Full Network Model Scope for FNM DB61

Similar documents
Full Network Model Scope for FNM DB59

Full Network Model Scope for FNM DB2016Q1

March 7, Subject: Southern California Edison 2011 Annual Progress Report

Pacific Gas and Electric Company s 2013 Annual Progress Report

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress

2020 & 2024 Draft LCR Study Results SDG&E Non-Bulk System. Frank Chen - Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019

APPENDIX F: 2012 Request Window Submittals

2019 & 2023 Final LCR Study Results San Diego-Imperial Valley non-bulk sub-areas

Updates and Modifications to Report

Updates and Modifications to Report

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

CPUC TRANSMISSION PROJECTS AND CONCEPTS-- SCE TERRITORY Third Quarter 2011

TRANSMISSION PROJECTS MODELED IN PHASE IIA DELIVERABILITY STUDY BASECASE

for DRECP Alternatives

CPUC TRANSMISSION PROJECTS AND CONCEPTS-- SCE TERRITORY First Quarter 2011 CAPACITY/ VOLTAGE LEVEL

Updates and Modifications to Report

Background Information

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

PG&E s 2017 Request Window Proposals CAISO 2017/2018 Transmission Planning Process

APPENDIX G: Contingencies on the ISO System that may Impact Adjacent Systems

Decision on the ISO Transmission Plan

PREPARED DIRECT TESTIMONY

2016 SDG&E Grid Assessment Results

ISO Transmission Plan February 2, 2015 APPENDIX H: Contingencies on the ISO System that may Impact Adjacent Systems

SDG&E Valley-Rainbow Project

PG&E s 2012 Request Window Proposals

2018 & 22 Final LCR Study Results Greater Bay Area

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description

PACI RAS Updates. Vahid Madani Pacific Gas and Electric Co. August 2, 2017

Western Area Power Administration

Introduction and Overview

2019 & 2023 Final LCR Study Results Greater Bay Area

April 2012 TRANSMISSION IMPACTS IN THE DRECP

Opening Transmission Planning Process Stakeholder Meeting Tom Cuccia Lead Stakeholder Engagement and Policy Specialist November 19-20, 2014

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

PACIFIC GAS AND ELECTRIC (PG&E)

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

Energy Storage at PG&E

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition

Valley - Rainbow Interconnection Project Feasibility Study Report

Illinois State Report

Report of Gary DeShazo

APPENDIX F: Project Need and Description

Tri-State December 2013 Board Meeting

Black Hills Project Summary

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

California Independent System Operator. Memorandum

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

California ISO Metering Exemption Listing Report

Report of Registration - State Reporting Districts Run Date : 5/1/2015 SAN DIEGO COUNTY

South Dakota 890 Study

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Tehachapi Renewable Transmission Project 3.1 OVERVIEW OF PROPOSED PROJECT

SDG&E High Voltage DC WECC Path 46 Rating Increase Comprehensive Progress Report

Agenda Day 2 Preliminary Reliability Assessment Results

Falcon-Midway 115 kv Line Uprate Project Report

TD-2306B-001, Interconnecting Large 2-20MW Generation Systems. Employees involved with generation interconnection on electric distribution circuits.

Wheeling Access Charges

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Agenda Draft Transmission Plan and transmission project approval recommendations

Appendix D Black Hills Project Summary

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Second Report of the Tehachapi Collaborative Study Group

Circuit Reliability Review

Appendix B. Summary of Changes to the Year Assessment

Wind Turbine. Commissioning Utilizing Mini-Grid Power. Scottish Renewables Onshore Wind Conference & Exhibition Aggreko

100 MW Wind Generation Project

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

The Value of Energy Storage. Dr. Ralph Romero Steven Rupp

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Q0044 interconnection at

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS

Agenda Less than $50 Million Projects and Preliminary Economic Assessment Results

Interconnection System Impact Study Report Request # GI

MTEP13 SPM #2- Central Region. March 25, 2013

Agenda Day 2 Preliminary Reliability Assessment Results

Q92 Asarco Interconnection

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

MILLIGAN SOLAR PROJECT

CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT

APPENDIX XIII PROJECT SPECIFICATIONS AND CONTRACT CAPACITY CALCULATION I. PROJECT SPECIFICATIONS

Contingency Description

Using Hosting Capacity Methodology to Develop Simplified Screens for New Solar PV Interconnections

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA (U 39 E)

North Gila Generator Interconnection

California PUC Rule 21 Generating. Facility Interconnection Application Guide. Technical Note

2017 Final LCR Study Results Fresno. Vera Hart Regional Transmission Engineer Stakeholder Call April 14, 2016

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Reliability Analysis Update

Transcription:

