EirGrid Monthly Availability Report March 2017

Similar documents
Rate of Change of Frequency Project Quarterly Report for Q4 2017

Rate of Change of Frequency Project Quarterly Report for Q2 2017

Final Capacity Auction Results 2019/2020 T-1 Capacity Auction. Date 01/02/2019 Document: FCAR1920T-1 Version 1.0

Final Capacity Auction Results 2018/2019 T-1 Capacity Auction. Date 26/01/2018 Version 1.0

SEM experience to date and the impacts for the future Sean McGoldrick, General Manager SEMO

Transmission overhead lines Irish context

It is 5.30 on a winter s evening...

Analysis of electric vehicle charging using the traditional generation expansion planning analysis tool WASP-IV

Engineers Ireland Site Visit 23 rd March 2010

Synchronisation Challenges for SmartGrid

January-March 2017 Customer Switching Report for the Electricity and Gas Retail Markets

Diversifying the Business Model Past Fossil Fuels Peat to Renewables. Bord na Móna, Ireland. November 2018

INTERCONNECTION BETWEEN IRELAND AND ENGLAND / WALES TECHNICAL INVESTIGATION INTO CONNECTION OF EAST WEST INTERCONNECTOR TO IRISH TRANSMISSION SYSTEM

STORAGE IN IRELAND- AN OVERVIEW. IWEA Autumn Conference October 11 th 2018 Bernice Doyle Chair IWEA Storage Committee

Fuel Mix Disclosure 2016

The Grid Link Project. Summary of the Report for the Independent Expert Panel

Control Units Ex e Glass Fiber Reinforced Polyester

Transmission Development Plan Draft for Public Consultation

Modelling of a Large Number of Electric Vehicles (EVs) in the All-Island Ireland Energy System

Fuel Mix Disclosure and CO 2 Emissions 2012

MMP Investigation of Arthur Kill 2 and 3

Technical Datasheet. Differential Pressure Gauge Diaphragm DG Range. Performance characteristics. Product applications. How can we help you?

CONTENT - FERRITE CORE

TRANSMISSION DEVELOPMENT PLAN

March Powerhouse Wind Ltd. Document Technical Summary for Thinair 102.

Siemens switchgear. Tried, tested, trusted. Circuit Breakers

The Grid West project - Summary of the report for the Independent Expert Panel

Pressure Switches Low Pressure Switch

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

Intermediate 17 Week Training

CERTIFICATE OF COMPLIANCE

Solutions Ex d IIB+H2, Aluminum and Stainless Steel

Engineering Data Book

Legal Entity. Licensed Premises Limited Company. Licensed Premises/ Night Club Limited Company. 16 th January Retail Shop.

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

Electricity and Gas Retail Markets Report Q Information Paper

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

CAPACITY LIMITED RESOURCES (CLR) / ENERGY LIMITED RESOURCES (ELR)

Transmission in Limp Home Mode (S- B-27.00/102b, December 16, 2008)

Copyright 2011 OSIsoft, LLC

BUSINESS AND CONSUMER SURVEY RESULTS

Jiangmen Keye Electric Appliances Manufacturing Co., Ltd. Manufacturer of Propeller Fan

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

Outages with Initiating Cause Code Unknown by Voltage Class

SMB. Features. Mechanical Characteristics. Maximum Ta=25 unless otherwise specified. Peak Pulse Power Dissipation by10/1000μs Test Waveform

CERTIFICATE OF COMPLIANCE

nvpm Measurements at Rolls-Royce

Bitzer Friga Pack Catalogue

2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

D4B- N. Safety Interlock Switches. Safety Limit Switch. Specifications. Standards and EC Directives. Certified Standard Ratings D4BN

