Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Similar documents
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

Q0044 interconnection at

Transmission Planning Attachment K Public Input Meeting

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY

Gateway South Transmission Project

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Appendix D Black Hills Project Summary

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

North Oregon Coast Area Study. Adam Lint

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

100 MW Wind Generation Project

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Wyoming Energy Projects

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Consulting Agreement Study. Completed for Transmission Customer

Business Park North Muskegon County, MI

South Dakota 890 Study

Falcon-Midway 115 kv Line Uprate Project Report

Appendix B. Summary of Changes to the Year Assessment

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

West Station-West Cañon 115 kv Transmission Project

Date: March 15, Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, Utah

Illinois State Report

Craig Quist Craig Quist

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Muskegon Waste Water Treatment Site Muskegon County, MI

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

Black Hills Project Summary

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Western Area Power Administration

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

MILLIGAN SOLAR PROJECT

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

15 Nelson-Marlborough Regional Plan

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

2013 ANNUAL PROGRESS REPORT

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Transmission Planning Report

2013 ANNUAL PROGRESS REPORT

CUSTOMER/ TWIN ARROWS PROJECT

Southeastern Region Transmission Planning. 10 Year Transmission Expansion Plan

System Impact Study Report

Sub Regional RTEP Committee - Southern. August 19, 2011

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Interconnection System Impact Study Report Request # GI

Customer Charge or Minimum Bill. Total Average Annual Bill (9 Dth) Total Volumetric Rate*

Sub-Regional RTEP Committee PJM South

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Reliability Analysis Update

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

New Jersey State Report

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

This are the pictures from the Stockholders Report

BC Hydro System 2011 Annual Progress Report

Proposed New Construction for

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Tri-State December 2013 Board Meeting

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran

New 115 kv Disconnect Switches at Bloomsburg MTS

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

March 7, Subject: Southern California Edison 2011 Annual Progress Report

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Feasibility Study Report

SPP Notification to Construct

APPENDIX E: Project Need and Description

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

2013 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting

Sub Regional RTEP Committee South

MTEP13 SPM #2- Central Region. March 25, 2013

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

Supplemental Report on the NCTPC Collaborative Transmission Plan

TransWest Express Project

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

PG&E s 2012 Request Window Proposals

Pacific Gas and Electric Company s 2013 Annual Progress Report

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

DFO STATEMENT OF NEED REPORT

APPENDIX E: Project Need and Description

Sub Regional RTEP Committee Mid-Atlantic

15 Nelson-Marlborough Regional Plan

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8

Transcription:

2000 PACIFICORP PAGE 1 Attachment K Rocky Mountain Power Five Year Study Findings & Kick Off Meeting Thursday, June 9 th 2016

2000 PACIFICORP PAGE 2 Rocky Mountain Power Area Transmission Planning Manager: Ken Shortt Area Transmission Engineering: Mark Adams Talmage Daley Jeremy Viula Nathan Wilson Nicole DeGiulio Carlton Jones Scott Murdock Sachith Abayakoon

2000 PACIFICORP PAGE 3 Study Areas for 2016 Findings Reports Honeyville/Malad Montpelier Utah Valley, Utah Kickoff Studies Smithfield/Preston & Sigurd, Utah Price, Utah Southern Wyoming &Vernal, Utah Scott Murdock Carlton Jones Nicole DeGiulio Carlton Jones Nicole DeGiulio Scott Murdock

2000 PACIFICORP PAGE 4 HONEYVILLE/MALAD STUDY FINDINGS AREA ENGINEER ~ MARK ADAMS Completed by Scott Murdock

2000 PACIFICORP PAGE 5 Honeyville/Malad Study Area Area boundaries: North: Malad City East: Cache National Forest West: West side Great Salt Lake South: Brigham City Ben Lomond is outside of the area, but a main source

