FB1100/FB1200 Flow Computer Battery Field Replacement Guide

Similar documents
Innovation in actuation.

Bettis GH-Series Pneumatic Spring-Return Actuator Torque Chart Imperial

Bettis GC01-Extension Series Extension Pneumatic Double-Acting & Spring-Return Actuator Torque Chart Metric

Bettis G01-Extension Series Extension Pneumatic Double-Acting & Spring-Return Actuator Torque Chart Imperial

type 122a three-way Switching Valve

EIM TEC2 Electric Actuator with Model 500 Quick-Start Guide

Battery Replacement. Installation Instructions. Summary of Changes. Catalog Number 2711P-RY2032. Original Instructions

Technical Bulletin. Modbus TCP/IP Communication Protocol For Diesel Fire Pump Controllers

PowerFlex DC Drive - Frame C Field SCR Module

Shafer Poppet Block Control

Ford Mustang V6 OEM-Style Fog Light Kit Parts List: Quantity: Tool List:

Triple offset technology for lower pressures.

*70200BAG1* 70200BAG FORD F150 GRILLE LIGHT MOUNT

Bettis Nuclear Series Actuators. Operation and Maintenance Manual VA Rev. E June 2014

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB DOUBLE ACTING SERIES PNEUMATIC ACTUATORS

Service Procedure COL-210

Colt Series C400, C500

Protecting your actuation process without compromise in severe applications

Disassembly and Reassembly for WG Series Worm Gear Operator. User Instructions Part Number: XXXXXX, Rev. 0 Release: February 2017

Installation, Operation and Maintenance Manual E Rev. D September Bettis Pneumatic Rotary Valve Actuators

2005 and 09 Mustang install instructions Sequential / Chase Unit Partial Plug-N-Play Kit Meter4it Eng. Updated: 3/28/09

Shafer RV-Series Rotary Vane Valve Actuators Valve Operating Systems for Critical Pipeline Applications

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators

Service Procedure COL-213

Rosemount 228. Toroidal Conductivity Sensor. Product Data Sheet July Series LIQ-PDS-228

INSTRUCTION MANUAL WARNING

Installation Manual TWM Performance Full replacement short shifter assembly Civic all trims and models

Fisher 3024C Diaphragm Actuator

Installation and Service Manual

YEARS. Alcad Stationary. Ni-Cd batteries ADVANCED SOLUTIONS ENGINEERING EXCELLENCE

289 Series Relief Valves

INSTALLATION INSTRUCTIONS

Bettis TEC2 Electric Actuator with Model 500 Quick-Start Guide. Quick-Start Guide E2K Rev. 2 October 2017

Types P551 and P551A External Closing Spring Retrofit Kits for the Type N550/N551 ESV

U00X ULTRASONIC LEVEL SWITCH. Ultrasonic Liquid Level Switches INSTALLATION AND OPERATIONS MANUAL. For Models: U002, U003 & U004

GETTING STARTED GUIDE NI AI, ±10 V, 16 Bit, 1 MS/s/ch Simultaneous

Fisher 546 Electro Pneumatic Transducer

Type 3320, Service Manual. Serviceanleitung Service Manuel

Electrically Held to Mechanically Latched Contactor

FAN POWERED HEPA FILTER UNIT

Fisher 644 and 645 Differential Pressure Pump Governors

DRAFT. Installation, Operation and Maintenance Instructions for Emerson KBG-V Series

Endurance TM Conductivity Sensors

Service Procedure COL-209

INSTALLATION INSTRUCTIONS

Y690A Series Pressure Reducing Regulators

Installation, Operation and Maintenance Manual DOC.IOM.MO.E October MO-Series Manual Override Gearboxes

Installation, Operation, and Maintenance Instructions for Bettis RGS F-Series Spring-Return (SR) Actuators

3M Occupational Health & Environmental Safety Division 3M SoundPro Outdoor Kit Instructions

HYGRODYNAMICS DEW POINT MONITOR MODEL 8092P 8092P-230VAC TABLE OF CONTENTS DIAGRAMS

Installation, Operation and Maintenance Manual RGS Rev. 0 November Bettis RGS F-Series Spring-Return Actuators