3VT Kompaktleistungsschalter bis 630A

Power consumption In operation At rest For wire sizing

Table 1d - FSA for All Returns, Females Tax Year

COMMISSION CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN AUGUST, 2017

2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

Vector Control CompactPLUS, Compact and Chassis Units

CERTIFICATE OF COMPLIANCE

SECONDARY FUEL TESTING ARRANGEMENTS

Advanced 17 Week Training

One battery to run them all! BluePrint July September 2016

EFDA TECHNOLOGY WORKPROGRAMME 2005

Pilot-Operated Directional Control Valves Series D3 - D11

Engineering Data Book

台灣黑馬牌指示量表類 DIAL INDICATOR METROLOGY

BUSINESS AND CONSUMER SURVEY RESULTS

References 4 Fuse carriers

Christopher Lyon NTEA Director of Fleet Relations

Monthly Economic Letter

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

SPH214 Small Panel Handler

Low Voltage 3-Phase Induction Motors. Range 0.18kW to 670kW

Increase Turbine Output. Gas Turbine Inlet Cooling

Proposed Route Location Map with Visual Sites

CHIP FUSE; RECTANGULAR TYPE FCC10,16,20,32, FHC10,16,20,32. RoHS COMPLIANCE ITEM Halogen and Antimony Free

RENEWABLES INTEGRATION STATUS REPORT

Functional Description HA /2005. Compact power packs SMA 03. Replaces HA /2003. p max up to 200 bar Q max up to 0,5-17 L/min

PNEUMATIC GROUP Brakes ORIGA SYSTEM PLUS

Pilot Operated Directional Control Valves Series D1VP, D3DP, D4P, D9P, D11P

Pneumatic Valve 4V100 Series

Updated Jan ) They may then choose to continue to appeal or not. Appeals will only be accepted via the on-line system.

Engineering Data Book

BMW HIGHLIGHTS BMW / / Repair set, crankcase breather /

BHS1.com Battery & Charger Stands Battery Roller Stands

SINGLE VOLTAGE EXTERNAL POWER SUPPLY TEST REPORT

Interpreting Results from the Iowa Assessments

November 2017 Customer Switching Report for the Electricity and Gas Retail Markets

1st Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations

The Hallmark of Excellence

connection Simero Vitrified Pvt. Ltd.

HRTPO Strategic Campaign. Passenger Rail. Agenda Item #11. Presentation To. May 19, Presentation By

Quality with Style Issued March 2008 A MEMBER OF THE SWIFT GROUP

MECHANICAL ENGINEERING (School of Mechanical Sciences) AGENDA NOTES Submitted to ACADEMIC COUNCIL. (09 January 2016)

MINIMUM OIL BURN/AUTOMATIC FUEL SWAPPING CAPABILITY

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON

Solutions Ex d IIB+H2, Stainless Steel EJBX*

Civil Dialogue Group on WINE Thursday April 19th, 2018

Automotive, Sulfur Resistant Lead (Pb)-Free Thick Film, Rectangular Chip Resistors

~... se_rv_ic_e M_A_NU_AL_2_44_4._z1,~

Clean energy systems need clean batteries

Electricity and Gas Retail Markets Report Q2 2017

Transcription:

% EirGrid Availability Report March 217 Availability report for March217 1. System Availability Data Valid up to 31/3/217 1. 365-Day Rolling Availability Daily Availability 95. 9. 85. 8. 75. 7. 65. 6. 31/1/216 21/3/216 1/5/216 29/6/216 18/8/216 7/1/216 26/11/216 15/1/217 6/3/217 25/4/217 Definitions Availability: the capacity-weighted percentage of the time that generators were available. Forced: outages where generators are unavailable due to unforeseen/unplanned outages. Scheduled: outages where generators are unavailable due to planned reasons, e.g., for maintenance. Ambient (seasonal derating): difference between the Maximum Capacity of a generator and the Dependable Capacity over a specified period of time. Maximum Capacity: the maximum capacity that a unit can sustain over a specified period of time. Dependable Capacity: the capacity of a unit, when modified for ambient conditions over a specified period of time. 365-day Rolling Availability: the average of the unit s Availability over the most recent 365 days (i.e., past year) HOW TO CONTACT US US General Queries Email: info@eirgrid.com Email: PSOP@eirgrid.com www.eirgridgroup.com 1 Based on EDIL (Electronic Dispatch Instruction Logger) declarations.

