CAPITAL PROGRAM (TELECOMMUNICATIONS PROJECT) USER REQUIREMENT SPECIFICATION (TECHNICAL REQUIREMENTS)

Similar documents
BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

an EnerSys Company Relocatable Mobile Solutions Engineered for all Environments

Construction and Connection of Street Light Assets

The following lighting types are NOT compatible with the TT- 402Wireless Inline Dimmers:

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount

Substation Lightning Protection. Document Number: 1-11-FR-11

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

Benefits. Safety. Durability. Performance. Russellstoll. Heavy Industrial/ Marine

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

Linear Luminaire for Fluorescent Lamps Series ECOLUX 6600

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

TENDER DOCUMENT PART-II

TEKMEC TEKMEC ABSOLUTE CONTROL PUSH BUTTON STATIONS PUSH BUTTON STATIONS - IN FRP & CAST ALUMINIUM ENCLOSURE STANDARD TAILOR MADE EC TI M I T ME PCMS

KENYA ELECTRICITY GENERATING COMPANY LIMITED

Emergency Light Fitting for Fluorescent Lamps Series 6009

APPENDIX C FACILITY ILLUSTRATION

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

Light Fitting for Fluorescent Lamps Series ECOLUX 6600

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Name of work : Electrification of PG Block Second Floor in V.P.S.V Ayurveda college Kottakkal.

19 floor rack with steel door

Light Fittings for Fluorescent Lamps Series EXLUX 6000 / 6400

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types:

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

SECTION AXIAL HVAC FANS

Light Fitting for Fluorescent Lamps Series ECOLUX 6600

Item L.1 Voltages 1. The consumer voltage must be between +10% and -10% of the nominal national voltage (nnv.)

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR

Linear luminaire with LED Series EXLUX 6002

CHAPTER V RESIDENTIAL WIRING

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL SYSTEMS AND CONSTRUCTION NQF LEVEL 3 NOVEMBER 2009

Request for Quotation (RFQ) for the provision of electrical construction services to the CSIR CSIR RFQ:

Nanometrics Solar Power System

EMERGENCY VEHICLE BATTERY MANAGER PS2024

For Conduit Inspections

Maintenance of Signal Sighting and Signals

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

Demonstrate knowledge of electrical theory for Electrical Service Technician B

STANDARD SPECIFICATION FOR. LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs DOCUMENT NO: 44LK-5100/E.02/011

The Clima Canal is quiet even at high outputs, making it a discreet and effective heater for almost any situation

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

Technical Specifications

SolarSheat Wall Installation Manual

Linear Luminaire for Fluorescent Lamps Series EXLUX 6401

Linear Luminaire with LED Series EXLUX 6002

SECTION HVAC AIR CLEANING DEVICES

ACCESSORIES FOR SZE2 CABINETS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ROADWAY LUMINAIRES

Marina Bay Sands Guidelines for Electrical and Wiring Service

FLORIDA DEPARTMENT OF TRANSPORTATION

Linear Luminaire with LED Series EXLUX 6002/2 Version IIC

TENDER DOCUMENTS SUPPLY OF ELECTRICAL EQUIPMENT FOR BHADRAK MUNICIPALITY FOR THE YEAR LAST DATE OF RECEIVED OF TENDER DOCUMENTS :

TABLE II Electrical Permit Fees

Segurança. Segurança. PSB Heating System Cold applied connection technology. Compulsório. Compulsório. Operation Manual and Installation Instructions

A. Submit manufacturer's literature and technical data before starting work.

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

ICOMIA Global Conformity Guideline for ISO/ABYC Standards and Canadian TP 1332 requirements. Guideline Number 3 Electrical

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SolarSheat Wall Installation Manual

NIT for Tender No. GCO 8644P13

SERIES COOLING TOWER SINGLE-CELL UP TO 1700HRT COOLING CAPACITY

THUNDERBIRD Solar Electric Fence Energisers. S20 / S20B / S40 / S40B / S79 / S150

D4: Racing Infrastructure

UNDERGROUND SERVICES - SECONDARY

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

ASSEMBLY AND INSTALLATION INSTRUCTIONS 738XB 70 CM OSCAR BOOMER MHz COMMUNICATIONS ANTENNAS (7/94)

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines.

