SECTION FIRE HYDRANTS WITH HYDRANT LOCKS

Similar documents
San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

SECTION 17 FIRE HYDRANT ASSEMBLIES General

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

VALVES, FIRE HYDRANTS, AND APPURTENANCES

San Antonio Water System Standard Specifications for Construction ITEM NO. 836 GREY-IRON AND DUCTILE-IRON FITTINGS

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION WATER DISTRIBUTION VALVES


SECTION SWING CHECK VALVES

General Specifications

September 2012 / M&H C502 / Model 129

San Antonio Water System Standard Specifications for Construction ITEM NO. 836 GREY-IRON AND DUCTILE-IRON FITTINGS

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

American Flow control 5 1/4 B-62-B-5

SECTION VIII. (Sub-section 430) Wastewater Valves and Appurtenances. 1. General thru Gate Valves thru 430-3

CLOW CANADA - M-67 HERITAGE BRIGADIER FIRE HYDRANT SPECIFICATION

Harlingen Water Works System Approved Products List For Subdivisions. January 11, 2005

American Flow control 5 1/4 b-84-b-5

SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RUBBER-SEATED BUTTERFLY VALVES 3 INCHES THROUGH 72 INCHES ANSI/AWWA C504 Class 150/250 December 2012

AMERICAN FLOW CONTROL 5 1/4 B-84-B-5 FIRE HYDRANT

MUELLER. Centurion Series Fire Hydrant. Centurion Super Centurion 200 Super Centurion 250. Reliable Connections. Background and Forward 2

AMERICAN FLOW CONTROL 5 1/4 B-62-B-5 FIRE HYDRANT

JEFFERSON UTILITIES 270 INDUSTRIAL BLVD. KEARNEYSVILLE, WV (304) STANDARDS AND SPECIFICATIONS

5 1/4 AMERICAN-DARLING B-84-B-5 FIRE HYDRANT BY AMERICAN FLOW CONTROL

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Sentinel 250 Fire Hydrant. Solid design and features to meet any municipal requirement.

FIREFLO - MODEL F-06 INSPECTION, INSTALLATION & MAINTENANCE MANUAL. Item No.s/Description

FIRE PROTECTION PRODUCTS

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION. A. Pipe, fittings, valves, and connections for sprinkler systems.

MUELLER. Super Centurion 350 Fire Hydrant. Reliable Connections. Inspection and Maintenance 2. Filling Oil Reservoir 3. Facing the Hydrant 4

DELETE first sentence of first paragraph that reads: REPLACE with the following:

Data Sheet Issue A

Style 234 Restrained Flexible Single-Gasket Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date

ADMIRAL HYDRANT. clowvalve.com

TECHNICAL SPECIFICATIONS OF METROPOLITAN WATERWORKS AUTHORITY OF THAILAND

AMERICAN COATINGS. Systems Guide

mh-valve.com 129 HYDRANT AWWA C502 NSF 61/372 CERTIFIED UL LISTED FM APPROVED 250 PSI WORKING PRESSURE 10-YEAR LIMITED WARRANTY

MEDALLION HYDRANT. clowvalve.com AWWA C502 UL LISTED FM APPROVED NSF 61/372 CERTIFIED 250 PSI WORKING PRESSURE 10-YEAR LIMITED WARRANTY

MUELLER Super Centurion fire hydrants

SECTION COILING DOORS AND GRILLES

Triton. Wet Barrel Ductile Iron. Fire Hydrants. Reliable Connections. operation / Maintenance manual. Inspection and Installation 2

MUELLER Hydrant Security Device

Mueller Super Centurion 250 Fire Hydrant

AMERICAN FLOW CONTROL 4 3/4 WATEROUS TREND FIRE HYDRANT

SECTION VALVES AND OPERATORS

mh-valve.com 129 HYDRANT AWWA C502 NSF 61/372 CERTIFIED UL LISTED FM APPROVED 250 PSI WORKING PRESSURE 10-YEAR LIMITED WARRANTY

Sentinel 250 Fire Hydrant

K81-DD FIRE HYDRANT GUARDIAN AWWA C502 NSF YEARS. For Generations CERTIFICATIONS ISO 9001 ISO BS OHSAS

UNION-TITE DUCTILE IRON C153 COMPACT FITTINGS

SECTION GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

FACILITY WATER DISTRIBUTION PIPING

Herpteraium SECTION VALVES GENERAL

Super Centurion Hydrants Designed for efficient flow and outstanding, long-term reliability

K81-D FIRE HYDRANT GUARDIAN AWWA C502 NSF YEARS. For Generations CERTIFICATIONS ISO 9001 ISO BS OHSAS

DIVISION 14 CONVEYING EQUIPMENT

ORDINANCE NO

AMERICAN FLOW CONTROL 4 3/4 WATEROUS TREND FIRE HYDRANT

SPECIFICATIONS - DETAILED PROVISIONS Section Valve and Gate Operations CONTENTS

Section 8 AMERICAN. Flanged Pipe

AVK SAUDI VALVES MANUFACTURING COMPANY

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

SECTION FACILITY FUEL OIL PIPING

Rev. 2/16 MUELLER Fire Hydrant Reference Manual Mueller Co. Printed in the U.S.A.