Figure 1 Figure 2 Double Acting Actuator Spring Return Actuator

OPERATING USER MANUAL for TEMPERATURE RECORDERS

RMR Floor-Mount Enclosures

Model 1100B CHG Terminator. Installation Instructions

Service Procedure COL-212

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB-SR SPRING RETURN SERIES PNEUMATIC ACTUATORS

PressureGuard. Self-Contained Hydraulic Emergency Shutdown Systems For Rotary or Non API 6A Linear Valves

HPUs Hydraulic Power Units

DUSTTRAK AEROSOL MONITOR SOLAR POWER KIT MODEL

User s Manual. Automatic Switch-Mode Battery Charger

Installation and Service Manual

WiFi Tank Level Monitor Installation Instructions

SPC-P Smart Power Connection with Temperature Monitoring Transmitter Pipe Mounted Installation Instructions

Baumann Sanitary Diaphragm Angle and Inline Control Valve

E24-E28 M88 & S38 Mass Air Flow Conversion System Instruction Manual

INSTALLATION INSTRUCTIONS

Upgrading the Boxer LAD blower module

Dodge Cummins 5.9L 24 Valve Edge Products EZ Module Installation Instructions & Manual

Series 957, 957N, 957Z, 957RPDA, 957NRPDA, 957ZRPDA

Shafer SH Series Actuator. Service Manual SHSM Rev. 1 September 2016

Type 289RC Exhaust Booster

RMR Free-Standing Enclosures

Operating Instructions M3 and M3HW Jackscrew Manual Override. Service Instructions Rev. D October 2014

ComfortPoint Programmable Lon, VAV/Unitary Controllers

SERIES CLASS 300 FULL-BORE REACTOR DISCHARGE VALVES. Installation, Maintenance and Operating Instructions

Spare Allen-Bradle. Battery Replacement. Installation Instructions. About This Publication. Catalog Number 2711P-RY2032

U00X ULTRASONIC LEVEL SWITCH. Ultrasonic Liquid Level Switches INSTALLATION AND OPERATIONS MANUAL. For Models: U002, U003 & U004

INSTALLATION INSTRUCTIONS

SERIES OPERATION AND MAINTENANCE MANUAL

Installation and Operating Manual

PET UNIT DOSE TABLE INSTALLATION MANUAL FN: Rev A 1/18

Fisher 2052 Diaphragm Rotary Actuator

Baumann Sanitary Control Valve

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors

ELECRAFT K3 HIGH-PERFORMANCE METER TRANSCEIVER INSTALLING CRYSTAL I.F. FILTERS. Rev A, October 15, 2007

Jeep TJ 6 Switch Panel

COMPONENT WORK SAMPLE 8 Simulated Assembly MAINTENANCE MANUAL. From 1974 to March 15, 2003

Factory Authorized Mechanism Enhancement (FAME)

HDI inch Choke Position Indicator User s Manual Rev Indicator Gauge Linear Potentiometer

Type 3360, Service Manual. Serviceanleitung Service Manuel

Remove the 3-11mm nuts holding mirror on. Don t drop the nuts!

Multiport Flow Selector. Compact And Economical Production Test Manifold

I N S TA L L AT I O N

"Engineered to Ride, Built to Last "

Cougar B Series Electric Vibrators 3 Frame

Instructions for Front Midrange / Tweeter Installation in BMW 3 Series/M3 (E36)

AIRTEK for Volvo Vehicles Single to Dual Height Control Valve Conversion Kit

Hybrid Racing Civic Si Shifter Cables

Transcription:

FB1100/FB1200 Flow Computer Battery Field Replacement Guide For Part Numbers (Kits): 399103-01-5 Battery Pack (lithium) 399186-01-8 Battery Pack (lead Acid) 399457-00-0 Battery Pack (lead acid-enersys) Remote Automation Solutions

