Job Cost Journal by Job/Cost Code with Hours Job 186 to 186, Status = 1

Similar documents
Health Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)


PLS PACIFIC LASER SYSTEMS OUR WARRANTY & SERVICE ASK YOUR DEALER TO DEMONSTRATE A PLS LASER TOOL. The Professional Standard

Building Integrity Property Services

New homes from the $170 s - $220 s

The PROFESSIONAL STANDARD

3. Dot & Line Lasers. Kit includes: PLS 2. *Also available as PLS 2 & PLS FT- 90 Combo Pack CONSTRUCTION PRODUCT GUIDE 2013

SARTELL PUBLIC SAFETY CAMPUS November 20 21, 2018

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia

BISCAYNE POINT ROW IMPROVEMENTS

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.

New RepairBase Line Item additions for the Update

Carpenter Home Inspections LLC

LSW9 Hydraulic lighting tower

New RepairBase Line Item additions for the Update

An Operational Comparison between the. Traverse City, MI. Larry C. Hardy Parking Garage

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

On-the-Job Training Program. Overview of Training Programs

SDH QUALITY ASSURANCE WALK -NEW

HAMPTON INN AND SUITES

CAPITAL IMPROVEMENT PROGRAM COMMITTEE RECOMMENDATION

CODE ANALYSIS BUILDING AREA STORIES 2 BUILDING HEIGHT 25'

Group Class Code Listing

Home Maintenance Schedule

CLOVER ESTATES - CHESTERFIELD, MI

Botaka Estates. New Homes Starting in the $160s BENTON CITY S NEWEST COMMUNITY. For More Information Contact Thomas Mayhew at (509)

MAINTENANCE WORKER I/II/III

GP Lam LVL. (20!and 22! by special order) 13 4! 31 2! 1.5E. Lengths: up to 60 feet. Referenced dimensions are nominal and used for design purposes.

Superintendent Project Manager -.15 days /wk Temp Water. Temp Water Temp Electricity. Temp Electricity Temp Office

78' 1" 56' 6" 07-A1.1-SITE (30% of Scale); Ebbert; Projects 10 v1.0; 3/24/ :41 PM

Maximum Span Tables. for Joists and Rafters. MSR Lumber. for Performance. Figure provided courtesy of the American Forest & Paper Association

flexible spaces all the right places... fogg.com Brookpark Rd. Extension North Olmsted, Ohio

PROJ. NO SECTION HYDRONIC PUMPS

DIVISION 6: PLUMBING ELEMENTS AND FACILITIES

OPACUS 18 X 65 DOUBLE STOREY TERRACE HOUSE

We make dampers easy for you!

PG-35AV-CH Coiled Hose and Spray Valve. PG-8WSAV-08 Lighweight Aluminum Spray Unit

IN-LINE MIXED FLOW DUCT FANS MIXVENT-TD Fan Systems

GP Lam LVL. Grade Thickness Depth , , , , , 149, 169, 189, 249 (209and 229 by special order) 2.

GP Lam LVL. Grade Thickness Depth , 9 1 4, 9 1 2, , , 14, 16, 18, 24 (20 and 22 by special order) 2.

Date:11/22/10 Time:11:46:45 Page:1 of 7

Blast Valves for HVAC Ducting

CITY OF LAREDO, SOUTH LAREDO WASTEWATER TREATMENT PLANT ADMINISTRATION BUILDING

CILIANTA 20 X 65 DOUBLE STOREY TERRACE HOUSE

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

FOR SALE. Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three (3) Buildings - 16.

Breaker TE 500. Technical data. Advantages. Drilling and Demolition. Rated power. Single impact energy. Full hammering frequency

Call Ken now on westcoastskylights.com.au. Skylight Must Knows

M Resort Spa Casino. Tom Chirdon. Faculty Advisor: William P. Bahnfleth Spring 2009

A-1. 1st Floor. Foundation. Existing Home. Varano-Cushner Addition. Webb Builders, Inc. BATH MASTER BDRM BEDROOM BASEMENT HALL BATH KITCHEN DINING

ADDENDUM 3. C. Bidders are requested to attach a copy of this Addendum to the Project Manual in their possession.

