Capital Improvement Plan Presentation January 10, 2017

Similar documents
CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

Todd Carlson Program Coordinator Engineering MMSD PP I/I Summit 2.0 October 15,

Capital Improvement Plan Review

Section 5 - Operations and Maintenance Program

City of Freeport Water & Sewer Capital Improvement Program FY2019-FY2024

Anderson, Eckstein and Westrick, Inc.

April 17, 2018 CITY OF BONNEY LAKE WATER PROJECTS. Geoff Dillard, P.E.

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

Purpose of Capital Improvement Program

STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION RE: PENNICHUCK WATERWORKS, INC. DW 13-

CITY OF BELLEVILLE 2017 Capital Budget

The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Lapeer County

City of Grand Forks Staff Report

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

FY 2012 PROPOSED BUDGET MOTOR POOL FUND SUMMARY

City of Springfield, Illinois Office of Public Works Sewer Division Annual Report

Bettendorf City Council Joint Use Sewer Administrative Consent Order February 4, 2013

Village of Bensenville CY2017 Community Investment Plan

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

MEMO. ELECTRIC WATER SEWER STORMWATER 3 Industrial Loop Drive PO Box 1589 Hannibal, MO (573)

Stormwater Utility Agency Mission Agency Overview

TRANSPORTATION ENGINEERING SERVICES: Street Project Management

City of Grand Forks Staff Report

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Contract Awards December 22, Composite Report

Public Works Department, Capital Improvement Program Project Tracking

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Proposed FY2015 Budget and Fare Increase

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

COST ESTIMATES: Curb-Running

Capital Improvement Plan, Summary, All '10/'11. City of St. Albans, Vermont Contact Fire Chief. Fire -E-1. Description. Justification.

CITY OF DELANO. City Council Date. January 5, 2016

IMPACTS OF ENERGY DEVELOPMENT ON TEXAS ROADS

Capital Improvement Plan

Herding Cats; Strategies used for KC Downtown Streetcar Utility Coordination ASCE Transportation Conference

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.

Chapter 6 - Capital Improvement Program

DES MOINES AIRPORT AUTHORITY BOARD SUMMARY OF REGULAR MEETING Des Moines International Airport Board Room May 13, 2014

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Presented to Council November 7, :30 p.m. More images

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

CITY OF MANHATTAN BEACH CALIFORNIA

Appendix C Preferred Solution

February 4, 2014 BOROUGH OF GLASSBORO Page No: 1 12:26 PM Purchase Order Listing By Vendor Name

Capital Improvement Plan

FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FY

City of Fort Myers City Manager s Recommended 5 Year Capital Improvement Program FY

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

TOWN OF NORTH BERWICK CAPITAL IMPROVEMENT PROGRAM

Ultra-Thins 2019 CEW. Tim O'Rourke RCRC Manager

An Asset Management Plan for Transit And Access Transit Fleet

January 2018 longandfoster.com

City-wide LED Street Light Conversion Program

R E C O M M E N D E D C A P I T A L I M P R O V E M E N T P L A N

Robert L. Griffin, PE. Mark C. Boland, PE. C. Russell McDaniel, PE. President / Chief Operations Officer Shield Engineering, Inc.

AGENDA REPORT Capital Improvement Program (CIP) General Plan Conformity Review

Pay Station EMV Chip Reader & Processor Upgrades

FOCUS ENGINEERING, inc STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 10TH STREET N. CITY OF LAKE ELMO, MN. Project No

City of Eau Claire Recommended Capital Improvement Plan. Presented to Council

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

City of Belmont FY 2019 Budget Capital Improvement Program (in millions)

Capital Improvement Program

Request For Bids. Sewer Cleaning Truck

City of Rochester Hills - Michigan Capital Improvement Plan

Schematic Layout Development

PUBLIC FACILITIES DIRECTORY

Engineering - Other Projects

Interstate Drive Extension

Capital Improvement Program Overview

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD,

CENTENNIAL PARK EXPANSION

CAPITAL IMPROVEMENT PROJECTS IN ALPHABETICAL ORDER

FIVE-YEAR CAPITAL IMPROVEMENT PLAN

KEEPING HOUSTON AIRPORTS OPENING DAY FRESH

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

DOCUMENTATION WORKBOOK FY 2017

FY 2013 Candidate Projects ($ Thousands) Street & Traffic Control Program - Thoroughfares