A. This section includes unit capacitors for power factor correction.

Knürr Smaract. Knürr Smaract. CompactRack

Heavy Duty Series (HDS) Installation and user guide

Emergency Luminaire with LED Series EXLUX 6409/1

PRODUCT NAME ORDER # PAGE # ANTENNAS

7 Lighting Technology

Outdoor system solutions

Cabinets Outdoor. Optimal protection from vandalism thanks to a fixing accessible only from within. Easily exchangeable exterior cladding components.

Amendment of UN ECE R100 regarding in-use requirements for vehicles of category L Status:

P3RC-12 SEER 2 Ton thru 4 Ton Units Cooling: 23,800 to 48,000 Btuh

BRS Quasi-Omni Antenna

Non Penetrating Mast Mount for 2.4M Antennas

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

Expense Report. spare muffin fans 29% ventilation 47.48% latch & cement board 23.05%

Electrical. Earthing & Bonding. Installation Techniques. Learning Notes MODULE 2.2 UNIT PHASE:2

SINGLE PHASE WIRING SPECIFICATIONS

5300 Series Installation Guidelines

Power and Cooling. Chassis Power System

ANNEX B TECHNICAL SPECIFICATIONS PORTABLE SOLAR-POWERED LIGHTS

104

Service Requirements

Applications. Illustrated Features

SUBSTATION DESIGN TRAINING

GE 8000-Line Motor Control Centers

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

forward curved inline duct blowers

Outdoor system solutions

33kV Connection up to 90MVA

SERIES COOLING TOWER SINGLE-CELL UP TO 1500HRT COOLING CAPACITY

NEC 2011 Code Changes

Transcription:

CAPITAL PROGRAM (TELECOMMUNICATIONS PROJECT) USER REQUIREMENT SPECIFICATION (TECHNICAL REQUIREMENTS) CONSTRUCTION OF TRAIN RADIO HIGH SITES FOR PYRAMID-SOUTH ELLISRAS LINE Author: Chief Engineering Technician Anton Dreyer.. Telecom (Technical Execution) Authorised: Manager: Project Manager Phehello Makoa... Capital Program (Telecoms) Date: 30 June 2009 Circulation Restricted To: Transnet Freight Rail Transnet and Relevant Third Parties Unrestricted Page 1 of 23

TABLE OF CONTENTS BBD6636 Version 1 ABBREVIATIONS, ACRONYMS AND DEFINITIONS...3 INTRODUCTION...4 BACKGROUND INFORMATION...4 SCOPE OF WORK...5 FORMAT OF TENDER PRICING SUBMISSION...6 APPENDIX A: CONTAINER REQUIREMENTS 12 VOLT DC SOLAR FEED...7 APPENDIX B: CONTAINER REQUIREMENTS 220 VOLT AC FEED...9 APPENDIX C: SUMMARY OF REQUIREMENTS...12 APPENDIX D: SITE PLANS...13 APPENDIX E: PRICING SCHEDULE...15 APPENDIX F: SECURITY FENCE...16 DRAWING 1: EQUIPMENT HOUSING...17 Page 2 of 23

ABBREVIATIONS, ACRONYMS AND DEFINITIONS ABBREVIATIONS AND ACRONYMS DESCRIPTION AC CoC LDW mm MPA RF RTO TFR Alternating Current Certificate of Completion Light Delivery Wagon Millimetre Mega Pascal Radio Frequency Radio Train Order Transnet Freight Rail DEFINITIONS Works DESCRIPTION Construction of infrastructure for radio communications Page 3 of 23

