Minto North Access Design

Similar documents
Revision Tailings Management Plan Minto Mine, YT

Appendix E3. Open Pit Pioneering and Pre-production

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer.

Glencore Xstrata Westside Story Mine Closure and Rehabilitation. Neil Rae Operations Manager

Quarterly Training Summit October 2016

TABLE OF CONTENTS SECTION TITLE PAGE NUMBER

Skills and Sequences for In-Car Instruction

Technical Information. (Innovative Transport Technology for Open Pit Mines)

Abstract. General N BANDA

B2. Fueling Operations

Design of Surface Mine Haul Road

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

GEO-7851 USING UAVS TO INCREASE PRODUCTIVITY AND SAFETY IN THE CONSTRUCTION INDUSTRY. Emmanuel de Maistre

APPLICATION guide book

Quarterly Stakeholder Call

Dump Point Safety. Vehicle concerns and Additional Points. Jonathan Hall, PE Tech Support, A&CC, M&ESD

Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines

DUFFERIN AGGREGATES ACTON QUARRY EXTENSION PROJECT

NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE

DESCRIPTION QUANTITY PRICE TOTAL

Examination of alternative mining methodologies that have the potential to increase productivity at the mine site

THE MINER S BEST FRIEND.

FREQUENTLY ASKED QUESTIONS

The Futran System: Breeding the paradigm shift. Andries Louw: Futran Limited and Podcars Africa

Appendix 4-2-C Project Air Emissions Inventory

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

2011 LOCAL STREET IMPROVEMENTS

mining sector and look to grow our business through strategic investments and co-operation agreements leveraging off our existing infrastructure.

Measure South Lane County Fire & Rescue General Obligation Bond November 3, 2015


INTEGRATED MINE CLOSURE II

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

Effective [one year after date of adoption] the provisions of this rule shall apply to:


Kirkland Lake Project May, Project Update to Indigenous Community Partners

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

INTERIM CONSTRUCTION RECORD REPORT TAILINGS POND 4 STAGE 3 RAISE

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES

NAU DESIGN GUIDELINES FOR DISABLED ACCESS PARKING AND ACCESSIBLE ROUTE AT VEHICULAR TRAFFIC AREAS

CITY OF REDLANDS EQUIPMENT OPERATOR IN TRAINING (OIT) EQUIPMENT OPERATOR I/II

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

BALCONES QUARRY November 2014

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

Build-A-Box. Modular Trench Shielding System. Tabulated Data Effective January 4, Revised: April 21, with CHANGE THREE

Dump Truck. 1. What is the definition of, or how can a hazard be described?

Granite Watershed Mining EIS - Proposed Action. (Umatilla NF and Wallowa-Whitman NF)

Technical Test Theory Wheeled Loading Shovel A21

National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES

Haulage Profile is a Vulcan tool which helps to users to estimate truck hours for a particular mine plan. It consists basically of two set of

Maximum ABS Braking Tests On A Freshly Re-Graded Gravel Shoulder

MNM Fatalities

Steese Rd - Curb & Sidewalk Improvement

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager

Build-A-Box Modular Trench Shielding System

Dump Truck - Articulated Chassis A56

E-Z Compliance Helper PA DEP / MSHA Regulation Cross Reference

EFFICIENT LOADING, HAULING AND DUMPING.

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION COAL MINE SAFETY AND HEALTH REPORT OF INVESTIGATION.

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

ORDINANCE TOWN OF ALBANY. Revised 8/19/03 GREEN COUNTY WISCONSIN

M.D. OF PINCHER CREEK NO. 9. Approved by Council Date: March 22, 2016

FREQUENTLY ASKED QUESTIONS

Dump Truck. 1. What is the definition of, or how can a hazard be described?

VCHS [V-Steel Container Handler, L-4]

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

EXCEPTION TO STANDARDS REPORT

WELCOME. New Septage Waste Haulage Receiving Station Municipal Class Environmental Assessment (Class EA)

TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

REMOTE AND SEMI-AUTOMATED OPERATION OF AN ELECTRIC CABLE SHOVEL

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Highwall Mining System

TIME TASK FORCE. Guidelines for the Mitigation of Motor Vehicle Fluid Spills at Crash Scenes (Non-Cargo)

DR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground.

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

CEM 417 WEEK 6. CONSTRUCTION TECHNOLOGY & maintenance. Construction Plants 22/02/2011 WEEK 6 CONSTRUCTION PLANTS

29 CFR Material handling equipment

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

Billing Code: P. Petitions for Modification of Application of Existing Mandatory Safety Standards

SHORE POWER ALTERNATIVES AAPA ENVIRONMENT COMMITTEE SEPTEMBER 17, 2015 JOSEPH HOWER, PE, DEE

Alternate Lug Wear. Appearance. What's Happening. Probable Causes

Illustrated Parts List I HDC 1000 ( ) Repair Parts Manual

August 22 nd, Highwall Mining in India: extending mineable reserves a presentation for CMPDI.

