Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

Similar documents
Tri-State December 2013 Board Meeting

Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

Colorado Department of Education Rural and Small Rural Designation

AGATE CAMPO RE PRITCHETT RE KARVAL RE PLAINVIEW RE VILAS RE-5 45

Customer Charge or Minimum Bill. Total Average Annual Bill (9 Dth) Total Volumetric Rate*

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

Cheyenne Light, Fuel and Power Transmission System Impact Study

Capital Investment Plan

Wyoming Basin Outlook Report April 1, 2015

System Impact Study 2009 T1 Transformer Replacement at Badwater Substation

Capacity of Diversion (cfs)

Wyoming Basin Outlook Report Feb 1, 2015

Wyoming Energy Projects

Consulting Agreement Study. Completed for Transmission Customer

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

WestConnect Regional Transmission Service. Presentation to ISAS September 26, 2017

Gillette Lost the Most Residents in 2017

System Impact Study 2009 T12 Badwater (Moneta)

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

Interconnection System Impact Study Report Request # GI

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Attending Meeting (has not voted) Advance Bylaw Ballot

ALAMOSA RE-11J 2, , SANGRE DE CRISTO RE-22J ,

ALAMOSA RE-11J 2, , SANGRE DE CRISTO RE-22J ,

ALAMOSA RE-11J 2, , SANGRE DE CRISTO RE-22J ,

VERMONT ELECTRIC POWER COMPANY (VELCO)

Designated Network Loads and Resources Load Served by Company Owned Resources

Wyoming electricity use is growing

2015 CITY/TOWN PDO CRASHES WITH COLLISION TYPE

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

15 Year Road Improvement / Maintenance Plan 2017 through 2031 Elko County Infrastructure Tax Allocation Roads Plan

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Transmission Planning Attachment K Public Input Meeting

Interconnection System Impact Study Final Report February 19, 2018

GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED

Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study

15 Year Road Improvement / Maintenance Plan 2017 through 2031 Elko County Infrastructure Tax Allocation Amended Version Number Two

Proposed New Construction for

April 10, Dear Customer:

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Building Permits. Permits issued between 2/1/2012 and 2/29/2012, sorted by classification and purpose

2015 CPS2 Bounds (Effective June 15, 2015)

Arizona Transmission Challenges

Gateway South Transmission Project

PUBLIC SERVICE COMPANY OF COLORADO SENATE BILL DESIGNATION OF ENERGY RESOURCE ZONES AND TRANSMISSION PLANNING REPORT PROCEEDING NO.

At a glance South Dakota & Nebraska

Powder River Basin. Page 3

MICROMARKET REPORT EVERGREEN

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO DIRECT TESTIMONY AND EXHIBITS OF CHRISTOPHER E. PINK TABLE OF CONTENTS

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

WRAP Oil & Gas: Part 1: 2002/2005 and 2018 Area Source Emissions Inventory Improvements

GUIDE TO COAL MINES Mines Served by BNSF Railway

Directions to Rocky Mountain National Park 1000 Us-36, Estes Park, CO (970) mi about 10 hours 32 mins

Black Hills Project Summary

Representing Nevada s Rural Electric Cooperatives, Power Districts, and Municipal Utilities.

WestConnect Regional Planning Update

FINAL FUNDING ALLOCATION: STATE GRANTS FOR LIBRARIES $4,500 + $0.23/per capita

ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP

FINAL FUNDING ALLOCATION: STATE GRANTS TO LIBRARIES $4,500 + $0.22/per capita. Threshold for Additional Per Capita Funding

Western Area Power Administration

Q0044 interconnection at

PERMITTED COAL MINES CONTACTS

Southwest Power Pool Network Integration Transmission Service Application

At a glance South Dakota & Nebraska

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

SPP-RTO: Operational Characteristics

David W. Salter Collection

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

WestConnect TTC/ATC Workshop. Joint CCPG-SSPG-SWAT Meeting NOVEMBER 16, 2017

Directions to Grand Lake, CO 625 mi about 13 hours 10 mins. Loading... 1 of 5 2/13/09 8:26 AM