B E C K E R & F R O N D O R F Construction Cost Consulting Project Management

MAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer.

UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM B August 19, 2016

Specifier s Document. Features and Benefits. Construction

BUYER. 031 HVAC: Equipment and Parts. Brandie Bingham. 055 Auto Accessories. Brandie Bingham. 060 Auto and Trailer Parts.

VEHICLE RECONDITIONING & REMANUFACTURING

Pre Written Final Company Last First Class ID Driving Deduction Trip Test Score

PROJECT: : Maysak New House Construction_Weno, Chuuk State DATE : 27 June 2016 ORDER : 23 SETS (Complete with Electrical) of the below Items

V i l l o s a 20 X 65 DoUBlE storey TERRaCE HoUsE

IN-LINE DUCT FANS MIXVENT-TD Fan Systems

Colin Smith W Costilla Street Colorado Springs, CO Jen Way. Subject Property. Researched and prepared by. Prepared exclusively for

SAVE OUR HERITAGE ORGANISATION 2009 PEOPLE IN PRESERVATION AWARD NOMINATION

OSIRIS 18 X 65 DOUBLE STOREY TERRACE HOUSE

Tank at Ground Level. Tank on Stand

HORSE BARNS & GARDEN SHEDS

MICRO FRIDGE OHC MICRO FRIDGE WARD RV QUEEN BED OHC OHC MICRO WARD PANTRY FRIDGE

Porta John Systems, Inc.

(Signed original copy on file)


Trellis Color Schedule Lot Address Color Scheme

ADAMS VS. CENTEX HOMES

AWARD WINNER 9 YEARS IN A ROW EASTERN EDITION

T.A.T Minimum Wage Scale

PRODUCED BY AN AUTODESK STUDENT PRODUCT. View Name. Ref. Breakheart Project

Expedition vehicle UM 8-FH-AS / Unimog 4x4

VENT FLASHINGS GALVANIZED STEEL

D02 GB W08 ST6 9,340 D05 D06 DRW HR6 OFFICE CPD ST4 FSL D01 D01 W01 GB EX RL +17,180 EX RL +17,000 9,875

The all-steel pipe braces are available in lengths from 7-6 to 52-6 and designed for formwork, precast and tilt-up bracing applications.

RODIA Diamond Core Drilling RODIA Diamond Drill Bits

Quote Request. Manchester Single Family Home Inspection. Quotes due February 10:00 AM

Over Sixty Years of Quality

RAM PRODUCTS 2018 CATALOG V7.22 VAN INTERIORS TRUCK RACKS VAN RACKS AND MORE

WOOD FIRE FLUE KIT AND ACCESSORIES MANUAL

METAL STUDS. TOTAL COST (Labor+ Material) UNIT COST (Labor+ Material) ITEM # DESCRIPTION QUANTITY UNIT TRADE COST GENERAL REQUIREMENTS

GREASE INTERCEPTOR REQUIREMENTS

TOY HAULERS FIFTH WHEELS

SMALL DIAMETER WHEELS

All-Fuel Chimney Systems

PRIMEX VENTING PRODUCTS AND ACCESSORIES

2010 MG NATIONAL MEETING ADELAIDE, SOUTH AUSTRALIA FINAL RESULTS MOTORKHANA

design options INTERIORS & EXTERIORS

Registered Voters Cards Cast % Num. Report Precinct 13 - Num. Reporting %

Committee Approved Critical Repairs

Expedition vehicle MD67 / MAN TGM 4x4

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

2004 MOTORHOMES GAS MODEL CLASS A. Comfortable Travel with Friends and Family

East Allen County Schools Facilities History Calendar Years October 5, 2015

Self Build detached dwelling

BASE CAMPS COMPLETE CAMP PACKAGE

Transcription:

Sample Company 2003 Job Cost Journal by Job/Cost Code with Hours Job 186 to 186, Status = 1 186 Williams Post Office Cost Code 1000.000 General Requirements 1 Historical JC 05/01/2001 Historical Job Costs 5 21,851.89 88 1282 04/24/2001 8.00 Reg Hrs 7 Jason Hepler 2 89 1282 04/25/2001 8.00 Reg Hrs 7 Jason Hepler 2 90 1282 04/26/2001 8.00 Reg Hrs 7 Jason Hepler 2 91 1282 04/27/2001 8.00 Reg Hrs 7 Jason Hepler 2 179 1295 04/30/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 180 1295 05/01/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 181 1295 05/02/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 182 1295 05/03/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 183 1295 05/04/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 209 1307 04/30/2001 8.00 Reg Hrs 7 Jason Hepler 2 210 1307 05/01/2001 8.00 Reg Hrs 7 Jason Hepler 2 211 1307 05/02/2001 8.00 Reg Hrs 7 Jason Hepler 2 212 1307 05/03/2001 8.00 Reg Hrs 7 Jason Hepler 2 213 1307 05/04/2001 8.00 Reg Hrs 7 Jason Hepler 2 253 1318 05/07/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 254 1318 05/08/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 255 1318 05/09/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 256 1318 05/10/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 257 1318 05/11/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 276 1328 05/07/2001 8.00 Reg Hrs 7 Jason Hepler 2 277 1328 05/08/2001 8.00 Reg Hrs 7 Jason Hepler 2 278 1328 05/09/2001 8.00 Reg Hrs 7 Jason Hepler 2 279 1328 05/10/2001 8.00 Reg Hrs 7 Jason Hepler 2 280 1328 05/11/2001 8.00 Reg Hrs 7 Jason Hepler 2 351 1344 05/14/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 352 1344 05/15/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 353 1344 05/16/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 354 1344 05/17/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 355 1344 05/18/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 366 1352 05/14/2001 8.00 Reg Hrs 7 Jason Hepler 2 367 1352 05/15/2001 8.00 Reg Hrs 7 Jason Hepler 2 368 1352 05/16/2001 8.00 Reg Hrs 7 Jason Hepler 2 369 1352 05/17/2001 8.00 Reg Hrs 7 Jason Hepler 2 370 1352 05/18/2001 8.00 Reg Hrs 7 Jason Hepler 2 391 1360 05/21/2001 8.00 Reg Hrs 7 Jason Hepler 2 392 1360 05/22/2001 8.00 Reg Hrs 7 Jason Hepler 2 393 1360 05/23/2001 8.00 Reg Hrs 7 Jason Hepler 2 394 1360 05/24/2001 8.00 Reg Hrs 7 Jason Hepler 2 395 1360 05/25/2001 8.00 Reg Hrs 7 Jason Hepler 2 431 1368 05/21/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 434 1368 05/24/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 435 1368 05/25/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 466 1378 05/29/2001 8.00 Reg Hrs 7 Jason Hepler 2 1