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Rolling Road (Route 638) Widening Project

Balancing the Transportation Needs of a Growing City

2015 Capital Improvement Plan

ENTERPRISE CAPITAL BROWARD COUNTY CAPITAL BUDGET

New Jersey Department of Transportation

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Wastewater Capacity Evaluation Update. January 7, 2019

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

CITY of NOVI CITY COUNCIL

Transcription:

Capital Improvement Plan Presentation January 10, 2017

Water System Sanitary Sewers Combined Sewers Local Streets Major Streets Veronica Ave Virginia to Shakespeare 2

Stephens Rd Gratiot to Kelly 3

Diameter Length (miles) % of City 6 28.45 27.3% 8 57.80 55.5% 12 13.03 12.5% 16 0.03 0% 20 1.31 1.3% 24 3.54 3.4% Total 104.15 100% Gate Valves Hydrants 890± 841± Capital Improvement Plan and Westrick, Inc. 4

Water Main Projects (1987-2016) 1987-2011 2012 2013 2014 2015 2016 5

$10,300,000, 9.3 Miles 5 years 9% 15% $9,800,000, 15.8 Miles 24 years 76% 77.9 Miles 2012-2016 1987-2011 Pre 1987 6

Fiscal Year Project Length (ft.) Estimated Cost $/ Ft 2017-18 Bell-Gratiot to Lambrecht, Wilson-Gratiot to Lambrecht, Lambrecht-Stephens to 10, Cushing Stephens to Wilson, Saxony Bell to 10 9,925 $3,325,000 $335/Ft 2017-18 Water Reservoir Rehabilitation n/a $3,240,000 n/a 2018-19 E. Side Gratiot Toepfer to 10 Mile (24 ) 9,100 $4,920,000 $540/Ft 2019-20 9 Mile WCL to Gratiot (12 ) 3,500 $1,365,000 $390/Ft 2019-20 Donald Toepfer to Stephens (8 ) 5,300 $1,880,000 $355/Ft 2020-21 9 Mile Gratiot to Kelly (12 ) 10,000 $4,020,000 $402/Ft * Est. cost includes engineering, observation and contingencies. TOTAL $18,750,000 Capital Improvement Plan and Westrick, Inc. 7

Size Estimated $/Ft Length (ft) Estimated Replacement Cost 6 8 $335/Ft 337,099 $ 112,928,165 12 $375/Ft 42,663 $ 15,998,625 20 $450/Ft 7,057 $ 3,175,650 24 $540/Ft 23,903 $ 12,907,620 Total 410,722 $ 145,010,060 *Includes projects in current CIP Estimates are based upon 2016 bids and include 25% for engineering, inspection and contingencies Capital Improvement Plan and Westrick, Inc. 8

2016 CCTV Investigation Capital Improvement Plan and Westrick, Inc. 9

Location Sewer Type Length (ft.) Length (mi.) Separated Storm 78,339 14.8 Separated Sanitary 83,781 15.9 Combined Combined 580,243 109.9 Total 742,363 140.6 Manholes Catch Basins 2750± 3600± 10

Pipe Size Storm Length (mi.) Sanitary Length (mi.) Storm % Sanitary % Unknown 0.34 0.01 1.3 0.0 6 to 15 11.2 8.66 41.1 31.7 18 to 36 3.26 3.74 12.0 13.7 42 to 66 0.03 0.03 0.1 0.1 84 to 132 0 0 0.0 0.0 Total 14.83 12.44 54.5% 45.5% 27.3 miles Capital Improvement Plan and Westrick, Inc. 11

Pipe Size Combined Length (mi.) % Unknown 1.7 1.5 4 to 15 56.1 49.5 18 to 30 44.5 39.2 33 to 60 9.5 8.4 66 to 84 1.6 1.4 Total 113.4 Capital Improvement Plan and Westrick, Inc. 12