1. INTRODUCTION This contract specification covers the construction of infrastructure for radio communications high sites for the Radio Train Order (RTO) network between Pyramid -South and Ellisras, herein after referred to as the "WORKS", and any other work arising out of or incidental to the above, or required of the Contractor for the proper completion of the "WORKS" in accordance with the true meaning and intent of the contract. 2. BACKGROUND INFORMATION 2.1. Transnet Freight Rail (TFR) is a business division of Transnet Limited, and it has a broad range of telecommunications services. These services include, amongst others, radio communications for the safe operation of trains. 2.2. The "WORKS" called for in this document are for the construction of infrastructure for radio high sites. These high sites will house radio communications systems used for RTO, a system used by Transnet Freight Rail for the control of train operations between PYRAMID-SOUTH and ELLISRAS. 2.3. The "WORKS" called for in this document have an impact on the safe operations of trains by TFR. The level of workmanship, the quality and durability of the installations, and adherence to safety rules and regulations is of the utmost importance. 2.4. TFR will hold a site meeting and conduct visits to all the sites that are covered in the "WORKS". Attendance of the site meeting and visits to all sites is compulsory for all tenderers. Tender responses from Contractors who have not attended the compulsory briefings will be automatically disqualified. Page 4 of 23

3. SCOPE OF WORK 3.1. This specification covers the construction of radio high sites for RTO communication systems. 3.2. These requirements will be refined after the compulsory site briefings, and any changes to the requirements will be communicated to those Contractors that attended the site briefings. The scope of work for the sites includes the following: 3.2.1. The upgrade of an access road to the applicable site, such that it can be possible for a 2x4 LDW vehicle to access the site. The sites where access roads are required will be identified during the site meetings. 3.2.2. The clearance of terrain for the construction of a concrete plinth. The concrete plinth must be 25 MPA and 100 mm thick with expansion joints (1.5m 2 blocks). 3.2.3. The supply and installation of a 3 X 30 mm copper earth mat, 500 mm from the outside perimeter of the site and connected to the mast, fence corner posts and container/building earth. 3.2.4. Supply and install 2,5 m palisade steel fence (hot dipped galvanised) with an access gate. Refer to the applicable site plans (Appendix D) and see Appendix F for fence specification details. 3.2.5. On each of the sites powered by solar, supply and install a container as per Drawing 1 "Equipment Housing" and Appendix A of this specification, namely "Container Requirements 12 volt DC Solar Feed". 3.2.6. On each of the sites where 220 volt AC power is available, supply and install a container as per Drawing 1 "Equipment Housing", and Appendix B of this specification, namely "Container Requirements 220 volt AC Feed". Page 5 of 23

3.2.7. Supply and install a mast as per the Site Plans. The mast must be a selfsupporting lattice type mast. Details of the mast requirements are listed in Appendix C. 3.2.8. Supply and install an antenna system, inclusive of antenna(s), RF cabling, connectors, cable trays, cable entry plates, lightning protection and earthing, refer to Appendix C and Appendix D. 3.3. When the construction of each site is completed in terms of this specification, the Contractor must complete a Certificate of Completion (CoC) and present it to the TFR. 3.4. When the TFR is satisfied that the site has been built according to specification, the CoC will be signed. 3.5. A signed CoC is required for payment to be processed. 4. FORMAT OF TENDER PRICING SUBMISSIONS All tender responses must include pricing in the format of the template shown in Appendix E of this specification. Page 6 of 23