Device Safety Considerations Reading these Instructions Before operating the device, read these instructions carefully and understand their safety implications. In some situations, improperly using this device may result in damage or injury. Keep this manual in a convenient location for future reference. Note that these instructions may not cover all details or variations in equipment or cover every possible situation regarding installation, operation, or maintenance. Should problems arise that are not covered sufficiently in the text, immediately contact Customer Support for further information. Protecting Operating Processes A failure of this device for whatever reason -- may leave an operating process without appropriate protection and could result in possible damage to property or injury to persons. To protect against this, you should review the need for additional backup equipment or provide alternate means of protection (such as alarm devices, output limiting, fail-safe valves, relief valves, emergency shutoffs, emergency switches, etc.). Contact Remote Automation Solutions for additional information. Returning Equipment If you need to return any equipment to Remote Automation Solutions, it is your responsibility to ensure that the equipment has been cleaned to safe levels, as defined and/or determined by applicable federal, state and/or local law regulations or codes. You also agree to indemnify Remote Automation Solutions and hold Remote Automation Solutions harmless from any liability or damage which Remote Automation Solutions may incur or suffer due to your failure to ensure device cleanliness. Grounding Equipment Ground metal enclosures and exposed metal parts of electrical instruments in accordance with OSHA rules and regulations as specified in Design Safety Standards for Electrical Systems, 29 CFR, Part 1910, Subpart S, dated: April 16, 1981 (OSHA rulings are in agreement with the National Electrical Code). You must also ground mechanical or pneumatic instruments that include electrically operated devices such as lights, switches, relays, alarms, or chart drives. Protecting from Electrostatic Discharge (ESD) This device contains sensitive electronic components which be damaged by exposure to an ESD voltage. Depending on the magnitude and duration of the ESD, it can result in erratic operation or complete failure of the equipment. Ensure that you correctly care for and handle ESD-sensitive components. System Training A well-trained workforce is critical to the success of your operation. Knowing how to correctly install, configure, program, calibrate, and trouble-shoot your Emerson equipment provides your engineers and technicians with the skills and confidence to optimize your investment. Remote Automation Solutions offers a variety of ways for your personnel to acquire essential system expertise. Our full-time professional instructors can conduct classroom training at several of our corporate offices, at your site, or even at your regional Emerson office. You can also receive the same quality training via our live, interactive Emerson Virtual Classroom and save on travel costs. For our complete schedule and further information, contact the Remote Automation Solutions Training Department at 800-338-8158 or email us at education@emerson.com.

Removing/Replacing Batteries Notes Refer to the table below for the correct field replacement kit part number. Main Battery Type Integral Battery Pack Unplugged Lithium (FB1100 Flow Computer only) Used with Orig. Model Spec Code(s) D3 UL Field Replacement Kit Part Number 399103-01-5 (See Page 3 of this Guide for replacement instructions) Integral Battery Pack Lead Acid for use with solar panel (Integral Solar Panel (D5) for Class I Division 2 only) D1, D4, D5 399186-01-8 399457-00-0 (Enersys battery) See Page 7 of this Guide for replacement instructions) Important When replacing one of the lead acid batteries, ensure your flow computer has the correct CPU and charger board for the battery type. See the compatibility chart, below: Charger Board and Lead Acid Battery Compatibility Lead Acid Battery Type CPU Type CPU and Charger Board 399381-01-0 CPU and Charger Board 399381-02-0 (for Enersys battery) 399186-01-8 SUPPORTED NOT SUPPORTED 399457-00-0 (Enersys) SUPPORTED SUPPORTED Ambient Temperature Range May be used up to a maximum ambient temperature of 80C and a minimum ambient temperature of -40C; see end product data plate for ambient temperature. Required Tools Tool Usage #1 Phillips-head screwdriver For screws on HMI module and other boards #2 Phillips-head screwdriver For screws on other modules and boards 1

Tool Hexagonal torque wrenches with 3mm and #1 and #2 Phillips-head bits Usage For loosening and tightening screws. Ranges must include 10 to 12 in-lbs (1.1 to 1.4 N m) and 4 to 6 in-lbs (0.5 to 0.7 N m) UL File Number for these kits is: E192567 Important Only use accessories (batteries) supplied with the flow computer or sold by Emerson as spare parts for this flow computer. If you substitute a part you obtain elsewhere (such as a battery) you will void your certification. DANGER EXPLOSION HAZARD: Ensure the area in which you perform this operation is nonhazardous. Performing this operation in a hazardous area could result in an explosion. DANGER EXPLOSION HAZARD: Never remove end cap(s) in a hazardous location. Removing cover(s) in a hazardous location could result in an explosion. WARNING! EXPLOSION HAZARD - Do not disconnect equipment unless power has been removed or the area is known to be non-hazardous. WARNING! EXPLOSION HAZARD Batteries must only be changed in an area known to be nonhazardous. WARNING! There are no user-serviceable parts inside the battery pack. Do not open the battery pack as you may damage the battery pack or injure yourself. Note These cells are to be used only in devices where servicing of the cell circuit and replacement of the lithium cells will be done by a trained technician. Important If this equipment is used in a manner not specified by the manufacturer, the protection provided by equipment may be impaired. 2