MATERIAL AND EQUIPMENT STANDARD FOR FAST DRYING SYNTHETIC PRIMER TO BE USED WITH HOT APPLIED COAL TAR OR BITUMEN (ASPHALT) ENAMEL ORIGINAL EDITION

2-6 FIRE HYDRANT---(MODEL ½ & 5 ¼

FRONT LOADER REFUSE CONTAINER BID SPECIFICATIONS

Utilities Catalog. PC-U2008, February, 2008

Design and Construction Standards SECTION PLUMBING PIPING

StarFlex series 5000 Double-Ball Flexible Expansion Joint for the Protection of Water Wastewater, and Industrial Pipelines

SECTION VALVES

CITY OF TAMPA ADDENDUM 2. July 13, Contract 17-C-00030; David L. Tippin Water Treatment Facility Lime Slaker Replacement

COMMERCIAL ITEM DESCRIPTION HOSE ASSEMBLY, NONMETALLIC, FIRE FIGHTING, WITH COUPLINGS

1. Valves shall conform to the latest version of AWWA Standard C-509 covering Resilient Seated gate Valves for Water Supply Service.

AMERICAN AVK COMPANY AVK SERIES 24 - HIGH PRESSURE, WET BARREL HYDRANT FIELD MAINTENANCE AND INSTRUCTION MANUAL TABLE OF CONTENTS

AMERICAN FLOW CONTROL 3-16 SERIES 2100 RESILIENT SEATED CHECK VALVE

SECTION MISCELLANEOUS VALVES

Dos Rios Chlorine Contact Basin Scum Well Rehabilitation Project Solicitation Number: CO Job No.:

2009 Edition. Tyton fittings 14"-24" NSF. For Water & Wastewater, Fire Protection & Industrial Applications. Certified to ANSI/NSF 61

AMERICAN AVK COMPANY AVK SERIES 67 - HIGH PRESSURE, POST/FLUSHING HYDRANT FIELD MAINTENANCE AND INSTRUCTION MANUAL TABLE OF CONTENTS

Grooved Piping System for Fire Protection Services

OPERATION AND MAINTENANCE MANUAL 5-1/4 AMERICAN-DARLING B-84-B-5 FIRE HYDRANT

TABLE OF CONTENTS. 3 Outlet Stainless Steel Body. 3 Outlet Ductile Body. 2 Outlet Ductile Body 2 Outlet Bronze Body

SPECIFICATIONS - DETAILED PROVISIONS Section Vertical Hollowshaft Electric Motors C O N T E N T S

OPERATION AND MAINTENANCE MANUAL 5-1/4 AMERICAN-DARLING B-62-B-5 FIRE HYDRANT

Grinnell Grooved Fire Protection Products Grooved Fittings

TABLE OF CONTENTS. Pipe Diameter Chart (Reference Only)..50 Extensions 38,40,42,44

5 1 /4 PACER. It s AMERICAN What We Know. DARLING MARK 73 2 FIRE HYDRANT AMERICAN FLOW CONTROL WATEROUS FIRE HYDRANT

FIRE HYDRANTS. Wet Barrel Fire Hydrants

Tapecoat. Application Guideline

Downloaded from

Butterfly Valve. Product Training Presentation Danfoss Flomatic Corporation

9900 SERIES SECTION LECTURE ROOM SEATING & TABLET ARM SPECIFICATIONS

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

CITY OF ALLIANCE, OHIO 2016 CHEMICAL SUPPLIES SPECIFICATIONS FOR

Excerpt from Chapter 3 of the City Code that address Fats, Oils and Grease (FOG) control program that was adopted by the City Council on May 9, 2016.

FIRE HYDRANT SPECIFICATION CHANGE SUBMITTAL

One City Plaza, Suite B P.O. BOX 1287 Cabot, Arkansas Phone Revised: April 2, 2019

AFG501 ALUMINUM FEMA 361 LOUVER LOUVER TYPE RECOMMENDED SPECIFICATION

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

516509_tabs 11/16/10 4:55 AM Page 1 FIRE HYDRANTS

Transcription:

SECTION 33 12 19 FIRE HYDRANTS WITH HYDRANT LOCKS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals. B. Submit name of hydrant manufacturer, type of bonnet paint, and engineering control drawing number for hydrant proposed for use. PART 2: PRODUCTS 2.01 HYDRANTS A. Provide hydrants in conformance with AWWA Standard C502, Dry Barrel Fire Hydrants (Latest Edition). Hydrants are approved by AW by issuance of a Certificate of Responsibility. Hydrants shall open left (counterclockwise). The following hydrant has been approved. Alternate hydrants will not be considered. APPROVED HYDRANT TYPE The AW approved hydrant at all locations is Mueller Model Super Centurion 250. Fire hydrants installed at Fort Sill and Fort Leavenworth require Hydra-Shield Neo Custodian Hydrant Locks. (Note: These locks are proprietary.) Hydrant locks must be installed prior to hydrants being connected to live water mains AND Hydrant Locks must be installed prior to newly installed water mains being connected to the existing distribution system. No active water main line shall have a fire hydrant that is not secured with a Hydrant Lock. B. The AW Project Manager may, at any time prior to or during installation of hydrants, randomly select furnished hydrant for disassembly and laboratory inspection, at AW s expense, to verify compliance with Specifications. When hydrant is found to be non-compliant, replace, at Contractor's expense, hydrants, with hydrants that comply with Specifications. C. Provide lower hydrant barrel fabricated from Ductile Iron Pipe as single piece, connected to upper hydrant barrel by means of joint coupling that will provide three hundred sixty (360) degree rotation of upper barrel. Revised June 2013 33 12 19-1

2.02 HYDRANT TEE A. Fire hydrant installations shall require the use of a hydrant tee on the main line. Hydrant valves shall be bolted to the hydrant tee for all installations. Mechanical joint hydrant tee shall be ductile iron class 350 and shall be produced in accordance with ANSI/AWWA A21.53/C153 and ANSI/AWWA A21.11/C111 for joints and ANSI/AWWA A21.4/C-104 for cement lining in sizes 3 through 24. Hydrant tee mechanical joint nuts and bolts shall be ductile iron, high strength, low alloy steel per ANSI/AWWA A21.11/C-111. 2.03 LEADS A. Branches (Leads): Conform to requirements of Section 33 11 00.15 - Ductile Iron Pipe and Fittings and Section 33 11 00.11 - Polyvinyl Chloride Pipe. 2.04 HYDRANT PAINTING A. New hydrants and refurbished hydrants shall be shop coated as specified herein. B. Hydrant locks installed on fire hydrants shall not be painted and paint shall not be allowed to enter or affect the hydrant locks system. C. Exterior Above Traffic Flange (Including Bolts & Nuts). 1. Surface preparation to be in accordance with SSPC-SP 10 (NACE 2) near white blast cleaned surface. 2. Coat with three coat alkyd/silicone alkyd system with total dry film thickness (DFT) of 6-9 mils as follows: a. Prime Coat - Oil modified alkyd primer, to be in general conformance with SSPC Paint Specification No. 25. Total dry film thickness (DFT) 2-3 mils. b. Intermediate Coat - Heavy Duty Industrial Alkyd Enamel to be in general conformance with SSPC Paint Specification No. 104, and Federal Standard A-A-2962A. Total dry film thickness (DFT) of 2-3 mils. c. Finish Coat - Silicone Alkyd Resin Enamel to be in general conformance with SSPC Paint Specification No. 21. Total dry film thickness (DFT) to be 2-3 mils. Exception - hydrant bonnet shall not be finished shop coated, only intermediate coated. Install color coded finish coating of bonnet in field. d. Bonnet Paint - Field apply finish coat of Silicone Alkyd Resin Enamel to be in general conformance with SSPC Paint Specification No. 21. Dry film thickness of 2-3 mils. Bonnet colors are to be as specified in Paragraph 3.01 to designate the available fire flow at 20 psi residual. Revised June 2013 33 12 19-2