APPENDIX A : CONTAINER REQUIREMENTS 12 VOLT DC SOLAR FEED BBD6636 Version 1 A1. The typical layout of this type of container is shown in Drawing 1 "Equipment Housing ". A2. The container is a basic housing unit with two cable entry facilities at opposite ends for the mounting of aluminium cable entry panels. A3. The electrical wiring must be as follows: A3.1 A 12 volt DC power distribution box, including circuit breakers and regulator, with vertical PVC cable duct with dimensions 40 mm x 40 mm. A3.2 Four circuit breakers: A3.2.1 A3.2.2 A3.2.3 A3.2.4 12 volt DC solar main feed breaker rated 40 ampere. Feed for equipment rated 15 ampere. Lights rated 5 ampere. Extractor fan rated 5 ampere. A3.3 A 12 volt internal fluorescent lamp to be mounted on the ceiling of the container. The light must have a switch. A3.4 An earth bus bar to be connected to the stainless steel frame at the base of the container. A3.5 Forced ventilation to be provided with a single temperature controlled 12 volt DC extractor fan. Natural airflow should be possible in the event of extractor fan failure. The ventilation openings shall be equipped with dust filters and wire mesh, and be designed to prevent rain from flowing into the interior and for easy replacement and cleaning of filter material. Page 7 of 23

A4. General requirements for container: A4.1 Dimensions: Height 2500 mm, Length 2400 mm, Width 2400 mm. A4.2 Panel thickness: 50 mm. A4.3 Wall finish: Chromadeck silicone polyester baked enamel exterior and interior with white colouring. A4.4 The Frame must be made of 304-grade stainless steel. A4.5 Cable entry panels: two aluminium panels of dimensions 210 mm x 297 mm with water drip shall be provided on both sides at each end of the horizontal cable tray. A vertical aluminium strip of 1 mm x 100 mm shall be provided to connect each entry plate to the stainless steel frame at the base of the container. The aluminium strips shall be BETWEEN the foam and the outer Chromadeck. The container housing entry shall be 170 mm x 255 mm. A4.6 Floor: the floor shall be 19 mm 8-ply marine wood covered with 3mm checker Aluminium plate. A4.7 The power and earth cable entry shall be from the bottom of the container. The entries must be through watertight glands. A4.8 A solar power system must be supplied. The system must have 600W output regulated at 13.8 volt, mounted as per site drawing for the particular site. Page 8 of 23

APPENDIX B : CONTAINER REQUIREMENTS 220 VOLT AC FEED B1. The typical layout of this type of container is shown in Drawing 1 "Equipment Housing ". B2. The container is a basic housing unit with two cable entry facilities at opposite ends for the mounting of aluminium cable entry panels. B3. The electrical wiring must be as follows: B3.1 A 220 volt AC power distribution box, including circuit brakers, with a vertical PVC cable duct with dimensions 40 mm x 40 mm. B3.2 Five circuit breakers: A3.2.1 A3.2.2 A3.2.3 220 volt AC feed rated at 65 ampere. Two for equipment feed rated at 15 ampere. One for air conditioning rated at 25 ampere. A3.2.4 One for lighting rated at 10 ampere B3.3 A 220 volt 60 watt fluorescent light to be mounted on the ceiling of the container. The light must have a switch. B3.4 A 220 volt external light mounted above door, with a switch inside the container. B3.5 An earth bus bar to be connected to the stainless steel frame at the base of the container. B3.6 A power duct as shown on Drawing 1 "Equipment Housing 1", equipped with six 220 volt AC socket outlets in total (three per equipment trip switch). Page 9 of 23

B3.7 Forced ventilation to be provided with a single temperature controlled 220 volt AC extractor fan. Natural airflow should be possible in the event of extractor fan failure. The ventilation openings shall be equipped with dust filters and wire mesh, and be designed to prevent rain from flowing into the interior and for easy replacement and cleaning of filter material. B3.8 Only when specified in the schedule of requirements, a 12000 BTU air conditioner that provides cooling only, must be provided, with an extractor fan with a gravitational louver system. An adjustable temperature sensor must control the extractor fan. The air conditioner must be protected against theft. B4. General requirements for container: B4.1 Dimensions: Height 2500 mm, Length 1800 mm, width 1800 mm. B4.2 Panel thickness: 50 mm. B4.3 Wall finish: Chromadeck silicone polyester baked enamel exterior and interior with white colouring. B4.4 The Frame must be made of 304-grade stainless steel. B4.5 Cable entry panels: two aluminium panels of dimensions 210 mm x 297 mm with water drip shall be provided on both sides at each end of the horizontal cable tray. A vertical aluminium strip of 1 mm x 100 mm shall be provided to connect each entry plate to the stainless steel frame at the base of the container. The aluminium strips shall be between the foam and the outer Chromadeck. The container housing entry shall be 170 mm x 255 mm. B4.6 Floor: the floor shall be 19 mm 8-ply marine wood covered with 3mm checker Aluminium plate. B4.7 The power and earth cable entry shall be from the bottom of the container. The entries must be through watertight glands. Page 10 of 23

