DENTAL LIGHT CLESTA LED DENTAL LIGHT TYPE 0 POLE MOUNT 0 CEILING MOUNT 05 TRACK MOUNT INSTALLATION INSTRUCTIONS R
Table of Contents. Precautions for Installation. Overview and Major Components. Specifications & Dimensions. Installation Instructions 5. Adjustment 6. Wiring Diagram Page - - 6 7-5 5-6 7-9
. Precautions for Installation. During lifting of the dental light, make sure to hold the horizontal arm, balance arm and pole described as follows. If not, it may lead to physical injury or property damage. TYPE 0 / 0 TYPE 05 Horizontal Arm Balance Arm Pole Wing Bolt *This drawing shows the type 0. For TYPE 0, the power supply BOX part becomes upside down. Balance Arm. Do not remove the wing bolt for TYPE 0/0 dental light (stopper for balance arm) until attach the light head. The balance arm can be jump up and it may cause to physical injury or damage to the equipment.. Do not drop or hit the product.. Do not connect the power supply other than rated voltage. 5. Properly connect ground wires. 6. Be sure to adjust the leveling of the unit and chair to prevent from drifting of the TYPE 0 dental light. Refer to the unit and chair installation manual. 7. When the installation process has been completed, check that all the mechanical and electrical functions are working properly. 8. Installation should be conducted by authorized personnel only. Follow instructions on installation manual. WARNING The LED is very bright. Do not direct the LED beam into the patient's or user's eyes.
. Overview and Major Components -. Type 0 Pole Mount Main Switch Fuse Horizontal Arm SENSOR/MANUAL Mode selection switch Joint Cover Balance Arm Light Head Section (Rear side) Intensity Control Volume Yoke Joint Yoke (Upper) Yoke (Bottom) Lens Cover (LED light source) Frame Cover Power Supply Box Section Touchless Sensor Handle -. Type 0 Ceiling Mount Light Head Section (Rear side) Intensity Control Volume Main Switch SENSOR/MANUAL Mode selection switch Horizontal Arm Frame Cover Power Supply Box Section Fuse Joint Cover Yoke Joint Balance Arm Yoke (Upper) Yoke (Bottom) Lens Cover (LED light source) Touchless Sensor Handle
. Overview and Major Components -. Type 05 Track Mount Light Head Section (Rear side) Fuse Intensity Control Volume Label Caution label Frame Cover Joint Cover Main Switch SENSOR/MANUAL Mode selection switch Balance Arm Yoke Joint Yoke (Upper) Yoke (Bottom) Lens Cover (LED light source) See page for details of label Touchless Sensor Handle
. Specifications & Dimensions -. Specifications (Type 0, 0, 05) Rated Voltage : AC0V 60Hz Rated Input : 0.5A Fuse : 50V 0.8A(T) Weight : Type 0 :. lbs. (6.5kg) Type 0 :. lbs. (kg) Type 05 : lbs. (5kg) Light Source : LED (5 LEDs) Optical Performance : Focal Distance 5.6" (650mm) : Light Intensity (Normal treatment mode) 00 Lux / 88 FTC ~ 8000 Lux / 60 FTC : Light Intensity (Composite mode) 00 Lux / 99 FTC : Correlated Color Temperature 5000K Light Pattern :." x 6." (85mm x 55mm) at 5.6" Protection class against electric shock : Class I Equipment. Usage environment : Temperature 50 ~ 0F (0 ~ 0ºC) Humidity 0 ~ 75% Air pressure 0. ~ 5. psi (700 ~ 060 hpa) Transportation / Storage environment : Temperature - ~ 58F (-0 ~ +70ºC) Humidity 0 ~ 95% Air pressure 0. ~ 5. psi (700 ~ 060 hpa) -. Dimensions --. Type 0 Pole Mount *Values are the standard values. [Unit: inch (mm)] Dimensional tolerance: ±0% -/8 (79.5) 8-/ (78.5) 9 (75) 60 90 90 5 56 60 -/8 (60.5) 5 (79.5) -/ (5) 0 0 8 -/8 (08) -/8 (08)
