West Station-West Cañon 115 kv Transmission Project

Similar documents
Appendix D Black Hills Project Summary

Black Hills Project Summary

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

2012 LOCAL TRANSMISSION PLAN:

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Tri-State December 2013 Board Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

2011 LOCAL TRANSMISSION PLAN:

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

GENERATOR INTERCONNECTION REQUEST. BHCT-G11 Interconnection System Impact Restudy PREPARED BY BLACK HILLS CORPORATION TRANSMISSION PLANNING

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

Proposed New Construction for

Falcon-Midway 115 kv Line Uprate Project Report

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

100 MW Wind Generation Project

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO DIRECT TESTIMONY AND EXHIBITS OF CHRISTOPHER E. PINK TABLE OF CONTENTS

Merger of the generator interconnection processes of Valley Electric and the ISO;

Decision on Merced Irrigation District Transition Agreement

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016

Interconnection System Impact Study Report Request # GI

SERTP rd Quarter Meeting

PREPARED DIRECT TESTIMONY

Interconnection Feasibility Study Report GIP-226-FEAS-R3

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

WestConnect Regional Planning Update

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

DFO STATEMENT OF NEED REPORT

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

SERTP rd Quarter Meeting

TransWest Express Project

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Status of PNM s Completed Transmission Construction Projects 11/30/2017

2013 ANNUAL PROGRESS REPORT

ATTACHMENT - DFO STATEMENT OF NEED

Frequently Asked Questions Leander-Round to Rock 138-kV Transmission Line Project Williamson County

APPENDIX F: Project Need and Description

2013 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting

GENERATOR INTERCONNECTION REQUEST. BHCT-G11 Interconnection System Impact Study PREPARED BY BLACK HILLS CORPORATION TRANSMISSION PLANNING

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Supplemental Report on the NCTPC Collaborative Transmission Plan

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

RULE 3206 REPORT PROPOSED CONSTRUCTION OR EXTENSION OF TRANSMISSION FACILITIES 2013 THROUGH Docket No. 12M-165E

Sub Regional RTEP Committee Western Region ATSI

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

2015 Grid of the Future Symposium

15 Nelson-Marlborough Regional Plan

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Building a 21 st Century Electric Grid. February 23, 2018

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

City of Palo Alto (ID # 6416) City Council Staff Report

PUBLIC SERVICE COMPANY OF COLORADO SENATE BILL DESIGNATION OF ENERGY RESOURCE ZONES AND TRANSMISSION PLANNING REPORT PROCEEDING NO.

Sub-Regional RTEP Committee PJM South

3.0 Radial Distribution Systems

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

MILLIGAN SOLAR PROJECT

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Local Transmission Plan. Rev. 1: April 2018

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

15 Nelson-Marlborough Regional Plan

Sub Regional RTEP Committee South

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Richard A. Vail

The Capital Grid Project:

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

COLORADO SPRINGS UTILITIES RESPONSE TO Xcel ENERGY INTERCONNECTION SYSTEM IMPACT STUDY REQUEST # GI , RESTUDY 1 (August 6, 2009)

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) )

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

4 COSTS AND OPERATIONS

Sub Regional RTEP Committee South

Minnesota Biennial Transmission. Zone Meeting 8

CUSTOMER/ TWIN ARROWS PROJECT

Interconnection Feasibility Study Report Request # GI

TRANSMISSION PLANNING CRITERIA

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

SPP Notification to Construct

EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE

STATE OF MINNESOTA ENVIRONMENTAL QUALITY BOARD MEQB DOCKET NO. MP-HVTL-EA-1-99

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Cost Benefit Analysis of Faster Transmission System Protection Systems

PUD ELECTRIC SYSTEM INTERCONNECTION

March 7, Subject: Southern California Edison 2011 Annual Progress Report

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Transcription:

West Station-West Cañon 115 kv Transmission Project Project Sponsor: Additional Project Participants: Project Description: Black Hills Colorado Electric New 115 kv line from West Station to West Cañon with load service substation at North Cañon. Voltage Class: 115 kv Facility Rating: 221 MVA Point of Origin/Location: West Station 115kV Point of Termination: West Cañon 115kV Intermediate Points: New North Cañon 69 kv Length of Line (in Miles): 42 Type of Project: Transmission Line and Substation Development Status: Planned Routing: Subregional Planning Group: CCPG Purpose of Project: Estimated Cost (in 2017 Dollars): Increased reliability $23 Million Schedule: Construction Date: 2019 Planned Completion/In-Service Date: Q4 2021 Regulatory Info: Approved - Colorado PUC: Decision No. C17-0539-E Regulatory Date: July 10, 2017 Permitting Info: Permitting Date: Contact Information: Wes Wingen, Manager of Transmission Planning Email wes.wingen@blackhillscorp.com Phone 605-721-2268

North Cañon 115/69 kv Substation Project Sponsor: Additional Project Participants: Project Description: Black Hills Colorado Electric New 115/69 kv substation near North Cañon on the West Station West Cañon 115 kv line. Voltage Class: 115 kv Facility Rating: 80 MVA Point of Origin/Location: North Cañon 69 kv substation (near Cañon City, CO) Point of Termination: Intermediate Points: Length of Line (in Miles): 0 Type of Project: Substation Development Status: Planned; this is change from Conceptual status in last year s report. Routing: Subregional Planning Group: CCPG Purpose of Project: Estimated Cost (in 2017 Dollars): Increased reliability and load growth capacity. $9.9 Million Schedule: Construction Date: 2021 Planned Completion/In-Service Date: Q4 2021 Regulatory Info: Approved - Colorado PUC: Decision No. C17-0539-E Regulatory Date: July 10, 2017 Permitting Info: Permitting Date: Contact Information: Wes Wingen, Manager of Transmission Planning Email wes.wingen@blackhillscorp.com Phone 605-721-2268