The Nordic market. NVF Conference Reykjavik 13. June Peter Storm NCC Roads A/S Denmark NCC Roads A/S 1

Reference: Capstone Mining Corp., Minto 118 Orebody, Ventilation Conceptual Design 740 Level Production and 710 Level Development

The meeting was called to order at 7:12 pm by Patrick Kinney, Acting Chairman.

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

AMI Wheel Loader Attachments

CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

800 Access Control, R/W Use Permits and Drive Design

Horizontal Alignment

PERFORMANCE ACTIVITY 603 SIGNS

Demonstrating Efficiency Gains from Installing Truck Turntables at Crushers. M Brazil, P A Grossman, J H Rubinstein and D A Thomas

Technical Test Theory Dump Truck - Articulated Chassis A56

Transcription:

Minto North Access Design September 3, 2014

Minto North Access Design September 2, 2014 1 Introduction This document presents an updated plan for creating an access road to the Minto North pit. It shows the main road, which connects to the internal pit ramp, as well as the accesses required for the first two benches. 2 Design Parameters The haul road is designed to a width of 30m and at grades no greater than 10%. Temporary accesses perpendicular to the main haul road will be necessary to access the upper four waste benches. 2.1 Road Width As stipulated by Yukon OHS Regulation (15.43): A haulage road shall be designed, constructed and maintained to provide (a) a travel width i. not less than three times the widest haulage vehicle used where dual lane traffic exists Additionally, Yukon OHS Regulation (15.43) states that: A haulage road shall be designed, constructed and maintained to provide (b) a shoulder barrier or berm i. at least three quarters of the height of the largest tire on any vehicle hauling on road The haul road is designed for dual-lane traffic using CAT 777F trucks, which have widths of 6.5m and tires measuring 2.70m high. The following table calculates the minimum required road width: Truck width Road surface width Tire height Berm height Berm width Total road width, against highwall or slope (one berm) Total road width, two berms 6.49 m 19.5 m 2.70 m 2.0 m 4.1 m 23.6 m 27.7 m The haul road is designed at a width of 30m, exceeding the minimums specified in YWCHSB regulations. Once the road enters the pit, its width is reduced to 27.0m; this value still exceeds the 23.6m required for a road adjacent to a highwall and also provides width for water conveyance ditching and piping where required. 2.2 Grade The maximum ramp grade is 10%. This is consistent with past practices at Minto and has been shown to suit the capabilities of the Cat 777D / Cat 777F haul truck fleet. 2.3 Runaway Lanes Two runaway lanes are provided on the access road, and one in the pit, after the major road sections steeper than 5.0%, as per Yukon OHS Regulation 15.43 (3): 1

Minto North Access Design September 2, 2014 Clearly marked emergency runaway lanes or retardation barriers shall be provided and maintained at suitable locations and be capable of safely bringing a runaway vehicle to a stop, where the road grade exceeds 5%. Each runaway lane will end in a large berm of loose rock, designed to act as an impact barrier. Runaway lanes are 12m in width. 2.4 Access to Upper Benches The top of the Minto North pit is comprised entirely of waste and will be mined in four 12.0 meter high benches. The accesses for the first two benches require additional road construction and are therefore shown in Figure 1; accesses to the next two will be contained within the pit footprint and are not shown. 2.5 Reclamation Prior to road construction, the topsoil will be removed and stockpiled separately in part of the Reclamation Overburden Dump designated for this purpose. Once the pit is complete and access is no longer required, the haul roads will be contoured to blend in with the original slope and then covered with soil overburden and stockpiled topsoil. 3 Construction Sequence The road is designed as a combination of cut and fill sections. After stripping topsoil and tree cover along the road footprint, a dozer will cut the slope where required. Where the cut material cannot be practically used for fill, it will be supplemented with rockfill meeting construction-spec requirements (Cu < 0.10%, paste ph > 5.0, NP/AP > 3, sulfide sulfur < 0.3%). The portion of the road required to access the first bench will be built before mining of the pit can commence. The remainder of the road will be built as required to access each subsequent bench; the entire road will be completed when the pit is mined down to the 908 elevation, where it will connect to the pit s internal hard-ramp. 4 Water Management and Erosion Control Consistent with Minto s Phase V/VI Water Management Plan, impacted water from the Minto North pit will be captured and pumped to the Minto Creek catchment. A ditch will be cut into the south edge of the road to capture water from the road surface, as well as water from the small catchment area above the road. The road itself will be given a 2% cross-slope, which will allow snowmelt and rainwater to report to the ditch. The ditch will lead into the Minto North pit, which will serve as the water collection point for surface runoff. Water captured in Minto North will be sent to the Main pit via a pipeline used for operational dewatering. The road will be built between September 2014 and January 2015 (i.e. it will be completed before freshet); winter conditions obviate the need for a complete water management system during road construction and the mining of the pit s upper benches, which are expected to produce no groundwater. 2

Minto North Access Design September 2, 2014 908 Figure 1: Minto North access road configuration. 3

Minto North Access Design September 2, 2014 908 Figure 2: Minto North access road configuration and internal pit ramp. 4