WECC-0126 PRC-004-WECC-2 Protection System and Remedial Action Scheme Misoperation Final Voting Record

Similar documents
Weighted Segment Vote. Yes Votes

VAR-501-WECC-3 Final Voting Results

MOD Final Voting Record

Attending Meeting (has not voted) Advance Bylaw Ballot

Utilities in the South Maintain Power Reliability Ratings, Despite Four Hurricanes in 2004

Consideration of Comments

Consideration of Comments

2015 CPS2 Bounds (Effective June 15, 2015)

Market Interface Committee/Operating Committee (MIC/OC) DRAFT Joint Meeting Minutes March 22, :00 p.m. 3:30 p.m. MT Salt Lake City, Utah

(Page 2 of 2) NOTE: Eight charts follow.

Comment Report. Project Name:

2013 ANNUAL PROGRESS REPORT

Category Vote Member Entity

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Exhibit Accompanying Direct Testimony of. Kurt G.

Remedial Action Scheme Reliability Subcommittee (RASRS) Meeting Minutes July 24, :00 a.m. 5:00 p.m. MT Salt Lake City, UT

Transmission Planning Report

J.D. Power and Associates Reports: Small-Business Customers Are Less Satisfied with Their Electric Utility Than are Larger-Business Customers

WestConnect Regional Transmission Service. Presentation to ISAS September 26, 2017

Plug-in Electric Vehicles are coming is your Utility Ready?

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

Arizona Transmission Challenges

DISCLAIMER This document is intended to provide an illustrative example of the cost allocation provisions of the Draft Agreement.

A-01 Criteria for Review and Approval of Documents

J.D. Power Reports Price and Billing/Payment are Primary Drivers of Increased Overall Customer Satisfaction with Electric Residential Utilities

Standards Efficiency Review SER Team Orientation

Volt Infrastructure Update. How Electric Vehicles are impacting our Community

Improved Community and Product Awareness Increases Satisfaction with Gas Utilities, J.D. Power Finds

Solar Electric Interest Group (SEIG) June 3, 2008

Michigan Public Service Commission Case No.: U The Detroit Edison Company Exhibit: A-17 Current and Historical Credit Ratings Schedule: I1

EGUG 2008 Closing Session Southern California Public Power Authority

2013 ANNUAL PROGRESS REPORT

NEW YORK CITY DEPARTMENT OF EDUCATION

Electric Utilities Set New Benchmark for Business Customer Satisfaction, J.D. Power Finds

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

CALIFORNIA GAS REPORT 2005 SUPPLEMENT

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

2018 CG Transient Stability and MOD 33 Updates

Overall Residential Electric Utility Customer Satisfaction Increases for Sixth Consecutive Year, J.D. Power Finds

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Association of Major Power Customers of BC (AMPC) BCUC Inquiry into the BC MRS Program, Project No:

California Gas Report 2007 Supplement. Prepared by the California Gas and Electric Utilities

November 8, 2016 General and Special Election Canvassed Results. Total. A. Donald McEachin (D) Cast

High Satisfaction Achieved When Electric Utilities Deliver Convenience, Focus on Citizenship, J.D. Power Finds

COPYRIGHT, ALL RIGHTS RESERVED, GOLFSTAT Bloomington, IL

Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources

Wyoming Energy Projects

WESTERN BLUE CHIP ECONOMIC FORECAST FOR JANUARY, 2017

Distribution System Efficiency Potential & Conservation Voltage Reduction

Moving Renewable Energy to the User

Teton County Official Precinct-by-Precinct Summary Wyoming General Election - November 8, 2016

2/26/2015

SS VD KH KS BP JI R3I R3HCBS CBI AS TT CI CS PH PS SM OBO OBS GAI GAS

2010 Primary Election Results (Including Canvass & Recount)

Exhibit to Agenda Item #1

State Electricity Profiles 2008

Customer Engagement Drives Electric Utility Business Customer Satisfaction to Record High

CUMULATIVE STANDINGS 2018 SAN DIEGO-IMPERIAL USATF ROAD CHAMPIONSHIP SERIES

2014 General Election. Tuesday, November 4, Winfield Township. Election Results

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

UDOT Consultant Services. Right of Way Services and Local Government Pool July 1, 2010 through June 30, June 15, 2010

WestConnect Regional Planning Update

U.S. System Summary: ARIZONA/SOUTHWEST

Harney County, Oregon

West Coast Marine and Ports Working Group

MEMORANDUM. TSS/ejv attachment. State of Michigan Jennifer M. Granholm, Governor

System Restoration Strategy Sr. Task Force Final Proposal Report

Safety Is Job No. 1 for Gas Utilities and the Most Important Driver of Satisfaction among Business Customers, J.D. Power Finds

