:2 132 87% 13% 11.31 314 TDK-NALLAP:1 132 89% 11% 5.62 315 TDK-RNTPLE:1 132 55% 45% 12.45 316 TDK-TDP:1 132 84% 16% 10.30 317 TDP-ATNGR:1 132 84% 16% 4.23 318 TDP-GANGUR:1 132 87% 13% 7.23 319 TDPT-KONPRM-W:1 132 75% 25% 10.36 320 TPT-KPMT:1 132 75% 25% 17.10 321 VKTG-RCGNRI:1 132 82% 18% 12.66 322 YEMN-GDRK:1 132 85% 15% 10.99 323 YGT-MURTSS:1 132 81% 19% 8.52 324 YGT-NALIN:1 132 89% 11% 2.03 325 YGT-NALIN:2 132 89% 11% 2.03 * These lines are AP lines but have been considered erroneously as PGCIL lines.

ANNEXURE 13 (11/11) Therefore, it is requested to kindly certify the above lines as ISTS so that the same lines can be considered for inclusion in POC charges. Thank you in anticipation. Regards Yours faithfully, Sd/- Chief Engineer/SLDC/APTRANSCO

ANNEXURE 14 (1/2)

ANNEXURE 14 (2/2)

ANNEXURE 15 (1/10)

ANNEXURE 15 (2/10)

ANNEXURE 15 (3/10)

ANNEXURE 15 (4/10)

ANNEXURE 15 (5/10)

ANNEXURE 15 (6/10)

ANNEXURE 15 (7/10)

ANNEXURE 15 (8/10)

ANNEXURE 15 (9/10)

ANNEXURE 15 (10/10)

ANNEXURE 16 (1/9)

Southern Regional Power Committee Bengaluru Record Notes of 2 nd Meeting of Scheduling and dispatching of Adani Solar Power Project held on 23 rd December 2016 at SRPC, Bengaluru The 2 nd meeting to discuss the scheduling and dispatch of Adani solar Power Project at Kamuthi in Tamil Nadu was held on 23 rd December 2016 with participation from Adani GEL, TANGEDCO, SRLDC and SRPC. The list of participants is given at ANNEXURE 1. Background ANNEXURE 16 (2/9) a) 1 st meeting on scheduling and dispatch of Adani solar Power Project was held at SRPC Bengaluru on 3 rd November 2016. In the meeting M/s. Adani Green Energy (Tamil Nadu) Ltd. (AGEL) had been requested to furnish the details of share holding pattern of M/s. AGEL solar projects at Kamuthi, Tamil Nadu to TANGEDCO, TANTRANSCO, SRLDC and SRPC. Subsequently they had submitted the documents (ANNEXURE 2). b) On receipt of the documents from AGEL(TN), TANTRANSCO had requested TANGEDCO to examine the same (ANNEXURE 3). c) SRLDC had sought clarity on DSM accounting in the backdrop of tariff being subjudice with Hon ble TNERC (ANNEXURE 4). d) As per the documents submitted by AGEL (TN), 5 PPAs were entered with TANGEDCO for total capacity of 648 MW solar power project. The following PPAs were signed by the companies with TANGEDCO. S.NO Company Installed Capacity Tariff Remarks 1 Adani Green Energy(Tamil 216 MW Rs 7.01 /kwh Nadu) Limited (AGEL(TN)) 2 Kamuthi Solar Power Limited 216 MW Rs 7.01 /kwh (KSP) 3 Ramnad Solar Power energy 72 MW Rs 7.01 /kwh Limited (RREL) 4 Ramnad Renewable Energy Limited (RREL) 72 MW Rs 7.01 /kwh 5 Kamuthi Renewable energy Limited (KREL) 72 MW Rs 7.01/ kwh for 25 MW Petition filed Rs 5.10/kwh for 47 MW by AGEL before TNERC Total 648 MW

e) AGEL(TN) had requested SRPC, SRLDC to consider the 648 MW project as single project and under the scheduling jurisdiction of Southern Regional Load Dispatch Centre (SRLDC). Deliberations in the Meeting 1. Shri S.R. Bhat, Member Secretary, SRPC welcomed the participants to the meeting and sought the views from SRLDC and TANGEDCO. 2. SRLDC informed the forum that they have taken up the Scheduling of Kamuthi, Adani solar power plant with their legal wing and they were unable to come to a firm conclusion regarding this issue. 3. SRLDC also stated that they are prepared to carry out the Scheduling and Dispatching of Kamuthi Solar Power Project (AGEL), with 10-15 days advance notice, in the event it is decided so. 4. TANGEDCO informed the forum that they have also scrutinized AGEL submitted documents and had sought more information from Kamuthi Solar Power Project (AGEL) to finalize the scheduling issue. TANGEDCO informed that AGEL would be informing the details to them with in a week s time. 5. AGEL informed the forum that they would also consult their legal wing or Legal Advisor obtain more clarity on AGEL, Kamuthi scheduling issue. 6. After deliberation it was decided that M/s. AGEL would obtain legal advice and submit the same to SRPC & SRLDC. Subsequently SRPC would refer the matter to CEA for legal advice. Tamil Nadu was also requested to consider furnishing their inputs to SRPC/CEA at the earliest. Member Secretary, SRPC thanked all the participants for valuable contribution. *** ANNEXURE 16 (3/9)

ANNEXURE 16 (4/9)