C1. Antenna system requirements: C1.1 Feeders must be 7/8" corrugated EC4-50 or equivalent. C1.2 All connections must be waterproofed. C2. Lightning protection: inline lightning protection and earth kit equivalent to polyphaser C002 must be provided. C3. The mast requirements are as follows: C3.1 Self-supporting mast to carry 2,5 m 2 antenna load at top of the mast at 160 km per hour wind speed. C3.2 Ladder with a safety cage. C3.3 Lightning spike. C3.4 Down conductor. C3.5 Earth mat. C3.6 12 Volt navigation lights. C3.7 All the mast construction must be signed off by a Certified Civil Engineer. D1. Electrical connection from main supply to container: D1.1 Power cable to be supplied and installed underground by the contractor. D1.2 Electrical installation compliance certificate must be provided by the contractor. Page 11 of 23

APPENDIX C : SUMMARY OF REQUIREMENTS SITE NAME CONTAINER MAST COVERAGE ANTENNA 455 MHZ COVERAGE ANTENNA HEIGHT & AZIMUTH LINK ANTENNA 455 MHZ LINK ANTENNA HEIGHT & AZIMUTH Pyramid-South Existing building Existing Dipole 12 m 0 Deg Kameeldrift-West 220 volt power Existing 4 stack dipole 25 m 0 Deg Nooitgedacht Existing building Existing 4 stack dipole 38 m 0 Deg 9 db Yagi 20 m 0 Deg 30 m 45 Deg 2 m 30 Deg Langberg Exist building Existing 4 stack dipole 19.5 m 237 Deg 2 X bayed 9 db Yagi 6 m 240 Deg 340 Deg Atlanta PPC 220 volt power 6 m Pole on containerrefer site plan Dipole 6 m 270 Deg 9 db Yagi 3 m 160 Deg Schoongezight 220 volt power Existing Dipole 12 m 180 Deg 9 db Yagi 10 m 70 Deg Bullskop Existing building Existing 4 stack dipole 27 m 180 deg 9 db Yagi 9 db Yagi 8 m 8 m 50 Deg 250 Deg Ferrogate Existing building Existing 4 stack dipole 22 m 255 Deg 9 db Yagi 30 m 45 Deg Thabazimbe 220 volt power 21 m 2 X bayed 9dB corner 20 m 0 Deg 220 Deg 2 X bayed 9 db Yagi 15 m 10 Deg 180 Deg Paulskloof 220 volt power Existing 4 stack dipole 30 m 320 Deg 9 db Yagi 15 m 190 Deg Page 12 of 23

APPENDIX D : SITE PLANS Page 13 of 23

Page 14 of 23

Page 15 of 23

Page 16 of 23

Page 17 of 23

Page 18 of 23

Page 19 of 23

Page 20 of 23

SCHEDULE SITE NAME ROAD MAST ANTENNA SYSTEM CONTAINER CONCRETE PLINTH FENCING TOTAL Pyramid-South Kameeldrift-West Nooitgedacht Langberg Atlanta PPC Schoongezight Bullskop Ferrogate Thabazimbe Paulskloof SUBTOTAL VAT @ 14% TOTAL Page 21 of 23

BBC9740 Version 1 APPENDIX F Page 22 of 23

BBC9740 Version 1 Drawing 1 END OF DOCUMENT Page 23 of 23