Entire City Sewer System Breakdown 81% 113.4 miles 19% 27.3 miles 10% 14.8 miles 9% 12.5 miles Combined Separated - Storm Separated - Sanitary 13

Capital Improvement Plan and Westrick, Inc. 14

Sanitary Sewer Cleaning & CCTV Investigation Map - 2012-2014/2015-2015 - 2017/2018-2018/2019-2019/2020-2020/2021 Capital Improvement Plan and Westrick, Inc. 15

Sanitary Sewer Rehabilitation Projects (2012-2016) - - - 2012/13 SRF Project: CIPP, Open Cut & Pipe Burst 2013 CIPP, Open Cut & Pipe Burst 2015/2016 CIPP & Open Cut 16

Project Type Project Cost Average Project Cost Clean/CCTV $1,900,000 $380,000 Sewer Lining $3,096,000 $774,000 Excavation Repairs $6,035,000 $1,508,750 Total $11,031,000 *Costs includes engineering, observation and contingencies. 17

Wastewater Asset Management Plan Clean and TV Storm sewers in combined area $415,469 Manhole and Catch Basin location and inspection $159,800 Inventory of all storm sewer assets in combined area $ 43,000 Condition Assessment $ 37,000 Wastewater Asset Management Plan Preparation $ 25,000 SAW Grant Administration $ 21,650 Subtotal $701,919 Storm water Asset Management Plan Clean and TV Storm sewers in separated area $349,833 Manhole and Catch Basin location and inspection $ 60,700 Inventory of all storm sewer assets in separated area $ 32,000 Condition Assessment $ 20,000 SAW Grant Administration $ 18,450 GIS Hardware, Software and training $ 54,830 Storm water Asset Management Plan Preparation $ 25,000 Storm water Management Plan and Ordinance Development $ 30,000 Subtotal $590,813 Total $1,292,732 Local Match $106,953 Grant Amount $1,185,779 18

2016 SAW Grant Project (Storm water, Asset Management and Wastewater (SAW) Grant Project) - Combined Sewer Area - Separated Sewer Area Capital Improvement Plan and Westrick, Inc. 19

Upcoming CIP Projects Estimated Cost Year Budgeted SAW Grant Project $658,800 2016-17 Greenbrier Pump Station Replacement $924,000 2016-17 2017/18 Sewer Rehabilitation $1,364,811 2017-18 2017/18 Clean/CCTV $445,000 2017-18 2018/19 Sewer Rehabilitation $1,200,000 2018-19 2018/19 Clean/CCTV $474,500 2018-19 2019/20 Sewer Rehabilitation $1,011,500 2019-20 2019/20 Clean/CCTV $498,000 2019-20 2020/21 Sewer Rehabilitation $1,011,500 2020-21 2020/21 Clean/CCTV $498,000 2020-21 $8,086,111 Estimated Cost includes engineering, observation and contingencies. SRF loan repayment of $256,000 per year not included. Capital Improvement Plan and Westrick, Inc. 20

Project Type Project Cost Average Cost Cleaning/CCTV $478,875 $4.13 ft Sewer Rehabilitation $1,146,953 Total $1,625,828 Estimated Cost includes engineering, observation and contingencies. SRF loan repayment of $256,000 per year not included. 21

Increased Water Pressure and Flow-- Better for Fire Protection and Home Water Use Reduced Water Main Breaks Reduced Water loss/unaccounted for Water More uniform distribution of water throughout the City 22

Reduce the number of emergency repairs that create sink holes, road cave-ins and sewer backups $$$ - avg. cost of trenchless repairs of $100/ft vs $400/ft for conventional excavation methods Proactive plan to address aging infrastructure versus crisis fixes 23

Kelly Rd Stephens to 10 Mile 24

Street Type Length (ft.) Length (miles) Percent of City Major 106,920 20.25 20.3% Local 419,918 79.53 79.7% Total 526,838 99.78 Capital Improvement Plan and Westrick, Inc. 25