. Specifications & Dimensions -. Dimensions --. Type 0 Ceiling Mount *Values are the standard values. [Unit: inch (mm)] Dimensional tolerance: ±0% -/8 (79.5) 8-/ (78.5) 9 (75) 60 90 90 5 56 60 (Length of pole) -/ (5) -5/8 (.7) (0) 7-/ (90) 8 6-/8 (96) 0-/ (7) 0-/ (68) ~7-/ (00~50) -/ ~5-/ (600~650) 5
. Specifications & Dimensions -. Dimensions --. Type 05 Track Mount *Values are the standard values. [Unit: inch (mm)] Dimensional tolerance: ±0% 77-/ (970) 57-/8 (50) (Length of pole) 5 0-5/8 (68.5) 90 90 0 (0) 7-/ (90) 8 5 (888) 0-/ (68) 6
. Installation Instructions -. Type 0 Pole Mount Necessary Tools Phillips screw drivers (#, #), Hex key wrenches (Metric, mm, mm,.5mm) Attach the arm assembly to the light pole () Pass the power cable of the light through the light pole adapter. (Fig.) () Pass the power cable of the light through the light pole. * Be careful not to damage the power cable when through to the light pole. () Insert the pole adapter and light assy to the light pole. * Refer to the installation manual attached to the light mounting kit (optional) for installation of the light pole. () Attach the hospital grade plug to the power cable end. This is to be installed electrician only, in accordance with the national electrical code and local electrical codes as applicable. (5) To convert the left handed operation as need. (Fig.). Remove the right/left fixing screw from the H-shaped arm joint as below.. Rotate the H-shaped arm joint to other position and reinsert screw. (Loosen large upper & lower fixing screw to help in moving bracket.) H-shaped arm joint Screw position for Left handed Right/left fixing screw Yoke rear cover M5 x 0 Cap bolt M x 6 Flat head screw Power cable Pole adapter Light pole Fig. Attach the Light Head () Unscrew the two M x 6 flat screws and remove the yoke cover from light head. Remove the two M5 x 0 cap bolt from head shaft. (Fig.) () Fix the light head to balance arm with two M5 x 0 cap bolts. *Fix the screw securely from bottom side first and upper side next. (Fig.) () Connect the P & P connectors. Same size of connectors met at each side of connectors. Connect the P connector from balance arm to P connector from yoke cover. (Fig.5) () Attach the yoke cover with two M x 6 flat screws. (Fig.6) (5) Remove the wing bolt and spacer, then attach the hole cap. (Fig.7) M5 x 0 Cap bolt Lower fixing screw Screw position for right handed Fig. Upper fixing screw Rotate Fig. Fig. P Connector P Connector P Connector M x 6 Flat head screw Fig.5 Fig.6 Fig.7 7 Spacer Wing bolt Hole cap
. Installation Instructions -. Type 0 Ceiling Mount Necessary Tools Phillips screw drivers (#, #), Hex key wrenches (Metric, mm, mm,.5mm), Hammer. Precaution for Installation () For safety in operation as well stability of the light source, the importance of proper ceiling structure can not be overemphasized. The ceiling structure capable of supporting 00lbs (00kg) dead weight is requires. () Be sure request specialized electric construction person accompanied by indoor electric wiring work. Power usage : 0V/60Hz More than 0W. Installation of Ceiling () Lead out the power supply cable (for indoor wiring 0.75m/m x wires power cable or mode) from the ceiling as necessary length (Approx. "/60cm) where the ceiling light is mounted. () Secure flange base to the ceiling referring to Fig.8 as below. () Attach the roll pin to the ceiling pole with hammer. See Fig.9 below. Insert the ceiling pole into the ceiling flange and set the roll pin to groove on the ceiling flange. Fix it with two M6 x 8 set screws. (Fig.0) Wood Ceiling Steel Frame Ceiling Concrete Ceiling Square timber (Hard wood more than " / 05mm) M8 Anchor nut (Embedded) Flange base Flat washer Spring washer M9 x 00 coach bolt Flat washer Spring washer M8 x 50 hex bolt Flat washer Spring washer M8 x 50 hex bolt Ceiling material Prepared hole diameter (mm) Fixing bolt Wood Steel Frame Concrete M9 x 00 coach bolt M8 x 50 hex bolt M8 x 50 hex bolt / M8 anchor nut Fig.8 How to fix the flange base Roll pin Same length Set roll pin to groove Ceiling pole Roll pin Ceiling pole Ceiling flange M6 x 8 set screws Ceiling pole Fig.9 How to fix the roll pin to the ceiling pole Fig.0 How to set the ceiling pole to the ceiling flange 8
. Installation Instructions Flange Base Template FULL-SIZE MOUNTING TEMPLATE 6"-5/ (REF) 6"-/6 (REF) "-9/ (REF) 7/6" Mounting Holes 9
. Installation Instructions Attach the Light Assembly ( ) Be sure the ceiling pole is plumb. Adjust vertical level of the ceiling pole with leveling nuts (M8) and secure ceiling flange to flange base with fixing nuts (m8) ( ) Slide the flange cover and flange cover ring (flat side up) over the ceiling pole and secure them about half way up the pole. Use only one set screw as you will be moving the on final installation. ( ) Install the light assembly to the ceiling pole running the wires cord up through the pole to the ceiling flange. Secure it with allen set screws. (Be careful not fall off the light assembly.) ( ) Connect the incoming power to the wires cord from the light assembly. Be sure to follow the local electrical codes. ( 5 ) Reposition the flange cover and secure it with the flange cover ring. Secure three M6 x 8 set screws. * Refer to Fig. for each components. M8 Nut (for Fixing) Flat washer Spring washer M8 Nut (for Leveling) Ceiling pole M6 x 8 set screw Flange cover Flange cover ring Light assembly Attach the Light Head Fig. ( ) Pass the light cables through the extension. Fix the extension to the balance arm with M5 x 0 cap bolts. (Refer to Fig.) ( ) Attach the light head to the extension. Refer to the P7 [Attach the Light Head] section. M5 x 0 Cap bolt Extension Fig. 0
. Installation Instructions -. Type 05 Track Mount Strength of Ceiling For safety in operation as well as stability of the light source, the importance of proper ceiling structure cannot be overemphasized. In general, a ceiling structure capable of supporting 00 lbs. dead weight is required. Construction of Ceiling A) In conventional ceilings with joists perpendicular to the center line of the light, attach the pallet by at least 6-5/6 x " (M8 x 75mm) lag screws. Suitable holes are provided in pallet for most installations, utilizing 6" or " cc ceiling joists. For other spacings or locations, additional holes can be cut in pallet. (Fig.) IMPORTANT : Locate power supply box end of track at headrest end of chair. - Not legrest. B) For conventional ceilings with joists parallel to the center line of the light, cross blocks must be installed in places to allow mounting with at least 6-5/6 x "(M8 x 75mm) lag screws. (Fig.5) C) For suspended ceilings, appropriate rigid structure must be attached to the ceiling framework to provide 00 lbs. dead weight capacity. (Fig.6) A) In conventional ceilings with joists perpendicular to the center line of the light Electrical Feed Opening Transformer End Used for " Center to Center Joists Used for 6" Center to Center Joists Fig. 5/6 x Lag Bolts (6)
. Installation Instructions B) For conventional ceilings with joists parallel to the center line of the light Crossblocks Places " Center to Center Fig.5 C) For suspended ceilings Reinforcement of ceiling structure capable of supporting 00 lbs. Fig.6