Table 1: Unit-by-Unit Average Availability Conventional Units March 217 Unit-by-Unit Average Availability March 217 Company Unit Capacity Availability % Aughinish Alumina Ltd Seal Rock - SK3 85 93.33.43 6.24 Seal Rock - SK4 85 89.73.17 5.46 4.64 Bord Gáis Whitegate WG1 444 99.4.96 Edenderry Power Ltd Edenderry ED1 118 93.7 6.93 Edenderry ED3 58 96.77 3.23 Edenderry ED5 58 96.77 3.23 SSE Generation Ireland Great Island GI4 461 98.96.14.9 Rhode RP1 52 99.96.4 Rhode RP2 52 1 Tarbert TB1 54 99.61.39 Tarbert TB2 54 1 Tarbert TB3 241 1 Tarbert TB4 243 1 Tawnaghmore - TP1 52 98.57 1.43 Tawnaghmore - TP3 52 1 ESB Energy Ireland Aghada - AD1 258 1 Aghada - AD2 431 94.61 5.35.4 Aghada - AT1 9 91.29 8.71 Aghada - AT2 9 9.98 9.2 Aghada - AT4 9 1 Ardnacrusha - AA1 21 99.66.34 Ardnacrusha - AA2 22 99.66.34 Ardnacrusha - AA3 19 99.66.34 Ardnacrusha - AA4 24 92.84 6.82.34 Erne - ER1 1 99.48.52 Erne - ER2 1 99.7.3 Erne - ER3 22 99.73.27 Erne - ER4 22 99.53.2.27 Lee - LE1 15 19.66 16.64 63.7 Lee - LE2 4 1 Lee - LE3 8 97.36 2.64 Liffey - LI1 15 98.97 1.3 Liffey - LI2 15 98.95 1.5 Liffey - LI4 4 1 Liffey - LI5 4 1 Lough Ree Power - LR4 91 72.3 5.46 22.24 Marina - MRC 123 98.95 1.5 Moneypoint - MP1 285 93.79 6.21 Moneypoint - MP2 285 99.79.21 Moneypoint - MP3 285 78.9 21.91 North Wall - NW5 14 1 Poolbeg - PBA 231 1 Poolbeg - PBB 231 99.38.62 Turlough Hill - TH1 73 96.63 2.7.67 Turlough Hill - TH2 73 98.8.58 1.34 Turlough Hill - TH3 73 98.89.56.55 Turlough Hill - TH4 73 99.44.56 West Offaly Power - WO4 137 9 1 Indaver Indaver IW1 16 99.49.51 Synergen Dublin Bay - DB1 45 99.79.18.3 Tynagh Energy Ltd Tynagh TYC 384 97.8 2.2 Viridian Power & Energy Huntstown - HN2 Huntstown - HNC 4 342 97.23 96.96.3 2.74 3.4

Table 2: Unit-by-Unit Average Availability Demand Side Units March 217 Unit-by-Unit Average Availability March 217 Company Unit Availability % Activation Energy Activation Energy 1 AE1 35.38 43.94 2.68 Activation Energy 2 AE2 62.3 37.97 Activation Energy 3 AE3 63.97 35.52.51 Activation Energy 4 AE4 1 Activation Energy 5 AE5 56.17 31.17 12.66 DAE VPP DAE VPP DP1 53.63 46.37 DAE VPP DP2 16.51 83.49 Electricity Exchange ltd. Electricity Exchange EE1 56.56 16.13 27.31 Electricity Exchange EE2 68.22 11.73 2.5 Electric Ireland Electric Ireland EI1 85.32 3.35 11.33 Endeco Endeco 1 EC1 7.2.3 29.77 Endeco 2 EC2 33.33 66.67 Energy Trading Ireland Energy Trading ET1 81.84 18.16 Powerhouse Powerhouse PG1 76.19 23.81 Viridian Power & Energy Viridian Energy VE1 7.31 29.69 Table 3: System Total Average Availability March 217 Availability % System Total Average Availability 92.16 5.37 1.82.65