Transmission Projects PG&E SCE 1. Cornerstone Bk. 6 Phase 1 2. Carrizo Plain Solar Generation Phase 1 3. Carrizo Plain Solar Generation Phase 3 4. Contra Costa Sub DPA Capacity Phase 1 5. Bridgeville - replace 115/60 kv Bank 1 & reconfigure 115kV to ring bus Phase 1 6. McFarland 70kV Sub- install 2nd 16MVA BNK for existing 16MVA BNK replacement Phase 1 7. Embarcadero 230kV Sub- replace 230-34.5kV Bank 3 with 150MVA Phase 1 8. Metcalf 230/115kV Bank replacement Phase 1 9. Oakland X 115kV Sub- Replace XFMRs 3 & 4 Phase 2 10. Diablo Canyon PP - remove 500kV SW521 Phase 1 11. Morro Bay-Midway 230 kv #1 Line Reconductoring Phase 1 12. Morro Bay-Midway 230 kv #2 Line Reconductoring Phase 1 13. Del Monte-Fort Ord 60 kv reinforcement- Phase I Phase 1 14. Morro Bay-Midway 1 & 2 230kV lines- interconnect Topaz Solar Farms w/2 gen lines Phase 4 15. Morro Bay-Midway 1 & 2 230kV lines- interconnect Topaz Solar Farms w/2 gen lines Phase 5 16. (G-Int) Sun Power - California Valley Solar Ranch Generation Interconnection Project (Caliente Switching Station) Phase 4 17. (G-Int) Sun Power - California Valley Solar Ranch Generation Interconnection Project (Caliente Switching Station) Phase 5 18. (G-Int) Sun Power - California Valley Solar Ranch Generation Interconnection Project (Caliente Switching Station) Phase 6 19. Bay Meadows 4/0 Cu Line Reconductoring Phase 1 20. Humboldt 115/60 kv transformers Phase 1 21. Moraga Transformer Capacity Increase Phase 1 22. Panoche-Helm & Helm-McCall 230 kv Line will be reconductored to carry 1893 amps under normal & emergency conditions Phase 2 1. Colorado River NEW 500/230kV Sub- construct new Devers-Colorado River (old DPV2), Devers & Devers-Valley2 500 kv Lines Phase 1 2. Devers-Coachella Valley 230 kv Line Loop into Mirage and add new A-Bank Phase 2 3. Devers-Coachella Valley 230 kv Line Loop into Mirage and add new A-Bank Phase 2A 4. SCE Northern Bulk System Netword Upgrades for Transition Cluster Phase 6A 5. SCE Northern Bulk System Netword Upgrades for Transition Cluster Phase 6B 6. Rio Hondo- Bk 1A, 2A, 3A & 4A Replacement & Substation Reconfiguration Phase 6 7. Ship 66kV Sub- New Sub to loop into Hinson-Arco-Pier E & Pico-Pier E-Tidelands 66kV lines Phase 1 8. Devers 500/220/115kV Sub- reconfigure 3A & 4A banks from bank/bus to Double-Breaker configuration & replace 1AA bank Phase 3 9. Leatherneck New 115/33kV Dist Sub, 84MVA, & connect to Carodean & Hi Desert Phase 1 10. Windhub - Rising Tree (fka Homestead), Alta 6 generator interconnection and several line repositions Phase 2 11. Devers - CPV Sentinel modifications Phase 7 12. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1 Page 1 of 6

13. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1B 14. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1C 15. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 1D 16. Ivanpah new substation, interconnect DPT1 & DPT2 gen ties & connection to Eldorado & Wheaton Substations Phase 2 SDGE 1. Poway-Pomerado (TL6913) uprate Phase 1 2. Escondido-Ash #2 (TL6956) new line and rebuild ASH Phase 1 3. Escondido-Ash #2 (TL6956) new line and rebuild ASH Phase 6 4. Point Loma 69kV Sub- Rebuild sub and add third transformer bank Phase 1 5. Ocotillo Express Transmission Facilities Phase 1 6. TL13828 - reconductor Phase 1 7. Sycamore loop in existing TL13821 to form new TL13821 and TL13828 Phase 1 8. Sycamore loop in existing TL13821 to form new TL13821 and TL13828 Phase 2 9. Sycamore loop in existing TL13821 to form new TL13821 and TL13828 Phase 4 NEVP 1. Osceola - Spring Valley Wind connection of 150MW of wind turbines Phase 1 2. Gonder-Pavant 230kV loop through Osceola Phase 1 Page 2 of 6