Removing/Replacing the Main Power Battery (Lithium Battery) UL Listed Battery Field Installed Accessory Kit for use in Class I, Division 1, Groups C & D and Class I, Division 2, Groups A, B, C, & D Flow Computer Integral Lithium Battery Pack Field Installed Accessory Kit Part No. 399103-01-5 for use with UL Listed Class I, Division 1, Groups C & D and Class I, Division 2, Groups A, B, C & D Model Series FB1100 Periodically you must replace the main battery pack. FBxConnect provides a battery life indicator showing the number of days of usage to help you monitor battery life. In addition, for lithium batteries only, the Status LED shows yellow when the battery is low and needs to be replaced. The device provides two battery connectors, enabling you to hot-swap the battery pack in a non-hazardous location. 3

In the following procedure, you slide out the first battery pack (leaving it connected), attach the new battery to the second (available) connector (so both batteries are connected), and then disconnect the old battery pack. Keep the replacement battery pack handy during the procedure. WARNING! EXPLOSION HAZARD Batteries must only be changed in an area known to be nonhazardous. See notices at the front of this document. 1. Remove the retaining clamp on the front end cap (if present) using a 3 mm hexagonal wrench. Components of Retaining Clamp Assembly 1 Screw 2 Retaining Clamp 3 Washer 2. Grasp the end cap. Front End Cap 4

3. Unscrew the end cap turning it counter-clockwise until the cover comes off. Set it aside in a safe location. Note If you need more leverage place a long screwdriver or other appropriate tool across the two notches in the cover to act as a pry bar. Front End Cap Removal 4. With a #2 Phillips-head screwdriver loosen the two captive fastening screws on the battery pack. 5. With a #1 Phillips-head screwdriver, loosen the two bottom captive fastening screws on the HMI module. Leave the two top screws on the HMI module connected to the battery pack. 5

6. Grasp the HMI module and gently pull it and the battery pack out of the enclosure, leaving the battery still connected. 7. Connect the new battery to the open connector. Route the wires so they are in the recessed area. Make sure the wires don t get caught in the end cap threads. 8. Disconnect the old battery pack s connector from the unit and set the old battery pack aside. 9. Slide the new battery pack into the unit. Tighten its two captive fastening screws. 10. Loosen the top captive fastening screws on the HMI module to separate it from the old battery pack. 11. Align the HMI module with the new battery pack and the tab on the CPU carrier bezel. Gently press the HMI module on, being careful not to pinch the battery wires. Tighten all four captive screws with a torque value of 4 to 6 in-lbs (0.5 to 0.7 N m). 12. Carefully align the end cap threads with the threads of the enclosure and replace the front end cap. Screw the end cap clockwise (eight full turns) until it is tightly sealed to the enclosure. Endcaps must have at least 8 full threads engaged upon reassembly. Note If you need more leverage place a long screwdriver or other appropriate tool across the two notches in the cover to act as a pry bar. 13. If applicable, tighten the retaining clamp onto the end cap using a 3mm hexagonal wrench. When tightening, torque to 10 to 12 in-lbs (1.1 to 1.4 N m). 6

Removing/Replacing the Main Power Battery (Lead Acid Battery) UL Listed Battery Field Installed Accessory Kit for use in Class I, Division 1, Groups C & D, Class I, Division 2, Groups A, B, C & D Flow Computer Integral Lead Acid Battery Pack Part No. 399186-01-8 for use with UL Listed Class I, Division 1, Groups C & D, Class I, Division 2, Groups A, B, C & D Model Series FB1100 and FB1200. Flow Computer Integral Lead Acid Battery Pack Part No. 399457-00-0 for use with UL Listed Class I, Division 1, Groups C & D, Class I, Division 2, Groups A, B, C & D Model Series FB1100 and FB1200. Periodically you must replace the main battery pack. FBxConnect provides a battery life indicator showing the number of days of usage to help you monitor battery life. The device provides two battery connectors, enabling you to hot-swap the battery pack in a non-hazardous location. 7

