Transmission Projects PG&E SCE 1. Cornerstone Bk. 6 Phase 1 2. Carrizo Plain Solar Generation Phase 1 3. Carrizo Plain Solar Generation Phase 3 4. Contra Costa Sub DPA Capacity Phase 1 5. Bridgeville - replace 115/60 kv Bank 1 & reconfigure 115kV to ring bus Phase 1 6. McFarland 70kV Sub- install 2nd 16MVA BNK for existing 16MVA BNK replacement Phase 1 7. Embarcadero 230kV Sub- replace 230-34.5kV Bank 3 with 150MVA Phase 1 8. Metcalf 230/115kV Bank replacement Phase 1 9. Oakland X 115kV Sub- Replace XFMRs 3 & 4 Phase 2 10. Diablo Canyon PP - remove 500kV SW521 Phase 1 11. Morro Bay-Midway 230 kv #1 Line Reconductoring Phase 1 12. Morro Bay-Midway 230 kv #2 Line Reconductoring Phase 1 13. Del Monte-Fort Ord 60 kv reinforcement- Phase I Phase 1 14. Morro Bay-Midway 1 & 2 230kV lines- interconnect Topaz Solar Farms w/2 gen lines Phase 4 15. Morro Bay-Midway 1 & 2 230kV lines- interconnect Topaz Solar Farms w/2 gen lines Phase 5 16. (G-Int) Sun Power - California Valley Solar Ranch Generation Interconnection Project (Caliente Switching Station) Phase 4 17. (G-Int) Sun Power - California Valley Solar Ranch Generation Interconnection Project (Caliente Switching Station) Phase 5 18. (G-Int) Sun Power - California Valley Solar Ranch Generation Interconnection Project (Caliente Switching Station) Phase 6 19. Bay Meadows 4/0 Cu Line Reconductoring Phase 1 20. Humboldt 115/60 kv transformers Phase 1 21. Moraga Transformer Capacity Increase Phase 1 22. Panoche-Helm & Helm-McCall 230 kv Line will be reconductored to carry 1893 amps under normal & emergency conditions Phase 2 1. Colorado River NEW 500/230kV Sub- construct new Devers-Colorado River (old DPV2), Devers & Devers-Valley2 500 kv Lines Phase 1 2. Devers-Coachella Valley 230 kv Line Loop into Mirage and add new A-Bank Phase 2 3. Devers-Coachella Valley 230 kv Line Loop into Mirage and add new A-Bank Phase 2A 4. SCE Northern Bulk System Netword Upgrades for Transition Cluster Phase 6A 5. SCE Northern Bulk System Netword Upgrades for Transition Cluster Phase 6B 6. Rio Hondo- Bk 1A, 2A, 3A & 4A Replacement & Substation Reconfiguration Phase 6 7. Ship 66kV Sub- New Sub to loop into Hinson-Arco-Pier E & Pico-Pier E-Tidelands 66kV lines Phase 1 8. Devers 500/220/115kV Sub- reconfigure 3A & 4A banks from bank/bus to Double-Breaker configuration & replace 1AA bank Phase 3 9. Leatherneck New 115/33kV Dist Sub, 84MVA, & connect to Carodean & Hi Desert Phase 1 10. Windhub - Rising Tree (fka Homestead), Alta 6 generator interconnection and several line repositions Phase 2 11. Devers - CPV Sentinel modifications Phase 7 12. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1 Page 1 of 6
13. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1B 14. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1C 15. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1D 16. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 2 SDGE 1. Poway-Pomerado (TL6913) uprate Phase 1 2. Escondido-Ash #2 (TL6956) new line and rebuild ASH Phase 1 3. Escondido-Ash #2 (TL6956) new line and rebuild ASH Phase 6 4. Point Loma 69kV Sub- Rebuild sub and add third transformer bank Phase 1 5. Ocotillo Express Transmission Facilities Phase 1 6. TL13828 - reconductor Phase 1 7. Sycamore loop in existing TL13821 to form new TL13821 and TL13828 Phase 1 8. Sycamore loop in existing TL13821 to form new TL13821 and TL13828 Phase 2 9. Sycamore loop in existing TL13821 to form new TL13821 and TL13828 Phase 4 NEVP 1. Osceola - Spring Valley Wind connection of 150MW of wind turbines Phase 1 2. Gonder-Pavant 230kV loop through Osceola Phase 1 Page 2 of 6