Generation Projects 1. GenOn Marsh Landing Capacity: 4 x 222 MW RES_ID: COCOPP_2_CTG1 COCOPP_2_CTG2 COCOPP_2_CTG3 COCOPP_2_CTG4 POD: 230kV bus at Contra Costa substation 2. Wagner Capacity: 6 MW RES_ID: GARNET_1_WT3WND POD: 115kV bus at GARNET substation 3. Bailey Creek Ranch Capacity: 0.6 MW RES_ID: VOLTA_6_BAILCK POD: 60kV bus at VOLTA substation 4. Topaz Solar Farms Capacity: 550 MW RES_ID: TOPAZ_2_SOLAR POD: 230kV bus at new Solar Switching Station 5. SPVP015 Capacity: 3 MW RES_ID: ETIWND_2_RTS015 POD: 230kV bus at Etiwanda substation 6. SPVP027 Capacity: 2 MW RES_ID: ETIWND_2_RTS027 POD: 230kV bus at Etiwanda substation 7. Ocotillo Express LLC SDGE Capacity: 265 MW RES_ID: OCTILO_5_WIND POD: 500kV bus at Ocotillo Switchyard 8. Thermal Energy Development Partnership L.P. Tracy Biomass - Pmax decrease from 24.2 MW to 23 MW Capacity: 23 MW Page 3 of 6

RES_ID: THMENG_1_UNIT 1 POD: 115kV bus at Thermal Energy substation 9. Nacimiento Hydroelectric Plant - Pmax increase from 3.8 MW to 4.4 MW Capacity: 4.4 MW RES_ID: OILFLD_7_QFUNTS POD: 60kV bus at Oilfield substation 10. CPV Sentinel Energy Project Capacity: 800 MW (8 x 131.8 MW) Aggregation RES_ID: SENTNL_2_UNITS Child RES_ID: SENTNL_2_CTG1 SENTNL_2_CTG2 SENTNL_2_CTG3 SENTNL_2_CTG4 SENTNL_2_CTG5 SENTNL_2_CTG6 SENTNL_2_CTG7 SENTNL_2_CTG8 POD: 230kV bus at Devers substation 11. SEPV-9 Solar PV Capacity: 9 MW RES_ID: DEVERS_1_SOLAR2 POD: 115kV bus at Devers substation 12. SEPV-8 Solar PV Capacity: 12 MW RES_ID: DEVERS_1_SOLAR1 POD: 115kV bus at Devers Substation 13. California Valley Solar Ranch Capacity: 40 MW RES_ID: CAVLSR_2_BSOLAR POD: 230 kv line #1 at Morro Bay - Midway substations 14. Ivanpah Solar - Unit 1 Capacity: 126 MW RES_ID: IVANPA_1_UNIT1 POD: 115KV bus at Ivanpah substation 15. Antelope Power Project Capacity: 20 MW RES_ID: GLOW_6_SOLAR POD: 66kV bus at GLOW substation (Antelope - Del Sur) Page 4 of 6

16. Sky River LLC Capacity: 77 MW RES_ID: JAWBNE_2_SRWND POD: Temporary 230kV bus at Vincent substation; permanent 230kV bus at Highwind substation 17. Municipal Capacity: 1.3 MW RES_ID: ESNHWR_1_PSMUNI POD: 115kV bus at Eisenhower substation 18. Ameresco San Joaquin Foothill Capacity: 4.3 MW RES_ID: CORRAL_6_SJOAQN POD: 60kV bus at Corral substation 19. Ameresco Forward Capacity: 4.3 MW RES_ID: WEBER_6_FORWRD POD: 60kV bus at Weber substation 20. Ameresco Vasco Road Capacity: 4.3 MW RES_ID: CAYTNO_2_VASCO POD: 230kV bus at Cayetano substation 21. Manzana Wind - Pmax increase from 189 MW to 300 MW Capacity: 300 MW RES_ID: MANZNA_2_WIND POD: 230kV bus at Whirlwind substation 22. Tri-Dam Project - Pmax increase from 18.7 MW to 25.9 MW Capacity: 25.9 MW Aggregation RES_ID: TULLCK_7_UNITS New Child RES_ID: TULLCK_7_UNIT 3 (7.2 MW) POD: 115kV bus at TULLOCH substation 23. VOLTA_7_QFUNTS - Pmax decrease from 2.9 MW to 2.3 MW Capacity: 2.3 MW RES_ID: VOLTA_7_QFUNTS POD: 60kV bus at VOLTA substation 24. Lincoln Landfill Power Plant - Pmax increase from 1.6 MW to 5 MW Capacity: 5 MW Page 5 of 6

RES_ID: PLSNTG_7_LNCLND POD: 115kV bus at PLSNTG substation 25. Houweling Nurseries Oxnard CHP Capacity: 2.2 MW RES_ID: SNCLRA_2_HOWLNG POD: 230 kv bus at Santa Clara substation Page 6 of 6