In the following procedure, you slide out the first battery pack (leaving it connected), attach the new battery to the second (available) connector (so both batteries are connected), and then disconnect the old battery pack. Keep the replacement battery pack handy during the procedure. WARNING! EXPLOSION HAZARD Batteries must only be changed in an area known to be nonhazardous. See notices at the front of this document. 1. Remove the retaining clamp on the front end cap (if present) using a 3 mm hexagonal wrench. Components of Retaining Clamp Assembly 1 Screw 2 Retaining Clamp 3 Washer 2. Grasp the end cap. Front End Cap 8

3. Unscrew the end cap turning it counter-clockwise until the cover comes off. Set it aside in a safe location. Note If you need more leverage place a long screwdriver or other appropriate tool across the two notches in the cover to act as a pry bar. Front End Cap Removal 4. With a #2 Phillips-head screwdriver loosen the two captive fastening screws on the battery pack. 5. With a #1 Phillips-head screwdriver, loosen the two bottom captive fastening screws on the HMI module. Leave the two top screws on the HMI module connected to the battery pack. 9

6. Grasp the HMI module and gently pull it and the battery pack out of the enclosure, leaving the battery still connected. 7. Connect the new battery to the open connector. Route the wires so they are in the recessed area. Make sure the wires don t get caught in the end cap threads. 8. Disconnect the old battery pack s connector from the unit and set the old battery pack aside. 9. Slide the new battery pack into the unit. Tighten its two captive fastening screws. 10. Loosen the top captive fastening screws on the HMI module to separate it from the old battery pack. 11. Align the HMI module with the new battery pack and the tab on the CPU carrier bezel. Gently press the HMI module on, being careful not to pinch the battery wires. Tighten all four captive screws with a torque value of 4 to 6 in-lbs (0.5 to 0.7 N m). 12. Carefully align the end cap threads with the threads of the enclosure and replace the front end cap. Screw the end cap clockwise (eight full turns) until it is tightly sealed to the enclosure. Endcaps must have at least 8 full threads engaged upon reassembly. Note If you need more leverage place a long screwdriver or other appropriate tool across the two notches in the cover to act as a pry bar. 13. If applicable, tighten the retaining clamp onto the end cap using a 3mm hexagonal wrench. When tightening, torque to 10 to 12 in-lbs (1.1 to 1.4 N m). 10

11

For customer service and technical support, visit www.emerson.com/supportnet Global Headquarters, North America, and Latin America: Emerson Automation Solutions Remote Automation Solutions 6005 Rogerdale Road Houston, TX 77072 U.S.A. T +1 281 879 2699 F +1 281 988 4445 www.emerson.com/remoteautomation Europe: Emerson Automation Solutions Remote Automation Solutions Unit 8, Waterfront Business Park Dudley Road, Brierley Hill Dudley UK DY5 1LX T +44 1384 487200 F +44 1384 487258 Middle East/Africa: Emerson Automation Solutions Remote Automation Solutions Emerson FZE P.O. Box 17033 Jebel Ali Free Zone South 2 Dubai U.A.E. T +971 4 8118100 F +971 4 8865465 Asia-Pacific: Emerson Automation Solutions Remote Automation Solutions 1 Pandan Crescent Singapore 128461 T +65 6777 8211 F +65 6777 0947 2018 Remote Automation Solutions, a business unit of Emerson Automation Solutions. All rights reserved. This publication is for informational purposes only. While every effort has been made to ensure accuracy, this publication shall not be read to include any warranty or guarantee, express or implied, including as regards the products or services described or their use or applicability. Remote Automation Solutions (RAS) reserves the right to modify or improve the designs or specifications of its products at any time without notice. All sales are governed by RAS terms and conditions which are available upon request. RAS accepts no responsibility for proper selection, use or maintenance of any product, which remains solely with the purchaser and/or end-user. Remote Automation Solutions