467 1378 05/30/2001 8.00 Reg Hrs 7 Jason Hepler 2 468 1378 05/31/2001 8.00 Reg Hrs 7 Jason Hepler 2 469 1378 06/01/2001 8.00 Reg Hrs 7 Jason Hepler 2 514 1391 05/29/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 515 1391 05/30/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 516 1391 05/31/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 517 1391 06/01/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 565 1401 06/04/2001 8.00 Reg Hrs 7 Jason Hepler 2 566 1401 06/05/2001 8.00 Reg Hrs 7 Jason Hepler 2 567 1401 06/06/2001 8.00 Reg Hrs 7 Jason Hepler 2 568 1401 06/07/2001 8.00 Reg Hrs 7 Jason Hepler 2 569 1401 06/08/2001 8.00 Reg Hrs 7 Jason Hepler 2 575 1403 06/06/2001 8.00 Reg Hrs 9 Eric Dunn 2 576 1403 06/07/2001 8.00 Reg Hrs 9 Eric Dunn 2 577 1403 06/08/2001 8.00 Reg Hrs 9 Eric Dunn 2 626 1414 06/04/2001 7.00 Reg Hrs 49 Hugh Molotsi 2 627 1414 06/05/2001 7.00 Reg Hrs 49 Hugh Molotsi 2 628 1414 06/06/2001 7.00 Reg Hrs 49 Hugh Molotsi 2 629 1414 06/07/2001 7.00 Reg Hrs 49 Hugh Molotsi 2 630 1414 06/08/2001 7.00 Reg Hrs 49 Hugh Molotsi 2 660 1426 06/11/2001 8.00 Reg Hrs 7 Jason Hepler 2 661 1426 06/12/2001 8.00 Reg Hrs 7 Jason Hepler 2 662 1426 06/13/2001 8.00 Reg Hrs 7 Jason Hepler 2 663 1426 06/14/2001 8.00 Reg Hrs 7 Jason Hepler 2 664 1426 06/15/2001 8.00 Reg Hrs 7 Jason Hepler 2 667 1428 06/11/2001 8.00 Reg Hrs 9 Eric Dunn 2 668 1428 06/12/2001 8.00 Reg Hrs 9 Eric Dunn 2 708 1438 06/11/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 709 1438 06/12/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 710 1438 06/13/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 711 1438 06/14/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 712 1438 06/15/2001 1.00 Reg Hrs 49 Hugh Molotsi 2 (Non-Labor) Cost Code Total: 21,851.89 Cost Code 1510.000 Temp. Utilities 2 Historical JC 05/01/2001 Historical Job Costs 5 624.05 97 29872WD 05/01/2001 Purchase Order 126 City of Walker Utilit 5 32.25 298 95194JRN-56 05/20/2001 Purchase Order 122 Graham Gas & Ele 5 26.88 299 654*98732-B 05/20/2001 Purchase Order 112 Parkinson Bell 5 19.89 300 6683 05/18/2001 Portable Toilet 5 Easley Waste Manag 5 75.25 (Non-Labor) Cost Code Total: 778.32 Cost Code 1520.000 Field Office & Sheds 96 SR-398155 04/30/2001 Job Trailer - May 28 Andres Equipment 5 215.00 (Non-Labor) Cost Code Total: 215.00 Cost Code 1540.000 Mobilize & Demobilize 3 Historical JC 05/01/2001 Historical Job Costs 5 878.90 (Non-Labor) Cost Code Total: 878.90 2

Cost Code 2000.000 SITE WORK 4 Historical JC 05/01/2001 Historical Job Costs 5 21,750.00 382 1946 05/25/2001 Paving 82 Miller Paving, Inc. 4 27,985.00 548 23944 05/29/2001 Sitework 14 Taketa Construction 4 7,250.00 (Non-Labor) Cost Code Total: 56,985.00 Cost Code 2300.000 Excavation/Export/Fill 5 Historical JC 05/01/2001 Historical Job Costs 5 1,510.31 (Non-Labor) Cost Code Total: 1,510.31 Cost Code 3000.000 CONCRETE 6 Historical JC 05/01/2001 Historical Job Costs 5 680.00 (Non-Labor) Cost Code Total: 680.00 Cost Code 3100.000 Foundation Formwork 7 Historical JC 05/01/2001 Historical Job Costs 5 3,423.87 374 651207 05/21/2001 Lumber & HW(Remai 20 Mealer Lumber Co., 1 2,790.59 (Non-Labor) Cost Code Total: 6,214.46 Cost Code 3200.000 Foundation Reinforcement 8 Historical JC 05/01/2001 Historical Job Costs 5 455.72 (Non-Labor) Cost Code Total: 455.72 Cost Code 3300.000 Foundation Cast-in-Place 9 Historical JC 05/01/2001 Historical Job Costs 5 5,226.44 (Non-Labor) Cost Code Total: 5,226.44 Cost Code 3340.000 Slab Prep 10 Historical JC 05/01/2001 Historical Job Costs 5 5,480.71 (Non-Labor) Cost Code Total: 5,480.71 Cost Code 3350.000 Slab Cast-in-Place 11 Historical JC 05/01/2001 Historical Job Costs 5 8,697.82 (Non-Labor) Cost Code Total: 8,697.82 Cost Code 4000.000 MASONRY 12 Historical JC 05/01/2001 Historical Job Costs 5 37,125.00 (Non-Labor) Cost Code Total: 37,125.00 Cost Code 5100.000 Structural Steel 13 Historical JC 05/01/2001 Historical Job Costs 5 10,943.50 (Non-Labor) Cost Code Total: 10,943.50 Cost Code 6100.000 Rough Framing 14 Historical JC 05/01/2001 Historical Job Costs 5 6,394.55 94 651024 05/01/2001 Window & Roof 20 Mealer Lumber Co., 1 2,274.59 (Non-Labor) Cost Code Total: 8,669.14 Cost Code 6120.000 Wall Framing 15 Historical JC 05/01/2001 Historical Job Costs 5 1,953.73 (Non-Labor) Cost Code Total: 1,953.73 3

