UNCLASSIFIED R-1 ITEM NOMENCLATURE

Similar documents
UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Exhibit R-2, RDT&E Budget Item Justification

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology. FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification February 2004

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

Exhibit R-2, RDT&E Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Airborne SIGINT Enterprise (JMIP) FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 24 R-1 Line #7

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED UNCLASSIFIED

The DoD Space Test Program Standard Interface Vehicle (ESPA) Class Program

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

UNCLASSIFIED CLASSIFICATION: EXHIBIT

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #22 Page 1 of 39

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

Cibola Flight Experiment

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 P-1 Line #51

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: End Item Industrial Preparedness Activities FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Next Steps in Human Exploration: Cislunar Systems and Architectures

Modular Reconfigurable Spacecraft Small Rocket/Spacecraft Technology Platform SMART

Cygnus Payload Accommodations: Supporting ISS Utilization

The Common Spacecraft Bus and Lunar Commercialization

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Combat Vehicle and Automotive Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

Antares Rocket Launch recorded on 44 1 Beyond HD DDR recorders Controlled by 61 1 Beyond Systems total

Massachusetts Space Grant Consortium

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: RQ-4

Rocket Activity Advanced High- Power Paper Rockets

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

SPACE LAUNCH SYSTEM. Steve Creech Manager Spacecraft/Payload Integration & Evolution August 29, 2017 A NEW CAPABILITY FOR DISCOVERY

The Falcon 1 Flight 3 - Jumpstart Mission Integration Summary and Flight Results. AIAA/USU Conference on Small Satellites, 2008 Paper SSC08-IX-6

UNCLASSIFIED: Distribution Statement A. Approved for public release.

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 17 R-1 Line #13

NASA Glenn Research Center Intelligent Power System Control Development for Deep Space Exploration

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Qty (Each)

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Capabilities Summary and Approach to Rideshare for 20 th Annual Small Payload Rideshare Symposium NASA Ames Research Center June 12-14, 2018

Suborbital Flight Opportunities for Cubesat-Class Experiments Aboard NLV Test Flights

Space Transportation Atlas V / Auxiliary Payload Overview

Manufacturing Implications within. new DODI (Dec 8, 2008) Summary for Industry. National Center For Advanced Technologies.

Transcription:

COST ($ in Millions) All Prior Years FY 2012 FY 2013 # Base OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Air Force Page 1 of 5 R-1 Line #106 Complete Total Program Element - 44.308 10.051 13.000-13.000 26.000 26.000 26.000 26.000 Continuing Continuing 662617: Free-Flyer Spacecraft Missions - 44.308 10.051 13.000-13.000 26.000 26.000 26.000 26.000 Continuing Continuing Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date A. Mission Description and Budget Item Justification The Space Test Program (STP) conducts space test missions for the purpose of accelerating DoD space technology transformation while lowering developmental risk. The program flies an optimally selected number of DoD sponsored experiments consistent with priority, opportunity, and funding. STP missions are the most costeffective way to flight test new space system technologies, concepts and designs, providing an inexpensive way to: - Support the space acquisition block development approach - Demonstrate and develop responsive research and development (R&D) space capabilities - Provide early operational capabilities to quickly react to new developments - Perform operational risk reduction through direct flight test of prototype components - Improve operational design by characterizing the space environment, event, or sensor physics proposed for an operational system/system upgrade - Develop, test, and acquire advanced payload support hardware for small and medium expendable launch vehicles (LV) and unmanned spaceflight vehicles The Deputy Secretary of Defense Space Test Program Management & Funding Policy, issued in Jul 2002, reaffirmed STP as the primary provider of spaceflight for the DoD space research community. The Jul 2002 policy statement also reaffirms STP's role as the single manager for all DoD payloads on the Space Shuttle and the International Space Station (ISS). In FY12, STP provided launch services to 4 Space Experiment Review Board (SERB)approved experiments. It also provided operations support for free-flyer experiments and long-duration external experiments on the ISS. The FY13 funds were oringially requested to support program closeout and termination. STP was re-instated in FY13 and funds are now providing services to 14 SERB-approved experiments. In FY14 funds will be used to ramp up the program and plan for a restored Space Test Program. STP-2 integration and mission operations will be continued in FY13-FY15 via existing funding in PE 0603401F Advanced Spacecraft Technology, RDT&E AF. STP-2 is a dedicated research and development launch mission that also supports the commercial new entrant launch strategy. STP is in Budget Activity 6, RDT&E Management Support, because it supports RDT&E satellite launches. Total Cost