2000 PACIFICORP PAGE 6 Study Service Area Urban & agricultural areas: Service to portions of Box Elder & Cache counties in Utah & Oneida county in Idaho Larger communities served are: Tremonton, Malad City & Brigham City Largest population center is Brigham City

2000 PACIFICORP PAGE 7 Honeyville/Malad Study Info One municipality in the study area Four transmission substations at 138 kv 16 distribution substations 11 transmission customers Transmission voltages: 138, 69 & 46 kv Distribution voltages: 12.47 & 4.16 kv

2000 PACIFICORP PAGE 8 MALAD AREA OF SERVICE: Mainly agricultural Service to Oneida & Box Elder counties Communities: o o o Snowville Malad City Holbrook Voltages: 138 kv, 69 & 12.47 kv Substations: o o o one transmission three distribution one customer owned

2000 PACIFICORP PAGE 9 WHEELON/CUTLER AREA OF SERVICE: Mainly agricultural & industrial Service to portions of Oneida, Box Elder & Cache counties in Utah Communities: o Fielding, Plymouth, Newton, Wheelon, Riverside, Collinston, Garland, Bothwell, Thatcher, Deweyville, Elwood, & Tremonton Voltages: 138, 46 & 12.47 kv Substations: o one transmission o eight distribution o three customer owned

2000 PACIFICORP PAGE 10 HONEYVILLE AREA SUBSTATIONS Mainly agricultural Service to Box Elder county Communities: o o o Honeyville Corrine Bear River Voltages: 138, 46 & 12.47 kv Substations: o o o one transmission six distribution two customer owned

2000 PACIFICORP PAGE 11 LAMPO AREA LOADS All industrial loads Service in Box Elder county Voltages: 138 & 46 kv Substations: o o one transmission three customer owned

2000 PACIFICORP PAGE 12 Total Area Load Growth Base System Loads o o Growth o Summer 2015: 276 MVA (76% industrial) Winter 2014-15: 220 MVA Summer: 1.1% (includes industrial) o Winter: 1.0% Projected System Loads o o Summer 2020: 310 MVA (includes industrial) Winter 2020-2021: 254 MVA

2000 PACIFICORP PAGE 13 Area Generation 2-18.75 MW hydro units, 37.5 MW, owned by PacifiCorp. Average combined daily output is 16 MW. Several small third party river hydro s east of Brigham City near Mantua.

2000 PACIFICORP PAGE 14 Area Distribution Capacity The area is sectionalized into four operating areas: Malad-19.2 MVA Honeyville-35 MVA, Transmission substations: Cutler-56 MVA Lampo-75 MVA Distribution substations: (4) 138-12.47 kv transformers 112.4 MVA (1) 138-4.16 kv transformer 14.0 MVA (2) 69-12.47 kv transformers 13.4 MVA (15) 46-12.47 kv transformers 65.0 MVA Total Distribution capacity is 205 MVA* *rounded up

Malad Bank #2 Increase Capacity 2000 PACIFICORP PAGE 15

2000 PACIFICORP PAGE 16 Move existing tap (3) to tap (4) in order to boost the voltage at Bear River & Blue Creek. e A load transfer on the distribution system is also required from Bush to Gold Rush; which will be done under the direction of field engineering.

Substation equipment bus fault-duty is within guidelines. 2000 PACIFICORP PAGE 17

During peak summer loading most any of the N-1 conditions may require load shedding. 2000 PACIFICORP PAGE 18

2000 PACIFICORP PAGE 19 Construction Schedule Summary Construction Schedule Summary 2016 CONSTRUCTION Set voltage recording meters at Blue Creek to verify high side voltage. Verify the jumpers on the Bear River tap line are equal to or greater than the line capacity. O/M O/M Subtotal $0 2017 CONSTRUCTION Malad Bank #2 Increase Capacity. $1,960,000 Subtotal $1,960,000 2018 CONSTRUCTION No construction proposed for this year. 2019 CONSTRUCTION Change No-Load Taps at Honeyville, move load from Bush to Gold Rush. N/A Subtotal $0 O/M Subtotal $0 2020 CONSTRUCTION No construction proposed for this year. Subtotal $0 Grand Total $1,960,000