Cost Code 6130.000 Roof Framing 16 Historical JC 05/01/2001 Historical Job Costs 5 8,469.79 74 1271 04/23/2001 8.00 Reg Hrs 11 Tim Teichman 2 75 1271 04/24/2001 8.00 Reg Hrs 11 Tim Teichman 2 76 1272 04/23/2001 8.00 Reg Hrs 17 Steven Cook 2 77 1272 04/24/2001 8.00 Reg Hrs 17 Steven Cook 2 78 1273 04/23/2001 8.00 Reg Hrs 20 Kevin Mendoza 2 79 1273 04/24/2001 8.00 Reg Hrs 20 Kevin Mendoza 2 80 1274 04/23/2001 8.00 Reg Hrs 24 Natalie Chapman 2 81 1274 04/24/2001 8.00 Reg Hrs 24 Natalie Chapman 2 82 1275 04/23/2001 8.00 Reg Hrs 27 David Hughes 2 83 1275 04/24/2001 8.00 Reg Hrs 27 David Hughes 2 (Non-Labor) Cost Code Total: 8,469.79 Cost Code 6190.000 Truss (Prefab) 17 Historical JC 05/01/2001 Historical Job Costs 5 16,200.27 (Non-Labor) Cost Code Total: 16,200.27 Cost Code 6200.000 Finish Carpentry 335 1336 05/15/2001 4.00 Reg Hrs 32 Andy Scott 2 337 1337 05/15/2001 8.00 Reg Hrs 33 Sean Martin 2 375 651207 05/21/2001 Lumber & HW(Remai 20 Mealer Lumber Co., 1 157.87 381 098709 05/23/2001 Cabinets & Counterto 9 Chen Countertops, In 4 4,795.00 (Non-Labor) Cost Code Total: 4,952.87 Cost Code 6400.000 Custom Casework 432 1368 05/22/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 433 1368 05/23/2001 8.00 Reg Hrs 49 Hugh Molotsi 2 (Non-Labor) Cost Code Total: Cost Code 6700.000 Rough Hardware 18 Historical JC 05/01/2001 Historical Job Costs 5 712.06 376 651207 05/21/2001 Lumber & HW(Remai 20 Mealer Lumber Co., 1 0.95 (Non-Labor) Cost Code Total: 713.01 Cost Code 7000.000 THERMAL & MOISTURE 95 651024 05/01/2001 Window & Roof 20 Mealer Lumber Co., 1 25.21 377 651207 05/21/2001 Lumber & HW(Remai 20 Mealer Lumber Co., 1-0.01 (Non-Labor) Cost Code Total: 25.20 Cost Code 7300.000 Roofing 231 2351 05/09/2001 Roofing 39 Volkov Roofing Co. 4 9,850.00 (Non-Labor) Cost Code Total: 9,850.00 Cost Code 8100.000 Metal Doors & Frames 19 Historical JC 05/01/2001 Historical Job Costs 5 5,090.14 (Non-Labor) Cost Code Total: 5,090.14 Cost Code 8500.000 Windows 20 Historical JC 05/01/2001 Historical Job Costs 5 19,821.00 (Non-Labor) Cost Code Total: 19,821.00 4