Table 4: Unit-by-Unit 365 Day Rolling Availability Conventional Units March 216 to March 217 Unit-by-Unit 365 Day Rolling Availability March 216 to March 217 Company Unit Capacity Availability % Aughinish Alumina Ltd Seal Rock - SK3 85 89.86 1.62 2.79 5.73 Seal Rock - SK4 85 84.87.88 9.94 4.31 Bord Gáis Whitegate WG1 444 91.6 1.16 6.29.95 Edenderry Power Ltd Edenderry ED1 118 87.1 4.16 8.83 Edenderry ED3 58 99.46.43.11 Edenderry ED5 58 99.54.35.11 SSE Generation Ireland Great Island GI4 461 87.75 7.61 3.36 1.28 Rhode RP1 52 99.6.92.2 Rhode RP2 52 98.81 1.17.2 Tarbert TB1 54 97.76 1.3.94 Tarbert TB2 54 98.46 1.4.5 Tarbert TB3 241 99.8.7.22 Tarbert TB4 243 95.58 4.2.22 Tawnaghmore - TP1 52 66.72 1.82 31.46 Tawnaghmore - TP3 52 6.15.1 39.84 ESB Energy Ireland Aghada - AD1 258 94.19 5.4.77 Aghada - AD2 431 95.49 1.9 2.96.46 Aghada - AT1 9 97.83.9 1.27 Aghada - AT2 9 97.43.31 2.26 Aghada - AT4 9 97.3.36 2.34 Ardnacrusha - AA1 21 74.33.82 24.85 Ardnacrusha - AA2 22 73.89.66 25.45 Ardnacrusha - AA3 19 72.58 2.36 25.6 Ardnacrusha - AA4 24 64.56 1.77 33.67 Erne - ER1 1 97.87.78 1.35 Erne - ER2 1 91.74 7.14 1.12 Erne - ER3 22 93.24.2 6.56 Erne - ER4 22 97.97.52 1.51 Lee - LE1 15 2.55 1.44 96.1 Lee - LE2 4.92 99.8 Lee - LE3 8 94.25.37 5.38 Liffey - LI1 15 84.15.59 15.26 Liffey - LI2 15 84.67.9 14.43 Liffey - LI4 4.83.14 99.3 Liffey - LI5 4 93.31 5.52 1.17 Lough Ree Power - LR4 91 85.72 8.7 5.58 Marina - MRC 123 98.23.27.72.78 Moneypoint - MP1 285 84.36 15.64 Moneypoint - MP2 285 88.89 11.3.8 Moneypoint - MP3 285 89.67 7.3 3.3 North Wall NW5 14 96.18.61 3.21 Poolbeg PBA 231 96.81.67 2.51.1 Poolbeg - PBB 231 9.63 4.58 4.78.1 Turlough Hill - TH1 73 93.93.94 5.13 Turlough Hill - TH2 73 88.52 6.94 4.54 Turlough Hill - TH3 73 96.3.58 3.39 Turlough Hill - TH4 73 95.24 1.22 3.54 West Offaly Power - WO4 137 84.71 6.76 8.53 Indaver Indaver IW1 16 88.58 11.42 Synergen Dublin Bay - DB1 45 8.8 1.58 16.74.88 Tynagh Energy Ltd Tynagh TYC 384 94.2 1.8 1.5 2.5 Viridian Power & Energy Huntstown - HN2 Huntstown - HNC 4 342 88.5 86.38 1.18 8.55 9.61 3.2 3.21

Table 5: Unit-by-Unit 365 Day Rolling Availability Demand Side Units March 216 to March 217 Company Unit-by-Unit Average Availability March 216 to March 217 Unit Availability % Activation Energy Activation Energy 1 AE1 41.34 42.22 16.44 Activation Energy 2 AE2 69.33 3.52.15 Activation Energy 3 AE3 8.62 14.78 4.6 Activation Energy 4 AE4 42.2 54.46 3.52 Activation Energy 5 AE5 3.38 57.38 12.24 DAE VPP DAE VPP DP1 5.58 16.45 32.97 DAE VPP DP2 7.14 92.86 Electricity Exchange ltd. Electricity Exchange EE1 57.58 26.28 16.14 Electricity Exchange EE2 43.36 12.45 44.19 Electric Ireland Electric Ireland EI1 81.22 4.93 13.85 Endeco Endeco 1 EC1 7.81.7 29.12 Endeco 2 EC2 56.77 26.87 16.36 Energy Trading Ireland Energy Trading ET1 86.45 13.55 Powerhouse Powerhouse PG1 82.79 17.21 Viridian Power & Energy Viridian Energy VE1 56.42.5 43.53 Table 6: 365 Day Rolling System Total Average Availability March 216 to March 217 Availability % System Total Average Availability 86.56 6.49 6.17.78