2000 PACIFICORP PAGE 20 Honeyville/Malad Study Any questions or comments?

2000 PACIFICORP PAGE 21 MONTPELIER STUDY FINDINGS AREA ENGINEER - MARK ADAMS Completed by Carlton Jones

2000 PACIFICORP PAGE 22 Montpelier Study Area Ovid & Montpelier in north 69 kv loop around Mud Lake Intersection of three state borders Naughton in south 46 kv system from Sage

2000 PACIFICORP PAGE 23 Montpelier Study Info Five residential load centers: Montpelier, Cokeville, Garden City, St. Charles, & Bear River Remaining substations are agricultural Four transmission substations: Ovid, Sage, Naughton* & Oneida* Transmission Voltages:138, 69, & 46 kv Distribution Voltages: 12.47, 7.2, & 2.4 kv No appreciable generation Substation equipment bus fault duty: within guidelines No transmission capacitors *Naughton & Oneida are outside this study, but are sources for the area.

2000 PACIFICORP PAGE 24 69 kv System Ovid 138-69 kv to Naughton 230-69 kv Ovid 138-69 kv Serves Rich, Montpelier & Bear Lake areas Substations: o three transmission o eleven distribution Sage 69-46 kv Naughton 230-69 kv

2000 PACIFICORP PAGE 25 46 kv System North & south from Sage service to Cokeville, Randolph, Woodruff Can be backfed by installing 138-46 kv mobile at Railroad Substations: o One transmission o Five distribution

2000 PACIFICORP PAGE 26 Load & Growth Base System Loads o o Summer 2016: 33.4 MVA Winter 2015-16: 23.8 MVA Growth o Summer: 2.3% o Winter: 1.2% Projected System Loads o o Summer 2020: 38.2 MVA Winter 2020-2021: 25.3 MVA Distribution Capacity: 65 MVA (Summer)

2000 PACIFICORP PAGE 27 N-0 System Improvements (2016-17) The Garden City area is prone to low voltages. Switching Lifton s feed to the Ovid-Naughton 69 kv line solves the low voltage problem. A tap change at Sage reduces the likelihood of low voltages on the Sage 46 kv system that may be increased by the above Lifton change. Regulators at St. Charles are undersized. They need to be replaced with 3-200 kva units.

2000 PACIFICORP PAGE 28 N-1 System Improvements Outages involving Naughton & Ovid sources are difficult to mitigate & may require dropping load. The line between Ovid & Sage can only be opened with circuit breakers. Installing two loop-opening switches, i.e. with bottles, one on either side of Indian Creek tap will help reduce switching outages. Note: Unplanned transmission outages are uncommon in the area.

2000 PACIFICORP PAGE 29 Construction Schedule Summary Construction Schedule Summary 2016 Construction Move Lifton's source to Ovid-Sage line. Change Sage O&M no-load tap to #3 from #1 prior to transfer St. Charles ~ Increase capacity: Replace existing $ 260,000 regulators with 250 kva units 2017 Construction New 69kV LO/LD switch between Lifton & Indian Creek $ 62,000 2018 Construction No work required 2019 Construction No work required 2020 Construction No work required Total: $ 322,000

2000 PACIFICORP PAGE 30 Montpelier Study Any questions or comments?

2000 PACIFICORP PAGE 31 Utah Valley Study Prepared by: Nicole DeGiulio Area Planner: Nathan Wilson

2000 PACIFICORP PAGE 32 System Overview 1 3 Primary Sources 1. 3-138 kv lines from Salt Lake Valley 2. Spanish Fork 345-138 kv 3. Lake Side Generation 4. Payson Generation (UAMPS) 4 2