Paving Projects Local Streets (2012-2016) 2012 2013 2014 2015 2016 26

Johnston Spindler to Stephens CDGB: $255,000 Beaconsfield Spindler to Biscayne CDBG: $288,000 2015 Resurfacing (Virginia Ego to Lincoln and Veronica Virginia to Shakespeare) $716,165 Beaconsfield 9 Mile to Biscayne $747,800 Almond Forest to 10 Mile $911,550 27

Upcoming CIP Projects Estimated Cost Year Budgeted Roxana Stephens to Hauss Johnston Forest to Hauss $644,000 $350,000 2016-17 Raven - Spindler to Stephens (CDBG) $228,375 2016-17 2017 Local Street Resurface/Reconstruct $625,000 2017-18 2018 Local Street Resurface/Reconstruct $625,000 2018-19 2019 Local Street Resurface/Reconstruct $625,000 2019-20 2020 Local Street Resurface/Reconstruct $625,000 2020-21 $3,722,375 Estimated Cost includes engineering, observation and contingencies 28

Paving Projects Major Streets (2012-2016) 2012 2013 2014 2015 2016 29

NB Kelly Road Reconstruction Stephens to 10 Mile TIP Project: Total cost $1,896,459, grant $1,356,011 SB Kelly Road Reconstruction Empire to Toepfer MDOT RRR Program: $1,655,000 (no cost to City) Joint Sealing Hayes 9 Mile to Stephens Stephens WCL to Gratiot Schroeder 9 Mile to 10 Mile 9 Mile Kelly to ECL Toepfer Beechwood to Gratiot 30

Upcoming CIP Projects Estimated Cost Year Budgeted Toepfer Ave. Resurfacing Gratiot to Boulder Toepfer Ave. Resurfacing Boulder to Raush Old 8 Mile Road Patching Vernier to Beaconsfield $2,025,000 ($1,350,000 federal funds) $2,182,500 ($1,396,800 federal funds) $850,000 ($543,554 federal funds) $5,057,500 ($3,290,354 federal funds) 2017-18 2018-19 2020-21 Estimated Cost includes engineering, observation and contingencies 31

Project Name Estimated Cost Toepfer Ave Resurfacing Raush to Kelly $2,250,000 9 Mile Reconstruction Gratiot to Tuscany $3,900,000 9 Mile Reconstruction Tuscany to Kelly $2,900,000 Hayes Road Resurfacing Stephens to 10 Mile $1,150,000 Toepfer Ave Resurfacing Kelly to Beaconsfield $1,000,000 NB Kelly Resurfacing 9 Mile to Stephens $1,300,000 32

Project Type Project Cost Length (miles) % of System Local Streets $6,436,000 2.92 3.7% Major Streets $13,998,000 5.12 25.3% Total $20,434,000 8.04 *Costs includes engineering, observation and contingencies. 33

Conducted in 2011 Surveys were completed using RoadSoft software and the Pavement Surface Evaluation and Rating (PASER)system consistent with state asset management requirements PASER rating system Rating 10: No maintenance required Rating 1: Reconstruction required Proposed rerating in FY 2017/18 34

Rating Miles % of City 10 7.958 7.61% 9 5.598 5.35% 8 0.852 0.81% 7 10.535 10.07% 6 33.348 31.89% 5 23.341 22.32% 4 13.286 12.71% 3 8.478 8.11% 2 1.019 0.97% 1 0 0.0% 104.571 Totals adjusted for projects completed since 2011 rating 35

Rating Action Required Length (mi) Estimated Cost 9 to 10 None 13.556 $0 7 to 8 Joint/Crack Seal 11.387 $284,000* 4 to 6 Resurface or Patch 69.975 $70,000,000** 1 to 3 Reconstruct 9.5 $25,916,000*** Total $96,200,000 *Based upon $25,000/mile and includes engineering, inspection and contingencies (EIC) **Based on Average cost of $55/square yards and includes EIC ***Based on $2,728,000/mi and includes EIC 36

Water $145,000,000 Combined/Sanitary Sewer $ 8,000,000 Storm Sewers TBD (Saw Grant) Streets $ 96,200,000 Total $249,200,000 37

THANK YOU Capital Improvement Plan and Westrick, Inc. 38