3. Colors - Primer: Manufacturers standard color. Finish coat of hydrant body and connection caps, to be painted to match the color of existing in service hydrants on the base. Approval of the color paint to be used on the hydrants shall be approved by the American Water Project Manager prior to the final application of paint to the newly installed hydrant. D. Field Maintenance Painting (Exterior Above Traffic Flange) 1. Surface Preparation to be in accordance with SSPC - SP2, Hand Tool Cleaning, or SSPC - SP3, Power Tool Cleaning, depending on condition of existing paint and extent of corrosion. It is not necessary to remove tightly adhered mill scale, rust, and paint. Mill scale, rust and paint are considered tightly adherent when they cannot be removed with dull putty knife. In some severe cases where it is necessary to remove majority of existing paint, surface should be cleaned in accordance with SSPC - SP11, Power Tool Cleaning to Bare Metal. 2. When surface is cleaned to bare metal (SSPC - SP11), coat hydrant with three coat Alkyd/Silicone Alkyd system in accordance with Paragraph 2.03.B.2 as for new hydrants. When surface is cleaned to SSPC - SP2 or SSPC - SP3, coat hydrant with Silicone Alkyd Resin Enamel in general conformance with SSPC Paint Specification No. 21. Total dry film thickness of 3-6 mils surface is cleaned to bare metal (SSPC - SP11), coat hydrant with three coat Alkyd/Silicone Alkyd system in accordance with Paragraph 2.04.B.2 as for new hydrants. E. Exterior Below Traffic Flange 1. Surface preparation in accordance with SSPC-SP10 (NACE 2) Near White Blast Cleaned Surface. 2. Primer and intermediate coat: coal tar epoxy in general conformance with SSPC Paint Specification No. 16. Apply two (2) coats with dry film thickness (DFT) of 8-10 mils each for total DFT of 16-20 mils. 3. Finish coat: Water based vinyl acrylic mastic. Apply one coat with dry film thickness of 6-8 mils. Color of finish coat to be same as finish coat for exterior above traffic flange. F. Interior Surfaces Above and Below Water Line Valve 1. Material used for internal coating of hydrant interior ferrous surfaces below water line valve must meet the requirements of local or State standards. 2. Coating shall be liquid or powder epoxy system in accordance with AWWA Standard C-550. Coating may be applied in two or three coats, according to manufacturer's recommendations, for total dry film thickness of 12-18 mils. Revised June 2013 33 12 19-3

PART 3: EXECUTION 3.01 INSTALLATION (FIRE HYDRANT) A. Set fire hydrant plumb and brace at locations and grades as shown on Drawings. When barrel of hydrant passes through concrete slab, place 1-inchthick piece of standard sidewalk expansion joint material around section of barrel passing through concrete. B. Locate nozzle center line minimum 18 inches above finish grade. C. Place 12-inch by 12-inch yellow indicators (plastic, sheet metal, plywood, or other material approved by AW Project Manager) on pumper nozzles of new or relocated fire hydrants installed on new water lines not in service. Remove indicators after new water line is tested and approved by Project Manager. D. Thrust blocks are required on all hydrant tees. If hydrant lateral is not restrained, contractor shall provide a thrust block behind hydrant shoe. Do not cover drain ports, bolts, or fittings when placing concrete thrust block. E. Obtain AW Project Manager's approval in writing prior to installation of hydrants which require changes in bury depth due to obstructions not shown on Drawings. Unit price adjustments will not be allowed for changes in water line flow line or fire hydrant barrel length caused by obstructions. F. Plug branch lines to valves and fire hydrants shown on Drawings to be removed. Deliver fire hydrants designated for salvage to AW at their base depot location. G. Coating Requirements: 1. Apply coatings in strict accordance with manufacturer's recommendations. No requirements of this specification shall cancel or supersede written directions and recommendations of specific manufacturer so as to jeopardize integrity of applied system. H. Furnish affidavit of compliance that coatings furnished complies with requirements of this Specification and referenced standards, as applicable. Per NFPA standards, provide a color code for the hydrant bonnet to indicate the hydrant s available flow at 20 psi according to the following table: Supply Water Line Flow Characteristics Less than 500 GPM Bonnet Color Red 500-999 GPM Orange 1000-1499 GPM Green 1500 GPM & Above Light Blue Revised June 2013 33 12 19-4

I. Remove and dispose of unsuitable materials and debris in accordance with local or State requirements. 3.02 HYDRANT LOCK INSTALLATION A. Due to the proprietary nature of the Hydrant Lock, the locks shall be acquired by AW. Due to the secure nature of the Hydrant Lock requirement, locks shall be installed by AW. All costs incurred by AW for the provision and installation of the Hydrant Lock shall be paid for by "The Project" through modification of the existing AW Contract with the Government. "The Project" shall be responsible for initiating the AW Contract Modification through AW's Contracting Officer (KO) or the Contracting Officer's Representative (COR). B. Upon AW's receipt of the Contract Modification, AW shall contact "the Project" within ten (10) working days to schedule the installation of the hydrant lock(s) on the hydrants purchased by "the Project". (Note: The availability of the hydrant locks is subject to the manufacturer's schedule and delivery. The installation process normally takes thirty (30) minutes per hydrant.) C. Hydrant(s) shall be accessible with adequately clear area around hydrant(s) for the installation process. Palletized Hydrant(s) [newly purchased and delivered on pallet(s)] shall not be stacked more than three (3) rows [one (1) pallet] high for safe installation and a minimum of 20 feet in front of the top of the hydrant(s) shall be clear and accessible. (Note: New hydrants should never be stored on the ground.) Installed Hydrants [hydrants newly installed on a water main(s) that are not yet connected to the water distribution system] shall be backfilled to natural ground with level surface with 20 feet clear and accessible 360 around hydrant. D. Hydrant Lock Installation(s) shall be inspected by AW as the owner of the lock and AW's KO/COR for payment verification purpose. END OF SECTION 33 12 19 Revised June 2013 33 12 19-5