Four Corners Queue Transmission Interconnection Study

ANNUAL TOWN ELECTION MAY 19,2015

Leaderboards: Old Individual Old Team New Individual New Team New Team with Players

Pacific Gas and Electric Company s 2013 Annual Progress Report

Central Washington University Football Career Passing and Total Offense

State Service. No Records For the Requested Choice. Date Printed

IEEE Stationary Battery Committee

Measuring Electric Service Reliability. Office of Public Accountability/ Ratepayer Advocate City of Los Angeles tel.

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

2015 System Assessment

Board of Directors July 7, 2017 Meeting Minutes

Registered Voters: 3,806 of 24,561 (15.50%)

November 20, Arizona Corporation Commission 1200 W Washington St Phoenix, AZ 85007

2011 CPS2 Bounds City of Tallahassee TAL

Ten-year Plan. Figure 1 and Table 1. Each of the facilities shown in the plan is described in greater depth in the last appendix of this report.

Gas Utility Satisfaction Reaches All-Time High, J.D. Power Finds. Safety First: Safety Prep Translates into Satisfaction among Business Customers

Oilseeds and Biofuels in Washington State, 2017

Representing Nevada s Rural Electric Cooperatives, Power Districts, and Municipal Utilities.

Firestone Invitational Presented by FirstEnergy Solutions

Bus and Truck Charging Interface Group

Re: Comments on the 12/7/09 Dynamic Transfer Stakeholder Meeting

Pacific Northwest/Canada To Northern California Transmission Feasibility Study

The Case for EV s in Local Government Fleets

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Votes Cast. Votes Cast

RALI CWM GWENDRAETH 2008 AWARDS LIST

Virginia City Hillclimb 2014 Run times for: Robert Blante 1985 Ford Mustang Convertible

Comment Report. Project Name:

Comment Report. Project Name: Comment Period Start Date: 12/4/2018 Comment Period End Date: 1/17/ Modifications to BAL

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423

HQ86 Lydden Hill British Rallycross Championship (MSA Super Car Class) BARC DRIVERS ENTRY LIST

% Election Day Early Vote Provisional V

Transcription:

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation Ballot Name: PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation After completing a routine 5-year review, the drafting team concluded that the substance of PRC-004-WECC-2 should be retired immediately because the reliability-related substance is addressed in peripheral NERC Standards. Ballot Pool Open: 07/11/2017 Ballot Pool Closed: 07/26/2017 Ballot Opened: 08/09/2017 Ballot Closed: 08/28/2017 Total Ballot Pool: 101 Total Votes: 90 Quorum: 89.1% Weighted Votes: 98.2% Ballot Results: PASS The document should be retired Voting Sectors Total In Ballot Pool Votes Non- Abstain Sector Weight Votes Weighted Segment Vote No Votes Abstain Total Votes for Quorum Didn't Vote Distribution 19 17 1 17 100.0% 0 1 18 1 End User Representative 1 1 0.1 1 10.0% 0 0 1 0 Generation 21 14 1 14 100.0% 0 1 15 6 13 11 1 11 100.0% 0 0 11 2 Other Non- Registered WECC Members and Participating Stakeholders 0 0 0 0 0.0% 0 0 0 0 State and Provincial Representatives 0 0 0 0 0.0% 0 0 0 0 22 20 1 19 95.0% 1 1 21 1 Transmission 25 23 1 22 95.7% 1 1 24 1 Totals 101 86 5.1 84 98.2% 2 4 90 11 1

Ballot Pool PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation AES Corporation Generation Leo Bernier Arizona Public Service Company Vivian Vo Arizona Public Service Company Linda Henrickson Arizona Public Service Company Transmission Gary Nolan Arizona Public Service Company Generation Kasey Bohannon Arizona Public Service Company Distribution Avista Corporation Balancing Authority of Northern Michelle Amarantos Scott Kinney Black Hills Corporation Transmission Eric Scherr Black Hills Corporation Distribution Eric Scherr Black Hills Corporation Generation Eric Scherr Black Hills Corporation Eric Scherr Bonneville Transmission Kammy Rogers- Holliday 2