. Installation Instructions --. Electrical Preparation Refer to Fig.7 for the location of electrical feed opening in pallet, provide wire, 0V, 60Hz circuit (5 amp. fuse or breaker) through flexible conduit with enough slack to protrude at least " below the pallet when installed. Terminate the conduit with /" body box connector suitable for mounting through /6 thickness. A readily accessible shut-off switch for this circuit is recommended. Use wiring suitable for 90 C service. Head of Chair "-5/8 DIA (Electrical Feed Opening) 65"-/ /8" DIA HOLE " DIA C'Bore (8Holes) 6"-5/6 5" "-5/8 "-/ " 8" 6" /6" Fig.7 --. Installation Instructions ( ) Lead out the power supply cable from the ceiling where the track light is mounted. ( ) Run the power supply cable through the pallet and mount the pallet with M8 x 75 (8) Lag bolts, M8 (8) flat washers. ( ) Place track against the pallet and slightly engage two mounting bolts at the end opposite to the electrical opening. ( ) Allowing the free end to hang down slightly for access, install the conduit box connector to the track. ( 5 ) Finish bolting the track securely to the pallet. ( 6 ) Connect the wires from the feed to the terminal block. ( 7 ) Slide the trolley onto the track (end near electrical opening) with the arrow on the trolley oriented toward the pulley on the track. ( 8 ) Carefully guide the wire from the trolley, around the spring-loaded pulley and back toward the end of track. ( 9 ) Attach retainer clamp to small screw in track. Clip the free end of the trolley wire into the plastic clip near end. ( 0 ) Install rubber bumpers at the end of the track in the holes provided. Power Supply Box Install Rubber Bumpers after Trolley Plastic Wire Clip Z Clip (Holds Bottom Cover) To Trolley Rubber Bumpers Connector Light / Electrical Feed Terminal Block Clamp (Factory Installed on Wire) Pulley Fig.8 End Cap
. Installation Instructions ( ) Check operation of the trolley. It is factory adjusted to provide smooth effortless travel, without play; however rollers can be readjusted if necessary. Loosen the set screw and adjust the socket cap screw to vary roller clearance. Trolley Rollers Adjustment Screw Set Screw Fig.9 ( ) Unpack the power supply box and mount it to the track with screws provided. ( ) Attach the pigtail leads to the corresponding power line wires at the terminal block. Retain the wires under the plastic clip. ( ) Connect the plug-in connector to the trolley wire. ( 5 ) Carefully slide bottom cover onto the track from free end. Be sure to engage lip onto Z bracket. ( 6 ) Install the end-cap with the screws provided. ( 7 ) Slide the trolley back and forth, checking for binding or rubbing. ( 8 ) Confirm that the swing arm is properly adjusted to stay where it is placed. If necessary, move the head up or down to expose the appropriate cross drilled nut and adjust with the tool provided. ( 9 ) Turn on power and check electrical operation of the light. 6 0 Power supply cable 5 Pallet Track 9 5 End-cup Trolley 6 Power Supply Box 8 DSL 7 7 8 9 Light Assembly Bottom Cover Rubber bumper This bracket is on the rear side of the cover 0 Screw with plain washer & spring washer Mx5( pcs) Hex Head Bolt M8x5(6 pcs) Spring Washer M8 (6 pcs) Fig.0