B. Program Change Summary ($ in Millions) FY 2012 FY 2013 Base OCO Total Previous President's Budget 47.409 10.051 0.000-0.000 Current President's Budget 44.308 10.051 13.000-13.000 Total Adjustments -3.101 0.000 13.000-13.000 Congressional General Reductions - 0.000 Congressional Directed Reductions - 0.000 Congressional Rescissions 0.000 0.000 Congressional Adds - 0.000 Congressional Directed Transfers - 0.000 Reprogrammings -0.264 0.000 SBIR/STTR Transfer -2.837 0.000 Other Adjustments 0.000 0.000 13.000-13.000 Change Summary Explanation FY2012: -$2.837M for SBIR; -$0.264M due to higher Department priorities. FY2014: +$13M to reinstitute the Space Test Program. C. Accomplishments/Planned Programs ($ in Millions) FY 2012 FY 2013 Title: PROGRAM SUPPORT Description: Provide program support for piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, NASA Shuttle, the ISS, manned and ISS resupply, and commercial spaceflight missions Provided program support for piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, the ISS, ISS resupply, and commercial spaceflight missions, and began program termination management, mission manifest changes/updates, documentation and records storage, and other closeout activities as required to terminate program. Resume program support for piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, the ISS, ISS resupply, and commercial spaceflight missions. With STP reinstated at lower funding levels, re-initiate the SERB process, and re-start the mission manifest process and associated program planning. Plans: 0.107 0.112 0.100 Air Force Page 2 of 5 R-1 Line #106

C. Accomplishments/Planned Programs ($ in Millions) FY 2012 FY 2013 Provide program support for piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, the ISS, ISS resupply, and commercial spaceflight missions. Restore mission manifest process and associated program planning. Title: PAYLOAD INTEGRATION Description: Initiate, develop, and continue integration of payloads onto piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, NASA Shuttle, the ISS, manned and ISS resupply, and commercial spaceflight missions to include acquisition of associated spacecraft and integration hardware 10.189 2.070 1.600 Continued remaining payload integration efforts onto piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, the ISS, ISS resupply and commercial spaceflight missions to include acquisition of associated spacecraft and integration hardware. Continue payload integration efforts onto piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, the ISS, ISS resupply and commercial spaceflight missions to include acquisition of associated spacecraft and integration hardware. Plans: Continue payload integration efforts onto piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, the ISS, ISS resupply and commercial spaceflight missions to include acquisition of associated spacecraft and integration hardware. Title: LAUNCH VEHICLE AND LAUNCH SERVICES Description: Initiate and continue purchase of launch services, launch vehicles and launch vehicle support for piggyback/ secondary, Small Launch Vehicle, Medium Launch Vehicle, ISS, ISS resupply, and commercial spaceflight missions. 17.180 1.737 4.870 Continued purchase of launch services, launch vehicles, and launch vehicle support for shared/piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, ISS, and ISS resupply, and commercial spaceflight missions for maximum flyout of existing, approved payloads. Resume purchase of launch services, launch vehicles, and launch vehicle support for shared/piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, ISS, and ISS resupply, and commercial spaceflight missions. Plans: Air Force Page 3 of 5 R-1 Line #106

C. Accomplishments/Planned Programs ($ in Millions) FY 2012 FY 2013 Continue purchase of launch services, launch vehicles, and launch vehicle support for shared/piggyback/secondary, Small Launch Vehicle, Medium Launch Vehicle, ISS, and ISS resupply, and commercial spaceflight missions. Title: ON ORBIT SATELLITE OPERATIONS Description: Initiate, develop, and continue first-year operations and operations planning for STP-sponsored missions. 8.902 1.328 0.700 Developed and continued first-year operations and operations planning for STP-sponsored missions. Develop and continue first-year operations and/or operations support for STP-sponsored missions. Plans: Develop and continue first-year operations and/or operations support for STP-sponsored missions. Title: PROGRAM MANAGEMENT ADMINISTRATION Description: Provide the unique program costs required for the operation of the Space Test Program in its management and oversight role 7.930 4.804 5.730 Provided the unique program costs required for the operation of the Space Test Program in its management and oversight role Provide the unique program costs required for the operation of the Space Test Program in its management and oversight role Plans: Provide the unique program costs required for the operation of the Space Test Program in its management and oversight role Accomplishments/Planned Programs Subtotals 44.308 10.051 13.000 D. Other Program Funding Summary ($ in Millions) Line Item FY 2012 FY 2013 Base OCO Total FY 2015 FY 2016 FY 2017 FY 2018 Complete Total Cost None: None 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Air Force Page 4 of 5 R-1 Line #106

D. Other Program Funding Summary ($ in Millions) Remarks N/A E. Acquisition Strategy N/A Line Item FY 2012 FY 2013 Base OCO Total FY 2015 FY 2016 FY 2017 FY 2018 Complete Total Cost F. Performance Metrics Please refer to the Performance Base Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 5 of 5 R-1 Line #106