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation Bonneville Distribution Bonneville Bonneville British Columbia Hydro & Authority Distribution Abstain No Comments Rebecca Berdahl Andrew Meyers Francis Halpin Hootan Jarollahi British Columbia Hydro & Authority Abstain No Comments Patricia Robertson British Columbia Hydro & Authority Transmission Abstain No Comments Patricia Robertson Independent Operator Richard Vine Independent Operator Transmission Richard Vine Dominion Resources Services, Inc. Generation Sean Bodkin El Paso Electric Company Transmission Pablo Onate El Paso Electric Company Pablo Onate 3

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation El Paso Electric Company Generation EPE agrees with the finding and conclusions of the Drafting Team for the retirement of this standard. Victor Garzon El Paso Electric Company Distribution EPE agrees with the finding and conclusions of the Drafting Team for the retirement of this standard. Victor Garzon Idaho Company Laura Nelson Idaho Company Generation Laura Nelson Idaho Company Distribution Laura Nelson Idaho Company Transmission Laura Nelson Nevada Company Transmission Eric Schwarzrock Northern Agency Northern Agency Generation Open Access Technology International End User Representative Dennis Sismaet Marty Hostler Mark Hackney Pacific Gas and Electric Company Generation Abstain none Alex Chua PacifiCorp Generation Sandra Shaffer PacifiCorp Distribution Sandra Shaffer Sandra PacifiCorp Transmission Shaffer 4

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation PacifiCorp PacifiCorp Platte River Authority Sandra Shaffer Sandra Shaffer Matthew Thompson Platte River Authority Sabrina Martz Platte River Authority Transmission Jeff Landis Platte River Authority Generation Public Service Company of New Mexico Tyson Archie Laurie Williams Public Service Company of New Mexico Generation Public Service Company of New Mexico Distribution Public Service Company of New Mexico Transmission Public Service Company of New Mexico District No. 1 of Clark County Transmission Laurie Williams Laurie Williams Laurie Williams Laurie Williams Jack Stamper 5

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation District No. 1 of Snohomish County Generation Franklin Lu District No. 1 of Snohomish County Distribution Franklin Lu District No. 1 of Snohomish County Transmission Franklin Lu District No. 1 of Snohomish County District No. 2 of Grant County District No. 2 of Grant Franklin Lu County Generation District No. 2 of Grant County Distribution District No. 2 of Grant County Transmission District No. 2 of Grant County Puget Sound Energy, Inc. Transmission LeRoy Patterson LeRoy Patterson LeRoy Patterson LeRoy Patterson LeRoy Patterson Theresa Rakowsky 6

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation Puget Sound Energy, Inc. Distribution Puget Sound Energy, Inc. Puget Sound Energy, Inc. Puget Sound Energy, Inc. Generation Theresa Rakowsky Theresa Rakowsky Lynda Kupfer Eleanor Ewry Sacramento Municipal Utility District Sacramento Municipal Utility District Generation Sacramento Municipal Utility District Distribution Sacramento Municipal Utility District Transmission Sacramento Municipal Utility District Salt River Project Generation Salt River Project Distribution San Diego Gas & Electric Transmission Kevin Nielsen Rudy Navarro Martine Blair San Diego Gas & Electric Distribution ANNIE RUIZ San Diego Gas & Electric Generation San Diego Gas & Electric Jerome Gobby Bridget Silvia 7

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation Seattle City Light Transmission Hao Li Seattle City Light Distribution Tuan Tran Seattle City Light Seattle City Light Seattle City Light Pawel Krupa Generation Charles Freeman Mike Haynes Southern Edison Company Generation Southern Edison Company Distribution Southern Edison Company Transmission Thomas Rafferty Steven Mavis Steven Mavis Southern Edison Company Tacoma Distribution Tacoma Tacoma Transmission Tacoma Romel Aquino Chad Edinger Chad Edinger Joseph Wilson Todd Lloyd 8

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation Tri-State Generation & Transmission - Reliability Distribution Janelle Gill Tri-State Generation & Transmission - Reliability Tracy Sliman Tri-State Generation & Transmission - Reliability Transmission Tracy Sliman Tri-State Generation & Transmission - Reliability Generation Mark Stein Tucson Electric John Tolo Tucson Electric Generation John Tolo Tucson Electric Distribution John Tolo Tucson Electric Transmission John Tolo Western Area Western Area Transmission Patrick Harwood Patrick Harwood Western Area - Rocky Mountain Region Transmission James Hirning 9

PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation Western Area - Upper Great Plains Region No NERC Standards should suffice. Lloyd Linke Western Area - Upper Great Plains Region Transmission No NERC Standards should suffice. Lloyd Linke 10