. Installation Instructions Check Operation of the Dental Light When the installation process has been completed, Check that all the mechanical and electrical functions are working properly. Item Touch-less Sensor Intensity control volume Movement of the Light Inspection method Confirms the light ON and when shake hand within approximately -/ (65mm) from the touch-less switch. Confirms switching the composite mode when hold hand within approximately -/ (65mm) from the touch-less switch for certain time. During normal treatment mode, make sure the light intensity changes when turning the intensity control volume. Make sure the light head stops and hold any positions. Make sure that no abnormal noise occurs when the product is operated. * At the beginning, light head movement (up/down, rotation) could be tight. This is a normal symptom. As you move light head for three four times, light movement becomes smooth. Method of confirmation Operation Check Operation Check Operation Check Operation Check WARNING The LED is very bright. Do not direct the LED beam into the patient's or user's eyes. 5. Adjustment After checked operation of the dental light, adjust the dental light if you have following cases Balance arm doesn't stay at the desired position Adjust the tension of the balance arm. Follow instructions [Adjustment of the tension of the balance arm] Light head is not vertical position Adjust the angle of the light head. Follow instruction [Adjustment of the angle of the light head] Adjustment of the tension of the balance arm Position the angle of the balance arm so the tension adjustment nut becomes visible just under slot A. Turn the nut and adjust the tension with the adjustment bar supplied with the light.(fig.) Adjustment Bar Slot A Adjustment Nut Slot A Balance Arm Fig. When the light head tends to go up, Turn the nut to direction. When the light head tends to go down, Turn the nut to direction. 5
5. Adjustment Adjustment of the angle of the light head Remove the yoke joint cover by removing the two M x 6 tapping screws. Move down the balance arm and loosen the set screw on the joint shaft by use of mm hex key wrench before adjust the angle of the light head. (Fig.) Yoke Joint Cover Adjustment Bar M x 6 Tapping screw Joint Shaft Set Screw Light Head Side Slot B Fig. CAUTION Turning the adjustment nut without loosen the set screw, it may cause damage to the shaft. Make sure loose the set screw before turning the adjustment nut. Position the angle of the balance arm so the head angle adjustment nut becomes visible just under the slot B. Turn the nut and adjust the tension with the adjustment bar supplied with the light. (Fig.) Adjustment Nut Slot B Adjustment Bar Slot B Balance Arm Fig. Adjustment of the angle of the light head When the light head tends to go down, Turn the nut to direction. When the light head tends to go up, Turn the nut to direction. After adjustment is done, re-tighten the set screw by use of mm hex wrench. Fix the joint cover with two M x 6 tapping screws and insert the joint cover into balance arm. CAUTION Unless this socket screw is re-tightened, the angle of the head will be changed during use. 6
CT code 5000mm A0BMM** CACP7** Default setting Setting condition Trunk line for LED module (0) A0BFJ** CACP7** Inside arm lead wire (0) A0BFT** N CN0 CN0 LED output A AC0V L Power Input VHP XHP LED output K CN0 NHP Default setting Sensor activation setting : Activate when a hand goes away. On: Activate when a hand comes in. Includes Composite Mode :Yes, On: No Speed setting of communication line : 800bps, On: 00bps 5 ON 6 SW 7 ON LED blink setting of Composite Mode : Slow blinking, On: Rapid blinking 8 PC PC side: Clair Unit, side: CP-One plus PC side: Clair Unit, side: CP-One plus SW PC JP LED module CN0 XHP SMP() M S CN07 XMP LED module Assy (5 LEDs) G0G7** Sensor PCB. (0) (G0GL**) Trunk line for LED sensor PCB (0) CN6 NHP CN XHP A0BFH** CN