MICROMARKET REPORT DENVER METRO

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Appendix D Black Hills Project Summary

Colorado Central Railroad (MSS 802)

March 7, Subject: Southern California Edison 2011 Annual Progress Report

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Full Network Model Scope for FNM DB2016Q1

Minnesota Biennial Transmission. Zone Meeting 8

Sub Regional RTEP Committee - Western. October 21, 2009

Steeplechase Builder Package Builder Permit-Ready Lots

Updates and Modifications to Report

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

100 MW Wind Generation Project

Garfield County Road Traffic Counts

Facilities List Alberta Facilities that Accept Hydrovac Waste

2011 EASTERN OREGON DEER RIFLE SEASONS

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Wyoming Cost of Living Index for the Second Quarter of 2012

Four Corners Queue Transmission Interconnection Study

Transcription:

Customer Name Basin Electric Cheyenne Power and Light City of Fort Morgan & Estimated Maximum Resource MW Point of Receipt Delivering Party & Voltage Antelope Valley 2 Yellowtail Basin Electric 115 kv Laramie River Station 1Dave Johnston Basin Electric 115 kv Cheyenne Prairie Generation 132 Archer 115 kv Substation Cheyenne Light Happy Jack Windpower, LLC Facility 30 Happy Jack 115 kv Substation Duke Energy 115 kv Silver Sage Windpower, LLC Facility 30 Happy Jack 115 kv Substation Duke Energy 115 kv Terra Moya Aqua, LC 0.96 Happy Jack 115 kv Substation Cheyenne Light Wygen (1) 60 Stegall West 230 kv Interconnection Black Hills Power 230 kv Wygen (2) 92 Dave Johnston 230 kv Substation Black Hills Power 230 kv Municipal Energy Agency of Nebraska 25.862 Ault Substation MEAN 115/230 kv Beaver Creek MEAN 115/230 kv Sidney East Substation MEAN 115/230 kv Salt Lake City Integrated Projects Firm Electric Service 8.445 Ault Substation Beaver Creek Municipal Agency of Nebraska 1.657 Ault, Beaver Creek, Sidney East, Stegall, and Weld Subs MEAN 115/230 kv City of Holyoke Salt Lake City Integrated Projects Firm Electric Service 1.881 Ault, Weld, Beaver Creek, s

West Side Resources: Black Hills Power and Light Wygen1 20 Stegall Substation BHP 230 kv Black Hills Power and Light PPA 20 Stegall Substation BHP 230 kv Haxtun Generation 2.85 Haxtun Substation MEAN 4.16 kv Kimball Generation 8 Kimball Substation MEAN 115 kv Kimball Wind Generation 10.5 Kimball Substation MEAN 34.5 kv Municipal Energy Agency of Nebraska Salt Lake City Integrated Projects Firm Electric Service 3.54 Archer Substation CRSP 115/230 kv Ault Substation CRSP 230 kv Beaver Creek Substation CRSP 115 kv CRSP 230 kv CRSP 115/230 kv Loveland Area Projects Capacity & Energy Displacement 26 Ault Substation LAPT 230/115 kv Big Sandy LAPT 115 kv East Side Resources: Hastings Whelan Energy Center #2 25 Sidney East SPP 230 kv Indianola and Waverly, IA Generation 15 Sidney East SPP 230 kv PacifiCorp DJ Generation 220 Dave Johnston PacifiCorp 115kV Medicine Bow Wind Project 6.39 Medicine Bow Substation Medicine Bow Wind, LLC 34.5/115kV Rawhide Energy Station and/or Craig Units 1 & 2 85 Ault Substation Platte River Power Authority 230 kv Platte River Power Authority Salt Lake City Integrated Projects Firm Electric Service 50 Ault Substation CRSP 230 kv