West Station-West Cañon 115 kv Line and New North Cañon Substation The proposed West Station West Cañon 115 kv line would provide additional import capacity along with increased reliability into the Cañon City 115 kv system. Past TPL-001-4 reliability 1 and interconnection studies along with current summer peak operational studies have shown overloads on the Portland-Skala, Skala-Cañon City, and Portland-West Station #1 and #2 115 kv lines. Also the West Cañon 230/69 kv transformer, which supports the Cañon City network from the west end, is a long lead time piece of equipment that adds additional overload scenarios to the above mentioned 115 kv lines if the transformer were to fail. A corrective action plan has been developed per the TPL-001-4 standard to provide a solution. Limited options due to the geographic area and transmission system were considered to alleviate the 115 kv line overloads, including rebuilding the existing 115 kv lines. Due to the nature of the system, rebuilding the existing 115 kv lines feeding into the Cañon City network would be challenging due to operational constraints as they are the only source into Cañon City. The best overall option was identified as a new 115 kv line that would feed into the Cañon City network from the 115 kv West Station substation. The new line will provide additional capacity into the load center and eliminate the need to sectionalize the existing 115 kv system to prevent post-contingency overloads. The new line will also provide the ability to reliably rebuild the constrained 115 kv line segments between Portland and Cañon City at a future time. The addition of a new North Cañon 115:69 kv substation was added to the project since it would decrease the overloading issues on the existing Portland & Cañon City 115:69 kv transformers as identified in in past reliability studies, and provide increased operational flexibility. A summary of the project components is as follows: The West Station - Desert Cove 115 kv rebuild project was previously completed using double circuit structures to accommodate the new West Station to West Cañon 115 kv circuit up to Desert Cove. The new transmission line will continue on from Desert Cove to West Cañon. This project will be constructed within existing right-of-way where possible, and new right-of-way will be obtained in a manner to minimize disruption. Construct a new 115/69 kv substation located in the North Cañon area to support the Cañon City 69 kv network. Upgrades to the existing 69 kv facilities are required to integrate the new substation into the 69 kv network. Obtain new right-of-way westward from the Desert Cove transmission corridor to the new North Cañon substation for 115 kv single circuit H-Frame structures. The new North Cañon substation will intersect the Cañon City Plant-West Cañon 115 kv line in the northwest corner of Cañon City which will complete the circuit to West Cañon. Since the West Cañon-Arequa Gulch 115 kv line is geographically nearby the proposed site of the new North Cañon substation, bisecting it with the new substation would add additional reliability. This option will not be implemented initially, but the new substation will be designed to accommodate the additional terminals later to balance initial cost with future flexibility. New right-of-way is being explored that may run parallel to the existing Midway -West Cañon 230 kv line for a majority of the line length to minimize disruption to the surrounding area. Per WECC s 1 Including both BHCT TCPC & CCPG studies

Long Term Planning Tool, the existing corridor is considered WECC Risk Class 1: Area Following Existing Linear Corridor and is preferable to higher Risk Class corridors. The routing of the new transmission line is under evaluation to potentially accommodate a future distribution substation in Pueblo West. The accommodation of the new substation would increase reliability and load serving capability in the Pueblo West area of the Black Hills system without materially impacting project costs or the planned benefits to the Cañon City area. The facility rating of the West Station North Cañon 115 kv circuit should be at least 221 MVA Summer and 274 MVA Winter (795 ACSR Drake @ 100 o C). The engineering and design work associated with the substation portion of the project will be performed to ensure that the completed project will meet the established noise and magnetic field requirements as stated in Rule 3206 (f) and Rule 3206 (e), respectively. Namely, the noise level of the substation will not exceed 50 db(a) at a distance of 25 feet beyond the property line, and the magnetic field level at the property line, one meter above the ground will not exceed 150 MilliGauss. The engineering and design work associated with the transmission line portion of the project was performed and also meets the established noise and magnetic field requirements. Black Hills initially included this project in the 2015 Rule 3206 filing for informational purposes only. Transmission planning analysis has subsequently refined the project scope. Potential joint participation in the project was under consideration in the San Luis Valley Subcommittee within the Colorado Coordinated Planning Group (CCPG). There was absence of interest in joint participation in the project by other entities as well as any foreseeable long term drivers to justify constructing the project at a higher voltage. The best-cost solution was determined to have the project designed, constructed, and operated as a single 115 kv circuit. The additional right-of-way that will be acquired for this project will be 125 feet wide to accommodate an additional circuit or an increase in operating voltage if needed. The total overall cost of the project is estimated at $32.9M, including the transmission line and the new North Cañon substation. The completion date of the line and substation portion of the project is scheduled for Q4 2021. In Decision C17-0539-E, the Colorado Public Utilities Commission found that the original project was in the ordinary course of business and that a CPCN was not necessary.