2000 PACIFICORP PAGE 33 Load Growth Base System Loads o Summer 2015: 1011 MW (Industrial 47%) o Winter 2014-15: 617 MW Growth: o Average Summer Percentage 3.2% o Average Winter Percentage 3.6% Projected System Loads o o Summer 2020: 1232 MW Winter 2019-20: 816 MW Distribution capacity 681 MVA

2000 PACIFICORP PAGE 34 N-0 Conditions Vineyard Upgrade, 2017 Vineyard XFMR at 112% (22.4 MVA Rating) This is an approved project Convert substation to 138kV & Install a 30 MVA LTC transformer at Vineyard substation. Estimated cost: $7.6 Million

2000 PACIFICORP PAGE 35 N-0 Conditions Pelican Point Low Voltage, 2018 Pelican Point has low voltage This is an approved project. Move Pelican Point on to distribution circuit, Saratoga 17 Estimated cost: $675k

2000 PACIFICORP PAGE 36 N-0 Conditions Willow Ridge Transformer, 2018 Willow Ridge XFMR at 104% (14 MVA Rating) This is an approved project. Increase Capacity ~ Install a 22.4 MVA transformer with LTC Estimated cost: $750k

2000 PACIFICORP PAGE 37 N-0 Conditions Benjamin Transformer, 2019 Benjamin 2.5 MVA XFMR at 109% This is an approved project. Install a 3.75 MVA transformer. The existing single phase regulators will also need to changed to match the new transformer rating. Estimated cost: $500k

2000 PACIFICORP PAGE 38 N-0 Conditions Mapleton Transformer, 2019 14 MVA transformer at 106% This is an approved project. Install a 22.4 MVA transformer with LTC. Estimated cost: $1.4m

2000 PACIFICORP PAGE 39 N-0 Conditions Lehi Carter Conversion, 2019 Accommodate a Lehi City Carter substation conversion to 138 kv. It is required to rebuild 2.1 miles of 46 kv line to 138 kv, from Carter to Bull River, tying into the existing 138 kv system. This is an approved project. Use 1272 ACSR conductor. Estimated cost: $1.7m

2000 PACIFICORP PAGE 40 N-0 Conditions American Fork Transformer, 2020 Existing transformer has a 28.3 MVA rating loaded to 106% Install a second 30 MVA transformer with LTC. Estimated cost: $5.8m

2000 PACIFICORP PAGE 41 Total Construction Costs Construction Item 2017 CONSTRUCTION Cost Vineyard ~ Increase capacity $7.6m Subtotal $7.6m 2018 CONSTRUCTION Pelican Point ~ Remove substation & move load to distribution $675k Willow Ridge ~ Increase capacity. Install a 46-12.5 kv transformer $750k Subtotal $1.425m 2019 CONSTRUCTION Benjamin ~ Increase capacity. Install a 46-12.5 kv transformer $500k Mapleton ~ Increase capacity. Install a 46-12.5 kv transformer $1.4m Lehi #3 ~ Convert to 138 kv & rebuild 46 kv line $1.7m Subtotal $3.6m 2020 CONSTRUCTION American Fork ~ Increase capacity. Install a second 138-12.5 kv transformer $5.8m Subtotal $5.8m TOTAL COST $18.425m

Any questions or comments? 2000 PACIFICORP PAGE 42

2000 PACIFICORP PAGE 43 Study Areas for 2016 Kickoff Studies Smithfield/Preston & Sigurd, Utah Carlton Jones Price, Utah Nicole DeGiulio Southern Wyoming & Vernal, Utah Scott Murdock

2000 PACIFICORP PAGE 44 Carlton Jones/Mark Adams SMITHFIELD/PRESTON AREA STUDY

2000 PACIFICORP PAGE 45 Smithfield/Preston Study Service Area Downey in the North Dividing line to the East is the Cache Nation Forest Wheelon & Treasureton are the main sources for the area