Public Service Company of Colorado Manchief Unit # 1 75 Beaver Creek 115 kv or Weld 230 kv PSCo 115/230 kv Peetz (Secondary Resource) 30 Peetz 115 kv PSCo 115 kv Basin Electric Firm Capacity 125 Sidney East Basin (SPP) 115 kv Basin Electric Firm Capacity 100 Stegall West, Ault Basin 230 kv Burlington Unit # 1 60 North Yuma Tri State 115 kv Carousel Wind 32 Big Sandy Tri State 115 kv Carousel Wind 69 North Yuma Tri State 230 kv Colorado Highlands Wind 94 Wildhorse Creek Coloado Highlands Wind 115 kv Craig Unit # 1 33 Ault Tri State 345 kv Craig Unit # 2 33 Ault Tri State 345 kv Craig Unit # 3 34 Ault Tri State 345 kv Kit Carson Wind Farm 51 North Yuma Tri State 115 kv Garland Power Plant 3 Ralston Shoshone Irrigation District 69 kv LAP 354 Ault, Dave Johnston, Yellowtail WAPA LAP 230 kv Limon #2 77 Big Sandy Tri State 115 kv LRS Unit # 2 81 Ault Stegall West, Dave Johnston, Sidney West Tri State 230 kv LRS Unit # 3 81 Ault Stegall West, Dave Johnston, Sidney West Tri State 230 kv Tri State SLCA/IP Firm Power Entitlements (including WRP/CDP) 258 Ault/Archer CRSP 230 kv Warren Air Force Base Tri State Generation and Transmission 5 Ault Substation

Western Area Power Administration Federal Power Alcova #1 & 2 41 Alcova LAP 115 kv Big Thompson #1 5 Flatiron LAP 115 kv Boysen #1 & 2 15 Boysen LAP 115 kv Buffalo Bill #1 3 18 Buffalo Bill LAP 69 kv Estes #1 3 45 Estes LAP 115 kv Flatiron #1 3 99 Flatiron LAP 115 kv Fremont Canyon #1 & 2 67 Alcova LAP 115 kv Glendo #1 & 2 38 Glendo LAP 115 kv Green Mountain #1 & 2 26 Green Mountain LAP 69 kv Guernsey #1 & 2 6 Limestone LAP 115 kv Heart Mountain #1 5 Heart Mountain LAP 69 kv Kortes #1 3 36 Miracle Mile LAP 115 kv Mary's Lake #1 8 Estes LAP 115 kv Mt. Elbert #1 & 2 206 Points of Interconnection with PSCo LAP 230 kv Pilot Butte #1 & 2 2 Pilot Butte LAP 115 kv Pole Hill #1 33 Flatiron LAP 115 kv Seminoe #1 3 52 Miracle Mile LAP 115 kv Shoshone #1 3 Buffalo Bill LAP 69 kv Spirit Mountain #1 5 Buffalo Bill LAP 69 kv Yellowtail #1 4 269 Yellowtail LAP 115 kv

Rocky Mountain Generation Cooperative, Inc. 0.135 Ault Substation Dave Johnston Substation Sidney Substation Stegall Substation Willwood Light and Power City of Wray Salt Lake City Integrated Projects Firm Electric Service 0.05 Archer Substation Casper Substation Glenrock Substation Thermopolis Substation Yellowtail Substation Salt Lake City Intergrated Projects Firm Electric Service 0.985 Ault Substation Colorado River Storage Project 230/115 kv Beaver Creek Substation Colorado River Storage Project 230/115 kv Colorado River Storage Project 115 kv Colorado River Storage Project 115 kv Municipal Energy Agency of Nebraska 3Ault Substation Platte River Power Authority 230 kv Dry Fork Station 30 Dave Johnston Substation Black Hills, Basin Electric, & PRECorp 230 kv Laramie River Substation 24 Ault Substation Missouri Basin Power Project 230 kv Dave Johnston Substation Missouri Basin Power Project 230 kv Stegall West Substation Missouri Basin Power Project 230 kv Wyoming Municipal Power Authority Salt Lake City Integrated Projects Firm Electric Service 6.26 Archer Substation Ault Substation CRSP 115 kv