XAP CN NHP XMP 0KB A0BML** Earth 90mm CADQ65** (0) A0BMK** CACP7** Lead wire () 00MM CACP7** A087L** XMP (AL-905) SENSOR MANUAL LED: Power LED LED: Sensor Signal LED SW VR lower limit setting SW Manual SW for operation test Settings of PCB dip switches ( SW,) and jumper pin (JP). SW Test mode ( Always ) : Normal operation, On: Test operation 6 CN9 NHP Sensor power input Sensor output GND Intensity adjustment Volume Section (0) Setting condition Transition time to Composite mode (by a sensor) : second, On: seconds A0BKF** Wake :. Composite Mode when a light is turned on by using a sensor. e, light stays in composite mode. On :. Regular Mode when a light is turned on by using a sensor. e, light goes into regular mode. Combining dental unit : Clair unit, On: CP-One plus LED Light Power PCB.(0) (G0JH**) LED Light Control PCB. (DL-900) (G0A0**) Red Sensor power output Sensor input Head Section (VR) Intensity adjustment PWM output DC5V Power input Light White White PWM input DC5V Power output + - GND Remarks Connector Symbol SM... SM Connector XM... XM Connector dot The side with black dot has male pins Red Plug Receptacle Functional earth line for power PCB. (0) Light / Terminal Block / -Fuse 50V/0.8A(T) Lead wire () 00MM Trunk line for power PCB. Lead wire () 00MM Power Switch Lead wire () 00MM Sensor/Manual Mode Selection Switch Bright Pink Light Ferrite (Four turns) Power line for Control PCB. (AL-90Q) A086X** GND DC5V power output VR input Red 9 Yoke Section Ferrite ( turn) Power Supply Box Section Arm Section 5. Wiring Diagram 5-. TYPE 0 Pole Mount Bright Pink 7
Trunk line for LED module (0) A0BFJ** XMP A0BFH** CN NHP Setting condition Default setting Sensor activation setting : Activate when a hand goes away. On: Activate when a hand comes in. Includes Composite Mode :Yes, On: No Speed setting of communication line : 800bps, On: 00bps 5 6 SW 7 LED blink setting of Composite Mode : Slow blinking, On: Rapid blinking 8 PC side: Clair Unit, side: CP-One plus PC side: Clair Unit, side: CP-One plus SW JP XMP 0KB XMP Settings of PCB dip switches ( SW,) and jumper pin (JP). Setting condition Default setting ON ON Test mode ( Always ) : Normal operation, On: Test operation PC PC LED module SMP() LED module Assy (5 LEDs) G0G7** Sensor PCB. (0) (G0GL**) Sensor power input Sensor output GND Intensity adjustment Volume Section (0) Head Section A0BKF** Red (VR) Intensity adjustment Yoke Section Transition time to Composite mode (by a sensor) : second, On: seconds Wake :. Composite Mode when a light is turned on by using a sensor. e, light stays in composite mode. On :. Regular Mode when a light is turned on by using a sensor. e, light goes into regular mode. SW Combining dental unit : Clair unit, On: CP-One plus A0BML** A0DEE** Inside arm lead wire (0) A0BFT** Trunk line for power PCB. (0) Power cable 00 (SJT) CADQ7** CN0 CN0 LED output A AC0V Power Input VHP XHP LED output K N L A0BMK** Power Switch XMP 5. Wiring Diagram 5-. TYPE 0 Ceiling Mount Trunk line for LED sensor PCB (0) Remarks Connector Symbol SM... SM Connector XM... XM Connector dot The side with black dot has male pins Plug Receptacle Functional earth line for power PCB. (0) Trunk line for extension(0) -Fuse 50V/0.8A(T) Terminal Block Light / M S LED Light Power PCB.(0) (G0JH**) / Lead wire () 00MM Lead wire () 00MM CACP7** CACP7** Earth 90mm CADQ65** CN07 CN0 XHP DC5V Power output CN0 NHP GND PWM input Lead wire () 00MM Lead wire () 00MM CACP7** CACP7** Ferrite ( turn) White Bright Pink (AL-905) Sensor/Manual Mode Selection Switch 8 A087L** Power line for Control PCB. (AL-90Q) A086X** Bright Pink Light SENSOR MANUAL XMP White Light Ferrite (Four turns) 6 LED: Sensor power output Sensor input DC5V Power input PWM output CN XAP Power LED Red GND DC5V power output VR input CN XHP CN6 NHP LED: Red Red 9 CN9 NHP Sensor Signal LED SW XMP LED Light Control PCB. (DL-900) (G0A0**) VR lower limit setting SW Manual SW for operation test Power Supply Box Section Arm Section Extension Section