2000 PACIFICORP PAGE 46 Smithfield/Preston Study Service Area Transmission Voltages are 230,138, & 46 kv Transmission substations: o Treasureton o Oneida o Franklin o Green Canyon 230-138 kv 25-138 kv (generation) 138-46 kv 138-46 kv o Smithfield 138-46 kv Thirteen distribution substations, 12.47 & 25 kv Municipalities: Logan City & Hyrum City Four transmission customers Area generation < 50 MW of natural gas & hydro

2000 PACIFICORP PAGE 47 Smithfield/Preston Study Any questions or comments?

2000 PACIFICORP PAGE 48 Carlton Jones/Nathan Wilson SIGURD UTAH AREA STUDY

2000 PACIFICORP PAGE 49 Sigurd Utah Study Includes portions of Sanpete, Sevier, Beaver, Garfield, Piute & Millard counties Some of the larger cities served include Gunnison, Beaver, Richfield, Panguitch, & Milford

2000 PACIFICORP PAGE 50 Sigurd Utah Study There are approximately 32 substations in the area Transmission voltages served are 230, 138, 69 & 46 kv Other entities within the area include Garkane Energy & Beaver City Municipal Electric

2000 PACIFICORP PAGE 51 Sigurd Utah Study Generation in the area is Blundell Geothermal Plant & Upper Beaver Hydro Plant.

2000 PACIFICORP PAGE 52 Sigurd Utah Study Any questions or comments?

2000 PACIFICORP PAGE 53 Nicole DeGiulio/Nathan Wilson PRICE AREA STUDY

2000 PACIFICORP PAGE 54 Price Study Soldier Summit in the north Emery city in southwest Green River in southeast I-70 defines the southern boundary

2000 PACIFICORP PAGE 55 Price Study Info Covers 5,200 square miles in Emery, Carbon & surrounding counties Two municipalities: Price city & Helper city Main source for the area is three local generation plants Approximately 60 substations, 31 are customer owned Transmission voltages 46, 69, 138 & 345 kv Study will concentrate mainly on the 138 kv system & below

2000 PACIFICORP PAGE 56 Price Study Any questions or comments?

2000 PACIFICORP PAGE 57 Scott Murdock/Talmage Daley SOUTHERN WYOMING STUDY

2000 PACIFICORP PAGE 58 Southern Wyoming Study The southern Wyoming study serves portions of Sweetwater, Carbon, & Albany counties. Major cities served include: Green River, Rock Springs, Sinclair & Laramie.

2000 PACIFICORP PAGE 59 Southern Wyoming Study Covers approximately 14,000 square miles of area There are approximately 32 substations in the area Transmission voltages: 345, 230, 115 & 57 kv Majority of investigative work will be 230 kv & below Area has several municipalities including WAPA & AMOCCO

2000 PACIFICORP PAGE 60 Southern Wyoming Study Main sources of generation are Flaming Gorge Dam in Utah, Jim Bridger thermal plant & Foote Creek Rim wind plant in Wyoming.

2000 PACIFICORP PAGE 61 Southern Wyoming Study Any Questions or Comments?

2000 PACIFICORP PAGE 62 Scott Murdock/Nathan Wilson VERNAL UTAH AREA STUDY

2000 PACIFICORP PAGE 63 Vernal Study Town of Hanna in west Town of Vernal in east Bonanza Power Plant (Deseret) It is approximately 53 miles northwest of Helper, Utah

2000 PACIFICORP PAGE 64 Vernal Study Info About 1,700 sq miles of territory located in Duchesne & Uintah counties Major communities served are Vernal & Maeser There are 11 substations, four are customer owned Transmission voltages include 345,138, & 69 kv

2000 PACIFICORP PAGE 65 Vernal Area Generation Generation from Flaming Gorge also contributes to the area Bonanza, owned by Deseret Generation & Transmission (DG&T), is the only generation within the study area

2000 PACIFICORP PAGE 66 Vernal Study Any Questions or Comments?