Generation Projects 1. GenOn Marsh Landing Capacity: 4 x 222 MW RES_ID: COCOPP_2_CTG1 COCOPP_2_CTG2 COCOPP_2_CTG3 COCOPP_2_CTG4 POD: 230kV bus at Contra Costa substation 2. Wagner Capacity: 6 MW RES_ID: GARNET_1_WT3WND POD: 115kV bus at GARNET substation 3. Bailey Creek Ranch Capacity: 0.6 MW RES_ID: VOLTA_6_BAILCK POD: 60kV bus at VOLTA substation 4. Topaz Solar Farms Capacity: 550 MW RES_ID: TOPAZ_2_SOLAR POD: 230kV bus at new Solar Switching Station 5. SPVP015 Capacity: 3 MW RES_ID: ETIWND_2_RTS015 POD: 230kV bus at Etiwanda substation 6. SPVP027 Capacity: 2 MW RES_ID: ETIWND_2_RTS027 POD: 230kV bus at Etiwanda substation 7. Ocotillo Express LLC SDGE Capacity: 265 MW RES_ID: OCTILO_5_WIND POD: 500kV bus at Ocotillo Switchyard 8. Thermal Energy Development Partnership L.P. Tracy Biomass - Pmax decrease from 24.2 MW to 23 MW Capacity: 23 MW Page 3 of 6
RES_ID: THMENG_1_UNIT 1 POD: 115kV bus at Thermal Energy substation 9. Nacimiento Hydroelectric Plant - Pmax increase from 3.8 MW to 4.4 MW Capacity: 4.4 MW RES_ID: OILFLD_7_QFUNTS POD: 60kV bus at Oilfield substation 10. CPV Sentinel Energy Project Capacity: 800 MW (8 x 131.8 MW) Aggregation RES_ID: SENTNL_2_UNITS Child RES_ID: SENTNL_2_CTG1 SENTNL_2_CTG2 SENTNL_2_CTG3 SENTNL_2_CTG4 SENTNL_2_CTG5 SENTNL_2_CTG6 SENTNL_2_CTG7 SENTNL_2_CTG8 POD: 230kV bus at Devers substation 11. SEPV-9 Solar PV Capacity: 9 MW RES_ID: DEVERS_1_SOLAR2 POD: 115kV bus at Devers substation 12. SEPV-8 Solar PV Capacity: 12 MW RES_ID: DEVERS_1_SOLAR1 POD: 115kV bus at Devers Substation 13. California Valley Solar Ranch Capacity: 40 MW RES_ID: CAVLSR_2_BSOLAR POD: 230 kv line #1 at Morro Bay - Midway substations 14. Ivanpah Solar - Unit 1 Capacity: 126 MW RES_ID: IVANPA_1_UNIT1 POD: 115KV bus at Ivanpah substation 15. Antelope Power Project Capacity: 20 MW RES_ID: GLOW_6_SOLAR POD: 66kV bus at GLOW substation (Antelope - Del Sur) Page 4 of 6
16. Sky River LLC Capacity: 77 MW RES_ID: JAWBNE_2_SRWND POD: Temporary 230kV bus at Vincent substation; permanent 230kV bus at Highwind substation 17. Municipal Capacity: 1.3 MW RES_ID: ESNHWR_1_PSMUNI POD: 115kV bus at Eisenhower substation 18. Ameresco San Joaquin Foothill Capacity: 4.3 MW RES_ID: CORRAL_6_SJOAQN POD: 60kV bus at Corral substation 19. Ameresco Forward Capacity: 4.3 MW RES_ID: WEBER_6_FORWRD POD: 60kV bus at Weber substation 20. Ameresco Vasco Road Capacity: 4.3 MW RES_ID: CAYTNO_2_VASCO POD: 230kV bus at Cayetano substation 21. Manzana Wind - Pmax increase from 189 MW to 300 MW Capacity: 300 MW RES_ID: MANZNA_2_WIND POD: 230kV bus at Whirlwind substation 22. Tri-Dam Project - Pmax increase from 18.7 MW to 25.9 MW Capacity: 25.9 MW Aggregation RES_ID: TULLCK_7_UNITS New Child RES_ID: TULLCK_7_UNIT 3 (7.2 MW) POD: 115kV bus at TULLOCH substation 23. VOLTA_7_QFUNTS - Pmax decrease from 2.9 MW to 2.3 MW Capacity: 2.3 MW RES_ID: VOLTA_7_QFUNTS POD: 60kV bus at VOLTA substation 24. Lincoln Landfill Power Plant - Pmax increase from 1.6 MW to 5 MW Capacity: 5 MW Page 5 of 6
RES_ID: PLSNTG_7_LNCLND POD: 115kV bus at PLSNTG substation 25. Houweling Nurseries Oxnard CHP Capacity: 2.2 MW RES_ID: SNCLRA_2_HOWLNG POD: 230 kv bus at Santa Clara substation Page 6 of 6