M S A07X8** Trunk line for power PCB. (AL-905) -Fuse A087M** 50V/0.8A(T) CAMV0** N L XMP XMP XMP Settings of PCB dip switches ( SW,) and jumper pin (JP). Default setting Setting condition Default setting Setting condition 5 Sensor activation setting : Activate when a hand goes away. On: Activate when a hand comes in. Includes Composite Mode :Yes, On: No Speed setting of communication line : 800bps, On: 00bps Test mode ( Always ) : Normal operation, On: Test operation ON 6 Transition time to Composite mode (by a sensor) : second, On: seconds SW 7 LED blink setting of Composite Mode : Slow blinking, On: Rapid blinking 8 Wake :. Composite Mode when a light is turned on by using a sensor. e, light stays in composite mode. On :. Regular Mode when a light is turned on by using a sensor. e, light goes into regular mode. SW ON PC PC side: Clair Unit, side: CP-One plus PC side: Clair Unit, side: CP-One plus SW Combining dental unit : Clair unit, On: CP-One plus PC JP Trunk line for LED module (0) A0BFJ** LED module SMP() CN0 XHP CN0 VHP LED module Assy (5 LEDs) G0G7** XMP Earth 500mm A087N** A0DEF** A0DEH** CACP77** CN07 CN0 XHP CN0 NHP CACP76** Sensor PCB. (0) (G0GL**) A087L** 5 A0BFH** SENSOR CN NHP 6 7 Sensor power input Sensor output GND MANUAL XMP Signal trunk line(05) A0DEJ** LED output A AC0V Power Input LED output K 5 LED Light Power PCB.(0) (G0JH**) 6 7 5 6 7 5. Wiring Diagram 5-. TYPE 05 Track Mount Remarks Connector Symbol SM... SM Connector XA... XA C onnector XM... XM Connector dot The side with black dot has male pins Plug Receptacle Functional earth line for power PCB. CT code 5000mm Terminal Block Light Power Switch /White /White /White /White / Trunk line for LED module (05) / Trunk line for Fuse holder(05) Lead wire () 50MM DC5V Power output GND PWM input Lead wire () 50MM Ferrite one turn (,,,,Red, wires.) White (AL-905) 6 LED: Intensity adjustment Volume Section (0) Sensor power output Sensor input Sensor/Manual Mode Selection Switch Trunk line for LED sensor PCB (0) A0BKF** CN XAP Power LED GND CN XHP Power line for Control PCB. (AL-90Q) A086X** White Pink Light Bright Bright Pink Light Ferrite (Four turns) DC5V Power input PWM output CN6 NHP LED: 0KB Red Red Red Red Red DC5V power output VR input Red 9 CN9 NHP Sensor Signal LED SW (VR) Intensity adjustment Head Section XMP Gray Gray LED Light Control PCB. (DL-900) (G0A0**) VR lower limit setting SW Yoke Section Trunk line B for power supply box - Yoke (05) XA7P XA7P XA7P Trunk line A for power supply box - Yoke Manual SW for operation test A0DEK** (AL-905) Ceiling height 8F Unnecessary trunk line A087R** Ceiling height 8.5 0F Trunk line C for power supply box - Yoke (AL-905) Power Supply Box Section A087T** 9
NOTE R BELMONT EQUIPMENT, Division of Takara Belmont USA, Inc. 0 Belmont Drive Somerset, New Jersey 0887 U.S.A. TEL.:(7) 69-5000 / (800) -9 Fax.:(7)56-05 TAKARA CO, CANADA LTD. 076 S. Sheridan Way, Mississauga, Ont., L5JM, Can. TEL.:(905) 8-755 Fax.:(905)8-60 TAKARA BELMONT CORPORATION (Manufacturer) --, Higashishinsaibashi, Chuo-ku, Osaka, 5-008, Japan TEL.: +8-6-6-595 FAX.: +8-6-6-680 Book No. E08A0 Printed in Japan, 05-0