Cost Code 9000.000 FINISHES 234 1919-TA 05/11/2001 Drywall 24 Johnson Drywall 4 9,309.00 (Non-Labor) Cost Code Total: 9,309.00 Cost Code 9100.000 Stucco 118 4728 05/07/2001 Stucco/Ext. Face 45 Welch Brothers Stu 4 14,551.00 (Non-Labor) Cost Code Total: 14,551.00 Cost Code 9300.000 Ceramic Tile 379 3490 05/24/2001 All Ceramic Tile 46 Prentice Tile 4 1,745.00 747 3508 06/15/2001 Tile Repair 46 Prentice Tile 4 50.00 (Non-Labor) Cost Code Total: 1,795.00 Cost Code 9500.000 Acoustical Treatment 235 4711890 05/14/2001 Acoustical Ceiling 25 Van Campen Interio 4 2,450.00 (Non-Labor) Cost Code Total: 2,450.00 Cost Code 9900.000 Painting 550 345481 05/29/2001 Interior/Exterior Painti 37 Perry Painting 4 9,255.00 (Non-Labor) Cost Code Total: 9,255.00 Cost Code 10300.000 Fireplaces & Stoves 220 48612 05/04/2001 Wall Insulation 32 Cole Insulation & Fir 4 2,250.00 549 48678 05/31/2001 Insulation - Final 32 Cole Insulation & Fir 4 1,930.00 (Non-Labor) Cost Code Total: 4,180.00 Cost Code 10800.000 Bath Accessories 336 1336 05/15/2001 4.00 Reg Hrs 32 Andy Scott 2 (Non-Labor) Cost Code Total: Cost Code 15100.000 Plumbing 21 Historical JC 05/01/2001 Historical Job Costs 5 2,104.00 104 AG9892 05/03/2001 Rough Plumbing 40 Hamby Plumbing & 4 783.00 551 0084 06/04/2001 Plumbing - Final 40 Hamby Plumbing & 4 2,176.00 741 0108 06/11/2001 Plumbing - Tile Dama 40 Hamby Plumbing & 4-50.00 (Non-Labor) Cost Code Total: 5,013.00 Cost Code 15700.000 HVAC 22 Historical JC 05/01/2001 Historical Job Costs 5 2,925.00 105 984825 05/04/2001 HVAC & Sheetmetal 2 Baxter Heating & Coo 4 4,550.00 230 984855 05/09/2001 Gutters 2 Baxter Heating & Coo 4 2,482.00 547 984991 06/04/2001 HVAC & Sheetmetal 2 Baxter Heating & Coo 4 9,412.00 (Non-Labor) Cost Code Total: 19,369.00 Cost Code 16000.000 ELECTRICAL 103 6744 05/04/2001 Electrical - Rough 31 Paulsen Electric 4 9,172.00 546 6792 06/01/2001 Electrical - Final 31 Paulsen Electric 4 28,756.00 (Non-Labor) Cost Code Total: 37,928.00 Cost Code 16100.000 Electrical Wiring 23 Historical JC 05/01/2001 Historical Job Costs 5 750.00 378 6577 05/24/2001 Purchase Lighting Fix 31 Paulsen Electric 1 12,618.35 5

(Non-Labor) Cost Code Total: 13,368.35 (Non-Labor) Job Total: 350,006.57 (Non-Labor) Grand Total: 350,006.57 6 of 6